Dike pond reinforcing structure

By designing a multi-layer reinforced structure on the body of the embankment, including air-retaining earth backfill area, stone concrete retaining wall and high-pressure rotary sprinkler treatment area, the problem of the body of the embankment and pond being prone to breaking, and the protection stability of the embankment and pond is improved and service life.

CN221941229UActive Publication Date: 2024-11-01NINGBO LONGYUAN SHENGHONG ECOLOGICAL CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323576163.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-26
Publication Date
2024-11-01
Estimated Expiration
2033-12-26

AI Technical Summary

Technical Problem

The existing dam is prone to water erosion, causing the dam to break, which has a short service life and poses a major safety hazard.

Method used

On the basis of the embankment, the closed earth backfill area, the stone concrete retaining wall, the stone backfill area, the concrete retaining wall, the non-woven geotextile, the protective surface and the high-pressure rotary spray pile treatment area are designed, and combined with the green belt and permeable concrete pavement to form a Multi-layer reinforced structure to improve the protection stability and reliability of the pond.

Benefits of technology

It effectively reduces the construction difficulty, significantly improves the protection stability and reliability of the dam, extends the service life of the dam, and enhances the compressive resistance of the dam, roads and protective surfaces on the top of the dam.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941229U_ABST
    Figure CN221941229U_ABST
Patent Text Reader

Abstract

The utility model discloses an embankment pond reinforcing structure which is arranged on an embankment body and comprises a closed earthwork backfilling area arranged on the backwater side of the embankment body, a stone concrete retaining wall arranged on the upstream side of the embankment body, a block stone backfilling area, a concrete retaining wall and a high-pressure jet grouting pile processing area arranged on the closed earthwork backfilling area and the bottom of the embankment body. A first planting soil layer and a green belt are arranged above the closed earthwork backfilling area, the stone concrete retaining wall is close to the embankment body, the dimension stone backfilling area is located between the stone concrete retaining wall and the concrete retaining wall, second non-woven geotechnical cloth, a rock ballast cushion layer, a protective face and a second planting soil layer are arranged among the stone concrete retaining wall, the dimension stone backfilling area and the concrete retaining wall, and the second non-woven geotechnical cloth is close to the dimension stone backfilling area. The rock ballast cushion layer is arranged on the second non-woven geotextile, and the protective face is located between the rock ballast cushion layer and the second planting soil layer. According to the utility model, reinforcement can be carried out on the basis of the original embankment body, the construction difficulty is reduced, the stability and reliability of embankment protection can be greatly improved, and the service life of the embankment is prolonged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a dike and pond reinforcement structure. Background Art

[0002] While the ocean and rivers bring wealth to mankind, they also bring certain threats of floods. Due to the uncertainty of their size and time, people living near water are often disturbed by floods. The construction of dikes and ponds greatly reduces the risk of flood disasters. Therefore, the stability of the dike and pond structure is directly related to the flood control capacity of the river bank and the coast. Once the dike and pond have scouring problems, it is likely to cause the slope to become unstable and the dike and pond to burst, causing serious consequences.

[0003] In the prior art, the embankment of the dike is easily breached by the continuous scouring of water flow, has a short service life, and has great safety hazards. Utility Model Content

[0004] The purpose of the utility model is to provide a technical solution for the dike reinforcement structure to address the deficiencies in the prior art. It can not only reinforce the original dike body to reduce the construction difficulty, but also greatly improve the stability and reliability of the dike protection and extend the service life of the dike.

[0005] In order to solve the above technical problems, the utility model adopts the following technical solutions:

[0006] A dike reinforcement structure,

[0007] The reinforcement structure is set on the embankment, and a crest road is set on the top of the embankment;

[0008] Features:

[0009] It includes an airtight earth backfill area located on the backwater side of the embankment, a stone-concrete retaining wall, a block stone backfill area and a concrete retaining wall located on the water-facing side of the embankment, and a high-pressure rotary jet pile treatment area located at the airtight earth backfill area and the bottom of the embankment. A first planting soil layer and a green belt are arranged above the airtight earth backfill area, and the green belt is close to the road on the top of the embankment. A first non-woven geotextile and a crushed stone cushion layer are arranged between the airtight earth backfill area and the embankment. The crushed stone cushion layer is close to the embankment, the stone-concrete retaining wall is close to the embankment, and the block stone backfill area is located between the stone-concrete retaining wall and the concrete retaining wall. A second non-woven geotextile, a slag cushion layer, a protective surface and a second planting soil layer are arranged between the stone-concrete retaining wall, the block stone backfill area and the concrete retaining wall. The second non-woven geotextile is close to the block stone backfill area, the slag cushion layer is arranged on the second non-woven geotextile, and the protective surface is located between the slag cushion layer and the second planting soil layer. Through the design of the above structure, not only can the original dike and pond be reinforced on the basis of the dike body to reduce the construction difficulty, but also the stability and reliability of the dike and pond protection can be greatly improved, and the service life of the dike and pond can be extended.

[0010] Furthermore, the road on the top of the embankment includes a ballast backfill layer, a cement stone chip stabilization layer and a permeable concrete pavement. The ballast backfill layer is close to the embankment body, and the cement stone chip stabilization layer is located between the ballast backfill layer and the permeable concrete pavement. The strength and stability of the road on the top of the embankment can be improved through the design of the ballast backfill layer, the cement stone chip stabilization layer and the permeable concrete pavement.

[0011] Furthermore, the green belt includes a third planting soil layer and concrete curbstones. The concrete curbstones are arranged on both sides of the third planting soil layer. Drainage pipes are inclined on the concrete curbstones. The concrete curbstones can protect the third planting soil layer and reduce soil erosion. The drainage pipes can drain water from the third planting soil layer.

[0012] Furthermore, the drainage pipe is a pre-buried PVC drainage pipe, and the distance between two adjacent drainage pipes is 5 to 6 meters.

[0013] Furthermore, the face protector is a prefabricated C30 concrete nut block face protector, which can improve the compressive resistance of the face protector and at the same time improve the stability of the face protector, so that the face protector is not damaged by external factors and prolongs its service life.

[0014] Furthermore, the bottom of the concrete retaining wall is connected with a concrete cushion layer through a concrete foundation, and the concrete cushion layer is connected to the embankment body, which can greatly improve the stability and reliability of the concrete retaining wall.

[0015] Furthermore, a clay compaction backfill layer is provided between the concrete retaining wall, the concrete foundation, the concrete cushion, the second non-woven geotextile and the embankment body to reduce voids and improve the stability and reliability of the entire foundation.

[0016] Furthermore, high-pressure jet grouting piles are provided in the high-pressure jet grouting pile treatment area, and the vertical and horizontal spacings of the high-pressure jet grouting piles are both a, a=250mm.

[0017] The utility model has the following beneficial effects due to the adoption of the above technical solution:

[0018] 1. The utility model can not only reinforce the existing dike body to reduce the construction difficulty, but also greatly improve the stability and reliability of dike protection and extend the service life of the dike.

[0019] 2. The use of prefabricated C30 concrete nut blocks for surface protection can improve the compressive resistance of the surface protection, while also improving the stability of the surface protection, preventing the surface protection from damage by external factors and extending its service life.

[0020] 3. A clay compaction backfill layer is set between the concrete retaining wall, concrete foundation, concrete cushion, second non-woven geotextile and the embankment to reduce gaps and improve the stability and reliability of the entire foundation. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The utility model is further described below in conjunction with the accompanying drawings:

[0022] Figure 1 It is a structural schematic diagram of a dike and pond reinforcement structure of the utility model;

[0023] Figure 2 It is a structural schematic diagram of the green belt in the utility model;

[0024] Figure 3 This is a schematic diagram of the distribution of the medium and high pressure jet grouting piles of the utility model;

[0025] Figure 4 It is a connection schematic diagram of the concrete retaining wall in the utility model.

[0026] In the figure: 1-high-pressure jet grouting pile treatment area; 2-airtight earth backfill area; 3-embankment; 4-stone concrete retaining wall; 5-block stone backfill area; 6-first non-woven geotextile; 7-crushed stone cushion layer; 8-first planting soil layer; 9-green belt; 10-slag backfill layer; 11-cement stone chip stabilization layer; 12-permeable concrete pavement; 13-embankment top road; 14-second non-woven geotextile; 15-slag cushion layer; 16-face protection; 17-second planting soil layer; 18-concrete retaining wall; 19-third planting soil layer; 20-concrete curb; 21-drainage pipe; 22-high-pressure jet grouting pile; 23-concrete foundation; 24-concrete cushion layer; 25-clay rammed backfill layer. DETAILED DESCRIPTION

[0027] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present utility model will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0028] In order to enable those skilled in the art to better understand the solution of the utility model, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is only a part of the embodiment of the utility model, not all of the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the utility model.

[0029] It should be noted that the terms "first", "second", etc. in the specification and claims of the utility model and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions.

[0030] like Figures 1 to 4As shown, a dike reinforcement structure of the utility model is provided, the reinforcement structure is arranged on the dike body 3, and a dike top road 13 is arranged on the top of the dike body 3; the dike top road 13 includes a slag backfill layer 10, a cement stone chip stabilization layer 11 and a permeable concrete pavement 12, the slag backfill layer 10 is close to the dike body 3, and the cement stone chip stabilization layer 11 is located between the slag backfill layer 10 and the permeable concrete pavement 12. The design of the slag backfill layer 10, the cement stone chip stabilization layer 11 and the permeable concrete pavement 12 can improve the strength and stability of the dike top road.

[0031] The reinforcement structure includes an airtight earthwork backfill area 2 arranged on the backwater side of the embankment body 3, a first planting soil layer 8 and a green belt 9 are arranged above the airtight earthwork backfill area 2, the green belt 9 is close to the embankment top road 13, the green belt 9 includes a third planting soil layer 19 and a concrete curb 20, the concrete curb 20 is arranged on both sides of the third planting soil layer 19, and a drainage pipe 21 is inclined on the concrete curb 20, the concrete curb 20 can protect the third planting soil layer 19 and reduce soil erosion, and the drainage pipe 21 can drain the water on the third planting soil layer 19. The drainage pipe 21 is a pre-buried PVC drainage pipe 21, and the distance between two adjacent drainage pipes 21 is 5 to 6m.

[0032] A first non-woven geotextile 6 and a crushed stone cushion layer 7 are arranged between the airtight earth backfill area 2 and the embankment body 3 . The crushed stone cushion layer 7 is close to the embankment body 3 , and the stone concrete retaining wall 4 is close to the embankment body 3 .

[0033] The reinforcement structure includes a stone concrete retaining wall 4, a block stone backfill area 5 and a concrete retaining wall 18 arranged on the water-facing side of the embankment body 3. The block stone backfill area 5 is located between the stone concrete retaining wall 4 and the concrete retaining wall 18. A second non-woven geotextile 14, a slag cushion layer 15, a protective surface 16 and a second planting soil layer 17 are arranged between the stone concrete retaining wall 4, the block stone backfill area 5 and the concrete retaining wall 18. The second non-woven geotextile 14 is close to the block stone backfill area 5. The slag cushion layer 15 is arranged on the second non-woven geotextile 14. The protective surface 16 is located between the slag cushion layer 15 and the second planting soil layer 17. The protective surface 16 is a prefabricated C30 concrete nut block protective surface, which can improve the compressive strength of the protective surface 16 and at the same time improve the stability of the protective surface 16, so that the protective surface 16 is not damaged by external factors and the service life is extended. Through the design of the above structure, not only can the embankment body 3 of the original embankment be reinforced to reduce the construction difficulty, but also the stability and reliability of the embankment protection can be greatly improved, and the service life of the embankment can be extended.

[0034] The bottom of the concrete retaining wall 18 is connected to a concrete cushion layer 24 through a concrete foundation 23, and the concrete cushion layer 24 is connected to the embankment body 3, which can greatly improve the stability and reliability of the concrete retaining wall 18. A clay ramming backfill layer 25 is provided between the concrete retaining wall 18, the concrete foundation 23, the concrete cushion layer 24, the second non-woven geotextile 14 and the embankment body 3 to reduce gaps and improve the stability and reliability of the entire foundation.

[0035] The reinforcement structure includes a high pressure jet grouting pile 22 treatment area 1 provided at the bottom of the airtight earthwork backfill area 2 and the embankment 3. The high pressure jet grouting pile 22 treatment area 1 is provided with high pressure jet grouting piles 22, and the vertical and horizontal spacings of the high pressure jet grouting piles 22 are both a, a=250mm.

[0036] The above are only specific embodiments of the present invention, but the technical features of the present invention are not limited thereto. Any simple changes, equivalent replacements or modifications made based on the present invention to achieve basically the same technical effects are all included in the protection scope of the present invention.

Claims

1. A dike reinforcement structure, The reinforcement structure is arranged on the embankment, and a embankment top road is arranged on the top of the embankment; Features: It includes an airtight earth backfill area arranged on the backwater side of the embankment, a stone-concrete retaining wall, a block stone backfill area and a concrete retaining wall arranged on the frontwater side of the embankment, and a high-pressure rotary jet pile treatment area arranged at the airtight earth backfill area and the bottom of the embankment. A first planting soil layer and a green belt are arranged above the airtight earth backfill area, and the green belt is close to the embankment top road. A first non-woven geotextile and a crushed stone cushion layer are arranged between the airtight earth backfill area and the embankment, the crushed stone cushion layer is close to the embankment, and the stone-concrete retaining wall is close to the embankment. The block stone backfill area is located between the stone-concrete retaining wall and the concrete retaining wall. A second non-woven geotextile, a slag cushion layer, a face protection and a second planting soil layer are arranged between the stone-concrete retaining wall, the block stone backfill area and the concrete retaining wall. The second non-woven geotextile is close to the block stone backfill area, the slag cushion layer is arranged on the second non-woven geotextile, and the face protection is located between the slag cushion layer and the second planting soil layer.

2. A dike reinforcement structure according to claim 1, Features: The embankment top road comprises a ballast backfill layer, a cement stone chip stabilization layer and a permeable concrete pavement, wherein the ballast backfill layer is close to the embankment body, and the cement stone chip stabilization layer is located between the ballast backfill layer and the permeable concrete pavement.

3. A dike reinforcement structure according to claim 1, Features: The green belt comprises a third planting soil layer and concrete curbstones. The concrete curbstones are arranged on both sides of the third planting soil layer. Drainage pipes are obliquely arranged on the concrete curbstones.

4. A dike reinforcement structure according to claim 3, Features: The drainage pipe is a pre-buried PVC drainage pipe, and the distance between two adjacent drainage pipes is 5 to 6 meters.

5. The dike reinforcement structure according to claim 1, Features: The protective surface is a prefabricated C30 concrete nut block protective surface.

6. The dike reinforcement structure according to claim 1, Features: The bottom of the concrete retaining wall is connected with a concrete cushion layer through a concrete foundation, and the concrete cushion layer is connected to the embankment body.

7. A dike reinforcement structure according to claim 6, Features: A clay compaction backfill layer is provided between the concrete retaining wall, the concrete foundation, the concrete cushion, the second non-woven geotextile and the embankment.

8. The dike reinforcement structure according to claim 1, Features: High-pressure jet grouting piles are arranged in the high-pressure jet grouting pile treatment area, and the vertical and horizontal spacings of the high-pressure jet grouting piles are both a, and a=250mm.