Intelligent battery replacing station with 40 shipping spaces
Through the design of a 40-position intelligent power swap station, RGV rails and stackers are used to realize automated battery transportation and charging, solving the problems of long charging time for new energy vehicles and low site utilization, achieving fast and efficient power replenishment and efficient land use use.
Patent Information
- Application Number
- CN202420737699.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-10
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-04-10
AI Technical Summary
The charging time of new energy vehicles is long, and the parking space occupied by charging pile equipment has low utilization rate, making it impossible to quickly complete energy replenishment.
Design a 40-position intelligent battery swap station, including battery swap bins, energy storage bins, charging bins and fire-fighting sandboxes. The battery can be transported and charged automatically through RGV rails and stackers to improve charging efficiency.
It significantly improves the electric energy replenishment efficiency of new energy vehicles, shortens the charging time to less than 5 minutes, reduces the equipment footprint, improves land use efficiency, and alleviates vehicle queuing and road congestion problems.
Smart Images

Figure CN221914064U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of intelligent charging and battery replacement for new energy vehicles, and specifically to a 40-slot intelligent battery replacement station. Background Art
[0002] The number of new energy vehicles is relatively high, and the existing charging products such as 1.5KW on-board chargers, 3.5KW home charging piles, 7KW commercial slow charging piles, and 120KW commercial fast charging piles have a long waiting time for charging. Calculated based on charging 60 degrees of electricity, it takes about 40 hours for a 1.5KW on-board charger to be fully charged, about 17 hours for a 3.5KW home charging pile to be fully charged, and about 8.5 hours for a 7KW commercial slow charging pile to be fully charged. Even the highest-power 120KW commercial fast charging pile takes 0.5 hours to fully charge, and it is impossible to complete energy replenishment in a very short time like a fuel vehicle.
[0003] At the same time, each charging gun head of the charging pile equipment needs to occupy a parking space for charging new energy vehicles, and the site utilization rate is low. Utility Model Content
[0004] The utility model aims at the technical problems existing in the prior art and provides a 40-slot intelligent battery swap station.
[0005] The technical solution of the utility model to solve the above technical problems is as follows:
[0006] A 40-slot smart battery swap station, including a battery swap station, an energy storage station, a charging station, a fire sandbox and an RGV. The battery swap station is a new energy vehicle battery swap station, including a vehicle inlet and outlet and a first RGV inlet and outlet; the energy storage station is a battery storage and charging station with 40 slots, including a stacker and a second RGV inlet and outlet; a charging cabinet is provided in the charging station, and the charging cabinet charges the battery in the energy storage station through cables;
[0007] The battery swap warehouse and the energy storage warehouse are arranged side by side, the first RGV inlet and outlet are connected to the second RGV inlet and outlet, and RGV tracks are arranged inside the first RGV inlet and outlet and the second RGV inlet and outlet, the direction of the RGV track is perpendicular to the vehicle inlet and outlet direction, and extends to the inside of the battery swap warehouse and the energy storage warehouse, and the RGV transports the exhausted battery from the battery swap warehouse to the energy storage warehouse, or transports the fully charged battery from the energy storage warehouse to the battery swap warehouse along the RGV track;
[0008] A front wheel lifting mechanism and a rear wheel lifting mechanism are also provided at the bottom of the battery swap compartment, and the front wheel lifting mechanism and the rear wheel lifting mechanism are used to lift the car to a designated position after the car enters the battery swap compartment;
[0009] The stacker's top and bottom rails are provided at the center of the top and bottom of the energy storage bin, and the direction of the stacker's top and bottom rails is perpendicular to the direction of the RGV track. A bin array consisting of 20 bins is provided on both sides of the stacker's top and bottom rails close to the side walls of the energy storage bin; the stacker is driven by a motor to move along the stacker's top and bottom rails to take out the battery from the designated battery bin and transport it to the RGV or take out the battery from the RGV and put it into the designated battery bin;
[0010] The fire-fighting sand box is arranged on a side of the energy storage compartment away from the battery exchange compartment.
[0011] Furthermore, the 40 storage positions in the energy storage warehouse include 36 battery charging positions, 1 firefighting position, 1 maintenance position, 1 first temporary storage position, and 1 second temporary storage position;
[0012] The fire-fighting position and the maintenance position are arranged adjacent to each other up and down, and the first temporary storage position and the second temporary storage position are arranged adjacent to each other up and down, and the fire-fighting position and the maintenance position are arranged on the two side walls of the energy storage warehouse relative to the first temporary storage position and the second temporary storage position; the fire-fighting position is connected with the fire-fighting sand box; the first temporary storage position is connected with the second RGV inlet and outlet, and the RGV enters the energy storage warehouse and docks in the first temporary storage position.
[0013] Furthermore, the 36 battery charging positions each include a battery holder, a charging connector, and a position detection module. The battery holder is provided with a plurality of limit columns that cooperate with the batteries. The charging connector is arranged on one side of the battery charging position and is electrically connected to the charging connector through a cable. The position detection module includes two travel switches that are symmetrically arranged on the battery holder.
[0014] Furthermore, a fire-fighting conveying line is provided at the bottom of the fire-fighting position, one end of the fire-fighting conveying line extends to the interior of the fire-fighting sand box, and a moving device that can move along the fire-fighting conveying line is provided on the fire-fighting conveying line.
[0015] Furthermore, the energy storage bin also includes a battery lifting frame, which is arranged outside the first temporary storage position and the second temporary storage position; lifting arms are provided on both sides of the battery lifting frame, and the spacing between the lifting arms on both sides is greater than the width of the RGV and smaller than the width of the battery. After the RGV enters the first temporary storage position, the lifting arms of the battery lifting frame lift the battery to the second temporary storage position.
[0016] Furthermore, the stacker includes a stacker frame, a stacker lifting mechanism and two fork arms, the fork arms are arranged in the stacker lifting mechanism, the stacker lifting mechanism is arranged in the stacker frame, the distance between the two fork arms is greater than the width of the RGV and smaller than the distance between the lifting arms on both sides of the battery lifting frame; the stacker lifting mechanism drives the fork arms to move up and down, and the fork arms are extended to the bottom of the target battery under the drive of the motor.
[0017] Furthermore, the energy storage warehouse is also provided with a temperature control system, which includes temperature and humidity detection equipment, an air-conditioning control cabinet, air-conditioning air inlet ducts, and air-conditioning air outlet ducts; the temperature and humidity detection equipment is electrically connected to the air-conditioning control cabinet; the air-conditioning air outlet ducts are arranged above the warehouse arrays on both sides of the energy storage warehouse.
[0018] Furthermore, a vehicle position correction and centering mechanism is also provided at the bottom of the battery swap compartment, and the vehicle position correction and centering mechanism includes a front wheel centering mechanism and a rear wheel centering mechanism.
[0019] Furthermore, the first RGV inlet and outlet are provided with an RGV lifting door.
[0020] Furthermore, the energy storage bin also includes a fire alarm detection device and a fire extinguishing system.
[0021] The beneficial effect of the utility model is that the utility model solves the problem of low site utilization. Compared with 1.5KW on-board chargers, 3.5KW home charging piles, 7KW commercial slow charging piles, and 120KW commercial fast charging piles, battery swap stations are more efficient in replenishing the electric energy of new energy vehicles. The charging piles require vehicles to wait for 30 to 2400 minutes to complete the electric energy replenishment, while battery swap stations can be switched to the electric energy replenishment operation of new energy vehicles within 5 minutes. Each charging gun head of the charging pile equipment needs to occupy a parking space for charging new energy vehicles, and this solution can accommodate 36 batteries for charging at the same time, and the equipment occupies an area of less than 6 parking spaces. If the charging pile wants to achieve the same number of battery charging, it requires 36 parking spaces and at least 18 charging pile equipment installation sites. Compared with the battery swap stations in Warehouse 11, Warehouse 13 and Warehouse 21, the number of swappable batteries has been significantly increased while occupying a similar area, which has greatly improved the land use efficiency and saved land investment costs for equipment construction companies. At the same time, it has also reduced the waiting time for battery swap vehicles and alleviated road congestion caused by vehicle queuing. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 A schematic diagram of the overall structure of a 40-bay smart battery swap station provided in an embodiment of the utility model;
[0023] Figure 2A schematic diagram of the positional relationship and structure of the stacker, RGV, and battery lifting frame inside the energy storage bin provided by the embodiment of the utility model;
[0024] Figure 3 A schematic diagram of the battery swap compartment structure provided in an embodiment of the utility model.
[0025] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0026] 1. Replace the battery compartment.
[0027] 101. front wheel lifting mechanism, 102. rear wheel lifting mechanism, 103. front wheel centering mechanism, 104. rear wheel centering mechanism, 105. RGV lifting door, 106. RGV track;
[0028] 2. Energy storage warehouse,
[0029] 201, stacker overhead rail, 202, stacker floor rail;
[0030] 3. RGV;
[0031] 4. Stacker,
[0032] 401, stacker frame, 402, stacker lifting mechanism, 403, fork arm;
[0033] 5. Charging compartment;
[0034] 6. Battery charging compartment,
[0035] 601, battery holder, 602, charging connector, 603, limit column, 604, travel switch;
[0036] 7. Battery lifting frame,
[0037] 701, lifting arm;
[0038] 8. Temperature control system,
[0039] 801, air conditioning control cabinet, 802, air conditioning air inlet duct, 803, air conditioning air outlet duct;
[0040] 9. Fire sand box, 10. Operation room. DETAILED DESCRIPTION
[0041] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of this application.
[0042] In the description of this application, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, "plurality" means two or more, unless otherwise clearly and specifically defined.
[0043] In the description of the present application, the term "for example" is used to mean "used as an example, illustration or description". Any embodiment described as "for example" in the present application is not necessarily to be construed as being more preferred or advantageous than other embodiments. In order to enable any technician in the field to implement and use the utility model, the following description is given. In the following description, details are listed for the purpose of explanation. It should be understood that a person of ordinary skill in the art can recognize that the utility model can be implemented without using these specific details. In other examples, well-known structures and processes will not be elaborated in detail to avoid unnecessary details that make the description of the utility model obscure. Therefore, the utility model is not intended to be limited to the embodiments shown, but is consistent with the widest range of principles and features disclosed in the present application.
[0044] like Figure 1-3 As shown, an embodiment of the utility model provides a 40-bay smart battery swap station, including a battery swap bay 1, an energy storage bay 2, a charging bay 5, a fire sandbox 9 and an RGV3. The battery swap bay 1, the energy storage bay 2 and the RGV3 are equipped with communication equipment according to demand, such as near-field communication modules such as Bluetooth.
[0045] The battery swapping warehouse 1 is a battery swapping station for new energy vehicles, including a vehicle inlet and outlet and a first RGV inlet and outlet; the energy storage warehouse 2 is a battery storage and charging station with 40 slots, including a stacker 4 and a second RGV inlet and outlet; a charging cabinet is provided in the charging warehouse, and the charging cabinet charges the batteries in the energy storage warehouse through cables.
[0046] The battery swap compartment 1 and the energy storage compartment 2 are arranged side by side, the first RGV inlet and outlet are connected to the second RGV inlet and outlet, and an RGV track 106 is provided in the first RGV inlet and outlet and the second RGV inlet and outlet, the direction of the RGV track is perpendicular to the vehicle inlet and outlet direction, and extends to the inside of the battery swap compartment and the energy storage compartment, and the RGV3 transports the depleted battery from the battery swap compartment 1 to the energy storage compartment 2, or transports the fully charged battery from the energy storage compartment 2 to the battery swap compartment 1 along the RGV track 106.
[0047] A front wheel lifting mechanism 101 and a rear wheel lifting mechanism 102 are also provided at the bottom of the battery swap compartment 1. The front wheel lifting mechanism 101 and the rear wheel lifting mechanism 102 are used to lift the car to a designated position after the car enters the battery swap compartment.
[0048] The stacker sky and ground rails (sky rail 201 / ground rail 202) are provided at the top center and the bottom center of the energy storage bin 2. The direction of the stacker sky and ground rails (sky rail 201 / ground rail 202) is perpendicular to the direction of the RGV track 106. Both sides of the stacker sky and ground rails (sky rail 201 / ground rail 202) are close to the side walls of the energy storage bin 2 and a bin array consisting of 20 bins is provided on each side; the stacker 4 is driven by a motor to move along the stacker sky and ground rails, and is used to take out the battery from the designated battery bin and transport it to the RGV3 or to take the battery out of the RGV3 and put it into the designated battery bin.
[0049] The fire-fighting sand box is arranged on a side of the energy storage compartment away from the battery exchange compartment.
[0050] It should be noted here that the stacker 4 may also be driven by pneumatic or hydraulic means, or other driving methods.
[0051] Furthermore, the 40 storage positions in the energy storage warehouse 2 include 36 battery charging positions 6, 1 firefighting position, 1 maintenance position, 1 first temporary storage position, and 1 second temporary storage position.
[0052] The fire-fighting position and the maintenance position are arranged adjacent to each other up and down, and the first temporary storage position and the second temporary storage position are arranged adjacent to each other up and down, and the fire-fighting position and the maintenance position are arranged on the two side walls of the energy storage warehouse relative to the first temporary storage position and the second temporary storage position; the fire-fighting position is connected with the fire-fighting sand box 9; the first temporary storage position is connected with the second RGV inlet and outlet, and the RGV stops in the first temporary storage position after entering the energy storage warehouse. A position sensor is also provided in the first temporary storage warehouse. The position sensor can use a laser sensor to detect the position of the RGV in the first temporary storage warehouse. When the RGV is docked in place, the laser sensor detects and sends a trigger signal.
[0053] Furthermore, the 36 battery charging positions 6 each include a battery holder 601, a charging connector 602, and a position detection module. The battery holder 601 is provided with a plurality of limit posts 603 that cooperate with the batteries. The charging connector 602 is arranged on one side of the battery charging position and is electrically connected to the charging connector 602 via a cable. The position detection module includes two travel switches 604, which are symmetrically arranged on the battery holder 601.
[0054] It should be noted that the charging connector 602 can be arranged in such a way that a column is arranged on one side of the battery charging position, and the two ends of the column are fixedly connected to the top and bottom of the energy storage bin respectively. A plurality of linear motors are sequentially mounted on the column, and the positions correspond to the battery holders, and the charging connector is arranged on the linear motor. When the battery is placed in the battery holder, the two travel switches 604 located on the battery holder 601 are pressed down at the same time, the travel switches are turned on, and an electrical signal is sent to the linear motor. The linear motor controls the charging connector to move down and connect to the battery charging port. When the battery needs to be taken out, the linear motor needs to control the charging connector to move up and leave the battery charging port. It should be understood here that if the battery is not placed in place after being placed in the battery holder, for example, it is tilted, the two travel switches 604 cannot be pressed down at the same time, and no electrical signal will be sent to the linear motor.
[0055] Furthermore, a fire-fighting conveying line is provided at the bottom of the fire-fighting position, one end of the fire-fighting conveying line extends to the interior of the fire-fighting sand box, and a moving device that can move along the fire-fighting conveying line is provided on the fire-fighting conveying line.
[0056] When a battery in the energy storage bin poses a fire risk, the stacker will first take the battery that is on fire or about to catch fire from the battery charging bin and then send it to the fire fighting bin. The mobile device on the fire fighting conveyor line will drive the battery into the fire fighting sand box for sand covering and fire fighting. The mobile device here can adopt the structure of a load-bearing plate plus a driving wheel.
[0057] Furthermore, the energy storage bin also includes a battery lifting frame 7, which is arranged outside the first temporary storage bin and the second temporary storage bin; lifting arms 701 are provided on both sides of the battery lifting frame 7, and the spacing between the lifting arms 701 on both sides is greater than the width of the RGV3 and smaller than the width of the battery. After the RGV3 enters the first temporary storage bin, the lifting arms 701 of the battery lifting frame 7 lift the battery to the second temporary storage bin.
[0058] The lifting arm can be driven hydraulically, pneumatically or electrically, and the movement of the lifting arm is triggered by a trigger signal emitted by a position sensor in the first temporary storage bin. For example, when the RGV moves into the energy storage bin and reaches the designated position, the position sensor in the first temporary storage bin sends a trigger signal to the battery lifting frame, and the lifting arms on both sides of the battery lifting frame rise to lift the depleted battery.
[0059] Furthermore, the stacker 4 includes a stacker frame 401, a stacker lifting mechanism 402 and two fork arms 403, the fork arms 403 are arranged in the stacker lifting mechanism 402, the stacker lifting mechanism 402 is arranged in the stacker frame 401, the distance between the two fork arms 403 is greater than the width of RGV3 and less than the distance between the lifting arms 701 on both sides of the battery lifting frame 7; the stacker lifting mechanism 402 drives the fork arms 403 to move up and down, and the fork arms 403 are extended to the bottom of the target battery under the drive of the motor.
[0060] Furthermore, the energy storage bin 2 is also provided with a temperature control system 8, which includes a temperature and humidity detection device (not shown in the figure), an air-conditioning control cabinet 801, an air-conditioning air inlet duct 802, and an air-conditioning air outlet duct 803; the temperature and humidity detection device is electrically connected to the air-conditioning control cabinet 801; the air-conditioning air outlet duct 802 is arranged above the bin array on both sides of the energy storage bin 2.
[0061] Specifically, the air conditioning control cabinet 801 automatically operates according to the output value of the temperature and humidity detection equipment (such as a temperature and humidity sensor), thereby ensuring that the temperature in the energy storage bin is stable within an appropriate range.
[0062] Furthermore, a vehicle position correction and centering mechanism is also provided at the bottom of the battery swap compartment 1, such as Figure 3 As shown, the vehicle position correction and centering mechanism includes a front wheel centering mechanism 103 and a rear wheel centering mechanism 104, and the front wheel centering mechanism 103 or the rear wheel centering mechanism 104 includes a longitudinally arranged roller and a drive motor (not shown in the figure). The roller is arranged on the front wheel lifting mechanism 101 and the rear wheel lifting mechanism 102, and the drive motor drives the roller to roll through a chain, thereby driving the vehicle to move left or right.
[0063] It should be understood here that the vehicle position correction and centering mechanism may also include a laser sensor, and the position of the vehicle is measured by multiple laser sensors. When the vehicle tilts or the body is biased to the left or right, the drive motor in the vehicle position correction and centering mechanism drives the roller to roll, thereby achieving the correction and centering of the body. When the body correction and centering is completed, the laser sensor will send a corresponding trigger signal to the front wheel lifting mechanism and the rear wheel lifting mechanism, triggering the front wheel lifting mechanism and the rear wheel lifting mechanism to work.
[0064] Furthermore, the first RGV entrance and exit is provided with an RGV lifting door 105. The RGV lifting door is in a closed state when no vehicle enters the battery swapping compartment, which can prevent small animals and the like from accidentally entering the energy storage compartment and causing unnecessary danger. The RGV lifting door can be controlled by the operation room or opened and closed automatically. When the vehicle enters the battery swapping compartment and is ready for battery swapping, it is opened by the operation room. It can also be opened automatically after the vehicle is ready for battery swapping without being controlled by the operation room. For example, after the body correction and centering are completed, the front wheel lifting mechanism and the rear wheel lifting mechanism rise synchronously. After the vehicle is lifted to a safe height, a trigger signal is sent to the RGV lifting door to open the door. When the battery swapping is completed and the RGV trolley returns to the energy storage compartment, a trigger signal is sent to the RGV lifting door to close.
[0065] Preferably, a position sensor may also be provided on the RGV lifting door. After the RGV lifting door is fully opened, the position sensor sends a trigger signal to the RGV trolley to inform the RGV trolley that the lifting door is opened.
[0066] Furthermore, the energy storage bin also includes a fire alarm detection device and a fire extinguishing system.
[0067] The fire alarm detection device may include infrared sensors, smoke sensors and other detection equipment, and can be used with sound and light alarms to detect fire alarms. The fire extinguishing system may include fire foam spray extinguishers, etc., which can be connected to the fire alarm detection device without being connected to the operation room. When the fire alarm detection device detects a fire, it will automatically spray fire foam to extinguish the fire.
[0068] On the basis of the above-mentioned embodiments, the battery swap compartment 1 is also provided with Bluetooth devices, voice broadcast and voice intercom equipment, vehicle overload detection equipment, monitoring equipment, lighting system, status display LED screen, license plate recognition system and other equipment.
[0069] The lifting mechanisms involved in this embodiment, such as the front wheel lifting mechanism, the rear wheel lifting mechanism, the stacker lifting mechanism, the battery lifting frame, and the RGV lifting door, can all be driven by a servo motor or other driving device, which is common knowledge in the art and will not be described in detail in this embodiment. It should be understood that the RGV3 also includes a drive control device that can move under the control of corresponding instructions.
[0070] Working principle:
[0071] When the smart battery swap station meets the battery swap conditions (for example, the battery swap compartment is empty, there is at least one fully charged battery in the station, etc.), the vehicle Figure 1Drive into the battery swap warehouse 1 in the direction indicated by the hollow arrow. When the monitoring equipment in the battery swap warehouse detects the designated position of the vehicle, the voice broadcast and voice intercom equipment remind the driver to perform corresponding operations, such as shifting the parking gear, connecting the Bluetooth device, etc. The monitoring equipment can use laser sensors, cameras, etc. to detect the vehicle position. According to the reminder, the driver connects the on-board Bluetooth to the Bluetooth device in the battery swap warehouse, and automatically uploads the vehicle status information to the main control system of the smart battery swap station, such as the operation room 10 of the energy storage warehouse. The main control system allocates storage locations for exhausted batteries and locations for fully charged batteries. The location allocation work of the main control system can be manually controlled or automatically completed through software settings. This process can be selected according to the existing technical level and will not be repeated here. After the main control system allocates a location for taking a fully charged battery, it will automatically send a trigger signal to trigger the linear motor corresponding to the location to drive the charging connector to move up and leave the battery charging port.
[0072] After the vehicle enters the designated position, the vehicle position correction and centering mechanism automatically corrects the vehicle position. After the correction is completed, the laser sensor used for correction and centering is sent to the front wheel lifting mechanism and the rear wheel lifting mechanism, triggering the front wheel lifting mechanism and the rear wheel lifting mechanism to work. The front wheel lifting mechanism and the rear wheel lifting mechanism rise synchronously to lift the vehicle to a safe height. After the vehicle reaches a safe height, the RGV lifting door is triggered to open, and the RGV trolley drives to the battery swapping position in the battery swapping warehouse.
[0073] When the RGV trolley reaches the designated position, the front wheel lifting mechanism and the rear wheel lifting mechanism are synchronously lowered to the battery replacement height, and the operator or the RGV trolley performs the battery lock unlocking operation to complete the removal of the new energy vehicle's depleted battery.
[0074] After the spent batteries are removed, the front wheel lifting mechanism and the rear wheel lifting mechanism lift the car to a safe height again, and then the RGV trolley transports the spent batteries into the first temporary storage bin of the energy storage bin.
[0075] When the energy storage bin detects that the RGV trolley has arrived at the first temporary storage bin (it should be understood that the position of the RGV trolley can be detected by a camera or laser sensor during actual implementation), the battery lifting frame rises to move the depleted battery to the second temporary storage bin.
[0076] The stacker moves along the floor rails to the power supply bin, takes out the fully charged battery from the power supply bin through the stacker lifting mechanism and fork arm, and then moves along the floor rails to the corresponding position of the first temporary storage bin, and places the fully charged battery on the RGV trolley through the stacker lifting mechanism and fork arm. Then the fork arm is retracted, the stacker lifting mechanism rises to the corresponding position of the second temporary storage bin, and the fork arm moves to the bottom of the exhausted battery in the second temporary storage bin. After the stacker lifting mechanism rises a certain distance to lift the exhausted battery, the fork arm is retracted and the exhausted battery is moved to the inside of the stacker frame. The stacker moves the idle battery bin along the floor rails, and places the exhausted battery into the idle battery bin for charging through the stacker lifting mechanism and fork arm.
[0077] After receiving the fully charged battery, the RGV trolley moves along the RGV track to the battery swap warehouse. When the RGV trolley arrives at the designated location, the front wheel lifting mechanism and the rear wheel lifting mechanism lower the car to the battery swap height for the installation of the fully charged battery. After the installation is completed, the front wheel lifting mechanism and the rear wheel lifting mechanism lift the car to a safe height, and the RGV trolley returns to the first temporary storage position of the energy storage warehouse. The front wheel lifting mechanism and the rear wheel lifting mechanism drop to the lowest position, and the car battery swap is completed, and it can leave the battery swap station.
[0078] It should be understood that the present embodiment does not include any motion control for some mechanisms, for example, the movement control of the stacker along the floor rails, the movement control of the stacker lifting mechanism, etc. Those skilled in the art may make corresponding arrangements based on the actual implementation situation, according to the customary means in the field or common knowledge. Therefore, the present embodiment does not include any corresponding detailed description. However, this does not affect the implementation of the scheme described in the present embodiment by those skilled in the art based on the above content.
[0079] Although the preferred embodiments of the utility model have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the utility model.
[0080] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A 40-bay smart battery swap station, characterized in that: It includes a battery swap warehouse, an energy storage warehouse, a charging warehouse, a fire sandbox and an RGV. The battery swap warehouse is a battery swap station for new energy vehicles, including a vehicle entrance and exit and a first RGV entrance and exit; the energy storage warehouse is a battery storage and charging station with 40 positions, including a stacker and a second RGV entrance and exit; the charging warehouse is equipped with a charging cabinet, which charges the batteries in the energy storage warehouse through cables; The battery swap warehouse and the energy storage warehouse are arranged side by side, the first RGV inlet and outlet are connected to the second RGV inlet and outlet, and RGV tracks are arranged inside the first RGV inlet and outlet and the second RGV inlet and outlet, the direction of the RGV track is perpendicular to the vehicle inlet and outlet direction, and extends to the inside of the battery swap warehouse and the energy storage warehouse, and the RGV transports the exhausted battery from the battery swap warehouse to the energy storage warehouse, or transports the fully charged battery from the energy storage warehouse to the battery swap warehouse along the RGV track; A front wheel lifting mechanism and a rear wheel lifting mechanism are also provided at the bottom of the battery swap compartment, and the front wheel lifting mechanism and the rear wheel lifting mechanism are used to lift the car to a designated position after the car enters the battery swap compartment; The stacker's top and bottom rails are provided at the center of the top and bottom of the energy storage bin, and the direction of the stacker's top and bottom rails is perpendicular to the direction of the RGV track. Both sides of the stacker's top and bottom rails are close to the side walls of the energy storage bin and each is provided with a bin array consisting of 20 bins; the stacker moves along the stacker's top and bottom rails to take the battery out of the designated battery bin and transport it to the RGV or take the battery out of the RGV and put it into the designated battery bin; The fire-fighting sand box is arranged on a side of the energy storage compartment away from the battery exchange compartment.
2. The 40-bay smart battery swap station according to claim 1 is characterized in that: The 40 storage positions in the energy storage warehouse include 36 battery charging positions, 1 firefighting position, 1 maintenance position, 1 first temporary storage position, and 1 second temporary storage position; The fire-fighting position and the maintenance position are arranged adjacent to each other up and down, and the first temporary storage position and the second temporary storage position are arranged adjacent to each other up and down, and the fire-fighting position and the maintenance position are arranged on the two side walls of the energy storage warehouse relative to the first temporary storage position and the second temporary storage position; the fire-fighting position is connected with the fire-fighting sand box; the first temporary storage position is connected with the second RGV inlet and outlet, and the RGV enters the energy storage warehouse and docks in the first temporary storage position.
3. The 40-bay smart battery swap station according to claim 2 is characterized in that: The 36 battery charging positions each include a battery holder, a charging connector, and a position detection module; The battery holder is provided with a plurality of limit posts which cooperate with the battery. The charging connector is arranged at one side of the battery charging position and is electrically connected to the charging connector via a cable. The position detection module includes two travel switches which are symmetrically arranged on the battery holder.
4. The 40-bay smart battery swap station according to claim 2 is characterized in that: A firefighting conveying line is provided at the bottom of the firefighting position, one end of the firefighting conveying line extends into the interior of the firefighting sand box, and a moving device that can move along the firefighting conveying line is provided on the firefighting conveying line.
5. The 40-bay smart battery swap station according to claim 1, characterized in that: The energy storage bin also includes a battery lifting frame, which is arranged outside the first temporary storage position and the second temporary storage position; lifting arms are provided on both sides of the battery lifting frame, and the spacing between the lifting arms on both sides is greater than the width of the RGV and smaller than the width of the battery. After the RGV enters the first temporary storage position, the lifting arms of the battery lifting frame lift the battery to the second temporary storage position.
6. The 40-bay smart battery swap station according to claim 5, characterized in that: The stacker includes a stacker frame, a stacker lifting mechanism and two fork arms, wherein the fork arms are arranged inside the stacker lifting mechanism, and the stacker lifting mechanism is arranged inside the stacker frame. The distance between the two fork arms is greater than the width of the RGV and less than the distance between the lifting arms on both sides of the battery lifting frame; the stacker lifting mechanism drives the fork arms to move up and down, and the fork arms are extended to the bottom of the target battery under the drive of the motor.
7. The 40-bay smart battery swap station according to claim 1, characterized in that: The energy storage warehouse is also provided with a temperature control system, which includes a temperature and humidity detection device, an air-conditioning control cabinet, an air-conditioning air inlet duct, and an air-conditioning air outlet duct; the temperature and humidity detection device is electrically connected to the air-conditioning control cabinet; the air-conditioning air outlet duct is arranged above the warehouse arrays on both sides of the energy storage warehouse.
8. The 40-bay smart battery swap station according to claim 1, characterized in that: A vehicle position correction and centering mechanism is also provided at the bottom of the battery swap compartment, and the vehicle position correction and centering mechanism includes a front wheel centering mechanism and a rear wheel centering mechanism.
9. The 40-bay smart battery swap station according to claim 1, characterized in that: The first RGV inlet and outlet are provided with RGV lifting doors.
10. The 40-bay smart battery swap station according to claim 1, characterized in that: The energy storage bin also includes a fire alarm detection device and a fire extinguishing system.
