Liquid cooling equipment for ICP debugging table
By designing liquid cooling equipment for ICP debugging benches, the problems of poor heat dissipation and high noise in the existing ICP system were solved, achieving more efficient heat dissipation and a convenient testing process, meeting the multiple testing needs of newly developed ICP products, and Improved device mobility and ease of use.
Patent Information
- Application Number
- CN202323308364.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-04
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2033-12-04
AI Technical Summary
During the development and testing process of the existing ICP system, the heat dissipation effect is poor and the noise is high, which cannot meet the development, production, maintenance and environmental testing needs of newly developed ICP products, and the existing testing equipment cannot meet the requirements of production and after-sales service at the same time. .
A kind of liquid cooling equipment for ICP debugging bench is designed, including vertical cabinet liquid cooling equipment and placement bench, which are connected to the evaporator, compressor, air condenser, drying filter and expansion valve through pipelines, and are equipped with self-locking Universal wheels and pipeline fixing clips facilitate movement and quick connection to avoid operating errors and liquid leakage.
It achieves better heat dissipation and noise reduction, meets the development, production, maintenance and environmental testing needs of newly developed ICP products. The equipment is easy to use, occupies a small area, is easy to move, and improves the accuracy and safety of the test. .
Smart Images

Figure CN221901201U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of aviation airborne finished product testing, in particular to a liquid cooling device for an ICP debugging platform. Background Art
[0002] The Integrated Core Processor (ICP) is at the core of the new generation aircraft avionics system. It can perform integrated processing of a variety of typical avionics tasks such as radar, communication and navigation identification, electronic warfare, display control, mission management, weapon management, and human-machine interface. It is the "brain" and "nerves" of the entire integrated avionics system.
[0003] The ICP system has advanced functions and high reliability, but its development process is extremely complicated, especially the idea of integration and modularization, which adds a lot of costs to the development and production of the system, and especially poses a huge challenge to testing. Therefore, in the development and delivery process of the ICP system, a dedicated test system is needed to ensure the function, performance and quality of the ICP production. This includes the function and performance testing of ICP through test equipment such as ICP software debugging station and ICP test console; during the testing of ICP products by ICP software debugging station and ICP test console, it is also necessary to connect environmental support equipment to dissipate heat for ICP; but most of the existing ICP equipment uses external air cooling equipment, which has poor heat dissipation effect and high noise. The new generation of ICP developed independently now has a liquid cooling pipeline inside, which replaces the original air cooling with liquid cooling, which has better heat dissipation effect, sufficient heat dissipation, and is quiet; but because of this, the existing ICP software debugging station and ICP test console cannot meet the test of this product.
[0004] At the same time, in recent years, with the gradual increase in the order volume of our ICP products, the pressure of after-sales service has also increased. The newly developed ICP product-specific testing equipment can no longer meet the testing requirements of production, after-sales, environmental testing, etc.
[0005] Therefore, a liquid cooling device for an ICP debugging station is now provided, which can meet the testing requirements of the development, production, maintenance, environmental testing, etc. of new ICP products, and is easy to use and move. Utility Model Content
[0006] The purpose of the utility model is to overcome the deficiencies of the prior art and provide a liquid cooling device for an ICP debugging station, which can meet the testing requirements of the development, production, maintenance, environmental testing, etc. of newly developed ICP products, and the device is easy to use, occupies a small space, and is easy to move.
[0007] In view of this, according to one aspect of the embodiment of the utility model, a liquid cooling device for an ICP debugging platform is provided, which is used for liquid cooling and heat dissipation during the debugging process such as development, production, maintenance, and environmental testing of an integrated core processor 2, including a liquid cooling device 9 and a placement platform 1;
[0008] The liquid cooling device 9 is a vertical cabinet, which is provided with an evaporator 4, a compressor 5, an air condenser 6, a drying filter 7, and an expansion valve 8 which are connected by pipelines and constitute a refrigeration circuit;
[0009] The top of the placement platform 1 is provided with a placement plane for placing the integrated core processor 2; the side wall of the placement platform 1 is provided with a plurality of pipeline fixing clamps 11 to clamp the tail ends of the liquid inlet pipe 901 and the liquid outlet pipe 902 of the liquid cooling device 9.
[0010] Optionally, a liquid storage tank 12 is provided below the fixing card 11 .
[0011] Optionally, the side wall of the placement platform 1 is provided with four pipeline fixing clips 11;
[0012] The two outer fixing cards 11 are arranged horizontally, and the two inner fixing cards 11 are arranged vertically. Optionally, the bottom of the liquid cooling device 9 is provided with self-locking universal wheels.
[0013] Optionally, the evaporator 4 is disposed in the water tank 13, and the outlet end of the water tank 13 is connected to the liquid inlet pipe 901 through a water supply pipeline to output the refrigerant;
[0014] The water supply pipeline is provided with a liquid supply pump 14, a water filter 15, a regulating hand valve 16, a flow meter 17, and a pressure gauge 18 in sequence;
[0015] The liquid outlet pipe 902 is connected to the water return port above the water tank 13 through the water return pipeline.
[0016] Optionally, a low pressure gauge is provided on the pipeline between the compressor 5 and the evaporator 4, and a high pressure gauge is provided on the pipeline between the compressor 5 and the air condenser 6; the low pressure gauge and the high pressure gauge are connected to the high and low pressure controllers respectively.
[0017] Optionally, the liquid cooling device 9 is further provided with an adjustable valve 19 , and both ends of the adjustable valve 19 are respectively connected to pipelines at both ends of the compressor 5 .
[0018] Optionally, a cabinet door and an operation screen are provided on the front side of the liquid cooling device 9 .
[0019] The beneficial effects of the utility model are as follows: (1) In this scheme, during the product testing process, the product to be tested is placed on the placement table, tested by the debugging equipment, and cooled by the liquid cooling equipment; the liquid cooling equipment is mainly composed of a compressor, an air condenser, an evaporator, an expansion valve, a liquid supply pump, etc.; the cooled liquid is transported to the cold end of the integrated core processing unit through the liquid supply pump and the liquid inlet pipe, and then returned to the water tank through the liquid outlet pipe and the return water pipe, and the liquid supply flow rate is adjusted by adjusting the hand valve to achieve liquid cooling and heat dissipation;
[0020] (2) In this solution, a plurality of pipeline fixing clips are provided on the left side wall of the placement table, so that the tail end of the liquid inlet pipe and the tail end of the liquid outlet pipe of the liquid cooling equipment can be conveniently clamped. When a large number of product tests are carried out, they can be quickly taken out, and the liquid inlet pipe and the liquid outlet pipe can be correspondingly mounted on both sides when not in use, which can effectively avoid the error of docking the liquid inlet pipe and the liquid outlet pipe. A liquid storage tank is also provided under the fixing card to help avoid operating errors and liquid leakage to contaminate other important pipelines;
[0021] (3) In this solution, the liquid cooling equipment and debugging equipment are both cabinet-type designs, and are equipped with self-locking universal wheels at the bottom, which occupy a small area and are easy to move. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 A schematic diagram of the structural principle of a liquid cooling device for an ICP debugging station according to an embodiment of the utility model;
[0023] Figure 2 It is a structural schematic diagram of a liquid cooling device for an ICP debugging platform according to an embodiment of the utility model;
[0024] Figure 3 It is a structural schematic diagram of a placement platform for a liquid cooling device for an ICP debugging platform according to an embodiment of the utility model;
[0025] Figure 4 It is an enlarged view of a placement table of a liquid cooling device for an ICP debugging table according to an embodiment of the utility model;
[0026] Figure 5 A schematic diagram of a debugging device system of a liquid cooling device for an ICP debugging station according to an embodiment of the utility model;
[0027] Description of reference numerals:
[0028] 1. Placement table; 2. Integrated core processor; 3. Debugging equipment; 4. Evaporator; 5. Compressor; 6. Air condenser; 7. Dry filter; 8. Expansion valve; 9. Liquid cooling equipment; 11. Fixing card; 12. Liquid storage tank; 13. Water tank; 14. Liquid supply pump; 15. Water filter; 16. Adjustment manual valve; 17. Flow meter; 18. Pressure gauge; 19. Adjustable valve; 901. Liquid inlet pipe; 902. Liquid outlet pipe. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of them. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0030] The present disclosure provides a liquid cooling device for an ICP debugging platform, which is used for liquid cooling and heat dissipation during the debugging process of the integrated core processor 2, such as development, production, maintenance, and environmental testing, and includes a liquid cooling device 9 and a placement platform 1;
[0031] The liquid cooling device 9 is a vertical cabinet, which is provided with an evaporator 4, a compressor 5, an air condenser 6, a drying filter 7, and an expansion valve 8 which are connected by pipelines and constitute a refrigeration circuit;
[0032] The top of the placement platform 1 is provided with a placement plane for placing the integrated core processor 2; the side wall of the placement platform 1 is provided with a plurality of pipeline fixing clamps 11 to clamp the tail ends of the liquid inlet pipe 901 and the liquid outlet pipe 902 of the liquid cooling device 9.
[0033] Furthermore, a liquid storage tank 12 is provided below the fixing card 11 .
[0034] Furthermore, the side wall of the placement platform 1 is provided with four pipeline fixing clips 11;
[0035] The two outer fixing cards 11 are arranged horizontally, and the two inner fixing cards 11 are arranged vertically.
[0036] Furthermore, the bottom of the liquid cooling device 9 is provided with self-locking universal wheels.
[0037] Furthermore, the evaporator 4 is disposed in the water tank 13, and the outlet end of the water tank 13 is connected to the liquid inlet pipe 901 through a water supply pipeline to output the refrigerant;
[0038] The water supply pipeline is provided with a liquid supply pump 14, a water filter 15, a regulating hand valve 16, a flow meter 17, and a pressure gauge 18 in sequence;
[0039] The liquid outlet pipe 902 is connected to the water return port above the water tank 13 through the water return pipeline.
[0040] Furthermore, a low-pressure gauge is provided on the pipeline between the compressor 5 and the evaporator 4, and a high-pressure gauge is provided on the pipeline between the compressor 5 and the air condenser 6; the low-pressure gauge and the high-pressure gauge are connected to the high and low-pressure controllers respectively.
[0041] Furthermore, an adjustable valve 19 is also provided in the liquid cooling device 9 , and both ends of the adjustable valve 19 are respectively connected to the pipelines at both ends of the compressor 5 .
[0042] Furthermore, a cabinet door and an operation screen are provided on the front side of the liquid cooling device 9 .
[0043] Example 1
[0044] A liquid cooling device for an ICP debugging platform, used for liquid cooling and heat dissipation during the debugging process of the integrated core processor development, production, maintenance, environmental testing, etc., including a liquid cooling device and a placement platform;
[0045] The liquid cooling device comprises a vertical cabinet, in which an evaporator, a compressor, an air condenser, a drying filter and an expansion valve are arranged, which are connected by pipelines and constitute a refrigeration circuit;
[0046] The top of the placement table is provided with a placement plane for placing the integrated core processing unit; the left side wall of the placement table is provided with a plurality of pipeline fixing clamps for clamping the tail ends of the liquid inlet pipe and the liquid outlet pipe of the liquid cooling device.
[0047] Furthermore, a liquid storage tank is provided below the fixing card to prevent liquid leakage in the liquid inlet pipe and the liquid outlet pipe from contaminating other important pipelines.
[0048] Furthermore, the left side wall of the placement table is provided with four pipeline fixing clips; wherein the two outer fixing clips are arranged horizontally, and the two inner fixing clips are arranged vertically;
[0049] When not in use, the liquid inlet pipe and the liquid outlet pipe are respectively inserted into the two horizontally arranged fixing cards from the outside to the inside, and the tail ends of the liquid inlet pipe and the liquid outlet pipe are inserted into the two inner fixing cards from the upper side to the bottom, so that the tail ends of the liquid inlet pipe and the liquid outlet pipe are downward.
[0050] Furthermore, the bottom of the liquid cooling device is provided with self-locking universal wheels, so as to facilitate the movement of the device.
[0051] Furthermore, the evaporator is arranged in a water tank, and the outlet of the water tank is connected to the liquid inlet pipe through a water supply pipeline to output the refrigerant; the water supply pipeline is provided with a liquid supply pump, a water filter, a regulating hand valve, a flow meter, and a pressure gauge in sequence; the liquid outlet pipe is connected to the return water port above the water tank through a return water pipeline, forming a refrigerant liquid circuit.
[0052] The high-temperature and high-pressure refrigerant gas discharged from the compressor enters the air condenser, is condensed into saturated liquid or supercooled liquid, and enters the evaporator after being reduced in pressure by the shut-off valve. The low-pressure refrigerant vapor-liquid mixture absorbs the heat of the cold medium outside the tube and becomes a low-pressure gas, which returns to the compressor for further compression. In this way, low-temperature liquid is continuously produced to cool the liquid in the water tank.
[0053] Furthermore, a low-pressure gauge is provided on the pipeline between the compressor and the evaporator, and a high-pressure gauge is provided on the pipeline between the compressor and the air condenser;
[0054] The low pressure meter and the high pressure meter are respectively connected to the high and low pressure controllers.
[0055] Furthermore, an adjustable valve is also provided in the liquid cooling device, and both ends of the adjustable valve are respectively connected to pipelines at both ends of the compressor.
[0056] Furthermore, the liquid inlet pipe and the liquid outlet pipe are both arranged on the left side of the liquid cooling device, and a cabinet door and an operation screen are arranged on the front side of the liquid cooling device.
[0057] Example 2
[0058] like Figure 1 to Figure 5 As shown, a liquid cooling device for an ICP debugging station is used for liquid cooling and heat dissipation during the debugging process of the integrated core processor 2 such as production, sales, and routine testing. The device includes a liquid cooling device 9 and a placement table 1. When the integrated core processor 2 is debugged, the integrated core processor 2 is placed on the placement plane on the top of the placement table 1, and the front interface of the integrated core processor 2 is connected to the corresponding interface on the debugging device 3 through multiple cables; the liquid cooling inlet and liquid cooling outlet on the rear side of the integrated core processor 2 are connected to the liquid cooling device 9 via a liquid inlet pipe 901 and a liquid outlet pipe 902 for liquid cooling and heat dissipation.
[0059] Specifically, one end of the liquid inlet pipe 901 is connected to the liquid cooling outlet of the liquid cooling device 9, and the other end is connected to the liquid cooling inlet of the integrated core processor 2; one end of the liquid outlet pipe 902 is connected to the liquid cooling inlet of the liquid cooling device 9, and the other end of the liquid outlet pipe 902 is connected to the liquid cooling outlet of the integrated core processor 2, forming a refrigerant liquid circulation.
[0060] In this embodiment, the liquid cooling device 9 and the debugging device 3 are both vertical cabinets, and both are provided with self-locking universal wheels at the bottom for easy movement.
[0061] Furthermore, in the present embodiment, a pipeline fixing clamp 11 is provided on the left side wall of the placement table 1 to clamp the tail ends of the liquid inlet pipe 901 and the liquid outlet pipe 902 of the liquid cooling device 9 .
[0062] Furthermore, in this embodiment, a liquid storage tank 12 is provided under the fixing card 11 to prevent liquid leakage from the liquid inlet pipe 901 and the liquid outlet pipe 902 during the disassembly and assembly process; and four pipeline fixing cards 11 are provided on the left side wall of the placement table 1; among them, the two outer fixing cards 11 are arranged horizontally, and the two inner fixing cards 11 are arranged vertically.
[0063] When not in use, Figure 3As shown, the liquid inlet pipe 901 and the liquid outlet pipe 902 are respectively inserted into the two horizontally arranged fixing cards 11 from the outside to the inside, and the tail ends of the liquid inlet pipe 901 and the liquid outlet pipe 902 are inserted into the two inner fixing cards 11 from the top to the bottom, so that the tail ends of the liquid inlet pipe 901 and the liquid outlet pipe 902 are downward.
[0064] Furthermore, in this embodiment, the liquid cooling device 9 is provided with an evaporator 4, a compressor 5, an air condenser 6, a filter dryer 7, and an expansion valve 8 connected by pipelines to form a refrigeration circuit. The evaporator 4 is arranged in the water tank 13, and the outlet end of the water tank 13 is connected to the liquid inlet pipe 901 through the water supply pipeline to output the refrigerant; after the refrigerant enters the heat exchange pipe of the integrated core processor 2 for heat exchange, it flows out from the liquid outlet pipe 902 and is connected to the return water port above the water tank 13 through the return water pipeline to form a loop; the water supply pipeline is provided with a liquid supply pump 14, a water filter 15, a regulating hand valve 16, a flow meter 17, and a pressure gauge 18 in sequence. The flow meter and the pressure gauge are used to monitor the pressure and flow of the refrigeration pipeline, and the hand valve 16 is adjusted to adjust the flow of the refrigerant.
[0065] Furthermore, in this embodiment, a low pressure gauge is provided on the pipeline between the compressor 5 and the evaporator 4, and a high pressure gauge is provided on the pipeline between the compressor 5 and the air condenser; the low pressure gauge and the high pressure gauge are respectively connected to the high and low pressure controllers, and the two ends of the adjustable valve 19 are respectively connected to the pipelines at both ends of the compressor 5 to ensure pipeline safety.
[0066] The refrigeration principle of the liquid cooling device 9 is: the high-temperature and high-pressure refrigerant gas discharged from the compressor 5 enters the air condenser 6, is condensed into a saturated liquid or a supercooled liquid, and enters the evaporator 4 after the pressure is reduced by the shut-off valve (not shown). The low-pressure refrigerant vapor-liquid mixture absorbs the heat of the cold medium outside the tube and becomes a low-pressure gas, which returns to the compressor 5 for further compression. In this way, low-temperature liquid is continuously produced to cool the liquid in the water tank.
[0067] In this embodiment, Figure 2 , Figure 3 As shown, the liquid cooling device 9 is arranged at the rear side of the placement table 1, the debugging device 3 is arranged on the right side of the liquid cooling device 9, the bottom of the debugging device 3 is provided with a self-locking universal wheel, and the liquid cooling inlet and outlet of the integrated core processor 2 are arranged at the rear side of the integrated core processor 2. The liquid inlet pipe 901 and the liquid outlet pipe 902 are both arranged on the left side of the vertical cabinet of the liquid cooling device (9), and the front side of the liquid cooling device 9 is provided with a cabinet door and an operation screen.
[0068] Furthermore, in this embodiment, if Figure 5 As shown, the internal system of the debugging device 3 includes multiple functional units such as ICP hardware testing equipment, discrete quantity testing unit, RS232 serial port testing unit, Ethernet testing unit, serial port monitoring computer, etc.
[0069] The above is only a specific embodiment of the utility model, and the utility model is described in detail. The undetailed part is conventional technology. However, the protection scope of the utility model is not limited to this. Any changes or replacements that can be easily thought of by any technician familiar with the technical field within the technical scope disclosed by the utility model should be included in the protection scope of the utility model. The protection scope of the utility model shall be based on the protection scope of the claims.
Claims
1. A liquid cooling device for an ICP debugging station, used for liquid cooling and heat dissipation during the development, production, maintenance, environmental testing and debugging of an integrated core processor (2). Features: It comprises a liquid cooling device (9) and a placement table (1); The liquid cooling device (9) is a vertical cabinet, and is provided with an evaporator (4), a compressor (5), an air condenser (6), a drying filter (7), and an expansion valve (8) which are connected by pipelines to form a refrigeration circuit; The top of the placement platform (1) is provided with a placement plane for placing the integrated core processing unit (2); the side wall of the placement platform (1) is provided with a plurality of pipeline fixing clamps (11) for clamping the tail ends of the liquid inlet pipe (901) and the liquid outlet pipe (902) of the liquid cooling device (9).
2. The device according to claim 1, It is characterized in that A liquid storage tank (12) is provided below the fixing card (11).
3. The device according to claim 1, It is characterized in that The side wall of the placement platform (1) is provided with four pipeline fixing clamps (11); The two outer fixing cards (11) are arranged horizontally, and the two inner fixing cards (11) are arranged vertically.
4. The device according to claim 1, It is characterized in that The bottom of the liquid cooling device (9) is provided with self-locking universal wheels.
5. The device according to claim 1, It is characterized in that The evaporator (4) is arranged in a water tank (13), and the outlet end of the water tank (13) is connected to the liquid inlet pipe (901) through a water supply pipeline to output the refrigerant; The water supply pipeline is provided with a liquid supply pump (14), a water filter (15), a regulating hand valve (16), a flow meter (17), and a pressure gauge (18) in sequence; The liquid outlet pipe (902) is connected to the water return port above the water tank (13) via a water return pipeline.
6. The device according to claim 1, It is characterized in that A low-pressure gauge is provided on the pipeline between the compressor (5) and the evaporator (4), and a high-pressure gauge is provided on the pipeline between the compressor (5) and the air condenser (6); the low-pressure gauge and the high-pressure gauge are connected to the high-pressure and low-pressure controllers respectively.
7. The device according to claim 1, It is characterized in that The liquid cooling device (9) is also provided with an adjustable valve (19), and the two ends of the adjustable valve (19) are respectively connected to the pipelines at the two ends of the compressor (5).
8. The device according to claim 1, It is characterized in that The front side of the liquid cooling device (9) is provided with a cabinet door and an operation screen.