On-site different-position splicing device for all-welded steel box truss composite beam
By using an on-site displacement assembly device and rotation construction method for fully welded steel box girder composite beams, the problems of traffic interference, positioning difficulty, and welding quality control in the construction of steel box girder composite beam bridges across railways were solved, achieving an efficient and safe construction process.
Patent Information
- Application Number
- CN202420524342.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-18
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-03-18
AI Technical Summary
Existing steel box girder composite bridges face challenges in construction across existing railway lines, including traffic disruptions caused by hoisting equipment, difficulty in positioning, challenges in controlling welding quality, long construction periods, and high safety risks.
The on-site off-site assembly device for fully welded steel box girder composite beams is adopted, including the beam body, rotation support and load-bearing support. Through off-site assembly and rotation construction methods, the steel box girder composite beams are installed using the load-bearing support and rotation support, reducing interference with existing lines, and the adjustable support structure ensures welding quality and assembly accuracy.
It reduced construction interference with existing railways, improved welding quality and assembly accuracy, shortened the construction cycle, reduced safety risks and costs, and provided a convenient operating method.
Smart Images

Figure CN221941139U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge construction, and more specifically to an on-site heterogeneous assembly device for a fully welded steel box truss composite beam. Background Art
[0002] The fully welded steel box truss composite beam bridge is a new type of structure developed in recent years. The structural form is the lower part of the steel box beam, and the upper structure is the steel truss beam. The steel box truss composite beam bridge structure is designed as a 10m triangular unit. The upper steel truss beam and the lower steel box beam are connected through the lower chord node. The rods are connected by integral node plate welding. The bridge deck construction is carried out after the construction of the steel box truss composite beam is completed. The steel box truss composite beam bridge is constructed across the existing railway line. The construction is difficult and the cycle is long. It is a line control project. The construction process is generally as follows: first construct the main pier body, then set up the bracket along the direction of the existing railway, assemble the steel box truss composite beam, and finally carry out the rotation construction. The steel box truss composite beam is fully welded. However, the existing steel box truss composite beam bridge has the following problems during the construction process across the existing railway line: 1. When the in-situ support method is used for erection, the lifting equipment is at the bottom, and the road below is half or completely closed, which restricts traffic; 2. When a single steel truss member is hoisted, it is a single member suspended assembly, and there is no positioning support on the bridge deck, which makes positioning difficult and construction workers have no working space, posing a great safety risk; 3. The node parts of the steel truss are welded with multiple members such as the web members and adjacent chord members to form a truss structure. The dimensional accuracy between the members here directly affects the assembly and linear dimensions of the bridge structure. The steel truss beam The web members of the diagonal bars at the nodes are designed to be butt-jointed and welded; 4. The connection methods between the joint plates, node plates and web members, and parallel connecting rods at the nodes of the steel trusses are all full penetration welding. At the same time, the effects of the longitudinal slope of the bridge, pre-arch, etc. on the angle must be comprehensively considered. Therefore, the weld quality of this bridge is high and the welding amount is large, which is prone to welding deformation and stress concentration; 5. The box body design welds have more full penetration and groove penetration welds, which makes it difficult to ensure the welding quality and control the welding deformation; 6. The rotation construction is an operating line construction, which requires the cooperation of various departments and has high safety risks. Utility Model Content
[0003] In view of this, the utility model provides an on-site heterogeneous assembly device for a fully welded steel box truss composite beam, the purpose of which is to solve the problems existing in the prior art.
[0004] In order to solve the above technical problems, the utility model adopts the following technical solutions:
[0005] A fully welded steel box truss composite beam on-site out-of-position assembly device, comprising:
[0006] Beam body; a pier body is provided at the middle position of the bottom of the beam body; a cap is provided at the bottom of the pier body;
[0007] A swivel bracket; the bottom of the swivel bracket is arranged on the top of the pedestal, and the top of the swivel bracket is arranged on the bottom of the beam body;
[0008] Load-bearing support; the load-bearing support includes multiple load-bearing columns, supporting trusses, distribution beams, adjustment steel plates, unloading and stacking plates and slope-adjusting frames; multiple load-bearing columns are arranged side by side on the top of the load-bearing support foundation; the supporting trusses are arranged on the top of the load-bearing columns; the distribution beams are arranged on the top of the supporting trusses; multiple adjustment steel plates are arranged on the top of the distribution beams; each of the adjustment steel plates is provided with an unloading and stacking plate on the top; the slope-adjusting frames are provided on the top of the unloading and stacking plates on both sides of the distribution beams.
[0009] Preferably, the load-bearing bracket further includes a load-bearing connecting rod; the load-bearing connecting rod is provided between adjacent load-bearing columns.
[0010] Preferably, an oil top is provided on the top of the distribution beam; and the oil top is provided under each of the slope-adjusting tire frames.
[0011] Preferably, the swivel bracket includes a swivel column, an end cross beam and a longitudinal beam; the swivel column and the longitudinal beam are symmetrically arranged on both sides of the pier body; the bottom of the swivel column is connected to the top of the pedestal; one side of the longitudinal beam is connected to the top of the pier body, and the other side of the longitudinal beam is connected to the corresponding top of the swivel column; the end cross beam is arranged on the side of the longitudinal beam away from the pier body; the longitudinal beam is arranged at the bottom of the beam body.
[0012] Preferably, the swivel bracket further includes a middle cross beam; the middle cross beam is arranged on the longitudinal beam, and the middle cross beam is located between the pier body and the end cross beam.
[0013] Preferably, each of the swivel columns is provided with a swivel connecting rod on one side close to the pier body; and the other side of each of the swivel connecting rods is connected to the pier body.
[0014] Compared with the prior art, the utility model has achieved the following technical effects:
[0015] 1) The utility model adopts a construction method in which the steel box truss composite beam is assembled in different positions and then rotated, which greatly reduces the construction time of the existing line and reduces the interference with the existing railway;
[0016] 2) The utility model adopts the in-situ bracket method for the off-site assembly of the steel box truss composite beam, in which the bracket is arranged parallel to the existing line, and the steel box truss beam is installed above the in-situ bracket parallel to the existing line, which ensures the welding quality and assembly accuracy and saves the construction period;
[0017] 3) The utility model adopts the out-of-position assembly construction method of steel box truss composite beams, so that the crane equipment is always away from the existing line, which greatly reduces the impact on the existing line;
[0018] 4) The load-bearing bracket in the utility model adopts an adjustable and gradually disassembled structure. When the steel box truss composite beam is installed, the stacking plate is disassembled to adjust the position of the steel box truss composite beam. In the beam dropping stage of the force system conversion, the beam can be gradually dropped by removing the stacking plate. The construction is convenient, the operation is convenient, the structure is novel, and it can be reused;
[0019] 5) The construction of the adjustment device of the utility model is fast and simple, which improves the adjustment accuracy, ensures the linear shape of the steel box truss composite beam, and provides a theoretical basis for the subsequent construction of the same type of bridges;
[0020] 6) The utility model saves the use cost of labor, materials and machines. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a structural schematic diagram of a fully welded steel box truss composite beam on-site out-of-position assembly device of the utility model;
[0022] Figure 2 is a schematic diagram of the structure of the swivel bracket;
[0023] Figure 3 It is a structural schematic diagram of the load-bearing bracket;
[0024] In the figure: 1. Beam body; 2. Pier body; 3. Cap; 4. Swivel bracket; 41. Swivel column; 42. End cross beam; 43. Longitudinal beam; 44. Middle cross beam; 45. Swivel connecting rod; 5. Load-bearing bracket; 51. Load-bearing column; 52. Support truss; 53. Distribution beam; 54. Adjustment steel plate; 55. Unloading and stacking plate; 56. Slope adjustment frame; 57. Load-bearing connecting rod; 58. Beam top slot; 6. Oil top. DETAILED DESCRIPTION
[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0026] Example
[0027] Reference Figure 1-3As shown, the utility model discloses an on-site heterogeneous assembly device for a fully welded steel box girder composite beam, comprising: a beam body 1, a swivel bracket 4 and a load-bearing bracket 5; a pier body 2 is provided at the middle position at the bottom of the beam body 1; a cap 3 is provided at the bottom of the pier body 2; the bottom of the swivel bracket 4 is arranged at the top of the cap 3, and the top of the swivel bracket 4 is arranged at the bottom of the beam body 1; the load-bearing bracket 5 comprises a plurality of load-bearing columns 51, a supporting truss 52, a distribution beam 53, an adjustment steel plate 54, a discharge stacking plate 55 and a slope adjustment frame 56; a plurality of load-bearing columns 51 are arranged side by side at the top of the load-bearing bracket foundation; the supporting truss 52 is arranged at the top of the load-bearing column 51; the distribution beam 53 is arranged at the top of the supporting truss 52; a plurality of adjustment steel plates 54 are provided at the top of the distribution beam 53; a discharge stacking plate 55 is provided at the top of each adjustment steel plate 54; a slope adjustment frame 56 is provided at the top of the discharge stacking plate 55 located on both sides of the distribution beam 53.
[0028] In the above technical solution, during the installation stage of the steel box truss composite beam, the swivel bracket 4 and the load-bearing bracket 5 are used as steel beam assembly brackets to install the steel beam. The longitudinal and transverse beams of the swivel bracket have the same function as the distribution beam of the load-bearing bracket, and are used to support the steel beam within the pier top range; when the force system is converted, the beam drop bracket is used to lift the top under the steel plate of the beam end support to relieve the force of the load-bearing bracket. After the beam is dropped, the swivel bracket is used to support the beam body again to offset the unbalanced bending moment of the steel beam.
[0029] In this embodiment, the load-bearing bracket 5 further includes a load-bearing connecting rod 57 ; a load-bearing connecting rod 57 is provided between adjacent load-bearing columns 51 .
[0030] In this embodiment, an oil jack 6 is provided on the top of the distribution beam 53 ; and an oil jack 6 is provided under each slope-adjusting tire frame 56 .
[0031] In this embodiment, the swivel bracket 4 includes a swivel column 41, an end cross beam 42 and a longitudinal beam 43; the swivel columns 41 and the longitudinal beam 43 are symmetrically arranged on both sides of the pier body 2; the bottom of the swivel column 41 is connected to the top of the pedestal 3; one side of the longitudinal beam 43 is connected to the top of the pier body 2, and the other side of the longitudinal beam 43 is connected to the top of the corresponding swivel column 41; the end cross beam 42 is arranged on the side of the longitudinal beam 43 away from the pier body 2; the longitudinal beam 43 is arranged at the bottom of the beam body 1.
[0032] In this embodiment, the swivel bracket 4 further includes a middle cross beam 44 ; the middle cross beam 44 is disposed on the longitudinal beam 43 , and the middle cross beam 44 is located between the pier body 2 and the end cross beam 42 .
[0033] In this embodiment, each swivel column 41 is provided with a swivel connecting rod 45 on one side close to the pier body 2 ; and the other side of each swivel connecting rod 45 is connected to the pier body 2 .
[0034] In this embodiment, the swivel column 41 is arranged at an angle.
[0035] In this embodiment, embedded parts are provided on the top of the base 3 for fixing the swivel column 41; embedded parts are provided on the pier body 2 for fixing and installing the swivel connecting rod 45; embedded parts are provided on the swivel column 41 and the top of the pier body 2 for connecting with the longitudinal beam 43.
[0036] In this embodiment, tensioning bars are provided on the longitudinal beam 53 for tensioning.
[0037] In this embodiment, precision-rolled threaded steel bars are used for the tie bars.
[0038] In this embodiment, a beam top slot 58 adapted to the differential adjustment steel plate 54 is provided at the top of the distribution beam 53 ; the number of the beam top slots 58 is the same as that of the differential adjustment steel plate 54 , and they are arranged in one-to-one correspondence.
[0039] During construction, the load-bearing support and swivel support are first constructed in the direction parallel to the existing railway, and the support foundation is pre-stressed. In order to meet the construction needs adjacent to the existing line, the crawler crane equipment is positioned and hoisted on the side of the steel truss away from the existing line. The lower steel box girder is installed longitudinally from the middle to both sides in sequence, and the two sections connected to the main truss are installed transversely first. After hoisting, the measurement and position are carried out, and then the code plate is used for positioning and welding. The upper steel truss is installed longitudinally from both sides to the middle, and transversely, the side away from the existing line is first hoisted. The upper steel truss is positioned and then welded with a matching plate. After all the steel box trusses are adjusted, welded and inspected and passed, the steel box truss support is removed, completing the preparation work before rotation.
[0040] The construction method of the fully welded steel box truss composite beam includes the following steps: 1) scheme review, site arrangement, and signing of a safety agreement; 2) construction of the middle main pier, including the construction of the pile foundation, the pedestal 3, and the pier body 2 of the middle main pier, and the installation of the embedded parts for the swivel bracket 4 on the middle main pier; 3) construction of the steel box truss composite beam support foundation, including the construction of the load-bearing bracket foundation, and pre-pressing the load-bearing bracket foundation after the construction is completed; 4) construction of the steel box truss composite beam support, including the installation of the swivel bracket 4 and the load-bearing bracket 5 by a car crane; 5) installation of the steel box composite truss, after the installation of the swivel bracket 4 and the load-bearing bracket 5 is completed, the steel box composite truss is constructed by first hoisting the lower steel box beam and then constructing the upper steel truss; 6) anti-corrosion coating of the steel box truss composite beam; 7) construction of the bridge deck and guardrail; 8) The truss composite beam support is removed, and the beam body 1 is lifted by the oil jack 6 on the top of the load-bearing support 5, and the unloading stacking plate 55 on the top of the load-bearing support 5 is removed, and the beam is slowly and synchronously lowered by the oil jack 6 until the beam end drops 150mm, and then the swivel support 4 is reconnected to the bottom plate of the steel box truss composite beam to support and offset the unbalanced bending moment on both sides, and then the oil jack 6 is released; 9) The steel box truss composite beam is rotated, and the steel box truss composite beam is rotated clockwise to 67°; 10) The supports and limiters at both ends of the steel box truss composite beam are installed. After the rotation is completed, the steel beam segments that have not been installed due to the rotation process are installed by a truck crane, and the supports and limiters at both ends of the steel box truss composite beam are installed; 11) The steel box truss composite beam support is removed, and the truck crane stands on the side away from the existing line to remove the remaining load-bearing supports 5 and swivel supports 4 of the steel box truss composite beam.
[0041] In this embodiment, during the construction process, the truck crane and the crawler crane both stand on the side away from the existing line.
[0042] In this embodiment, the truck crane adopts a 30t truck crane, and the crawler crane adopts a 320t crawler crane.
[0043] In this embodiment, after the swivel bracket 4 and the load-bearing bracket 5 are installed, they need to be pre-pressed.
[0044] In this embodiment, the specific construction process of the steel box composite truss installation is as follows: the steel box girder segments are installed in sequence from both sides of the middle main pier. After the installation of the lower steel box girder is completed, the upper steel truss segments are installed symmetrically from both sides to the middle using crawler cranes. When the steel box girder segments are hoisted, the positioning segments connected to the upper steel truss are hoisted symmetrically first. There are 9 segments in the cross section. The two segments on the side away from the existing line are not hoisted temporarily due to the limited working radius of the crane. When hoisting the upper steel truss rods, the bracket-free + matching plate positioning method is adopted. The side away from the existing line is hoisted first, and the upper crossbeam is connected synchronously. There are a total of 24 sets of steel truss triangular units on both sides.
[0045] In this embodiment, after the oil jack 6 is released, the part of the load-bearing support 5 that interferes with the rotation of the swivel support 4 is removed. When removing, the unloading stacking plate 55, the adjustment steel plate 54 and the slope adjustment tire frame 56 on the load-bearing support 5 are first removed, and then the distribution beam 53, the supporting truss 52, the load-bearing connecting rod 57, the load-bearing column 51 and the load-bearing support foundation are removed, and finally the preparation work before rotation is started.
[0046] From the perspective of safety, the hoisting equipment of the utility model is far away from one side of the existing line, and the most unfavorable working conditions of the coverage meet the construction requirements of the existing line; from the perspective of economy, the reuse reduces the waste of materials and saves costs; from the perspective of technology, the coordinate position of the steel box truss composite beam is more accurately located, and the adjustment is convenient and simple; from the perspective of safety, the construction safety is guaranteed, the workers can operate conveniently, and the space is large. The utility model ensures the safety, economy and technical rationality of construction, has important application value, and provides early exploration and valuable experience for the construction of the same type of fully welded steel box truss composite beam.
[0047] The above description is only a preferred embodiment of the present invention and does not limit the technical scope of the present invention. Therefore, any minor modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention are still within the scope of the technical solution of the present invention.
Claims
1. A fully welded steel box truss composite beam on-site out-of-place assembly device, characterized in that: include: A beam body (1); a pier body (2) is provided at the middle of the bottom of the beam body (1); a bearing platform (3) is provided at the bottom of the pier body (2); A swivel bracket (4); the bottom of the swivel bracket (4) is arranged on the top of the support platform (3), and the top of the swivel bracket (4) is arranged on the bottom of the beam body (1); A load-bearing support (5); the load-bearing support (5) comprises a plurality of load-bearing columns (51), a supporting truss (52), a distribution beam (53), an adjustment steel plate (54), a discharge stacking plate (55) and a slope adjustment frame (56); a plurality of the load-bearing columns (51) are arranged side by side on the top of the load-bearing support foundation; the supporting truss (52) is arranged on the top of the load-bearing columns (51); the distribution beam (53) is arranged on the top of the supporting truss (52); a plurality of the adjustment steel plates (54) are arranged on the top of the distribution beam (53); a discharge stacking plate (55) is arranged on the top of each adjustment steel plate (54); the slope adjustment frame (56) is arranged on the top of the discharge stacking plates (55) located on both sides of the distribution beam (53).
2. The on-site heterogeneous assembly device for all-welded steel box truss composite beams according to claim 1 is characterized in that: The load-bearing support (5) further comprises a load-bearing connecting rod (57); the load-bearing connecting rod (57) is arranged between adjacent load-bearing columns (51).
3. The on-site heterogeneous assembly device for all-welded steel box truss composite beams according to claim 2 is characterized in that: An oil top (6) is provided on the top of the distribution beam (53); and the oil top (6) is provided below each of the slope-adjusting tire frames (56).
4. The on-site heterogeneous assembly device for all-welded steel box truss composite beams according to claim 1 is characterized in that: The swivel bracket (4) comprises a swivel column (41), an end cross beam (42) and a longitudinal beam (43); the swivel column (41) and the longitudinal beam (43) are symmetrically arranged on both sides of the pier body (2); the bottom of the swivel column (41) is connected to the top of the pedestal (3); one side of the longitudinal beam (43) is connected to the top of the pier body (2), and the other side of the longitudinal beam (43) is connected to the top of the corresponding swivel column (41); the end cross beam (42) is arranged on the side of the longitudinal beam (43) away from the pier body (2); and the longitudinal beam (43) is arranged at the bottom of the beam body (1).
5. The on-site heterogeneous assembly device for all-welded steel box truss composite beams according to claim 4 is characterized in that: The swivel bracket (4) further comprises a middle cross beam (44); the middle cross beam (44) is arranged on the longitudinal beam (43), and the middle cross beam (44) is located between the pier body (2) and the end cross beam (42).
6. The on-site heterogeneous assembly device for all-welded steel box truss composite beams according to claim 4 is characterized in that: Each of the swivel columns (41) is provided with a swivel connecting rod (45) on one side close to the pier body (2); the other side of each of the swivel connecting rods (45) is connected to the pier body (2).
