High-strength portal steel plate brush structure

By arranging the surrounding anchor cables and fixing rings on the steel plate brush of the cave door to increase the holding force, the problem of the existing steel plate brush of the cave door being loosened under high water pressure is solved, and higher sealing and strength are achieved.

CN221896590UActive Publication Date: 2024-10-25LIANSHENG IND EQUIP (SUZHOU) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323642534.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-10-25
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

During the use of the existing shield machine's door steel brushes, due to excessive water pressure and insufficient bearing capacity, the steel brushes may loosen and affect the sealing effect.

Method used

Design a high-strength steel brush structure for cave doors. By setting surrounding anchor cables and fixed rings on the steel brush plate, the anchor cables and locking blocks are used to increase the holding force and ensure the fixation and sealing of the steel brush plate.

Benefits of technology

By increasing the tensile strength of the steel brush plate, the sealing performance is improved, ensuring that the influx of muddy water can be effectively prevented in a high water pressure environment, and the sealing effect of the cave door is enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221896590U_ABST
    Figure CN221896590U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of shield tunneling machines, in particular to a high-strength tunnel portal steel plate brush structure. The device comprises a tunnel portal, a hydraulic coupler arranged in the tunnel portal and a plurality of steel brush plates, each steel brush plate comprises a base and a plurality of steel plate brushes fixedly installed on the base through nuts and bolts, one end of each steel plate brush is installed on the base, and the other end of each steel plate brush is attached to the outer surface of the hydraulic coupler in a pressing mode. A fixing ring is arranged at the end, close to the hydraulic coupler, of the steel plate brush, anchor cables are arranged on the steel plate brush close to the hydraulic coupler in a surrounding mode, and the anchor cables are sequentially arranged on the fixing ring in series. The steel brush plate has the advantages that at least one circle of embracing anchor cable is arranged on the steel brush plate, the embracing force of the steel brush plate is increased through the anchor cable, the tensile force bearing capacity of the steel brush plate is increased, it is guaranteed that the steel brush plate can bear more tensile force in the using process, the strength is improved, and therefore the sealing performance of the steel brush plate is prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of shield machines, in particular to a high-strength tunnel gate steel plate brush structure. Background Art

[0002] The shield machine, whose full name is shield tunnel boring machine, is a special engineering machinery for tunnel excavation. Modern shield tunnel boring machines integrate optical, mechanical, electrical, hydraulic, sensor and information technology. They have the functions of excavating and cutting soil and rock, conveying soil and ballast, assembling tunnel lining, measuring and guiding deviation correction, etc. They involve multiple disciplines and technologies such as geology, civil engineering, machinery, mechanics, hydraulics, electricity, control, and measurement. Moreover, they must be designed and manufactured in a "tailor-made" manner according to different geology, and the reliability requirements are extremely high. Shield tunnel boring machines have been widely used in tunnel projects such as subways, railways, highways, municipal administration, and hydropower.

[0003] Steel plate brushes are installed on the starting or receiving tunnel doors of the tunnel boring shield machine to prevent mud and water from flowing into the starting shaft or receiving shaft components from the tunnel door. The steel plate brushes are fixed at the tail of the tunnel door and are generally composed of multiple layers of steel plate brushes that are staggered up and down. The upper and lower layers of steel plate brushes form face-to-face contact, so as to ensure the sealing effect.

[0004] Prior art, CN202223200711.2 A steel plate brush installation structure for preventing overlapping plates of a shield machine tunnel portal, which relies on the elastic force provided by the steel plate brush itself to press on the hydraulic coupler. However, due to its use environment factors, during use, the water pressure is too high and the steel plate brush may loosen due to insufficient bearing capacity.

[0005] Therefore, it is necessary to design a high-strength tunnel gate steel plate brush structure to solve the above problems. Utility Model Content

[0006] The utility model aims to provide a high-strength tunnel door steel plate brush structure to overcome the above-mentioned deficiencies in the current prior art.

[0007] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0008] A high-strength tunnel portal steel plate brush structure, comprising a tunnel portal, a hydraulic coupler arranged in the tunnel portal and a plurality of steel brush plates, characterized in that the steel brush plates are evenly arranged around the tunnel portal axis and are arranged in multiple layers, the steel brush plates include a base and a plurality of steel plate brushes fixedly mounted on the base by nuts and bolts, one end of the steel plate brush is mounted on the base, and the other end is pressed against the outer surface of the hydraulic coupler, a fixing ring is arranged on the steel plate brush near one end of the hydraulic coupler, and an anchor cable is also arranged around the steel plate brush near the hydraulic coupler, and the anchor cables are sequentially strung on the fixing ring.

[0009] Preferably, the base is placed on the end face of the hole.

[0010] Preferably, at least two rows of fixing rings and coordinated anchor cables are arranged on the steel plate brush.

[0011] Preferably, anchor cable locking blocks are respectively provided on both sides of the tunnel door, and both ends of the anchor cable are respectively strung on the anchor cable locking blocks.

[0012] The beneficial effect of the utility model is that the technical solution increases the clamping force of the steel brush plate and its tensile bearing capacity by arranging at least one circle of anchor cable on the steel brush plate, thereby ensuring that it can withstand more tensile force during use and increasing its strength, thereby preventing the sealing of the steel brush plate. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 This is a structural schematic diagram of a high-strength tunnel gate steel plate brush structure of the utility model;

[0014] Figure 2 This is a schematic diagram of a steel brush plate of a high-strength tunnel door steel plate brush structure of the utility model;

[0015] Figure 3 This is a schematic diagram of a top material assembly of a high-strength tunnel door steel plate brush structure of the utility model;

[0016] In the figure: 1. tunnel door; 2. hydraulic coupler; 3. steel brush plate; 31. base; 32. nut; 33. steel plate brush; 4. fixing ring; 5. anchor cable; 6. anchor cable locking block. DETAILED DESCRIPTION

[0017] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0018] In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0019] Reference Figures 1 to 3, a high-strength tunnel door steel plate brush structure, comprising a tunnel door 1, a hydraulic coupler 2 arranged in the tunnel door 1, and a plurality of steel brush plates 3;

[0020] The steel brush plates 3 are evenly arranged around the axis of the tunnel door 1 and are arranged in multiple layers;

[0021] The steel brush plate 3 comprises a base 31 and a plurality of steel brushes 33 fixedly mounted on the base 2 by nuts 32 and bolts;

[0022] The base 31 is placed on the end surface of the hole door 1 and can be fixed by welding or fixing with a fixing piece;

[0023] One end of the steel plate brush 33 is mounted on the base 31, and the other end is pressed against the outer surface of the hydraulic coupler 2; a fixing ring 4 is provided on the steel plate brush 33 near one end of the hydraulic coupler 2; and an anchor cable 5 is provided around the steel plate brush 33 near the hydraulic coupler 2, and the anchor cables are sequentially arranged in series on the fixing ring;

[0024] In order to improve the holding force, at least two rows of fixing rings 4 and coordinated anchor cables 5 are provided on the steel plate brush 33;

[0025] In order to effectively adjust the tightening force of the anchor cable 5 , anchor cable locking blocks 6 are respectively provided on both sides of the tunnel door 1 , and the two ends of the anchor cable 5 are respectively strung on the anchor cable locking blocks 6 and locked by the anchor cable locking blocks 6 .

[0026] The utility model is beneficial in that the technical solution provides at least one circle of anchor cables on the steel brush plate, which increases the clamping force of the steel brush plate and its tensile bearing capacity, thereby ensuring that it can withstand more tensile force during use and increasing its strength, thereby preventing the steel brush plate from being sealed.

[0027] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A high-strength tunnel door steel plate brush structure, comprising a tunnel door, a hydraulic coupler arranged in the tunnel door, and a plurality of steel brush plates, characterized in that: The steel brush plate is evenly arranged around the axis of the tunnel portal and is arranged in multiple layers. The steel brush plate includes a base and a plurality of steel brushes fixedly installed on the base by nuts and bolts. One end of the steel brush is installed on the base, and the other end is pressed against the outer surface of the hydraulic coupler. A fixing ring is arranged on the steel brush near one end of the hydraulic coupler, and an anchor cable is also arranged around the steel brush near the hydraulic coupler, and the anchor cables are sequentially strung on the fixing ring.

2. A high-strength tunnel gate steel plate brush structure according to claim 1, characterized in that: The base is placed on the mouth end surface of the cave door.

3. A high-strength tunnel gate steel plate brush structure according to claim 1, characterized in that: At least two rows of fixing rings and coordinated anchor cables are arranged on the steel plate brush.

4. A high-strength tunnel gate steel plate brush structure according to claim 1, characterized in that: Anchor cable locking blocks are respectively arranged on both sides of the tunnel door, and the two ends of the anchor cable are respectively strung on the anchor cable locking blocks.