Artificial well wall chemical sand prevention experiment device
By designing an artificial well wall chemical sand control experimental device to simulate the fluid erosion process in the underground environment, the problem of high cost of sand control screen erosion tests in the existing technology has been solved, and a rapid and convenient test of the sand control screen performance has been achieved. It simulates the erosion conditions in the actual underground environment and saves experimental costs.
Patent Information
- Application Number
- CN202323532710.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-25
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2033-12-25
AI Technical Summary
The existing sand control experimental device is difficult to simulate the deposition process of formation sand around the bottom hole screen, resulting in high cost and cumbersome erosion test and evaluation of the sand control screen, and cannot effectively test the sand control, anti-corrosion and anti-erosion properties.
An artificial well wall chemical sand control experimental device is designed, including experimental components, liquid adding tanks, heating components and pumps. By simulating the fluid erosion process in the underground environment, the simulated sand layer and simulated wellbore are used to simulate the erosion of the screen. Conditions, control liquid temperature, flow rate and pressure, and conduct multi-faceted performance tests.
It realizes fast and convenient testing of sand control screen performance, simulates the erosion conditions in the actual underground environment, saves experimental costs, and can evaluate sand control, anti-corrosion and anti-erosion performance at the same time.
Smart Images

Figure CN221925998U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of chemical sand prevention, in particular to an artificial well wall chemical sand prevention experimental device. Background Art
[0002] In oil production operations, sand production from the formation has become one of the main problems faced in the process of exploitation of loose sandstone oil and gas reservoirs. Sand screens are an important type of downhole sand control tool and are used in large quantities. Screens are commonly eroded under the action of high-speed sand-containing fluid in oil wells for a long time. The presence of mud and fine silt causes blockage of the sand screen, and the pressure drop inside and outside the screen increases, resulting in an increase in local flow velocity at local locations of the screen, forming a "hot spot" and causing the screen filter unit to break, resulting in sand control failure. In order to prevent the occurrence of screen erosion and damage, it is necessary to carry out erosion test research and evaluation tests on the screen.
[0003] The existing sand control experimental equipment is not convenient for simulating the deposition process of formation sand around the bottom screen of the well. At the same time, the performance of the sand control screen that needs to be tested mainly includes sand control, corrosion resistance and erosion resistance. During the experiment, it is necessary to test on different equipment to obtain experimental data, which requires more cost for related tests and is more troublesome. Utility Model Content
[0004] In order to solve the above technical problems, the technical solution adopted by the utility model is:
[0005] A chemical sand control experimental device for an artificial well wall comprises a shell, a movable plate is movably installed on the front side of the shell, an experimental component is fixedly installed inside the shell, a sand control screen is movably installed inside the experimental component, and a sealing member located above the sand control screen is movably installed on the top of the experimental component.
[0006] A further improvement of the technical solution of the utility model lies in that: the experimental component includes a liquid adding box and an experimental cylinder, the liquid adding box is fixedly installed inside the shell, the experimental cylinder is fixedly installed on the top of the shell, a heating component is fixedly installed on the outside of the liquid adding box, a pump is fixedly installed on the top of the shell, the left and right ends of the pump are fixedly connected with delivery pipes, an annular liquid injection channel is fixedly installed on the outside of the experimental cylinder, the delivery pipe is respectively connected with the liquid adding box and the annular liquid injection channel, a recovery pipe is fixedly connected to the bottom of the experimental cylinder, a reversing valve is fixedly installed on the outside of the recovery pipe, a return liquid channel connected to the liquid adding box is fixedly installed on the left side of the reversing valve, a flow meter and a pressure gauge are fixedly installed on the outside of the delivery pipe, and the flow meter and the pressure gauge are located on the left side of the experimental cylinder.
[0007] A further improvement of the technical solution of the utility model is that the heating component includes an insulating outer cover, a heating coil and a controller, the insulating outer cover is fixedly installed on the outside of the liquid adding tank, the heating coil is fixedly installed on the inside of the insulating outer cover, the heating coil is located in the liquid adding tank, the controller is fixedly installed on the left side of the insulating outer cover, and the temperature sensor is fixedly installed in the liquid adding tank.
[0008] A further improvement of the technical solution of the utility model is that the experimental cylinder includes a cylinder body, a simulated sand layer and a simulated wellbore, the simulated wellbore is fixedly connected to the inside of the cylinder body, the simulated sand layer is arranged between the cylinder body and the simulated wellbore, and the sand-proof screen pipe is movably connected to the inner side of the simulated wellbore.
[0009] A further improvement of the technical solution of the utility model is that: the inner side of the annular liquid injection channel is fixedly connected with a nozzle arranged in an annular shape in the experimental cylinder.
[0010] A further improvement of the technical solution of the utility model is that the pump is a high-low pressure pump.
[0011] A further improvement of the technical solution of the utility model is that a sealing plate is movably installed at the lower right side of the cylinder.
[0012] A further improvement of the technical solution of the utility model is that: the left side of the liquid adding tank is fixedly connected with a liquid adding pipe, the bottom of the liquid adding tank is fixedly connected with a waste discharge pipe, the outside of the liquid adding pipe is fixedly installed with a safety valve, and the outside of the waste discharge pipe is fixedly installed with a liquid discharge valve.
[0013] Due to the adoption of the above technical solution, the utility model has achieved the following technical progress compared with the prior art:
[0014] 1. The utility model provides an artificial well wall chemical sand control experimental device, which is provided with an experimental component and the sand control screen is installed in the experimental component. The sand control screen is located in the experimental component to simulate the sand control screen being located in the wellbore. The erosion principle of formation sand is used to simulate the erosion process of the sand control screen. The experimental parameters are close to the actual application environment, simulating the erosion of the sand control screen by the fluid in the downhole environment. The sand control screen is tested simultaneously by various parameters and other factors to test various properties of the sand control screen, thereby saving experimental consumption.
[0015] 2. The utility model provides an artificial well wall chemical sand control experimental device, which can control the temperature, flow rate and pressure of the liquid through the experimental components to simulate the influence of different pressure differences on the sand retaining performance of the screen filter body under high temperature conditions. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a structural schematic diagram of the artificial well wall chemical sand control experimental device of the utility model;
[0017] Figure 2 It is a schematic diagram of the experimental component structure of the utility model;
[0018] Figure 3 It is a schematic diagram of the cross-sectional structure of the experimental tube of the utility model;
[0019] Figure 4 This is a schematic diagram of the structure of the heating component of the utility model;
[0020] Figure 5 It is a schematic diagram of the cross-sectional structure of the liquid adding tank of the utility model.
[0021] In the figure: 1. Shell; 2. Movable plate; 3. Experimental component; 31. Liquid adding tank; 32. Experimental cylinder; 321. Cylinder; 322. Simulated sand layer; 323. Simulated wellbore; 324. Sealing plate; 33. Heating component; 331. Insulating cover; 332. Heating coil; 333. Controller; 334. Temperature sensor; 34. Pump; 35. Delivery pipe; 36. Annular injection channel; 37. Recovery pipe; 38. Reversing valve; 39. Return liquid channel; 310. Flow meter; 311. Pressure gauge; 312. Liquid adding pipe; 313. Waste discharge pipe; 4. Sand screen; 5. Seal. DETAILED DESCRIPTION
[0022] The utility model is further described in detail below:
[0023] like Figures 1 to 5 As shown, the utility model provides an artificial well wall chemical sand control experimental device, including a shell 1, a movable plate 2 is movably installed on the front side of the shell 1, an experimental component 3 is fixedly installed inside the shell 1, a sand control screen pipe 4 is movably installed inside the experimental component 3, and a sealing member 5 located above the sand control screen pipe 4 is movably installed on the top of the experimental component 3.
[0024] By providing an experimental component 3 and installing the sand screen 4 in the experimental component 3, the sand screen 4 is located in the experimental component 3 to simulate that the sand screen 4 is located in the wellbore, and the erosion principle of formation sand is used to simulate the erosion process of the sand screen 4. The experimental parameters are close to the actual application environment, and the erosion of the sand screen 4 by the fluid in the downhole environment is simulated. The sand screen 4 is tested on various properties of the sand screen by various parameters at the same time. The test method is convenient and fast. At the same time, the temperature, flow rate and pressure of the liquid can be controlled by the experimental component 3 to simulate the influence of different pressure differences on the sand retaining performance of the screen filter body under high temperature conditions.
[0025] like Figure 2As shown, the experimental component 3 includes a liquid adding tank 31 and an experimental cylinder 32. The liquid adding tank 31 is fixedly installed inside the shell 1, and the experimental cylinder 32 is fixedly installed on the top of the shell 1. A heating component 33 is fixedly installed on the outside of the liquid adding tank 31, a pump 34 is fixedly installed on the top of the shell 1, and a delivery pipe 35 is fixedly connected to the left and right ends of the pump 34. An annular liquid injection channel 36 is fixedly installed on the outside of the experimental cylinder 32, and the delivery pipe 35 is respectively connected to the liquid adding tank 31 and the annular liquid injection channel 36. A recovery pipe 37 is fixedly connected to the bottom of the experimental cylinder 32, and a reversing valve 38 is fixedly installed on the outside of the recovery pipe 37. A return liquid channel 39 connected to the liquid adding tank 31 is fixedly installed on the left side of the reversing valve 38. A flow meter 310 and a pressure gauge 311 are fixedly installed on the outside of the delivery pipe 35, and the flow meter 310 and the pressure gauge 311 are located on the left side of the experimental cylinder 32.
[0026] The liquid in the liquid adding tank 31 is extracted by starting the pump 34 and transported to the annular liquid injection channel 36 through the delivery pipe 35 and injected into the simulated sand layer 322 through the nozzle inside the annular liquid injection channel 36. After the simulated sand layer 322 erodes the sand screen 4, the liquid passes through the sand screen 4 into the recovery pipe 37 and flows back to the liquid adding tank 31 through the reversing valve 38 and the return liquid channel 39, simulating the deposition process of formation sand around the sand screen 4 at the bottom of the well, thereby testing the performance of the sand screen 4 from multiple aspects. At the same time, the reversing valve 38 can be used to reverse the direction to discharge, collect and analyze the liquid and sand, and perform damage analysis on the filter medium eroded by sand and water.
[0027] like Figure 4 As shown, the heating component 33 includes an insulating outer cover 331, a heating coil 332 and a controller 333. The insulating outer cover 331 is fixedly installed on the outside of the liquid filling tank 31, the heating coil 332 is fixedly installed on the inside of the insulating outer cover 331, the heating coil 332 is located in the liquid filling tank 31, and the controller 333 is fixedly installed on the left side of the insulating outer cover 331.
[0028] The liquid adding tank 31 is heated by the heating coil 332 located inside the heat-insulating outer cover 331 , and the temperature, flow rate and pressure of the liquid are adjusted to simulate the influence of different pressure differences on the sand retaining performance of the screen filter body under high temperature conditions.
[0029] like Figure 3 As shown, the experimental cylinder 32 includes a cylinder body 321, a simulated sand layer 322 and a simulated wellbore 323. The simulated wellbore 323 is fixedly connected to the inside of the cylinder body 321. The simulated sand layer 322 is arranged between the cylinder body 321 and the simulated wellbore 323. The sand-proof screen pipe 4 is movably connected to the inner side of the simulated wellbore 323. The temperature sensor 334 is fixedly installed in the liquid filling tank 31.
[0030] The simulated sand layer 322 between the cylinder 321 and the simulated wellbore 323 is used to simulate the deposition process of the formation sand of the sand control screen 4 to detect multiple properties of the sand control screen 4.
[0031] like Figure 2 and Figure 3 As shown, the inner side of the annular liquid injection channel 36 is fixedly connected to a nozzle arranged in an annular shape in the test cylinder 32 .
[0032] The liquid is injected into the test tube 32 under controlled pressure through the annular injection channel 36 and the annular nozzle to cooperate with the simulated sand layer 322 to simulate the erosion process.
[0033] like Figure 2 As shown, the pump 34 is a high-low pressure pump.
[0034] By using the pump 34 as a high-pressure or low-pressure pump, the pressure can be flexibly adjusted.
[0035] like Figure 3 As shown, a sealing plate 324 is movably installed at the lower right side of the cylinder 321.
[0036] The simulated sand layer 322 can be replaced by the sealing plate 324 to simulate different usage conditions.
[0037] like Figure 2 As shown, the left side of the liquid adding tank 31 is fixedly connected with a liquid adding pipe 312, the bottom of the liquid adding tank 31 is fixedly connected with a waste pipe 313, the outside of the liquid adding pipe 312 is fixedly installed with a safety valve, and the outside of the waste pipe 313 is fixedly installed with a drain valve.
[0038] The experimental pressure difference is stabilized by control through the safety valve.
[0039] The working principle of the artificial well wall chemical sand control experimental device is described in detail below.
[0040] like Figures 1 to 5As shown, the sand screen 4 is clamped inside the simulated wellbore 323 and the seal 5 is used to seal and press the sand screen 4 from the top of the cylinder 321. The liquid in the liquid filling tank 31 is extracted by turning on the pump 34 and is transported to the annular injection channel 36 through the delivery pipe 35 and injected into the simulated sand layer 322 through the nozzle inside the annular injection channel 36. After the simulated sand layer 322 erodes the sand screen 4, it passes through the sand screen 4 into the recovery pipe 37 and is connected to the return liquid channel 39 through the reversing valve 38 and flows back to the liquid filling tank 31. , simulating the deposition process of formation sand around the sand screen 4 at the bottom of the well, regulating the hydraulic pressure of the liquid in the liquid adding tank 31 through the pump 34 and monitoring the pressure and flow through the flow meter 310 and the pressure gauge 311, and at the same time controlling the controller 333 to heat the liquid adding tank 31 through the heating coil 332, heating the liquid in the liquid adding tank 31 and injecting it into the simulated sand layer 322, and controlling the safety valve on the liquid adding pipe 312 to simulate the influence of different pressure differences on the sand retaining performance of the sand screen 4 under high temperature conditions.
[0041] The above generally describes the present invention in detail, but it is obvious to a person skilled in the art that some modifications or improvements can be made to the present invention. Therefore, modifications or improvements that do not deviate from the spirit of the present invention are within the scope of protection of the present invention.
Claims
1. An artificial well wall chemical sand control experimental device, comprising a housing (1), characterized in that: A movable plate (2) is movably mounted on the front side of the shell (1); an experimental assembly (3) is fixedly mounted inside the shell (1); a sand screen (4) is movably mounted inside the experimental assembly (3); a sealing member (5) located above the sand screen (4) is movably mounted on the top of the experimental assembly (3); the experimental assembly (3) comprises a liquid adding tank (31) and an experimental cylinder (32); the liquid adding tank (31) is fixedly mounted inside the shell (1); the experimental cylinder (32) is fixedly mounted on the top of the shell (1); a heating assembly (33) is fixedly mounted outside the liquid adding tank (31); a pump (34) is fixedly mounted on the top of the shell (1); and the pump (34) is Both left and right ends are fixedly connected with a delivery pipe (35); an annular liquid injection channel (36) is fixedly installed on the outside of the experimental cylinder (32); the delivery pipe (35) is respectively connected to the liquid adding tank (31) and the annular liquid injection channel (36); a recovery pipe (37) is fixedly connected to the bottom of the experimental cylinder (32); a reversing valve (38) is fixedly installed on the outside of the recovery pipe (37); a return liquid channel (39) connected to the liquid adding tank (31) is fixedly installed on the left side of the reversing valve (38); a flow meter (310) and a pressure gauge (311) are fixedly installed on the outside of the delivery pipe (35); the flow meter (310) and the pressure gauge (311) are located on the left side of the experimental cylinder (32).
2. The artificial well wall chemical sand control experimental device according to claim 1 is characterized by: The heating component (33) comprises a heat-insulating outer cover (331), a heating coil (332), a controller (333) and a temperature sensor (334); the heat-insulating outer cover (331) is fixedly mounted on the outside of the liquid adding tank (31); the heating coil (332) is fixedly mounted on the inside of the heat-insulating outer cover (331); the heating coil (332) is located inside the liquid adding tank (31); the controller (333) is fixedly mounted on the left side of the heat-insulating outer cover (331); and the temperature sensor (334) is fixedly mounted inside the liquid adding tank (31).
3. The artificial well wall chemical sand control experimental device according to claim 1 is characterized by: The experimental cylinder (32) comprises a cylinder body (321), a simulated sand layer (322) and a simulated wellbore (323); the simulated wellbore (323) is fixedly connected to the inside of the cylinder body (321); the simulated sand layer (322) is arranged between the cylinder body (321) and the simulated wellbore (323); and the sand control screen pipe (4) is movably connected to the inner side of the simulated wellbore (323).
4. The artificial well wall chemical sand control experimental device according to claim 1 is characterized by: The inner side of the annular liquid injection channel (36) is fixedly connected to a nozzle arranged in an annular shape in the experimental cylinder (32).
5. The artificial well wall chemical sand control experimental device according to claim 1 is characterized by: The pump (34) is a high- and low-pressure pump.
6. The artificial well wall chemical sand control experimental device according to claim 3 is characterized by: A sealing plate (324) is movably mounted at the lower right side of the cylinder (321).
7. The artificial well wall chemical sand control experimental device according to claim 1 is characterized by: The left side of the liquid adding tank (31) is fixedly connected to a liquid adding pipe (312), the bottom of the liquid adding tank (31) is fixedly connected to a waste discharge pipe (313), a safety valve is fixedly installed on the outside of the liquid adding pipe (312), and a liquid discharge valve is fixedly installed on the outside of the waste discharge pipe (313).