Large-diameter jacking pipe retreating device
By using a combined device of steel beams, steel strands and a reverse pushing mechanism in pipe jacking construction, the problem of difficult pipe jacking back is solved, an efficient, low-cost and low-risk rollback process is achieved, ensuring construction safety. stability and security.
Patent Information
- Application Number
- CN202420034044.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-05
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-01-05
AI Technical Summary
During the pipe jacking construction process, when large obstacles or equipment failures are encountered, it is difficult to retreat the machine head and pipe sections. The existing methods have problems such as pipeline migration, deep foundation pits, and high risks.
Design a large-diameter pipe jacking back device, which includes a steel beam, steel strand and movable beam welded behind the machine head. Combined with the reverse pushing mechanism, through the cooperation of the steel strand and the anchor clamp, the machine head and the pipe are The slow retreat of the joints, and grouting during the retreat process reduces formation losses.
It achieves the rollback process with the shortest construction period, lowest cost and lowest risk, reduces formation losses and construction risks, and ensures the stability of ground caissons and pipeline deformations.
Smart Images

Figure CN221897251U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pipe jacking construction, in particular to a large-diameter pipe jacking retreat device. Background Art
[0002] During the pipe jacking construction process, if there is a large obstacle in front of the machine head, or the pipe jacking equipment fails and the jacking construction cannot continue, it is necessary to retract the machine head and the pipe section that has been pushed in, and return the machine head and pipe section to the starting well. Due to the large diameter of the pipe, the deep soil cover, and the long jacking distance, it is difficult to retract the machine head and pipe section. The commonly used methods are:
[0003] 1. Open excavation (opening skylight);
[0004] A fence is formed around the machine head and pipe segment, the machine head is exposed by open excavation, the pipe segment and machine head are lifted out, and then the area is backfilled. However, there are problems with pipeline migration, deep open excavation pits, and the site requirements are the largest.
[0005] 2. Reverse jacking and pushing out of the jacking pipe;
[0006] At present, the machine head and pipe section are not retreated, and grouting is carried out periodically to ensure water sealing of the tunnel. When the reverse jacking pipe reaches the original machine head cut-out position, the jacking machine cutterhead stops rotating, and the original jacking pipe and pipe section are retreated to the No. 6 working well for reception. However, the original pipe section and machine head have been stationary for a long time, and there is a possibility of being locked; when the reverse machine head is jacked, the cutterhead does not rotate, the jacking distance is long, and there is a risk of excessive jacking force; there is a risk of deviation in the machine head docking.
[0007] In summary, there is an urgent need for a large-diameter pipe jacking retraction device to solve the above problems. Utility Model Content
[0008] The utility model aims to provide a large-diameter jacking pipe retracting device to solve the problems raised in the above-mentioned background technology.
[0009] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0010] A large-diameter jacking pipe retraction device comprises a steel beam welded to the rear of a head of a jacking machine and clamped on the inner edge of the head, a plurality of steel strands are fixedly connected to the steel beam, a movable crossbeam located in a working well is fixedly connected to the other end of the steel strands, the length direction of the steel strands is parallel to the axial direction of the pipe section, and a reverse jacking mechanism is connected between the movable crossbeam and the opening of the working well.
[0011] As a further solution of the utility model: the movable crossbeam is fixedly connected with a first seamless steel pipe corresponding to each steel strand, each steel strand movably passes through the corresponding first seamless steel pipe, and a first anchor clamp adapted to the steel strand is arranged at one end of each first seamless steel pipe away from the hole;
[0012] A second seamless steel pipe corresponding to each steel strand is fixedly connected to the steel beam, and each steel strand moves through the corresponding second seamless steel pipe. A second anchor clamp adapted to the steel strand is arranged at one end of each second seamless steel pipe away from the hole.
[0013] As a further solution of the present invention: the first anchor clamp and the second anchor clamp are both of model YM15-25.
[0014] As a further solution of the utility model: a plurality of first stiffened plates are welded along a 45° direction between the periphery of the first seamless steel pipe and the movable cross beam, and a plurality of second stiffened plates are welded along a 45° direction between the periphery of the second seamless steel pipe and the steel beam.
[0015] As a further solution of the utility model: the reverse pushing mechanism includes a reaction frame fixed at the hole opening, reaction jacks symmetrically distributed on both sides of the pipe section are connected between the reaction frame and the movable crossbeam, and a sliding bracket is fixed in the working well, which is slidably connected to the movable crossbeam and arranged along the axial direction of the pipe section.
[0016] Compared with the prior art, the beneficial effects of the utility model are:
[0017] After the utility model adopts the above structure, through the mutual cooperation between the steel beam, steel strand, movable crossbeam and reverse jacking mechanism, the movable crossbeam and reverse jacking mechanism are set in the well, the steel beam is welded behind the head of the pipe jacking machine and clamped on the inner edge of the pipe jacking machine, and then the steel strand is installed on the movable crossbeam and steel beam, and the original pipe section head is slowly withdrawn from the No. 6 working well, while grouting is carried out to reduce the formation loss, and the information construction and tracking grouting are adopted during the construction process to ensure that the deformation of the ground caisson and pipeline meets the requirements. The adoption of this scheme has the shortest construction period, the lowest cost and the smallest risk point. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The present invention will be further described in detail below in conjunction with the embodiments in the accompanying drawings, but this does not constitute any limitation to the present invention.
[0019] Figure 1 The figure is a plan view of a large diameter pipe jacking retraction device.
[0020] Figure 2 The present invention is a schematic diagram of the structure of a movable crossbeam in a large-diameter jacking pipe retraction device.
[0021] Figure 3This is a schematic elevation diagram of the arrangement of movable crossbeams at the opening position of a large-diameter jacking pipe retraction device.
[0022] Figure 4 The diagram is a plan view of the arrangement of movable crossbeams at the opening of a large-diameter jacking pipe retraction device.
[0023] In the figure: 1. steel beam; 2. steel strand; 3. movable crossbeam; 4. reverse jacking mechanism; 401. reaction frame; 402. reaction jack; 403. sliding bracket; 5. first seamless steel pipe; 6. first anchor clamp; 7. first stiffened plate. DETAILED DESCRIPTION
[0024] The technical solution of this patent is further described in detail below in conjunction with specific implementation methods.
[0025] See also Figure 1-4 A large diameter jacking pipe retraction device includes a steel beam 1 welded to the rear of the head of the jacking machine and stuck to the inner edge of the head, a plurality of steel strands 2 are fixedly connected to the steel beam 1, a movable crossbeam 3 located in the working well is fixedly connected to the other end of the steel strand 2, the length direction of the steel strand 2 is parallel to the axial direction of the pipe section, and a reverse jacking mechanism 4 is connected between the movable crossbeam 3 and the opening of the working well. When in use, the movable crossbeam 3 and the reverse jacking mechanism 4 are arranged in the well, the steel beam 1 is welded to the rear of the head of the jacking machine and stuck to the inner edge of the jacking machine, and then the steel strand 2 is installed on the movable crossbeam 3 and the steel beam 1, and the two ends of the steel strand 2 are connected to the steel beam 1 and the movable crossbeam 3 by anchor clamps, and the original pipe section head is slowly retracted from the No. 6 working well, and grouting is performed while retracting to reduce formation losses. Informatization construction and tracking grouting are adopted during the construction process to ensure that the deformation of the ground caisson and pipelines meet the requirements. While pulling out the pipe, use the grouting equipment to pour low-strength fillers into the gaps formed by pulling out the pipes, filling the space formed by pulling out the pipes. To prevent the soil above the pipes from collapsing, fillers are added as the pipes are pulled out. When the pipe jacking machine reaches the reserved hole, fillers with higher strength and faster solidification than the fillers are used to form a water-stopping seal at the hole, which will be broken during the second jacking.
[0026] According to the size of the reaction load, the movable crossbeam 3 of the opening has a beam width of 900*height of 800*length of 6800mm, a center spacing of anchor holes of 3710mm, and uses YM15-25 anchors. A temporary sliding bracket 403 is set under the movable crossbeam 3. Two 200t reaction jacks 402 are used at both ends of the movable crossbeam 3 to push symmetrically and synchronously to ensure uniform force on both sides. The beam width of the tail steel beam 1 of the machine head is 700*height 360*length 4500mm, the center spacing of the anchor holes is 3710mm, and the YM15-25 anchor is used.
[0027] Based on the above calculations and analysis, steel beam 1 and movable cross beam 3 meet the construction requirements, but they still need to be further designed and loaded by a professional steel structure manufacturer based on the above load and size requirements.
[0028] A total of 2 strands of steel strands 2 are set, each with a force of 8000KN / 2=4000KN. Considering a safety factor of 1.2, FN=4800KN. The initial selection is to use a stranded steel strand (7 wires) with a nominal diameter of 15.2mm and a cross-sectional area of 139mm 2 ; Elastic modulus is 1860MPa, single maximum tensile force F = 1860MPa*0.75*139mm 2 =193.9KN; the cutting length of a single steel strand is 16m, which can meet the anchoring requirements. As the pipe section is pulled out, a grinding wheel cutter is used to cut off the corresponding length of steel strand (3m); it is strictly forbidden to use oxygen acetylene or electric welding to burn and cut. It is strictly forbidden to cross or entangle the steel strands during installation. If broken wires are found during use, they should be replaced in time; a steel strand bracket is set up every 6m, and the bracket can be set up with scaffolding steel pipes. According to the maximum reaction force calculation, the total number of steel strands required is n=4800 / 193.9≈25 (1.2 times the surplus coefficient has been considered); a total of 2 bundles are set up, and each bundle is arranged with 25 steel strands using YM15-25 self-anchored anchors, which are reliable and reusable.
[0029] Among them, the movable crossbeam 3 is fixedly connected with a first seamless steel pipe 5 corresponding to each steel strand 2, each steel strand 2 movably passes through the corresponding first seamless steel pipe 5, and a first anchor clamp 6 adapted to the steel strand 2 is arranged at one end of each first seamless steel pipe 5 away from the hole; the steel beam 1 is fixedly connected with a second seamless steel pipe corresponding to each steel strand 2, each steel strand 2 movably passes through the corresponding second seamless steel pipe, and a second anchor clamp adapted to the steel strand 2 is arranged at one end of each second seamless steel pipe away from the hole. The model of the seamless steel pipe is 273*28mm in outer diameter and about 217mm in inner diameter.
[0030] Furthermore, the models of the first anchor clamp 6 and the second anchor clamp are both YM15-25.
[0031] Furthermore, a plurality of first stiffening plates 7 are welded along a 45° direction between the periphery of the first seamless steel pipe 5 and the movable cross beam 3, and a plurality of second stiffening plates are welded along a 45° direction between the periphery of the second seamless steel pipe and the steel beam 1. The welding stiffening plates strengthen the orifice to prevent the orifice from being damaged by the tension force and to prevent stress concentration at the orifice; the edge of the orifice is polished to be rounded to prevent the steel strand 2 from being cut.
[0032] Specifically, the reverse push mechanism 4 includes a reaction frame 401 fixed at the hole, reaction jacks 402 symmetrically distributed on both sides of the pipe section are connected between the reaction frame 401 and the movable crossbeam 3, and a sliding bracket 403 slidably connected to the movable crossbeam 3 and arranged along the axial direction of the pipe section is fixed in the working well. Since the pipe section weighs 28 tons and the head weighs 71 tons, the total weight is 71+28*5=211 tons, and the most unfavorable working condition is considered to be: 115.1+211=326 tons; therefore, 4 200-ton jacks are set, evenly distributed on both sides of the pipe section, 2 on each side.
[0033] When in use, remove all pipelines and equipment in the pipeline and lean against the wall → install steel beam 1 behind the pipe jacking machine → install reaction frame 401 and reaction jack 402 in the working well → install sliding bracket 403 → install movable crossbeam 3 → install steel strand 2 and anchor clamps → pre-tighten (pre-tension) the anchor clamps at both ends of steel strand 2 → pre-drill holes from the ground to 50 cm above the pipeline → start reaction jack 402 and grout simultaneously → stop pulling out after the jack cylinder stroke reaches 50 cm, and grout the cavity from the ground → continue to start reaction jack 402 → continue grouting to fill the cavity after 50 cm → the first section of pipe comes out of the hole → reaction jack 402 retracts → remove steel strand 2 and anchor clamps → lift off the pipe section → movable crossbeam 3 is in place → install steel strand 2 and anchor clamps again → start reaction jack 402 to pull out the next section of pipe.
[0034] The above embodiments are preferred implementation modes of the present invention and are only used to facilitate the explanation of the present invention. They are not intended to limit the present invention in any form. Any person with ordinary knowledge in the relevant technical field, if they do not depart from the scope of the technical features of the present invention, can make equivalent embodiments by partial changes or modifications to the technical contents disclosed in the present invention, and they still fall within the scope of the technical features of the present invention without departing from the technical features of the present invention.
Claims
1. A large-diameter pipe jacking retraction device, comprising a steel beam (1) welded to the rear of a head of a pipe jacking machine and clamped on the inner edge of the head, a plurality of steel strands (2) are fixedly connected to the steel beam (1), a movable crossbeam (3) located in a working well is fixedly connected to the other end of the steel strands (2), the length direction of the steel strands (2) is parallel to the axial direction of the pipe section, a reverse jacking mechanism (4) is connected between the movable crossbeam (3) and the opening of the working well, and is characterized in that: The movable crossbeam (3) is fixedly connected with a first seamless steel pipe (5) corresponding to each steel strand (2), each steel strand (2) movably passes through the corresponding first seamless steel pipe (5), and a first anchor clamp (6) adapted to the steel strand (2) is arranged at one end of each first seamless steel pipe (5) away from the hole; A second seamless steel pipe corresponding to each steel strand (2) is fixedly connected to the steel beam (1), each steel strand (2) movably passes through the corresponding second seamless steel pipe, and a second anchor clamp adapted to the steel strand (2) is arranged at one end of each second seamless steel pipe away from the hole; A plurality of first stiffening plates (7) are welded between the periphery of the first seamless steel pipe (5) and the movable cross beam (3) along a 45° direction, and a plurality of second stiffening plates are welded between the periphery of the second seamless steel pipe and the steel beam (1) along a 45° direction.
2. A large diameter jacking pipe retraction device according to claim 1, characterized in that: The models of the first anchor clamp (6) and the second anchor clamp are both YM15-25.
3. A large diameter jacking pipe retraction device according to claim 1, characterized in that: The reverse thrust mechanism (4) comprises a reaction frame (401) fixed at the hole opening, reaction jacks (402) symmetrically distributed on both sides of the pipe section are connected between the reaction frame (401) and the movable crossbeam (3), and a sliding bracket (403) slidably connected to the movable crossbeam (3) and arranged along the axial direction of the pipe section is fixed in the working well.
