Sludge pipe network cleaning device for constructional engineering
By introducing rubber pipes and support mechanisms into the sludge pipe network cleaning device, combined with the blockage removal mechanism, the problem of inconvenient movement of the device in the underground pipeline and difficulty in handling blockages is solved, achieving a wider cleaning range and efficient dirt Mud removal.
Patent Information
- Application Number
- CN202323604565.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-28
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2033-12-28
AI Technical Summary
The existing sludge pipe network cleaning device for construction projects is inconvenient to move in underground pipelines, resulting in limited cleaning range and difficulty in handling blockages.
A device including a rubber tube, a support mechanism and a blockage removal mechanism is designed. The rubber tube moves in sludge pipes of different sizes through the support mechanism, and is flushed with a water guide hose for high-pressure water, and is adjusted by the blockage removal mechanism. The pipe and the cleaning rod will remove the clogged objects.
The mobility and cleaning efficiency of the device in the underground sludge pipe are improved, the cleaning range is expanded, and blocked objects are effectively treated, improving the cleaning efficiency.
Smart Images

Figure CN221934900U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of sludge pipe network cleaning, and more specifically, to a sludge pipe network cleaning device for construction engineering. Background Art
[0002] Sludge pipe network cleaning for construction projects involves many aspects, aiming to maintain and manage the sewage pipe system inside the building to prevent pipe blockages, leaks and other pipe-related problems. The following are the aspects that may be involved in sludge pipe network cleaning for construction projects:
[0003] Pipeline Inspection and Assessment: A comprehensive inspection and assessment of the sewer system to understand the condition of the pipes, the extent of damage, accumulated dirt, and blockages.
[0004] Inspection and repair: After the cleaning is completed, the pipe system is inspected again to find leaks, pipe damage and other problems, and repair and maintenance work are carried out.
[0005] Safety measures: Take necessary safety measures to ensure safety during the cleanup process, including the use of personal protective equipment and compliance with relevant safety regulations.
[0006] Taking all the above into consideration, the cleaning of sludge pipe networks for construction projects is a comprehensive project that requires a professional team and equipment to ensure the effectiveness and durability of the cleaning.
[0007] The document with prior art publication number CN214441525U provides a sludge pipe network cleaning device for construction projects. The device realizes automatic cleaning through the setting of a driving motor and an electric telescopic rod, reduces the labor intensity of cleaning personnel, and improves cleaning efficiency. The fixing pins and adjustment holes enable the device to clean the inner walls of sludge pipe network bodies of different models. The adjustment is convenient and easy for cleaning personnel to master.
[0008] Although the above-mentioned prior art solution can achieve the relevant beneficial effects through the structure of the prior art, it still has the following defects: when the device is used, it is not convenient to move and clean in the underground pipeline, resulting in a limited cleaning range. At the same time, it is not convenient to deal with blockages such as branches in the underground sludge pipe, resulting in poor practicality.
[0009] In view of this, we propose a sludge pipe network cleaning device for construction engineering. Utility Model Content
[0010] 1. Technical issues to be solved
[0011] The purpose of the present application is to provide a sludge pipe network cleaning device for construction engineering, so as to solve the problem raised in the above-mentioned background technology that it is inconvenient to carry out mobile cleaning in underground pipes, resulting in a limited cleaning range.
[0012] 2. Technical solution
[0013] A sludge pipe network cleaning device for construction engineering comprises a rubber tube, an equipment head, a supporting mechanism, an adjusting tube, and a blockage removing mechanism, wherein one end of the rubber tube is connected and fixedly provided with the equipment head; the supporting mechanism is rotatably connected and provided on the outer wall of the equipment head; the adjusting tube is slidably fitted in the equipment head, and the blockage removing mechanism is connected and fixedly provided on the adjusting tube.
[0014] Preferably, a water-conducting hose is fixedly provided inside the rubber tube, the other end of the water-conducting hose is communicated with the inner wall of the equipment head, a motor is fixedly provided on the inner wall of the equipment head, and a driving wheel is fixedly provided on the motor.
[0015] Preferably, the supporting mechanism includes an annular frame, which is rotatably connected to the outer wall of the equipment head, and an annular rack is fixedly connected to the inner side and both sides of the outer side of the annular frame, the inner annular rack is meshingly transmitted with a driving wheel, and the outer annular rack is meshingly transmitted with a plurality of transmission wheels, a worm is fixedly connected to the transmission wheel, the worm is rotatably connected to the outer wall of the equipment head, the worm is meshingly transmitted with a worm wheel, the worm wheel is fixedly connected to a supporting roller frame, and the supporting roller frame is rotatably connected to the outer wall of the equipment head.
[0016] Preferably, an electric push rod A is fixedly connected to the inner wall of the adjusting tube, and the other end of the electric push rod A is fixedly connected to the inner wall of the equipment head.
[0017] Preferably, the blockage clearing mechanism includes an electric push rod B, which is fixedly connected to the inner wall of the equipment head, and is fixedly connected to a plurality of adjusting rods, the other end of the adjusting rod is rotatably connected to a plurality of connecting rods, the other end of the connecting rod is rotatably connected to a cleaning rod, and one end of the cleaning rod is rotatably connected to the equipment head.
[0018] 3. Beneficial effects
[0019] Compared with the prior art, the advantages of the present application are: by setting up a rubber tube and a supporting mechanism, the rubber tube can be used to push the equipment head to move in the underground sludge pipe, and the supporting mechanism can enable the equipment head to move in sludge pipes of different sizes, thereby improving the practicability of the device. At the same time, by setting up a blockage clearing mechanism, the dirt is passed through an adjusting tube, and then the cleaning rod is unfolded and the rubber tube is pulled, the blockage can be cleared, thereby improving the practicability and cleaning efficiency of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 A schematic diagram of the overall structure of this application when used;
[0021] Figure 2 This is a schematic cross-sectional view of the structure of the equipment head of this application;
[0022] Figure 3 This is a cross-sectional expansion diagram of the support mechanism structure of the present application;
[0023] Figure 4 This is a schematic cross-sectional view of the regulating tube and the obstruction removal mechanism structure of the present application;
[0024] Explanation of the numbers in the figure: 1. Rubber tube; 2. Equipment head; 3. Support mechanism; 4. Adjustment tube; 5. Blockage removal mechanism; 101. Water guide hose; 201. Motor; 202. Driving wheel; 301. Ring frame; 302. Ring rack; 303. Transmission wheel; 304. Worm; 305. Worm wheel; 306. Support roller frame; 401. Electric push rod A; 501. Electric push rod B; 502. Adjustment rod; 503. Connecting rod; 504. Cleaning rod. DETAILED DESCRIPTION
[0025] Please refer to Figures 1-4, this application provides a technical solution:
[0026] A sludge pipe network cleaning device for construction engineering includes a rubber tube 1, an equipment head 2, a supporting mechanism 3, an adjusting tube 4, and a blockage removing mechanism 5. One end of the rubber tube 1 is connected and fixedly provided with the equipment head 2; the supporting mechanism 3 is rotatably connected and provided on the outer wall of the equipment head 2; the adjusting tube 4 is slidably fitted in the equipment head 2, and the blockage removing mechanism 5 is connected and fixedly provided on the adjusting tube 4.
[0027] Specifically, a water hose 101 is fixedly connected inside the rubber tube 1 , and the other end of the water hose 101 is connected to the inner wall of the equipment head 2 . A motor 201 is fixedly connected to the inner wall of the equipment head 2 , and a driving wheel 202 is fixedly connected to the motor 201 .
[0028] In this embodiment, the water hose 101 is used to flush the sludge pipe using high-pressure water.
[0029] Furthermore, the supporting mechanism 3 includes an annular frame 301, which is rotatably connected to the outer wall of the equipment head 2, and an annular rack 302 is fixedly connected to the inner side and the outer side of the annular frame 301. The inner annular rack 302 is meshingly transmitted with the driving wheel 202, and the outer annular rack 302 is meshingly transmitted with a plurality of transmission wheels 303. The transmission wheel 303 is connected and fixedly provided with a worm 304, and the worm 304 is rotatably connected to the outer wall of the equipment head 2. The worm 304 is meshingly transmitted with a worm wheel 305, and the worm wheel 305 is connected and fixedly provided with a supporting roller frame 306, and the supporting roller frame 306 is rotatably connected to the outer wall of the equipment head 2.
[0030] In this embodiment, the supporting roller frame 306 enables the equipment head 2 to move conveniently in the sludge pipe.
[0031] Furthermore, an electric push rod A401 is fixedly connected to the inner wall of the adjusting tube 4 , and the other end of the electric push rod A401 is fixedly connected to the inner wall of the equipment head 2 .
[0032] In this embodiment, the electric push rod A401 realizes the function of moving out the regulating tube 4.
[0033] In addition, the blockage clearing mechanism 5 includes an electric push rod B501, which is fixedly connected to the inner wall of the equipment head 2, and is fixedly connected to a plurality of adjusting rods 502. The other end of the adjusting rod 502 is rotatably connected to a plurality of connecting rods 503, and the other end of the connecting rod 503 is rotatably connected to a cleaning rod 504, and one end of the cleaning rod 504 is rotatably connected to the equipment head 2.
[0034] In this embodiment, the cleaning rod 504 facilitates the removal of blockages.
[0035] The implementation principle of the sludge pipe network cleaning device for construction engineering in the embodiment of the present application is as follows: when the sludge pipe needs to be cleaned, the equipment head 2 is first inserted into the sludge pipe, and then the motor 201 is used to drive the connected driving wheel 202 to rotate, so that the driving wheel 202 drives the annular frame 301 connected to the annular rack 302 to rotate, so that the annular racks 302 on both sides of the annular frame 301 drive the worm 304 connected to the transmission wheel 303 to rotate, so that the worm 304 drives the support roller frame 306 connected to the worm wheel 305 to rotate, so as to achieve support in the sludge pipe.
[0036] Then push the rubber tube 1 to move the equipment head 2 in the sludge pipe. At this time, high-pressure water can be injected through the water hose 101 to flush the sludge pipe. At the same time, when the blockage needs to be dealt with, the electric push rod A401 is used to drive the adjusting tube 4 to move out so that the adjusting tube 4 passes through the blockage. Then the electric push rod B501 is used to drive the adjusting rod 502 to move, so that the adjusting rod 502 drives the cleaning rod 504 to rotate through the connecting rod 503, and then the rubber tube 1 is pulled, so that the blockage can be pulled out and cleaned.
Claims
1. A sludge pipe network cleaning device for construction engineering, comprising a rubber pipe (1), an equipment head (2), a support mechanism (3), an adjustment pipe (4), and a blockage removal mechanism (5), characterized in that: One end of the rubber tube (1) is connected and fixedly provided with a device head (2); The support mechanism (3) is rotatably connected and arranged on the outer wall of the equipment head (2); The regulating tube (4) is slidably arranged in the equipment head (2); The blockage clearing mechanism (5) is connected and fixedly arranged on the regulating pipe (4).
2. The sludge pipe network cleaning device for construction engineering according to claim 1 is characterized in that: A water-conducting hose (101) is fixedly connected to the rubber tube (1), the other end of the water-conducting hose (101) is in communication with the inner wall of the equipment head (2), a motor (201) is fixedly connected to the inner wall of the equipment head (2), and a driving wheel (202) is fixedly connected to the motor (201).
3. The sludge pipe network cleaning device for construction engineering according to claim 2 is characterized in that: The support mechanism (3) comprises an annular frame (301), the annular frame (301) is rotatably connected to the outer wall of the equipment head (2), annular racks (302) are fixedly connected to the inner side and the outer sides of the annular frame (301), the inner annular rack (302) is meshingly transmitted with a driving wheel (202), the outer annular rack (302) is meshingly transmitted with a plurality of transmission wheels (303), the transmission wheel (303) is connected and fixedly provided with a worm (304), the worm (304) is rotatably connected to the outer wall of the equipment head (2), the worm (304) is meshingly transmitted with a worm wheel (305), the worm wheel (305) is connected and fixedly provided with a support roller frame (306), and the support roller frame (306) is rotatably connected to the outer wall of the equipment head (2).
4. The sludge pipe network cleaning device for construction engineering according to claim 1 is characterized in that: An electric push rod A (401) is fixedly connected to the inner wall of the regulating tube (4), and the other end of the electric push rod A (401) is fixedly connected to the inner wall of the equipment head (2).
5. The sludge pipe network cleaning device for construction engineering according to claim 1 is characterized in that: The blockage clearing mechanism (5) comprises an electric push rod B (501), the electric push rod B (501) is connected and fixed to the inner wall of the equipment head (2), a plurality of adjustment rods (502) are connected and fixed to the electric push rod B (501), the other end of the adjustment rod (502) is rotatably connected to a plurality of connecting rods (503), the other end of the connecting rod (503) is rotatably connected to a cleaning rod (504), and one end of the cleaning rod (504) is rotatably connected to the equipment head (2).