Auxiliary tool for wind power tower drum production

By using the driving wheel and driven wheel in the auxiliary tooling for wind power tower production, the lifting force point of the tower is changed to the inner wall of the tower, and the lifting and rotation of the driving wheel is achieved through the hydraulic lifting platform and the motor transmission, the paint spraying is solved The blind spot problem improves the paint integrity and tower life, and adapts to towers of different diameters.

CN221934284UActive Publication Date: 2024-11-01GUAZHOUDINGSONG MASCH EQUIP MFG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323595896.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-28
Publication Date
2024-11-01
Estimated Expiration
2033-12-28

AI Technical Summary

Technical Problem

During the painting process, the wind power tower is painted blind spot due to the support point of the outer wall of the tower support equipment, resulting in incomplete paint surface, prone to cracking, and time-consuming and labor-intensive operation, affecting the life of the tower.

Method used

A wind power tower production auxiliary tool is designed, using the driving wheel and the driven wheel to change the lifting force point of the tower to the inner wall of the tower, and the driving wheel can be lifted and rotated through the hydraulic lifting platform and the motor transmission to ensure that the driving wheel can be lifted and rotated. Spray paint covers intact.

Benefits of technology

It avoids the blind spot of painting, reduces the post-painting operation, improves the paint surface integrity, extends the service life of the tower, and adapts to towers of different diameters, simplifies the painting operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221934284U_ABST
    Figure CN221934284U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of wind power tower drum production equipment, in particular to a wind power tower drum production auxiliary tool which comprises a cross beam, lifting devices are fixedly connected to the two ends of the cross beam, supporting plates are fixedly connected to the bottoms of the lifting devices, universal wheels are connected to the bottoms of the supporting plates, and driven wheels are rotatably connected to one side of the cross beam at intervals. The cross beam is fixedly connected with a base, the base is rotatably connected with a driving wheel, the driving wheel is located in the middle of the driven wheel, the driving wheel is rotatably connected with a motor through a gearbox, and the driving wheel and the driven wheel are tangent to the inner wall of a short section of the tower drum. The situation that a blind area exists when the outer wall of the tower drum is painted is avoided, follow-up paint repair is not needed, the tower drum can rotate by arranging the driving wheel, and paint spraying is more uniform and convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of wind power tower production equipment, in particular to an auxiliary tooling for wind power tower production. Background Art

[0002] The wind turbine tower is the tower pole of wind power generation. It mainly plays a supporting role in the wind turbine generator set and absorbs the vibration of the set. During the production process, the outer wall of the tower needs to be painted. The purpose of painting the outer wall is to extend the service life of the tower, improve its aesthetics and corrosion resistance. At present, the support points of the tower support equipment of the wind turbine tower are on the outer wall during painting, resulting in a blind spot for painting. The support points need to be repainted afterwards, which causes incomplete paint to a certain extent and is prone to cracking in the later stage. It is time-consuming and labor-intensive, and also affects the life of the tower paint surface. Therefore, it is necessary to improve the auxiliary tooling during painting. Utility Model Content

[0003] In view of the above technical problems, the utility model provides a tower production auxiliary tooling without blind spots for outer wall painting.

[0004] In order to solve the above technical problems, the utility model discloses an auxiliary tooling for wind turbine tower production, including a crossbeam, both ends of the crossbeam are fixedly connected with a lifting device, the bottom of the lifting device is fixedly connected with a support plate, the bottom of the support plate is connected with a universal wheel, one side of the crossbeam is rotatably connected with a driven wheel, the crossbeam is also fixedly connected with a base, the base is rotatably connected with a driving wheel, the driving wheel is located in the middle of the driven wheel, the driving wheel is rotatably connected to the motor through a gearbox, and the driving wheel and the driven wheel are tangent to the inner wall of the tower short section.

[0005] Furthermore, the lifting device includes a telescopic arm and a hydraulic cylinder, the output end of the hydraulic cylinder and the top of the telescopic arm are fixedly connected to the crossbeam, the bottom of the hydraulic cylinder is fixedly connected to the lower part of the telescopic arm through a hydraulic cylinder base, and the bottom of the telescopic arm is fixedly connected to the support plate.

[0006] Furthermore, the base is fixedly connected to a hydraulic lifting platform, and the driving wheel, motor, and gearbox are all connected to the hydraulic lifting platform.

[0007] Furthermore, a reinforcement plate is fixedly connected between the telescopic arm and the support plate and on the crossbeam.

[0008] Compared with the prior art, the utility model has the following advantages:

[0009] 1. The utility model changes the lifting force point of the tower to the inner wall of the tower through the driving wheel and the driven wheel, so that there will be no blind area for painting on the outer wall of the tower when painting, avoiding the operation of repainting in the later stage, saving time and effort, and the complete paint surface is conducive to extending the service life of the tower, and the tower can be rotated by the driving wheel, which is convenient for painting operation.

[0010] 2. The utility model sets the driving wheel as a liftable structure through a hydraulic lifting platform, which can adapt to short sections of towers with different diameters, has a wider adaptability and is more practical. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a schematic diagram of the structure of the utility model.

[0012] Figure 2 It is the left view of the utility model when working.

[0013] In the figure: 1. cross beam, 2. driving wheel, 201. base, 202. hydraulic lifting platform, 203. motor, 204. gearbox, 3. telescopic arm, 4. hydraulic cylinder, 5. hydraulic cylinder base, 6. support plate, 7. universal wheel, 8. driven wheel, 9. tower short section. DETAILED DESCRIPTION

[0014] The utility model will be further described below in conjunction with the accompanying drawings.

[0015] like Figure 1 , Figure 2 The wind power tower production auxiliary tooling shown includes a crossbeam 1, both ends of the crossbeam 1 are fixedly connected to a lifting device, the bottom of the lifting device is fixedly connected to a support plate 6, the bottom of the support plate 6 is connected to a universal wheel 7, one side of the crossbeam 1 is rotatably connected to a driven wheel 8, the crossbeam 1 is also fixedly connected to a base 201, the base 201 is rotatably connected to a driving wheel 2, the driving wheel 2 is located in the middle of the driven wheel 8, the driving wheel 2 is rotatably connected to the motor 203 through a gearbox 204, and the driving wheel 2 and the driven wheel 8 are tangent to the inner wall of the tower short section 9.

[0016] It should be noted that the hydraulic lifting platform 202 and the gearbox 204 in this embodiment are existing devices, and their specific structures will not be described in detail.

[0017] In order to facilitate the lifting and placement of the tower short section 9, the beam 1 is set as a liftable structure. The lifting device includes a telescopic arm 3 and a hydraulic cylinder 4. The output end of the hydraulic cylinder 4 and the top of the telescopic arm 3 are fixedly connected to the beam 1. The bottom of the hydraulic cylinder 4 is fixedly connected to the lower part of the telescopic arm 3 through the hydraulic cylinder base 5. The bottom of the telescopic arm 3 is fixedly connected to the support plate 6, which provides convenience for lifting and placing the tower short section 9.

[0018] In order to make the driving wheel 2 and the driven wheel 8 perfectly incline the inner wall of the tower short section 9 when facing tower short sections 9 of different diameters, a hydraulic lifting platform 202 is fixedly connected to the base 201, and the driving wheel 2, the motor 203, and the gearbox 204 are all connected to the hydraulic lifting platform 202, so that tower short sections 9 of different diameters can be adapted by raising and lowering the driving wheel 2.

[0019] In order to increase the strength of the device and adapt to the heavier tower short section 9, reinforcing plates are fixedly connected between the telescopic arm 3 and the support plate 6 and on the crossbeam 1, which can increase the stability and service life of the device.

[0020] The working process of this embodiment is as follows:

[0021] The utility model is placed at both ends of the tower short section 9, and then the height of the output end of the hydraulic cylinder 4 is lowered by the hydraulic cylinder 4, the hydraulic lifting platform 202 is lowered, and then the universal wheel 7 is moved, and the driving wheel 2 and the driven wheel 8 are extended into both ends of the tower short section 9, and then the output end of the hydraulic cylinder 4 is raised by the hydraulic cylinder 4, and then the tower short section 9 is lifted, and the outer wall painting operation is started. After the painting operation is completed in the current area, the hydraulic lifting platform 202 is raised, and then the driving wheel 2 is raised to a position that fits the inner wall of the tower short section 9, and then the motor 203 is turned on, and the motor 203 drives the driving wheel 2 to rotate through the gearbox 204 The motor 203 is moved to rotate the tower short section 9. When the tower short section 9 turns to the unpainted surface, the motor 203 is turned off and the painting is started. The above steps are repeated until the entire outer wall of the tower short section 9 is touched. After the outer wall painting process is completed, the hydraulic lifting platform 202 is lowered, and the output end height of the hydraulic cylinder 4 is lowered by the hydraulic cylinder 4, so that the tower short section 9 can be put down, and the outer wall painting of the next tower short section 9 can be carried out. The main function of the gearbox 204 is to change the transmission ratio between the motor 203 and the driving wheel 2. With a smaller transmission ratio, the driving wheel 2 can obtain a larger driving force, thereby stabilizing the slow rotation of the tower short section 9.

Claims

1. A wind power tower production auxiliary tooling, comprising a crossbeam (1), wherein both ends of the crossbeam (1) are fixedly connected to a lifting device, a support plate (6) is fixedly connected to the bottom of the lifting device, and a universal wheel (7) is connected to the bottom of the support plate (6), wherein: A driven wheel (8) is rotatably connected to one side of the cross beam (1), a base (201) is fixedly connected to the cross beam (1), a driving wheel (2) is rotatably connected to the base (201), the driving wheel (2) is located in the middle of the driven wheel (8), the driving wheel (2) is rotatably connected to the motor (203) via a gearbox (204), and the driving wheel (2) and the driven wheel (8) are tangent to the inner wall of the tower short section (9).

2. The auxiliary tooling for wind turbine tower production according to claim 1 is characterized in that: The lifting device comprises a telescopic arm (3) and a hydraulic cylinder (4); the output end of the hydraulic cylinder (4) and the top of the telescopic arm (3) are fixedly connected to the crossbeam (1); the bottom of the hydraulic cylinder (4) is fixedly connected to the lower part of the telescopic arm (3) via a hydraulic cylinder base (5); and the bottom of the telescopic arm (3) is fixedly connected to the support plate (6).

3. The auxiliary tooling for wind turbine tower production according to claim 1 is characterized in that: The base (201) is fixedly connected to a hydraulic lifting platform (202), and the driving wheel (2), the motor (203), and the gearbox (204) are all connected to the hydraulic lifting platform (202).

4. The auxiliary tooling for wind turbine tower production according to claim 2 is characterized in that: A reinforcement plate is fixedly connected between the telescopic arm (3) and the support plate (6) and on the crossbeam (1).