Novel T-connection tower for overhead current collection line of new energy station
By designing a new T-connection tower at the new energy station, the tower and insulator components are used to achieve reliable connection and insulation isolation between the main line and the branch line, which solves the problem of line complexity and safety, reduces investment and floor space, and improves line efficiency. stability.
Patent Information
- Application Number
- CN202323458053.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-19
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2033-12-19
AI Technical Summary
In the new energy field area, there are many loops in the cross-arm empty collector lines, and the branch line collector lines and the main line collector lines are complicated, resulting in large project investments and large lines covering a large area. In addition, the air T-contacts are easy to break and the drainage lines are alternate. Short circuit affects the safety of power generation unit equipment.
Design a new type of T-connection tower for overhead current collection lines in new energy stations, using towers, first cable cross arms, second cable cross arms, long wiring cross arms, short wiring cross arms, support insulators and jumper insulators and other components, through effective distance design and different side settings, to achieve reliable connection and insulation isolation between the main line and the branch line.
It reduces project investment, reduces the area occupied by the collector line, improves the safe and stable operation of the line, and avoids the risk of T-contact breakage and short circuit.
Smart Images

Figure CN221896331U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of T-connection tower installation, in particular to a new type of T-connection tower for overhead power collection lines in new energy stations. Background Art
[0002] With the continuous improvement of the level of social and economic development, the development of the power system in the new energy field has been rapidly expanded, and each power generation unit needs to be collected to the new energy field booster collection station through the collection line. Affected by the main transformer, the layout of the power generation unit, the site terrain and the capacity of the switch cabinet, there are many cross-arm empty collection line circuits, and the branch line collection line and the main line collection line are complicated. As a result, the project investment is large, the line corridor will occupy a large amount of land in the new energy field, and the power generation will be affected locally. How to connect the branch line collection line and the main line and ensure that the line power supply is reliable and beautiful has always been a difficult problem to solve.
[0003] Usually, after the collector line is laid out, the branch line and the main line are connected in the air through the drainage line by measuring the safe distance between the branch line and the main line. Since there are many T-connections and the drainage line is long, it is easy to cause the T-connection to break and the drainage line to short-circuit. In severe cases, it will cause damage to the power generation unit equipment.
[0004] Therefore, a new T-connection tower for overhead collector lines of new energy stations is proposed. Utility Model Content
[0005] The purpose of the utility model is to provide a new type of T-junction tower for overhead collector lines of new energy stations to solve the problems raised in the above-mentioned background technology.
[0006] In order to solve the above technical problems, the utility model provides the following technical solutions: a new type of T-junction tower for overhead collector lines of a new energy station, comprising a tower, a first cable crossarm and a second cable crossarm, the first cable crossarm and the second cable crossarm being fixedly installed on the upper part of the tower in sequence from bottom to top, a first long wiring crossarm and a first short wiring crossarm being fixedly installed on the tower below the first cable crossarm, a second long wiring crossarm and a second short wiring crossarm being fixedly installed below the second cable crossarm, the first cable crossarm being two front and rear, and a first supporting insulator being fixedly installed at the end of each, the second cable crossarm being two front and rear, and a second supporting insulator being fixedly installed at the end of each, a first jumper insulator being fixedly installed at both ends of the first long wiring crossarm, a second jumper insulator being fixedly installed at both ends of the second long wiring crossarm, a third jumper insulator being fixedly installed at the suspended end of the first short wiring crossarm, and a fourth jumper insulator being fixedly installed at the suspended end of the second short wiring crossarm.
[0007] According to the above technical solution, the first short wiring cross arm is located between the first cable cross arm and the first long wiring cross arm, and is equidistant from the two, the second short wiring cross arm is located between the second long wiring cross arm and the second cable cross arm, and is equidistant from the two, and the second long wiring cross arm is located between the first cable cross arm and the second cable cross arm, and is equidistant from the two.
[0008] According to the above technical solution, the first long connection cross arm and the first short connection cross arm are respectively located on opposite sides of the tower, and the second long connection cross arm and the second short connection cross arm are respectively located on opposite sides of the tower.
[0009] According to the above technical solution, the first support insulator and the second support insulator are both oriented upward, and the first jumper insulator, the second jumper insulator, the third jumper insulator and the fourth jumper insulator are all oriented horizontally.
[0010] According to the above technical solution, a first hanging insulator is fixedly installed on the lower surface of the first long connecting cross arm, and there are no less than two first hanging insulators, which are arranged at equal distances.
[0011] According to the above technical solution, a second hanging insulator is fixedly installed on the lower surface of the second long connecting cross arm, and there are no less than two second hanging insulators, which are arranged at equal distances.
[0012] Compared with the prior art, the utility model has the following beneficial effects: the utility model transforms the double-circuit terminal tower into a T-connection tower, which can avoid the previous aerial T-connection method and reliably connect the branch line with the main line, thereby reducing project investment, reducing the area occupied by the collector line corridor, and improving the safe and stable operation of the line. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0014] Figure 1 It is a main structural schematic diagram of the utility model;
[0015] Figure 2 It is a right view structural schematic diagram of the utility model;
[0016] In the figure: 1, tower, 2, first cable crossarm, 3, second cable crossarm, 4, first long connection crossarm, 5, second long connection crossarm, 6, first short connection crossarm, 7, second short connection crossarm, 8, first jumper insulator, 9, second jumper insulator, 10, third jumper insulator, 11, fourth jumper insulator, 12, first hanging insulator, 13, second hanging insulator, 14, first supporting insulator, 15, second supporting insulator. DETAILED DESCRIPTION
[0017] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0018] Example 1
[0019] See also Figure 1-2 The utility model provides a technical solution: a new type of T-connection tower for overhead power collection lines of a new energy station, comprising a tower 1, a first cable cross arm 2 and a second cable cross arm 3, wherein the first cable cross arm 2 and the second cable cross arm 3 are fixedly installed on the upper part of the tower 1 from bottom to top, a first long connection cross arm 4 and a first short connection cross arm 6 are fixedly installed on the tower 1 below the first cable cross arm 2, a second long connection cross arm 5 and a second short connection cross arm 7 are fixedly installed below the second cable cross arm 3, and the first cable cross arm 2 is There are two front and rear crossarms, and each end of which is fixedly installed with a first supporting insulator 14; there are two front and rear crossarms 3 of the second cable, and each end of which is fixedly installed with a second supporting insulator 15; first jumper insulators 8 are fixedly installed at both ends of the first long wiring crossarm 4, second jumper insulators 9 are fixedly installed at both ends of the second long wiring crossarm 5, third jumper insulators 10 are fixedly installed at the suspended end of the first short wiring crossarm 6, and fourth jumper insulators 11 are fixedly installed at the suspended end of the second short wiring crossarm 7.
[0020] The tower 1 is the main vertical space support and installation structure. The first cable crossarm 2 and the second cable crossarm 3 support the wiring of the main power supply line. The first long connection crossarm 4 and the second long connection crossarm 5 support the branch line on the long connection side. The first short connection crossarm 6 and the second short connection crossarm 7 support the branch line on the short connection side. The first supporting insulator 14 and the second supporting insulator 15 insulate the main power supply line from the first cable crossarm 2 and the second cable crossarm 3 to avoid the risk of electric shock caused by circuit breakdown. The first jumper insulator 8, the second jumper insulator 9, the third jumper insulator 10 and the fourth jumper insulator 11 are all used to insulate the branch line from the first long connection crossarm 4, the second long connection crossarm 5, the first short connection crossarm 6 and the second short connection crossarm 7 to avoid the risk of electric shock caused by circuit breakdown.
[0021] Specifically, the first short wiring crossarm 6 is located between the first cable crossarm 2 and the first long wiring crossarm 4, and is equidistant from the two. The second short wiring crossarm 7 is located between the second long wiring crossarm 5 and the second cable crossarm 3, and is equidistant from the two. The second long wiring crossarm 5 is located between the first cable crossarm 2 and the second cable crossarm 3, and is equidistant from the two.
[0022] Through effective distance design, different main lines and branch lines can be effectively isolated in space, so that electrical breakdown and short circuit will not occur between them. At the same time, by ensuring that the length of each branch line and main line is determined during the installation process, control installation is facilitated.
[0023] Specifically, the first long connection cross arm 4 and the first short connection cross arm 6 are respectively located at opposite sides of the tower 1 , and the second long connection cross arm 5 and the second short connection cross arm 7 are respectively located at opposite sides of the tower 1 .
[0024] By setting up on the opposite sides, the main line, branch line and jumper lines have independent layout space to avoid confusion and thus problems such as short circuits. At the same time, by setting up on the opposite sides, the load on both sides is further protected and the balance can be further ensured.
[0025] Specifically, the first support insulator 14 and the second support insulator 15 are both oriented upward, and the first jumper insulator 8, the second jumper insulator 9, the third jumper insulator 10 and the fourth jumper insulator 11 are all oriented horizontally.
[0026] The first support insulator 14 and the second support insulator 15 support the main power supply line vertically to ensure the effectiveness of the support. The first jumper insulator 8, the second jumper insulator 9, the third jumper insulator 10 and the fourth jumper insulator 11 provide effective isolation support for the vertical extension of the jumper to avoid accidental contact with the cross arms.
[0027] Specifically, a first hanging insulator 12 is fixedly mounted on the lower surface of the first long connecting cross arm 4 , and there are no less than two first hanging insulators 12 , which are arranged at equal intervals.
[0028] The first hanging insulator 12 can effectively separate and support the jumper between the main power supply line and the branch line on the first long wiring cross arm 4, thereby ensuring the effectiveness of insulation isolation.
[0029] Specifically, a second suspension insulator 13 is fixedly mounted on the lower surface of the second long connecting cross arm 5 , and the number of the second suspension insulators 13 is no less than two and they are arranged at equal intervals.
[0030] The second hanging insulator 13 can effectively separate and support the jumper between the main power supply line and the branch line on the second long connection cross arm 5, thereby ensuring the effectiveness of insulation isolation.
[0031] Working principle: When in use, after the wiring position is determined by design, the main line is erected through the first cable crossarm 2 and the second cable crossarm 3, and the branch line is connected through the first long wiring crossarm 4, the second long wiring crossarm 5, the first short wiring crossarm 6 and the second short wiring crossarm 7, and then the jumper connection is made to connect the main line and the branch line to achieve effective T-connection branch line diversion.
[0032] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0033] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A novel T-junction tower for overhead power collection lines at a new energy station, comprising a tower frame (1), a first cable cross arm (2) and a second cable cross arm (3), characterized in that: The first cable cross arm (2) and the second cable cross arm (3) are fixedly installed on the upper part of the tower (1) in sequence from bottom to top; the tower (1) below the first cable cross arm (2) is fixedly installed with a first long connection cross arm (4) and a first short connection cross arm (6); the second long connection cross arm (5) and a second short connection cross arm (7) are fixedly installed below the second cable cross arm (3); the first cable cross arm (2) consists of two front and rear cross arms, and a first support insulator (14) is fixedly installed at the end of each cross arm ), the second cable crossarm (3) consists of two front and rear crossarms, and a second supporting insulator (15) is fixedly installed at the end of each crossarm, first jumper insulators (8) are fixedly installed at both ends of the first long wiring crossarm (4), second jumper insulators (9) are fixedly installed at both ends of the second long wiring crossarm (5), a third jumper insulator (10) is fixedly installed at the hanging end of the first short wiring crossarm (6), and a fourth jumper insulator (11) is fixedly installed at the hanging end of the second short wiring crossarm (7).
2. According to claim 1, a new type of T-junction tower for overhead collector lines of new energy stations, characterized in that: The first short-circuit crossarm (6) is located between the first cable crossarm (2) and the first long-circuit crossarm (4), and is equidistant from both of them; the second short-circuit crossarm (7) is located between the second long-circuit crossarm (5) and the second cable crossarm (3), and is equidistant from both of them; the second long-circuit crossarm (5) is located between the first cable crossarm (2) and the second cable crossarm (3), and is equidistant from both of them.
3. According to claim 2, a new type of T-junction tower for overhead collector lines of new energy stations, characterized in that: The first long connection cross arm (4) and the first short connection cross arm (6) are respectively located on opposite sides of the tower (1), and the second long connection cross arm (5) and the second short connection cross arm (7) are respectively located on opposite sides of the tower (1).
4. According to claim 1, a new type of T-junction tower for overhead collector lines of new energy stations, characterized in that: The first support insulator (14) and the second support insulator (15) are both oriented upwards, and the first jumper insulator (8), the second jumper insulator (9), the third jumper insulator (10) and the fourth jumper insulator (11) are all oriented horizontally.
5. According to claim 3, a new type of T-junction tower for overhead collector lines of new energy stations is characterized by: A first hanging insulator (12) is fixedly mounted on the lower surface of the first long connecting cross arm (4), and the number of the first hanging insulators (12) is no less than two and they are arranged at equal distances.
6. According to claim 3, a new type of T-junction tower for overhead collector lines of new energy stations is characterized by: A second hanging insulator (13) is fixedly mounted on the lower surface of the second long connecting cross arm (5), and the number of the second hanging insulators (13) is no less than two and they are arranged at equal distances.
