Settlement observation device for constructional engineering

By adopting a sliding and rotating connection design in the settlement observation device, the problem of insufficient external protection of the observation pile is solved, good protection and convenient installation of the observation guide column are achieved, and data accuracy and installation efficiency are improved.

CN221925092UActive Publication Date: 2024-10-29SHENYANG XINGLUDA TESTING INSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420658540.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-01
Publication Date
2024-10-29
Estimated Expiration
2034-04-01

AI Technical Summary

Technical Problem

The exterior of the observation piles of settlement observation devices in existing construction projects lacks effective protection and can easily cause tilting due to collisions with foreign objects or people, thus affecting the accuracy of monitoring data.

Method used

A structure including settlement observation piles, observation protection plates, built-in slides, clamping columns, guide plates and other structures is designed. Through sliding and rotating connections, the observation guide columns are well protected and conveniently installed, and the inconvenience and replacement of traditional welding operations are improved. efficiency.

Benefits of technology

It effectively prevents the observation guide column from tilting, ensures data accuracy, simplifies the docking and replacement operations of the observation protective plate and the sign, and improves installation efficiency and flexibility.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221925092U_ABST
    Figure CN221925092U_ABST
Patent Text Reader

Abstract

The utility model discloses a settlement observation device for constructional engineering, which relates to the technical field of observation device protection and comprises a settlement observation pile, an observation protection plate is arranged on the surface of the settlement observation pile, and an external butt joint groove is formed in the surface of an observation indication board. An external butt joint column is slidably connected to the inner wall of the external butt joint groove, and the surface of the external butt joint column is fixedly mounted on the surface of the observation protection plate, so that by means of the settlement observation device for constructional engineering, the defect that a traditional observation guide column does not have the protection performance when in a static state is overcome; in this way, it is guaranteed that the observation guide pillar has a good protection effect, the convenience of the observation guide pillar protection installation operation by the observation protection plate is guaranteed, and meanwhile the inconvenience of butt joint between the observation protection plate and the observation indication board through welding operation traditionally is improved. And the high efficiency of replacement and installation of the observation protection plate is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of observation device protection, in particular to a settlement observation device for construction engineering. Background Art

[0002] Settlement observation is to conduct observations based on the observation points set up on the building and the fixed (permanent leveling points) measuring points, and express the degree of settlement with data. All buildings and structures with more than one floor that require the setting of observation points in the design, artificial foundations, land foundations (sand foundations), etc., should have settlement observations set up. During construction, observations and records should be carried out on schedule or by layer until completion.

[0003] For most construction projects, when setting up settlement observations, observation piles are usually installed directly and used. Although this operation is relatively convenient, there is no good protection for the outside of the observation piles. Therefore, they are easily tilted by collisions with foreign objects or people at the construction site, which leads to deviations in the secondary monitoring and inaccurate data during settlement observations. Utility Model Content

[0004] The purpose of the utility model is to solve at least one of the technical problems existing in the prior art and to provide a settlement observation device for construction engineering, which can solve the problems raised by the above background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a settlement observation device for construction engineering, comprising a settlement observation pile, the surface of the settlement observation pile is provided with an observation protective plate, the surface of the observation signboard is provided with an external docking groove, the inner wall of the external docking groove is slidably connected with an external docking column, the surface of the external docking column is fixedly installed on the surface of the observation protective plate, the inner side of the external docking column is slidably connected with a built-in clamping column, the inner side of the observation protective plate is provided with a built-in slide groove, the inner wall of the built-in slide groove is slidably connected with a built-in slide plate, the surface of the built-in slide plate is fixedly installed with a built-in guide plate, and the surface of the built-in guide plate is slidably connected to the inner wall of the built-in slide groove.

[0006] Preferably, an observation indicator board is fixedly installed on the surface of the settlement observation pile, and an observation guide column is fixedly installed on the inner side of the observation indicator board.

[0007] Preferably, an elastic component is slidably sleeved on the surface of the built-in clamping column, and two ends of the elastic component are respectively fixedly mounted on the surface of the built-in clamping column and the inner side of the external docking column.

[0008] Preferably, the shapes of the adjacent parts of the built-in slide plate and the built-in clamping column are both inclined.

[0009] Preferably, the inner side of the built-in guide plate is rotatably connected to a built-in rotating ring, the surface of the built-in rotating ring is fixedly mounted with an external stud, and the surface of the external stud is threadedly connected to the inner side of the observation protection plate.

[0010] Preferably, a fixed slot communicating with an external docking slot is provided on the inner side of the observation indicator plate.

[0011] Compared with the prior art, the beneficial effects of the utility model are:

[0012] (1) The settlement observation device for construction projects drives the built-in slide plate to move synchronously on the inner side of the observation protection plate through the built-in guide plate. At this time, the built-in slide plate pushes the built-in clamping column into the inner wall of the fixed clamping groove for fixed installation. This method improves the disadvantage that the traditional observation guide column has no protective performance when it is stationary. In addition, this method not only ensures that the observation guide column has a good protective effect, but also ensures the convenience of the observation protection plate to the observation guide column protection installation operation. It also improves the inconvenience of the traditional welding operation between the observation protection plate and the observation signboard, and ensures the high efficiency of the replacement and installation of the observation protection plate.

[0013] (2) In the settlement observation device for construction engineering, the inclination of the built-in slide plate and the built-in clamping column is to facilitate the pushing when abutting, thereby ensuring the flexibility of the adjustment movement of the built-in clamping column.

[0014] (3) In the settlement observation device for construction projects, the function of the built-in clamping column is to fix the external docking column to the inner wall of the external docking groove after the external docking column enters the inner wall of the external docking groove and is used on the inner side of the observation signboard. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The utility model is further described below in conjunction with the accompanying drawings and embodiments:

[0016] Figure 1 This is a schematic diagram of the structure of a settlement observation device for construction engineering of the utility model;

[0017] Figure 2 This is a schematic diagram of the structure of a settlement observation device for construction engineering of the utility model;

[0018] Figure 3 This is a schematic diagram of the plane structure of the observation protection plate of the utility model;

[0019] Figure 4 For this utility model Figure 3 Enlarged structural diagram at A in the middle.

[0020] Figure numerals: 1. Settlement observation pile; 2. Observation signboard; 3. Observation guide column; 4. Observation protection plate; 5. External docking groove; 6. External docking column; 7. Internal clamping column; 8. Elastic component; 9. Internal slide groove; 10. Internal slide plate; 11. Internal guide plate; 12. Internal rotating ring; 13. External stud; 14. Fixed clamping slot. DETAILED DESCRIPTION

[0021] This section will describe in detail the specific embodiments of the utility model. The preferred embodiments of the utility model are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the utility model, but it cannot be understood as a limitation on the protection scope of the utility model.

[0022] In the description of the present invention, it should be understood that descriptions involving orientation, such as up, down, front, back, left, right, etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0023] In the description of the present utility model, "greater than", "less than", "exceed" etc. are understood as not including the number itself, and "above", "below", "within" etc. are understood as including the number itself. If there is a description of "first" or "second", it is only used for the purpose of distinguishing the technical features, and cannot be understood as indicating or implying the relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.

[0024] In the description of the present invention, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in the present invention based on the specific content of the technical solution.

[0025] See also Figure 1-4 The utility model provides a technical solution: a settlement observation device for construction engineering, comprising a settlement observation pile 1, and the settlement observation pile 1 is a foundation pile for construction engineering.

[0026] Furthermore, an observation signboard 2 is fixedly installed on the surface of the settlement observation pile 1, and an observation guide column 3 is fixedly installed on the inner side of the observation signboard 2. By installing the observation signboard 2 on the surface of the settlement observation pile 1, the settlement observation pile 1 will mark the relevant reservoir data and annotations, and the observation guide column 3 will carry out settlement observation and detection on the settlement observation pile 1 during the construction project.

[0027] Furthermore, an observation protection plate 4 is provided on the surface of the settlement observation pile 1, and the function of the observation protection plate 4 is to provide protection for the observation guide column 3, thereby reducing the disadvantage that the observation guide column 3 has no external protection and is prone to collision and tilting.

[0028] Furthermore, an external docking groove 5 is opened on the surface of the observation sign 2, and the inner wall of the external docking groove 5 is slidably connected with an external docking column 6, and the surface of the external docking column 6 is fixedly installed on the surface of the observation protective plate 4. When the observation protective plate 4 and the observation sign 2 are docked, the external docking column 6 on the observation protective plate 4 can form a precise docking fit with the external docking groove 5 on the observation sign 2, thereby ensuring the convenience of the docking operation when the observation protective plate 4 and the observation sign 2 are fixed.

[0029] Furthermore, the inner side of the external docking column 6 is slidably connected to the internal card column 7, and the surface of the internal card column 7 is slidably sleeved with an elastic component 8, and the two ends of the elastic component 8 are respectively fixedly installed on the surface of the internal card column 7 and the inner side of the external docking column 6. The function of the internal card column 7 is to follow the external docking column 6 into the inner wall of the external docking groove 5 after the external docking column 6 is docked, and then the internal card column 7 is fixed on the inner side of the observation sign 2 for use.

[0030] Furthermore, a built-in slide groove 9 is opened on the inner side of the observation protection plate 4, and a built-in slide plate 10 is slidably connected to the inner wall of the built-in slide groove 9. The shapes of the adjacent parts of the built-in slide plate 10 and the built-in card column 7 are both inclined. The inclination of the built-in slide plate 10 and the built-in card column 7 is to form the convenience of pushing when abutting, thereby ensuring the flexibility of the adjustment movement of the built-in card column 7.

[0031] Furthermore, a built-in guide plate 11 is fixedly installed on the surface of the built-in skateboard 10, and the surface of the built-in guide plate 11 is slidably connected to the inner wall of the built-in slide groove 9. The function of the built-in guide plate 11 is to assist the two built-in skateboards 10 to move on the inner side of the observation protective plate 4.

[0032] Furthermore, the inner side of the built-in guide plate 11 is rotatably connected with a built-in rotating ring 12, and the surface of the built-in rotating ring 12 is fixedly installed with an external stud 13, and the surface of the external stud 13 is threadedly connected to the inner side of the observation protection plate 4. The inner side of the observation indicator plate 2 is provided with a fixed card slot 14 that is interconnected with the external docking slot 5. When the observation protection plate 4 is installed and used on the surface of the observation guide post 3, when the external docking post 6 on the observation protection plate 4 enters the inner wall of the external docking slot 5, the operator can rotate the external stud 13 to rotate and adjust on the inner side of the observation protection plate 4. Therefore, the external stud 13 is rotated between the built-in rotating ring 12 and the built-in guide plate 11. Driven to move, the built-in guide plate 11 drives the built-in slide plate 10 to move synchronously on the inner side of the observation protection plate 4. At this time, the built-in slide plate 10 pushes the built-in card column 7 into the inner wall of the fixed card slot 14 for fixed installation. This method improves the disadvantage that the traditional observation guide column 3 has no protective performance when it is stationary. Furthermore, this method not only ensures that the observation guide column 3 has a good protective effect, but also ensures the convenience of the observation protection plate 4 to the protection and installation operation of the observation guide column 3. It also improves the inconvenience of the traditional welding operation to connect the observation protection plate 4 and the observation sign 2, and ensures the high efficiency of the replacement and installation of the observation protection plate 4.

[0033] Working principle: A settlement observation device for construction engineering is installed and used on the surface of an observation guide column 3 through an observation protective plate 4. When the external docking column 6 on the observation protective plate 4 enters the inner wall of the external docking groove 5, the operator can rotate the external stud 13 to rotate and adjust on the inner side of the observation protective plate 4. Therefore, the external stud 13 is driven to move by the rotation between the built-in rotating ring 12 and the built-in guide plate 11. Therefore, the built-in guide plate 11 drives the built-in slide plate 10 to move synchronously on the inner side of the observation protective plate 4. At this time, the built-in slide plate 10 pushes the built-in clamping column 7 into the inner wall of the fixed clamping groove 14 for fixed installation.

[0034] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments. Various changes can be made within the knowledge scope of ordinary technicians in the technical field without departing from the purpose of the present invention.

Claims

1. A settlement observation device for construction engineering, comprising a settlement observation pile (1), characterized in that: The surface of the settlement observation pile (1) is provided with an observation protection plate (4), the surface of the observation signboard (2) is provided with an external docking groove (5), the inner wall of the external docking groove (5) is slidably connected to an external docking column (6), the surface of the external docking column (6) is fixedly mounted on the surface of the observation protection plate (4), the inner side of the external docking column (6) is slidably connected to a built-in clamping column (7), the inner side of the observation protection plate (4) is provided with a built-in slide groove (9), the inner wall of the built-in slide groove (9) is slidably connected to a built-in slide plate (10), the surface of the built-in slide plate (10) is fixedly mounted with a built-in guide plate (11), and the surface of the built-in guide plate (11) is slidably connected to the inner wall of the built-in slide groove (9).

2. A settlement observation device for construction engineering according to claim 1, characterized in that: An observation indicator board (2) is fixedly mounted on the surface of the settlement observation pile (1), and an observation guide column (3) is fixedly mounted on the inner side of the observation indicator board (2).

3. A settlement observation device for construction engineering according to claim 2, characterized in that: An elastic component (8) is slidably sleeved on the surface of the built-in clamping column (7), and two ends of the elastic component (8) are respectively fixedly mounted on the surface of the built-in clamping column (7) and the inner side of the external docking column (6).

4. A settlement observation device for construction engineering according to claim 3, characterized in that: The shapes of the adjacent portions of the built-in slide plate (10) and the built-in clamping column (7) are both inclined.

5. A settlement observation device for construction engineering according to claim 4, characterized in that: The inner side of the inner guide plate (11) is rotatably connected to an inner rotating ring (12), the surface of the inner rotating ring (12) is fixedly mounted with an external stud (13), and the surface of the external stud (13) is threadedly connected to the inner side of the observation protection plate (4).

6. A settlement observation device for construction engineering according to claim 5, characterized in that: The inner side of the observation indicator plate (2) is provided with a fixed card slot (14) which is in communication with the external docking slot (5).