Construction waste recycling and crushing device
By introducing a magnetic mechanism and a filter into the construction waste recycling and crushing device, the problem of the inability of existing technology to effectively screen metals is solved, the resource utilization rate is improved, and efficient recycling of metals in construction waste is achieved.
Patent Information
- Application Number
- CN202323477688.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-20
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2033-12-20
AI Technical Summary
Existing construction waste recycling devices cannot effectively screen out steel bars and other metals that can be recycled again, resulting in low resource utilization efficiency.
A construction waste recycling and crushing device including a crushing box, a magnetic suction mechanism and a filter screen is designed. The magnetic suction mechanism is used to absorb metal scraps, and the metal scraps are screened and recycled through the filter screen and vibration motor.
It achieves effective screening and recycling of steel bars and other metals in construction waste that can be recycled again, improving resource utilization.
Smart Images

Figure CN221907312U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of recycling and crushing devices, in particular to a construction waste recycling and crushing device. Background Art
[0002] Abandoned steel bars, sand, gravel, bricks, etc. are common in construction waste, and construction waste crushing and recycling equipment has begun to appear and be put into use.
[0003] After searching, for example, a construction waste recycling device with Chinese patent number CN202110970758.8 is found. This device can greatly reduce the cost of processing construction waste by arranging a crushing mechanism and a grinding mechanism inside the device, thereby greatly improving the efficiency of construction waste recycling. However, the construction waste recycling device cannot effectively screen out metals such as steel bars that can be recycled again in the construction waste, thereby reducing the efficiency of resource utilization. Therefore, a construction waste recycling and crushing device is proposed to solve the above problem. Utility Model Content
[0004] 1. Technical issues to be resolved
[0005] In view of the deficiencies in the prior art, the utility model provides a construction waste recycling and crushing device, which has the advantages of being easy to screen metals for reuse, and solves the problem of low resource utilization in comparative devices.
[0006] (II) Technical solution
[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction waste recycling and crushing device, comprising a crushing box, a feed hopper is fixedly installed on the top of the crushing box, two crushing motors are fixedly installed on the left side of the crushing box, a crushing roller is fixedly installed on the output shaft of the crushing motor, a collection frame is arranged inside the crushing box, and a magnetic attraction mechanism is arranged inside the crushing box;
[0008] The magnetic attraction mechanism includes an installation inclined plate, an ferromagnet, a slide groove, a slider, a connecting rod and a scraper. The left and right inner walls of the crushing box are fixedly installed with installation inclined plates, the top of the installation inclined plate is provided with an ferromagnet, the front and rear side walls of the installation inclined plate are provided with slide grooves, the inside of the slide groove is slidably connected with a slider, the top of the slider is fixedly installed with a connecting rod, and a scraper is fixedly installed between the two groups of the connecting rods.
[0009] Furthermore, the bottom of the scraper is in contact with the top of the magnetic magnet, and a material guide inclined plate is fixedly installed inside the crushing box.
[0010] Furthermore, a filter is fixedly installed inside the crushing box, and a vibration motor is arranged at the bottom of the filter.
[0011] Furthermore, a threaded rod is threadedly connected to the front side of the connecting rod, and a threaded groove is formed on the front side wall of the mounting inclined plate.
[0012] Furthermore, a rotating handle is fixedly installed on the front side of the threaded rod, and a box door is opened on the front side of the crushing box.
[0013] Furthermore, the two crushing motors are symmetrically arranged front and back, and the crushing roller is rotationally connected to the crushing box.
[0014] (III) Beneficial effects
[0015] Compared with the prior art, the technical solution of this application has the following beneficial effects:
[0016] The construction waste recycling and crushing device is provided with a magnetic attraction mechanism. When crushing and recycling construction waste, the crushed fragments will be guided by the guide inclined plate to the mounting inclined plate, the metal fragments will be attracted by the magnet, and the waste that cannot be attracted will slide down along the mounting inclined plate and slide onto the filter net. After the crushing is completed, the box door can be opened and the threaded rod can be removed. Then, the scraper can be moved along the direction of the mounting inclined plate to scrape off the metal waste on the magnet for recycling. In this way, the metals such as steel bars that can be recycled again can be screened out from the construction waste, thereby improving the resource utilization rate. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a three-dimensional schematic diagram of the utility model;
[0018] Figure 2 This is a front cross-sectional view of the utility model;
[0019] Figure 3 For this utility model Figure 2 A magnified view of the structure at center;
[0020] Figure 4 It is a left side sectional view of the local structure of the utility model.
[0021] In the figure: 1 crushing box, 2 feeding hopper, 3 crushing motor, 4 crushing roller, 5 collecting frame, 6 magnetic suction mechanism, 601 mounting inclined plate, 602 magnetic suction, 603 slide, 604 slider, 605 connecting rod, 606 scraper, 7 material guide inclined plate, 8 filter screen, 9 vibration motor, 10 threaded rod, 11 threaded groove. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] See also Figure 1-3 A construction waste recycling and crushing device in this embodiment includes a crushing box 1, a feed hopper 2 is fixedly installed on the top of the crushing box 1, two crushing motors 3 are fixedly installed on the left side of the crushing box 1, a crushing roller 4 is fixedly installed on the output shaft of the crushing motor 3, a collecting frame 5 is arranged inside the crushing box 1, and a magnetic attraction mechanism 6 is arranged inside the crushing box 1.
[0024] exist Figure 2 , Figure 3 and Figure 4 In the embodiment, the inner walls of the left and right sides of the crushing box 1 are fixedly installed with mounting inclined plates 601, the top of the mounting inclined plates 601 is provided with an iron magnet 602, the front and rear side walls of the mounting inclined plates 601 are provided with a slide groove 603, the inside of the slide groove 603 is slidably connected with a slider 604, the top of the slider 604 is fixedly installed with a connecting rod 605, and a scraper 606 is fixedly installed between the two groups of connecting rods 605. By setting the magnetic attraction mechanism 6, when the construction waste is crushed and recycled, the crushed materials will be guided by the guide inclined plate 606. Plate 7 is guided to the installation inclined plate 601, and the metal scraps will be attracted by the magnet 602. The scraps that cannot be attracted will slide down along the installation inclined plate 601 and slide onto the filter screen 8. After the crushing is completed, the box door can be opened, and the threaded rod 10 can be removed. Then, the scraper 606 can be moved along the direction of the installation inclined plate 601 to scrape off the metal scraps on the magnet 602 for recycling. In this way, metals such as steel bars that can be recycled can be screened out from the construction waste, thereby improving resource utilization.
[0025] exist Figure 2 and Figure 4 In the embodiment, the bottom of the scraper 606 is fitted with the top of the magnet 602, and a guide ramp 7 is fixedly installed inside the crushing box 1. The scraper 606 is fitted with the magnet 602, so that the metal scraps on the surface of the magnet 602 can be scraped off more thoroughly.
[0026] exist Figure 2 In the crushing box 1, a filter screen 8 is fixedly installed inside, and a vibration motor 9 is arranged at the bottom of the filter screen 8. By arranging the filter screen 8 and the vibration motor 9, the crushed materials can be screened and filtered.
[0027] exist Figure 2 and Figure 3In the figure, the front side of the connecting rod 605 is threadedly connected with a threaded rod 10, and the front side wall of the mounting inclined plate 601 is provided with a threaded groove 11. By setting the threaded rod 10 and the threaded groove 11, the position of the scraper 606 can be fixed when the scraper 606 is not in use, and it can be disengaged from the limit when in use.
[0028] exist Figure 1 and Figure 2 In the figure, a rotating handle is fixedly installed on the front side of the threaded rod 10, and a box door is opened on the front side of the crushing box 1. The box door is provided to facilitate the user to recycle the crushed materials in the crushing box 1, and the rotating handle is provided to facilitate the rotation of the threaded rod 10.
[0029] When implementing, follow these steps:
[0030] 1) First, throw the construction waste to be crushed into the feed hopper 2, and turn on the crushing motor 3 and the vibration motor 9 to drive the crushing roller 4 to rotate and crush the waste;
[0031] 2) The crushed scraps will then be guided by the guide ramp 7 to the mounting ramp 601, the metal scraps will be adsorbed by the magnet 602, and the scraps that cannot be adsorbed will slide down along the mounting ramp 601 and slide onto the filter 8 to screen the scraps;
[0032] 3) The crushed materials after the final screening will fall into the collection frame 5. After the crushing is completed, the box door can be opened, and the threaded rod 10 can be removed. Then, the scraper 606 can be moved along the direction of the installation inclined plate 601 to scrape off the metal waste on the magnetic magnet 602 for recycling.
[0033] To sum up, the construction waste recycling and crushing device, by setting up a magnetic suction mechanism 6, when crushing and recycling construction waste, the crushed fragments will be guided by the guide inclined plate 7 to the mounting inclined plate 601, and the metal fragments will be attracted by the ferromagnetic magnet 602. The waste that cannot be attracted will slide down along the mounting inclined plate 601 and slide onto the filter screen 8. After the crushing is completed, the box door can be opened, and the threaded rod 10 can be removed. Then, the scraper 606 can be moved along the direction of the mounting inclined plate 601 to scrape the metal waste on the ferromagnetic magnet 602 for recycling. In this way, metals such as steel bars that can be recycled again in the construction waste can be screened out, thereby improving resource utilization efficiency and solving the problem that the comparative device cannot effectively screen out metals such as steel bars that can be recycled again in the construction waste, thereby reducing resource utilization efficiency.
[0034] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0035] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A construction waste recycling and crushing device, comprising a crushing box (1), characterized in that: A feed hopper (2) is fixedly mounted on the top of the crushing box (1), two crushing motors (3) are fixedly mounted on the left side of the crushing box (1), a crushing roller (4) is fixedly mounted on the output shaft of the crushing motor (3), a collecting frame (5) is arranged inside the crushing box (1), and a magnetic attraction mechanism (6) is arranged inside the crushing box (1); The magnetic attraction mechanism (6) comprises an installation inclined plate (601), an ferromagnet (602), a slide groove (603), a slider (604), a connecting rod (605) and a scraper (606); the left and right inner walls of the crushing box (1) are fixedly installed with the installation inclined plates (601); the top of the installation inclined plates (601) is provided with an ferromagnet (602); the front and rear side walls of the installation inclined plates (601) are provided with slide grooves (603); the inside of the slide groove (603) is slidably connected with the slider (604); the top of the slider (604) is fixedly installed with a connecting rod (605); and the scraper (606) is fixedly installed between the two groups of the connecting rods (605).
2. A construction waste recycling and crushing device according to claim 1, characterized in that: The bottom of the scraper (606) fits with the top of the magnetic magnet (602), and a material guide inclined plate (7) is fixedly installed inside the crushing box (1).
3. The construction waste recycling and crushing device according to claim 1, characterized in that: A filter screen (8) is fixedly installed inside the crushing box (1), and a vibration motor (9) is arranged at the bottom of the filter screen (8).
4. The construction waste recycling and crushing device according to claim 1, characterized in that: The front side of the connecting rod (605) is threadedly connected to a threaded rod (10), and the front side wall of the mounting inclined plate (601) is provided with a threaded groove (11).
5. The construction waste recycling and crushing device according to claim 4, characterized in that: A rotating handle is fixedly mounted on the front side of the threaded rod (10), and a box door is opened on the front side of the crushing box (1).
6. The construction waste recycling and crushing device according to claim 1, characterized in that: The two crushing motors (3) are symmetrically arranged front and back, and the crushing roller (4) is rotationally connected to the crushing box (1).