Positioning device of contact net pillar

By introducing T-type connecting blocks and locking mechanisms into the contact network pillar positioning device, the problem of low deviation and disassembly efficiency of embedded bolts in the traditional contact network fixing method is solved, and more efficient construction operations and a simplified disassembly process are achieved. .

CN221938073UInactive Publication Date: 2024-11-01CHINA RAILWAY NO 9 BUREAU GRP NO 1 CONSTR CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420620633.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-28
Publication Date
2024-11-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The traditional method of fixing embedded steel plates and nuts in contact nets cannot effectively prevent the unknown deviation of embedded bolts during concrete pouring, resulting in low construction efficiency, especially the disassembly of the third positioning plate is complicated and inconvenient.

Method used

A positioning device for contact network pillars is designed, by providing a connecting assembly and a locking mechanism between the first positioning plate, the second positioning plate and the third positioning plate, the fixability is strengthened by using a T-type connecting block and the L-type connecting frame. The locking frame and limiting slot are used to realize the synchronous upward removal of the third positioning plate, simplifying the disassembly process.

Benefits of technology

The disassembly efficiency of the third positioning plate is improved, the construction operation is simplified, the disassembly complexity is reduced, and the construction efficiency is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221938073U_ABST
    Figure CN221938073U_ABST
Patent Text Reader

Abstract

The utility model discloses a positioning device of an overhead line system strut, which comprises a first positioning plate, a second positioning plate and a third positioning plate, positioning holes are respectively arranged in the first positioning plate, the second positioning plate and the third positioning plate, and a connecting component is assembled between the first positioning plate and the second positioning plate. And a locking mechanism is assembled between the second positioning plate and the third positioning plate. The T-shaped connecting block is adopted to be connected with the connecting frame, the number of fixing points between the connecting frame and the lateral fixing beam is increased by arranging the T-shaped connecting block, and therefore the fixing stability between the connecting frame and the lateral fixing beam is enhanced; in the dismantling process of the device, after dismantling of the connecting frame and the lateral fixing beam is completed, the first positioning plate, the second positioning plate and the third positioning plate can be directly and synchronously moved upwards to be separated from the embedded bolts, so that dismantling of the third positioning plate is simpler and more convenient, and the construction efficiency of dismantling of the third positioning plate is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of contact network positioning, in particular to a positioning device for a contact network pillar. Background Art

[0002] In the prefabricated ballastless track post-tensioned prestressed concrete simply supported box girder, the lower part of the contact network foundation is made of embedded steel plates and bolts cast in reinforced concrete. The upper steel support is fixed to the 8 bolts below. The foundation bears all the loads transmitted by the support and ensures the stability of the support. According to previous construction experience and the construction process of various railways, there is a problem of "wire intrusion" of the contact network. The traditional method of using embedded steel plates and nuts to fix the embedded bolts of the contact network cannot guarantee the construction quality. The embedded steel plates are set in the steel cage, and the embedded bolts are limited by the embedded steel plates, but the top of the embedded bolts cannot be limited, which makes it easy for unknown offsets to occur during the concrete pouring process.

[0003] In the Chinese utility model patent document with authorization announcement number: CN220225415U, entitled: A positioning device for controlling the position of a contact network pillar, a technical solution is proposed. By setting the first positioning plate, the second positioning plate and the third positioning plate to cooperate with each other, the top of the embedded bolt is limited to ensure the verticality of the embedded bolt during the concrete pouring process. In this technical solution, the first positioning plate, the second positioning plate and the third positioning plate need to be disassembled after the pouring is completed, and the first positioning plate and the second positioning plate are fixed with fixing bolts. When disassembling, the first positioning plate and the second positioning plate can only be disassembled first, and then the third positioning plate can be disassembled. After the first positioning plate and the second positioning plate are removed, it is more difficult to disassemble the third positioning plate, and it is not convenient to lift the third positioning plate upward for disassembly, which leads to a decrease in the efficiency of construction personnel in disassembling the third positioning plate. To this end, we propose a positioning device for contact network pillars. Utility Model Content

[0004] The purpose of the utility model is to provide a positioning device for a contact network pillar to solve the problems raised in the above background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a positioning device for a contact network pillar, comprising a first positioning plate, a second positioning plate and a third positioning plate, wherein the first positioning plate, the second positioning plate and the third positioning plate are respectively provided with positioning holes, a connecting component is installed between the first positioning plate and the second positioning plate, and a locking mechanism is installed between the second positioning plate and the third positioning plate.

[0006] Preferably, the connecting assembly includes a connecting frame, which is symmetrically assembled between the first positioning plate and the second positioning plate. The top of the second positioning plate is fixedly connected with a fixing bolt that passes through the connecting frame and the first positioning plate. The top of the fixing bolt is threaded with a fixing nut. The bottom of the connecting frame is fixedly connected with a connecting block.

[0007] Preferably, the vertical cross-section of the connecting frame is L-shaped, and the cross-section of the connecting block is T-shaped.

[0008] Preferably, the locking mechanism includes a first fixed block, which is fixedly connected to the top of the second positioning plate, and the top of the first fixed block passes through the first positioning plate, the first fixed block is provided with a limiting groove and a first insertion groove passing through the second positioning plate from top to bottom, the surface of the third positioning plate is fixedly connected to the second fixed block, a locking cavity is provided in the second fixed block, a second insertion groove passing through the second fixed block is provided on the top of the locking cavity, and a locking frame is assembled between the first fixed block and the second fixed block.

[0009] Preferably, the locking frame comprises a locking block, the top center of the locking block is fixedly connected to a limiting block via a connecting shaft, and the top of the limiting block is fixedly connected to a handle ring.

[0010] Compared with the prior art, the beneficial effects of the utility model are: a positioning device for a contact network pillar, compared with the traditional technical scheme, firstly, the connecting component between the first positioning plate and the second positioning plate is redesigned, and a T-shaped connecting block is adopted to connect with the connecting frame, and the fixing points between the connecting frame and the lateral fixed beam are increased by setting the T-shaped connecting block, thereby enhancing the stability of the fixation between the connecting frame and the lateral fixed beam, and at the same time, a locking mechanism is set between the second positioning plate and the third positioning plate, and after the pouring is completed, the connection and fixation between the second positioning plate and the third positioning plate are completed by inserting the locking frame into the corresponding second fixing block, and during the dismantling of the device, after the dismantling between the connecting frame and the lateral fixed beam is completed, the first positioning plate, the second positioning plate and the third positioning plate can be directly moved up synchronously and separated from the embedded bolts, so that the disassembly of the third positioning plate is simpler and more convenient, and the construction efficiency of the disassembly of the third positioning plate is improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a three-dimensional diagram of the utility model.

[0012] Figure 2 It is a structural schematic diagram of the utility model.

[0013] Figure 3 It is a structural schematic diagram of the locking mechanism of the utility model.

[0014] Figure 4It is a structural schematic diagram of the locking frame of the utility model.

[0015] Figure 5 The utility model is a schematic diagram of the structure for limiting the position of the embedded bolts.

[0016] Figure 6 It is a schematic diagram of the structure for disassembly after the casting of the utility model is completed.

[0017] In the figure: 1. first positioning plate; 2. second positioning plate; 3. third positioning plate; 4. positioning hole; 5. connecting assembly; 51. connecting frame; 52. fixing bolt; 53. fixing nut; 54. connecting block; 6. locking mechanism; 61. first fixing block; 62. second fixing block; 63. first insertion slot; 64. limiting slot; 65. locking cavity; 66. second insertion slot; 67. locking frame; 671. locking block; 672. connecting shaft; 673. limiting block; 674. handle ring. DETAILED DESCRIPTION

[0018] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0019] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 and Figure 6 The utility model provides a technical solution: a positioning device for a contact network pillar, comprising a first positioning plate 1, a second positioning plate 2 and a third positioning plate 3, wherein the first positioning plate 1, the second positioning plate 2 and the third positioning plate 3 are respectively provided with positioning holes 4, and the positioning holes 4 are used for inserting embedded bolts, and the verticality of the embedded bolts is limited after the first positioning plate 1, the second positioning plate 2 and the third positioning plate 3 are assembled.

[0020] A connecting assembly 5 is installed between the second positioning plate 2 and the first positioning plate 1, and the second positioning plate 2 and the third positioning plate 3 are connected and fixed by the connecting assembly 5. Figure 2 As shown in the figure, the connection assembly 5 includes a connection frame 51, the connection frame 51 is L-shaped, the number of the connection frames 51 is at least two groups, the two groups of connection frames 51 are symmetrically distributed on the left and right, and the surface of the second positioning plate 2 is welded and fixed with a fixing bolt 52 that penetrates the connection frame 51 and the first positioning plate 1, and the top of the fixing bolt 52 is screwed with a fixing nut 53. Through the cooperation of the fixing bolt 52 and the fixing nut 53, the second positioning plate 2, the connection frame 51 and the first positioning plate 1 are connected and fixed;

[0021] A connecting block 54 is welded and fixed at the bottom end of the connecting frame 51. The connecting block 54 is used to be fixedly connected to the lateral fixed beam during the concrete pouring process. The connecting block 54 is T-shaped, and the three fixed ends of the connecting block 54 are respectively opened and equipped with connecting bolts. The T-shaped connecting block 54 is provided to enhance the stability of the connection between the connecting frame 51 and the lateral fixed beam.

[0022] like Figure 3 and Figure 4 As shown in the figure, a locking mechanism 6 is installed between the third positioning plate 3 and the second positioning plate 2. The third positioning plate 3 is connected and fixed to the second positioning plate 2 by the provided locking mechanism 6 during the process of disassembly after the use of the device is completed, so that the third positioning plate 3 can be directly driven to move up synchronously during the upward movement of the first positioning plate 1 and the second positioning plate 2, which is convenient for disassembly of the third positioning plate 3, saving and simplifying the construction operation;

[0023] The locking mechanism 6 is symmetrically distributed on the left and right sides of the center of the third positioning plate 3 and the second positioning plate 2. The stability of the connection between the third positioning plate 3 and the second positioning plate 2 is enhanced by the symmetrically distributed locking mechanism 6. The locking mechanism 6 includes a first fixed block 61 and a second fixed block 62. The first fixed block 61 is welded and fixed to the surface of the second positioning plate 2 and passes through the surface of the first positioning plate 1. The inner cavity of the first fixed block 61 is provided with a first insertion groove 63 that passes through the second positioning plate 2. The top of the first fixed block 61 is provided with a limiting groove 64 connected to the first insertion groove 63. The second fixed block 62 is welded and fixed to the surface of the third positioning plate 3. A locking cavity 65 is provided in the second fixed block 62, and a second insertion groove 66 that is connected to the locking cavity 65 is provided on the top of the second fixed block 62. A locking frame 67 is assembled between the first fixed block 61 and the second fixed block 62. The locking frame 67 passes through the first insertion groove 63 and the second insertion groove 66 and enters the locking cavity 65. The locking frame 67 is rotated so that the locking frame 67 locks the first fixed block 61 and the second fixed block 62.

[0024] like Figure 4As shown in the figure, the locking frame 67 includes a locking block 671, a connecting shaft 672 is welded and fixed on the top of the locking block 671, a limiting block 673 is welded and fixed on the top of the connecting shaft 672, the length of the connecting shaft 672 can be set according to the actual construction situation, the distance between the second positioning plate 2 and the third positioning plate 3, and a handle ring 674 is welded and fixed on the top of the limiting block 673. The locking block 671 and the limiting block 673 are respectively rectangular, and the locking block 671 is adapted to the size of the first insertion groove 63 and the second insertion groove 66. The locking block 671 is inserted through the first insertion groove 63 and the second insertion groove 66. After the entry groove 63 and the second insertion groove 66 enter the locking cavity 65, the locking block 671 is rotated through the handle ring 674 to make the locking block 671 engage with the locking cavity 65. At the same time, after the locking frame 67 rotates, the limiting groove 64 limits and engages the limiting block 673, so that during the rising process of the second positioning plate 2, the locking frame 67 drives the third positioning plate 3 below to move synchronously. The locking frame 67 is symmetrically distributed front and rear in the first fixed block 61 and the second fixed block 62, thereby increasing the stability of the connection and fixation between the first fixed block 61 and the second fixed block 62.

[0025] Working principle: Figure 5 and Figure 6 As shown in, during the use of the device, the third positioning plate 3 is first connected to the embedded bolts, and the third positioning plate 3 is supported and fixed by the top steel bars in the beam body. After the third positioning plate 3 is installed and fixed, the second positioning plate 2 and the first positioning plate 1 are connected with the embedded bolts, and then the connecting frame 51 is connected and fixed to the lateral fixed beam. The overall assembly is completed, and the verticality of the embedded bolts is maintained during the concrete pouring process through the cooperation of the first positioning plate 1, the second positioning plate 2 and the third positioning plate 3. When the concrete pouring is completed, the locking frame 67 is inserted into the locking cavity 65 of the second fixing block 62 in the third positioning plate 3. 67 is rotated to complete the clamping connection between the locking frame 67 and the first fixing block 61 and the second fixing block 62. Then, after the connecting frame 51 and the lateral fixing beam are disassembled, the first positioning plate 1, the second positioning plate 2 and the third positioning plate 3 can be simultaneously removed from the installation position. There is no need to disassemble the first positioning plate 1 and the second positioning plate 2 and then take the third positioning plate 3. The first positioning plate 1, the second positioning plate 2 and the third positioning plate 3 can be realized, which simplifies the disassembly process and improves the disassembly efficiency of the device. After the disassembly is completed, the locking frame 67 is rotated again to separate the second positioning plate 2 from the third positioning plate 3, which is convenient for subsequent reuse.

Claims

1. A positioning device for a contact network support, comprising a first positioning plate (1), a second positioning plate (2) and a third positioning plate (3), characterized in that: The first positioning plate (1), the second positioning plate (2) and the third positioning plate (3) are respectively provided with positioning holes (4); a connecting component (5) is installed between the first positioning plate (1) and the second positioning plate (2); and a locking mechanism (6) is installed between the second positioning plate (2) and the third positioning plate (3).

2. A contact network support positioning device according to claim 1, characterized in that: The connection assembly (5) comprises a connection frame (51), the connection frame (51) being symmetrically mounted between a first positioning plate (1) and a second positioning plate (2), the top of the second positioning plate (2) being fixedly connected with a fixing bolt (52) penetrating the connection frame (51) and the first positioning plate (1), the top of the fixing bolt (52) being threaded with a fixing nut (53), and the bottom of the connection frame (51) being fixedly connected with a connection block (54).

3. A contact network support positioning device according to claim 2, characterized in that: The vertical cross section of the connecting frame (51) is L-shaped, and the cross section of the connecting block (54) is T-shaped.

4. A contact network support positioning device according to claim 1, characterized in that: The locking mechanism (6) comprises a first fixed block (61), the first fixed block (61) is fixedly connected to the top of the second positioning plate (2), and the top of the first fixed block (61) passes through the first positioning plate (1), the first fixed block (61) is provided with a limiting groove (64) and a first insertion groove (63) which pass through the second positioning plate (2) from top to bottom, the surface of the third positioning plate (3) is fixedly connected with a second fixed block (62), a locking cavity (65) is provided in the second fixed block (62), and a second insertion groove (66) which passes through the second fixed block (62) is provided at the top of the locking cavity (65), and a locking frame (67) is assembled between the first fixed block (61) and the second fixed block (62).

5. A contact network support positioning device according to claim 4, characterized in that: The locking frame (67) comprises a locking block (671), the top center of the locking block (671) is fixedly connected to a limiting block (673) via a connecting shaft (672), and the top of the limiting block (673) is fixedly connected to a handle ring (674).