Desilting system for settling pond of tunnel construction sewage treatment station
By designing a sedimentation funnel and conveyor belt system built with steel plates, the existing concrete sedimentation tank has a large area and a long construction period, and has achieved efficient sewage treatment and automatic sludge discharge in tunnel construction with limited space, extending the service life of the equipment .
Patent Information
- Application Number
- CN202420127991.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-18
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-01-18
AI Technical Summary
The existing concrete sedimentation tanks occupy a large area and have a long construction period in tunnel construction, making it difficult to effectively clean the silt when space is limited.
A sedimentation tank silting system for tunnel construction sedimentation tanks including sedimentation funnels, bases and conveyor belts was designed. Sedimentation funnels were constructed using steel plates and I-shaped steel support was used, combining mud discharge pipes, silting gate valves and conveyor belts to realize sewage. multi-stage precipitation and automatic sludge discharge.
The system covers a small area and is simple to construct. It can be combined in a limited space to ensure the reduction of sewage turbidity, solve the problem of difficulty in discharging mud, and extend the service life of sewage treatment equipment.
Smart Images

Figure CN221933143U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel construction sewage treatment, in particular to a sedimentation tank desilting system for a tunnel construction sewage treatment station. Background Art
[0002] A large amount of wastewater is generated during the construction of tunnels. When tunnels pass through poor geological units, excavation or blasting operations will produce gushing water mixed with cement mortar water. Dust reduction after tunnel blasting will also generate wastewater. In addition, wastewater seeping from jet grouting materials and bedrock fissure water are also important sources of wastewater in tunnel construction.
[0003] Tunnel wastewater discharge treatment is a very important part of tunnel construction. Tunnel wastewater contains a large amount of sand, mud, etc. If it cannot be effectively precipitated, the turbidity of the treated sewage will not meet the requirements, and it will cause varying degrees of damage to the facilities and equipment of the sewage treatment station, affecting its service life. At present, in order to precipitate tunnel wastewater, a concrete sedimentation tank will be built at the construction site. Tunnel wastewater first enters the concrete sedimentation tank for sedimentation, but the existing concrete sedimentation tank occupies a large area and has a long construction period. In the case of limited space, dredging is extremely inconvenient.
[0004] Therefore, it is necessary to design a new sedimentation tank structure to overcome the above defects. Summary of the invention
[0005] The utility model aims to provide a sedimentation tank desilting system for a sewage treatment station in tunnel construction, so as to solve the problems of large floor space and long construction period in the existing concrete sedimentation tank.
[0006] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0007] A dredging system for a sedimentation tank of a sewage treatment station for tunnel construction, the system comprising a sedimentation funnel, a base and a conveyor belt;
[0008] The bottom of the sedimentation funnel is contracted and provided with a mud discharge pipe, the upper part of the mud discharge pipe is provided with a silt removal gate valve, the lower part of the mud discharge pipe is provided with a mud discharge valve, and the side of the mud discharge pipe is provided with a water outlet pipe;
[0009] The bottom of the sedimentation funnel is supported by the base;
[0010] The conveyor belt is arranged below the sedimentation funnel.
[0011] Furthermore, a sewage reduction bend is arranged on the inner side of the top of the sedimentation funnel.
[0012] Furthermore, the upper portion of the sedimentation funnel has the same cross-section from top to bottom, and is a section of equal cross-section;
[0013] The cross section of the lower part of the sedimentation funnel gradually decreases from top to bottom, forming a variable cross-section section.
[0014] Furthermore, the base is a concrete base, which is provided at four locations, respectively located at the four corners of the bottom of the sedimentation funnel.
[0015] Furthermore, a support is provided on the top of the base, and the support is an I-beam support and is horizontally placed on the top of an adjacent base.
[0016] Furthermore, the equal-section section and the variable-section section of the sedimentation funnel are provided with horizontal transition sections.
[0017] Furthermore, the horizontal transition section is supported on the top of the support.
[0018] Furthermore, the bottom of the desilting port gate valve has a positioning flange, the bottom of the mud discharge pipe is provided with a mud discharge port, and the mud discharge port is connected to the desilting port gate valve through a positioning flange and fastening bolts.
[0019] Furthermore, the fastening bolts are located on the outer periphery of the mud discharge pipe.
[0020] Furthermore, the sewage speed reduction bends are arranged in rows on both sides of the top of the sedimentation funnel and are evenly arranged.
[0021] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0022] The utility model provides a sedimentation tank desilting system for a sewage treatment station under tunnel construction. A sedimentation funnel is constructed using steel plates and is supported by I-beams and a pedestal. Compared with a concrete sedimentation tank, it occupies a small area and is simple to construct. It can not only be hoisted and moved, but also can be combined in series in a limited space to precipitate sewage in the tunnel in multiple stages, thereby ensuring that the turbidity of sewage entering the sewage treatment plant is reduced to a certain level, and can effectively solve the problem of sludge discharge without the operation of large-scale equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, drawings of other embodiments can be obtained based on these drawings without paying creative work.
[0024] Figure 1 It is a plan view of the utility model.
[0025] Figure 2 yes Figure 1 II cross-section diagram in.
[0026] Figure 3 It is a side view of the utility model.
[0027] Figure 4 It is a front view of the utility model.
[0028] Figure 5 It is a large-scale drawing of the mud discharge pipe of the utility model.
[0029] The symbols in the figure are:
[0030] 1-sedimentation funnel, 2-sewage reduction bend, 3-support, 4-base, 5-outlet pipe, 6-sludge discharge pipe, 7-sludge discharge valve, 8-conveyor belt, 9-conveyor belt roller, 10-fastening bolts, 11-dredging port gate valve, 12-positioning flange. DETAILED DESCRIPTION
[0031] In order to facilitate the understanding of the present invention, the present invention will be described more comprehensively with reference to the relevant drawings. The drawings provide preferred embodiments of the present invention. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thoroughly and comprehensively understood.
[0032] In the description of the present invention, it should be understood that the terms "upper", "lower", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0033] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connection", "setting", etc. should be understood in a broad sense, for example, it can be fixed connection, setting, or detachable connection, setting, or integral connection, setting. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0034] like Figure 1-5 The utility model provides a sedimentation tank desilting system for a sewage treatment station for tunnel construction. The system comprises a sedimentation funnel 1, a base 4 and a conveyor belt 8.
[0035] The sedimentation funnel 1 is formed by welding steel plates, the cross section of the upper part is the same from top to bottom, which is a constant cross section section, and the cross section of the lower part gradually decreases from top to bottom, which is a variable cross section section. Figure 1In the embodiment of the present invention, the equal-section section is composed of four vertical steel plates forming a square structure, and the variable-section section is composed of four steel plates inclined from top to bottom to form a funnel-shaped structure. The equal-section section and the variable-section section of the sedimentation funnel 1 are provided with a horizontal transition section. Figure 1 In the embodiment, the horizontal transition section is a square annular steel plate. Of course, the cross section of the sedimentation funnel 1 may be a square or other structural form such as a circle. A sewage reduction bend 2 is arranged on the inner side of the top of the sedimentation funnel 1. The sewage reduction bend 2 is arranged in rows on both sides of the top of the sedimentation funnel 1 and is evenly arranged. Since the sewage reduction bend 2 is L-shaped, the flow rate of the introduced sewage can be reduced, and tunnel sewage from different regions and sources can also be introduced into the sedimentation funnel 1 through different sewage reduction bends 2.
[0036] The base 4 is a concrete base, such as Figure 1 In the embodiment, the base 4 is a cubic structure, and is provided at four locations, respectively at the four corners of the bottom of the sedimentation funnel 1, and the bottom is located below the ground. In addition, a support 3 is provided on the top of the base 4, and the support 3 is an I-beam support, and is horizontally placed on the top of the adjacent base 4 to form a square frame, and the horizontal transition section is supported on the top of the support 3.
[0037] The bottom of the sedimentation funnel 1 is contracted and provided with a mud discharge pipe 6, a dredging port gate valve 11 is provided on the upper part of the mud discharge pipe 6, a mud discharge valve 7 is provided on the lower part of the mud discharge pipe 6, and a water outlet pipe 5 is provided on the side of the mud discharge pipe 6. The bottom of the dredging port gate valve 11 has a positioning flange 12, and the bottom of the mud discharge pipe 6 is provided with a mud discharge port, which is connected to the dredging port gate valve 11 through the positioning flange 12 and the fastening bolts 10. The fastening bolts 10 are located on the outer periphery of the mud discharge pipe 6.
[0038] The conveyor belt 8 is arranged below the sedimentation funnel 1, and the conveyor belt 8 is provided with a conveyor belt roller 9. The conveyor belt 8 is upwardly corresponding to the mud discharge port, and the mud and sand discharged from the sedimentation funnel 1 can be conveyed to a designated position.
[0039] During operation, the silt removal port gate valve 11 is first closed to introduce tunnel sewage into the sedimentation funnel 1. After reaching the predetermined capacity, it is left to settle. Then, the silt removal port gate valve 11 and the mud discharge valve 7 are opened to discharge the silt settled at the bottom of the sedimentation funnel 1 from the mud discharge port to the conveyor belt 8 and removed. When the silt discharge is completed, the mud discharge valve 7 is closed to allow the tunnel sewage to be discharged through the outlet pipe 5 and enter the next treatment link.
[0040] According to actual construction requirements, the system of the utility model can be connected in series to form a multi-stage sedimentation system, and the tunnel sewage discharged from the outlet pipe 5 of the first-stage sedimentation funnel 1 can enter the second-stage sedimentation funnel 1 for further sedimentation, thereby improving the sediment sedimentation rate.
[0041] The utility model uses steel plates welded together to form a sedimentation funnel 1, which cooperates with a mud discharge valve 7 and a conveyor belt 8 to achieve multi-stage sewage sedimentation and automatic sludge discharge in a limited space, thereby reducing the processing pressure of the sewage treatment plant and extending the service life of the sewage treatment equipment.
[0042] In addition, the steel plate welded sedimentation funnel 1 can be circulated and is more economical than the concrete sedimentation tank. The combination of the mud discharge valve 7 and the conveyor belt 8 can solve the mud discharge problem without using large-scale operating equipment.
[0043] The above specific examples are used to illustrate the present invention, which are only used to help understand the present invention and are not intended to limit the present invention. For those skilled in the art of the present invention, some simple deductions, deformations or substitutions can be made based on the idea of the present invention.
Claims
1. A sedimentation tank desilting system for a tunnel construction sewage treatment station. Features: The system comprises a sedimentation funnel (1), a base (4) and a conveyor belt (8); The bottom of the sedimentation funnel (1) is contracted and provided with a mud discharge pipe (6), the upper part of the mud discharge pipe (6) is provided with a silt removal gate valve (11), the lower part of the mud discharge pipe (6) is provided with a mud discharge valve (7), and the side of the mud discharge pipe (6) is provided with a water outlet pipe (5); The bottom of the sedimentation funnel (1) is supported by the base (4); The conveyor belt (8) is arranged below the sedimentation funnel (1).
2. A tunnel construction sewage treatment station sedimentation tank desilting system according to claim 1, Features: A sewage reduction bend (2) is arranged on the inner side of the top of the sedimentation funnel (1).
3. A tunnel construction sewage treatment station sedimentation tank desilting system according to claim 2, Features: The upper part of the sedimentation funnel (1) has the same cross-section from top to bottom, and is a section of equal cross-section; The cross section of the lower part of the sedimentation funnel (1) gradually decreases from top to bottom, forming a variable cross-section section.
4. A tunnel construction sewage treatment station sedimentation tank desilting system according to claim 3, Features: The base (4) is a concrete base, which is provided at four locations, respectively located at the four corners of the bottom of the sedimentation funnel (1).
5. A tunnel construction sewage treatment station sedimentation tank desilting system according to claim 4, Features: A support (3) is provided on the top of the base (4), and the support (3) is an I-beam support and is horizontally placed on the top of an adjacent base (4).
6. A tunnel construction sewage treatment station sedimentation tank desilting system according to claim 5, Features: The equal-section section and the variable-section section of the sedimentation funnel (1) are provided with a horizontal transition section.
7. A tunnel construction sewage treatment station sedimentation tank desilting system according to claim 6, Features: The horizontal transition section is supported on the top of the support (3).
8. A sedimentation tank desilting system for a tunnel construction sewage treatment station according to claim 7, Features: The bottom of the desilting port gate valve (11) is provided with a positioning flange (12), and the bottom of the mud discharge pipe (6) is provided with a mud discharge port, and the mud discharge port is connected to the desilting port gate valve (11) via the positioning flange (12) and the fastening bolts (10).
9. A tunnel construction sewage treatment station sedimentation tank desilting system according to claim 8, Features: The fastening bolts (10) are located on the outer periphery of the mud discharge pipe (6).
10. A sedimentation tank desilting system for a tunnel construction sewage treatment station according to claim 9, Features: The sewage speed reduction bends (2) are arranged in rows on both sides of the top of the sedimentation funnel (1) and are evenly arranged.