Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

2266 results about "Plant soil" patented technology

Urban road rainfall runoff ecological coprocessing device and method

The invention discloses an urban road rainfall runoff ecological coprocessing device and a method. The device comprises an urban road rainfall runoff ecological coprocessing box and a bioretention purification unit, wherein an overflow weir board, a second screen mesh partition and a perforation partition are arranged in the urban road rainfall runoff ecological coprocessing box at intervals sequentially; the interior of a box body is divided into an overflow chamber, a water inlet chamber, a water distribution chamber and a bioretention purification chamber that are sequentially arranged by the overflow weir board, the second screen mesh partition and the perforation partition; and the bioretention purification unit is arranged in the bioretention purification chamber, and comprises a gravel layer, a sand filter layer, a planting soil layer and plants. The device and the method can sequentially remove floating matters, particles and soluble pollutants that are in different particle sizes in rainfall runoff, achieve hierarchical control of the pollutants in the rainfall runoff, can store a part of rainfall runoff to meet growth requirements of the plants in the bioretention unit, achieve a water conservation effect, and can also achieve multi-purpose control of water quality and water quantity of the urban road rainfall runoff.
Owner:BEIJING UNIVERSITY OF CIVIL ENGINEERING AND ARCHITECTURE +1

High and steep side slope ecological retrieved green spray-seeding base material and preparation method and application of base material

The invention relates to the technical field of side slope treatment, and discloses a high and steep side slope ecological retrieved green spray-seeding base material and a preparation method and application of the base material. The spray-seeding base material comprises the following raw materials in parts by weight: 330-420 parts of planting soil, 20-30 parts of peat soil, 1.5-5 parts of organic fertilizer, 1-3 parts of grass fibers, 1-3 parts of sawdust, 0.03-0.05 part of a water-retaining agent, 0.02-0.04 part of an adhesive, 0.1-0.5 part of inorganic fertilizer, 0.5-2 parts of a pH adjustment agent, 30-44 parts of hybrid seeds and 150-200 parts of water, wherein the hybrid seeds consists of the following plant seeds in parts by weight: 10-12 parts of rhizomes tall fescue, 2-4 parts of trifolium repens, 3-5 parts of alfalfa, 2-3 parts of bermuda grass, 2.5-4 parts of indigofera pseudotinctoria, 4-6 parts of magnolia multiflora, 3-5 parts of cassia corymbosa, 2-3 parts of amorpha fruticosa and 1-2 parts of coreopsis. The base material disclosed by the invention for spray-seeding can make a soil replacement base layer with the intensity higher than 0.25MPa; after 45 days when a turf is formed, the rainwash strength is higher than or equal to 120mm/h; within half a year to a year, an ecological plant colony with shrubs which grow with the rainwash strength higher than or equal to 200mm/h and serve as main plants is formed.
Owner:HUANGSHI GARDEN FLOWER & WOOD CO LTD

Revegetation method for tailings dams in northern region

A revegetation method for tailings dams in the northern region includes the following steps: (A) slopes are cleaned up and leveled in order to eliminate potential geological hazards; (B) the surface layer of a tailings dam is covered by 10 to 15 centimeters of planting soil; (C) slurry-like plant-growing soil culture medium is sprinkled on the surface of the covering soil, so that a plant-growing substratum with a stable, excellent crumble structure is formed; (D) plant seeds with high stress resistance combined with artificial soil are chosen to be sowed on the surface of the plant-growing substratum, so that a seed layer which is about 2 centimeters in thickness is formed; (E) a management measure with a spray irrigation system and protective nets is adopted to maintain epigaeous seedlings at the late stage. The revegetation method has the advantages that the revegetation method can enhance the adaptability of plants to the complex adverse environment of a tailings pond, including stronger drought-resisting, saline-alkali tolerant, barren-tolerant and nutrient-obtaining capabilities, the method can be utilized to restore the ecology of the slopes of the tailings dam and build a steady vegetation layer, and also has the effects of stabilizing the slopes, conserving water and soil and inhibiting runoff and flying tailings sand.
Owner:青岛冠中生态股份有限公司

Novel rainwater retention infiltration system

PendingCN107100261AReduce runoff pollution loadRunoff pollution load reductionFatty/oily/floating substances removal devicesSewerage structuresWater storagePipeflow
The invention relates to the technical field of rainwater collection and processing, and discloses a novel rainwater retention infiltration system. The novel rainwater retention infiltration system comprises a pre-processing tank and a retention infiltration tank, wherein the pre-processing tank is arranged at the outer side of the retention infiltration tank; the pre-processing tank and the retention infiltration tank are separated by virtue of a perforated partition board; gravels are kept in the pre-processing tank; the retention infiltration tank is sequentially provided with plants, a water storage layer, a coverage layer, a planting soil layer, a packing layer, an isolating layer and a gravel layer in a thickness direction; a drainage pipeline is arranged in the gravel layer of the retention infiltration tank; an overflow pipe is vertically arranged in the retention infiltration tank; one end of the overflow pipe communicates with the drainage pipeline and the other end is exposed out of the retention infiltration tank; and a reoxygenation pipe is arranged in the packing layer. With the application of the system provided by the invention, stormwater runoff pollution load can be effectively reduced, rainwater runoff volume and peak can be diminished and the problem that the system gets blocked can be effectively prevented; and the system is simple in structure, low in maintenance cost, simple and feasible in implementation and broad in application scope.
Owner:广西益江环保科技股份有限公司 +1

Tree planting method and tree planting structure in coastal saline and alkaline area

ActiveCN103947320AReduce salinityConducive to survival and growthForestrySoil-working methodsTerrainAlkali soil
The invention discloses a tree planting method and a tree planting structure in a coastal saline and alkaline area. The tree planting method comprises the steps of building a cofferdam, arranging a lifting layer, carrying out salt pressing and alkali discharging on the lifting layer, digging planting holes, paving waterproof geotechnical cloth, paving a broken stone water filter layer, paving a straw curtain water filter layer, backfilling planting soil and planting trees. According to the tree planting method disclosed by the invention, after the steps and measures are comprehensively adopted, the salt returning period of saline and alkali soil can be slowed down, good conditions are created for the surviving and the growth of the trees due to the soil fertility of the planting soil, and a greenery landscape can be easily formed after the trees are planted; since the terrain is lifted, saline and alkaline original soil is relatively reduced, alkali discharging pipes are not needed to be paved in specific construction, the period of salt discharging and alkali controlling is reduced, and the cost is reduced. The tree planting method and the tree planting structure, disclosed by the invention, are suitable for being popularized and applied in a greening process of the coastal saline and alkaline area.
Owner:SHANDONG DONGSHENG GARDEN ENG CO LTD

Overland runoff rainwater storing and purifying integrated device with flooded culvert pipes and overland runoff rainwater storing and purifying method

The invention relates to an overland runoff rainwater storing and purifying integrated device with flooded culvert pipes and an overland runoff rainwater storing and purifying method. The device comprises a pre-precipitating chamber (2) and a wet land unit (2), wherein overland runoff rainwater passes through a perforated partition (4) and enters the wet land unit (2) after being precipitated preliminarily; the perforated culvert pipes (3) are arranged in the wet land unit (2) side by side; the culvert pipes (3) transversely penetrate in two sides of the wet land unit (2); perforated plugs (12) are arranged at two ends of each culvert pipe (3); the wet land unit (2) comprises a gravel cushion layer (9), a sand filter layer (8) and a planting soil layer (7); and perforated drainage pipes (5) are buried in the gravel cushion layer (9). By using the device and the method, particles and soluble pollutants in the runoff rainwater can be removed, so that the pollutants in the runoff rainwater are eliminated; and the treated rainwater is stored in the device and the culvert pipes (3), wet land plants can grow by using the treated rainwater, the water seeps to surrounding soil by submerging two ends of each culvert pipe in a wet land, and the purpose of continuously cultivating and supplementing underground water is achieved.
Owner:BEIJING UNIV OF CIVIL ENG & ARCHITECTURE

Method for greening and restoring hard side slope

InactiveCN110089353ALower pHEffectively replenish organic matterFlowers cultivationHops/wine cultivationRevegetationAutomatic control
The invention discloses a method for greening and restoring a hard side slope. The method comprises the steps of cleaning a slope surface, arranging an anchor rod, laying a galvanized wire mesh sheet,improving red sandstone into planting soil, laying a geomembrane, executing sowing, establishing an automatic irrigation system and executing operation and maintenance, wherein the red sandstone soillayers with different sandstone contents are improved by adding an improver, meanwhile spray heads are installed on a pre-buried spray system by utilizing an automatic control system, and planted plants are irrigated by using the spray heads. A sprinkling irrigation system can be automatically controlled according to temperature and humidity. The invention provides a hard slope greening restoration technology for improving red sandstone into planting soil. Long-term growth conditions are provided for vegetations, the ecological restoration requirements of a rock slope and a hard slope are met, slope protection greening planting plants are combined with a traditional vegetation concrete ecological-restoration technology, vegetation restoration and anchoring fixation are simultaneously carried out, and the vegetation growth on slopes and slope fixation can be better achieved.
Owner:CHINA FIRST METALLURGICAL GROUP

Borrowed soil spraying and seeding base material and road side slope ecological protection constructing method

The invention relates to a borrowed soil spraying and seeding base material and a road side slope ecological protection constructing method. The borrowed soil spraying and seeding base material comprises a slope face base material and a plant-growing base material. The slope face base material comprises water and the following constituents of, by weight, 100 parts of planting soil, 90-110 parts of plant fiber, 1.0-1.5 parts of papermaking black liquid concentrated modified fluid, and 2.0-4.0 parts of organic fertilizer; and the plant-growing base material comprises water, plant seeds and the following constituents of, by weight, 50 parts of planting soil, 50 parts of peat soil, 45-55 parts of plant fiber, 0.5-0.8 part of papermaking black liquid concentrated modified fluid, and 1.0-2.0 parts of organic fertilizer. The borrowed soil spreading and seeding base material has the suitable granular structure, porosity and pH value and long-lasting water keeping and holding ability, suitable and stable environment and fertilizing effects are provided for growing of side slope plants, and slope face attachment is firm, the loss rate is low, hardening does not occur after long term use, and the borrowed soil is suitable for ecological protecting of the road side slope stone or hard soil slope face.
Owner:陕西省三和建设工程有限公司

Functional rainwater garden applicable to sponge community

The invention discloses a functional rainwater garden applicable to a sponge community. The functional rainwater garden comprises a pre-percolation layer, a water storage layer and an overflowing facility, wherein the pre-percolation layer comprises an annular edge slope arranged at the periphery of the garden; a zeolite-active carbon filtering system is laid on the annular edge slope; a part, far away from the garden, of the annular edge slope is higher than a part close to the garden; the water storage layer comprises a covering layer, a planting soil layer, a percolation layer and a filling layer which are arranged in sequence from top to bottom; an overflowing pipe of the overflowing facility penetrates into the water storage layer along the vertical direction; an overflowing hole of the overflowing facility is higher than the water storage layer. According to the functional rainwater garden, a multi-grade percolation system composed of the pre-percolation layer, an active carbon layer and the water storage layer has the effects of filtering, precipitating, permeating and adsorbing rainfall runoff, carrying out ion exchange, biodegradation and plant absorption and the like, and pollutants including heavy metal, organic matters, nitrogen and phosphorus and the like in the runoff are reduced, so that absorption and purification of the runoff are realized; water for greenbelts is reduced, and urban waterlogging and municipal drainage pressure are alleviated; a heat island effect is alleviated and an ecological city is constructed.
Owner:HUATIAN ENG & TECH CORP MCC +1

Coastal saline-alkali soil terrace type afforesting method for improvement of dredger fill

The invention discloses a coastal saline-alkali soil terrace type afforesting method for improvement of dredger fill. The coastal saline-alkali soil terrace type afforesting method for improvement of the dredger fill comprises water seepage ditches, foundation terrain dredger fill, straw curtains, geotechnical cloth, improved planting soil, local models and the like, wherein square seepage ditches of the water seepage ditches are longitudinally excavated in the lowest position of the foundation terrain dredger fill, particle-size ballast stones are filled into the square seepage ditches, the distance between the foundation terrain dredger fill and the ground is 1-1.5m, the gradient of the foundation terrain dredger fill is 15 degrees to 30 degrees, straw is distributed on the foundation terrain dredger fill, the geotechnical cloth is laid on the straw curtains, and then the improved planting soil is laid on the geotechnical cloth. Due to the fact that the coastal saline-alkali soil terrace type afforesting method for improvement of the dredger fill is combined with the terrace type shape, the coastal saline-alkali soil terrace type afforesting method for improvement of the dredger fill is beneficial to retaining rainwater, enables salinity to be effectively leached and reduced, is beneficial to fertilizer and soil conservation, and enables the survival rate of landscape plants to be more than 90%, the waste is effectively utilized, natural resources are protected, and afforesting cost is reduced by more than 50%.
Owner:TIANJIN TA LANDSCAPE PLANNING & DESIGN CO LTD

Gabion box ecological gabion river channel slope protection construction method

The invention discloses a gabion box ecological gabion river channel slope protection construction method. The gabion box ecological gabion river channel slope protection construction method is mainly characterized in that the defect that only the flood control function, the water diversion function, the drainage function, the impoundment function, the shipping function and the like of a river channel are often considered according to a traditional river channel slope protection structure, and the ecological function of the river channel is rarely considered is overcome. The gabion box ecological gabion river channel slope protection construction method includes the following steps that a cofferdam is constructed, a worktable is arranged, and a footing construction period is carried out; after gabion slope protection construction is over, gaps between surface course dimension stone are recharged with soil and watered, it is ensured that the gaps of dimension stone are filled with soil, and a dimension stone slope is covered by a layer of cultivating and planting soil; aquatic plants are planted underwater, and a lawn is planted on a bank of the river channel. According to a construction technology, water, cement and a formwork are not needed, and construction is convenient. The gaps between building stone can be manually or naturally filled with mud on earth, root systems of the plants can be deeply pricked into the slope through the mud between the building stone, so that engineering measures are combined with vegetation measures, and a soft overall protection face is formed. The requirements for water and soil conservation and environment greening are met, and therefore the original ecological environment is recovered.
Owner:湖北华夏水利水电股份有限公司

System and method integrating road surface runoff collection, purification, storage and utilization for plants

The invention relates to a system and a method integrating road surface runoff collection, purification, storage and utilization for plants. A biological planting groove lower than a road surface is used for collecting and processing road surface runoff at an initial stage and formed by stacking a planting soil layer, an infiltration filtering layer, a supporting layer, a water storage layer, an impervious layer and the like from the top to the bottom. The road surface runoff at a later stage is collected in a level observing well separated in the groove through an overflowing groove on the side of the biological planting groove and can be discharged directly through a lateral wall water discharging pipe. The collected road surface runoff at the initial stage is calculated according to an area rainstorm intensity formula and collecting time, and on the basis of the calculated road surface runoff at the initial stage, filling material texture and thickness, soil infiltration capacity, a soil surface distance and an overflow distance are combined to distribute filling materials of the planting soil layer and the water storage layer. Storage water is extracted by an extraction device and utilized for road surface plants. The system and the method are applicable to collection, processing and comprehensive utilization of the road surface runoff which is at the initial stage and has a pollution effect and emergency management of a road environment under the condition of leakage of dangerous goods during transportation.
Owner:CHINA ACAD OF TRANSPORTATION SCI +1

Ecological grass planting trench for cities with rich water resource

The invention provides an ecological grass planting trench for cities with rich water resource, which is arranged on one side of a sidewalk road. The ecological grass planting trench sequentially comprises a vegetation layer, a planting soil layer, a building block brick layer, a water permeating and discharging pipe and a gravel layer from top to bottom. The ecological grass planting trench is arranged on one side of the sidewall road and used for collecting rainfall running water on the sidewall road, the pollutants in the running water can be reduced, and a purpose for locally purifying the running water and controlling the pollution of the running water can be achieved; the ecological grass planting trench is arranged between the sidewall road and a green land, so that not only is the landscape not influenced, but also convenience in construction can be realized; the rainfall running water is stopped in the gravel layer and gradually and slowly permeated, finally the water content of the soil of the green land is replenished, the rainfall running water can be completely absorbed and purified, and the water for irrigating the green land can be reduced; the lower end of the water permeating and discharging pipe is connected with a rainy water opening or a rainy water well, the other end of the water permeating and discharging pipe is closed, so that the collected rainfall running water on the sidewalk road can be collected into the rainy water opening or the rainy water well, and a purpose for reducing the rainfall running water and postponing the flood peak can be achieved.
Owner:SHANGHAI JIAO TONG UNIV

Method for afforesting wall surfaces and side slopes with climbing-vine curtain wall

InactiveCN101779562AMeet growthMeet the actual needs of coverageWallsExcavationsGrowth plantEngineering
The invention discloses a method for afforesting wall surfaces and side slopes with climbing-vine curtain wall, which comprises the following steps: (1) seed selection of plants: the plants having the climbing and hanging growth properties are selected; (2) planting containers are set: the planting containers are established according to the real situation and construction requirement of the slope surface; (3) filling of planting soil: the cured and finely-broken farming soil is filled; (4) supporting net racks are established and woven; (5) planting of plants: the plants having the climbing and hanging growth properties are planted with the traditional method; (6) later-period management: watering and fertilizer application are immediately carried out; (7) prevention of injurious insects: pesticide and germicide are sprayed. The method has the following advantages that the curtain wall supporting net racks are added, so the growth of the plant vines which climb upwards can be ensured to stay at a mighty state; the nutrition supply is required to be coordinated with the plant growth; the nature of the plants is satisfied through the order coordination and scientific guidance; the later-period management of the plant is fine; and the perennation permanent-green woody Leguminosae is used, so the afforesting coverage rate is improved, the source of the plants is vast, the choice is multiple, and the construction technical method is simple and convenient.
Owner:贵州黔达喀斯特生态科技有限公司

Plastic fiber cultivating soil and preparation method thereof

Plastic fiber cultivating soil is prepared from 15-35% of foundation soil, 5-35% of plant fiber powder, 10-50% of perlite, 5-15% of peat soil and 5-15% of dual-component hot-melt adhesion composite fibers. The composite fibers are formed by compositing two thermoplastic polymers through composite spinning according to a sheath-core type structural mode. The difference of melting points of the adopted two thermoplastic polymers is not lower than 30 DEG C. The composite fibers are composed of dual-component hot-melt adhesion composite fibers A with the particle size being 15-25 mm and dual-component hot-melt adhesion composite fibers B with the particle size being 3-8 mm. The composite fibers A and the composite fibers B can be made of same materials or different materials. The particle size of the plant fiber powder is 0.2-0.9 mm. The plastic fiber cultivating soil has the advantages that the cultivating soil can be cured and formed and is long in service life, not prone to weathering, low in weight, high in moisture-preserving performance and breathability, capable of being recycled after being discarded and the like. The plastic fiber cultivating soil has the main effects that the problems that in the vertical greening construction process, plants cannot be easily attached to walls, planting soil is large in gravity, and the soil is not easily shaped and is prone to dispersion are solved, and the problem that large-scale mechanical seedling inserting is difficult in upland soil planting. Due to the fact that most raw materials come from agricultural and forestry waste, a contribution can be made to agriculture and environmental protection, and the fiber soil can be recycled or directly used as combustion improver after being used.
Owner:湖南尚佳绿色环境有限公司

Intelligent flower watering system controlled by mobile phone Bluetooth or PC and control method of intelligent flower watering system

The invention discloses an intelligent flower watering system controlled by mobile phone Bluetooth or a PC and a control method of the intelligent flower watering system. The intelligent flower watering system comprises a signal collecting processing module. The input end of the signal collecting processing module is connected with a soil moisture sensor and a parameter control module. The output end of the signal collecting processing module is connected with a watering module. A communication channel of the signal collecting processing module is connected with a terminal control module. The soil moisture sensor is used for detecting a flower and plant soil moisture state. The parameter control module is used for setting a preset watering threshold value. The signal collecting processing module is used for comparing the received flower and plant soil moisture with a water threshold value preset by a potentiometer, and after interaction of the control terminal module and a terminal device, instruction control over turning on or off of watering module is carried out. The moisture of soil in a flowerpot can be obtained through the soil moisture sensor, the watering module can turn on or off a water pump by comparing of the soil moisture and the watering threshold value, and accordingly the state of flowers and plants can be monitored in real time.
Owner:CHANGAN UNIV

Method for using gridding plant biological bag to process greening slope

InactiveCN101213910ASolve the problem of greeningIncreasing the thicknessExcavationsHorticultureRevegetationEngineering
The present invention relates to a method that uses the mesh plant biological bag to perform the slope revegetation. The steps are that the slope is cleared and leveled; the foundation of the toe of side slope is leveled and tamped; the roof bolts are fixed on the surface of the slope at a given angle; after one end of the mesh is firmly bound on the roof bolts, the mesh is flattened, and then the plant biological bags are piled on the mesh, and planting soil or gravel soil can be refilled between the plant biological bags and the surface of the slope so as to tamp the filling soil and the plant biological bag, and the other end of the mesh is collected and folded at the outer side of the piled plant biological bags so as to be fixed on the roof bolts that is arranged at the upper layer of the surface of the slope and to hold the refilling soil and the plant biological bags; after the mesh biological bags are arranged from down to up in different layers to be a given height, a penetration-resistant layer shall be arranged and is arranged between two layers of the mesh plant biological bags; the penetration-discharging pipes are uniformly distributed between the mesh plant biological bag layer and the penetration-resistant layer; after the foundation of the mesh plant biological bags is completed, seeds can be sowed or nursery stock of trees can be planted on the foundation. The present invention has simple construction, and is free from the restriction of the shape and the gradient of the slope, and has high survival rate and high coverage rate of the plant, and quick effect.
Owner:卢正才

Method for ecologically improving tobacco-planting soil

A method for ecologically improving tobacco-planting soil is disclosed. In October of the first year, after flue-cured tobaccos or corns are harvested, straws are chopped down and spread on furrows directly without plowing soil, straw decomposition accelerator or other microbe fertilizers are spread on the straws, and then ridge soil is dumped in furrows to cover and bury the straws. Green manure is applied in lines, common vetch green manure is applied on the soil surface burying the straws in lines with a width of 55-65cm, and the green manure is buried by ridging without plowing. In the next year, 10-15days before transplanting flue-cured tobaccos, flue-cured tobacco base fertilizer is applied on the green manure according to the line-spacing requirements of flue-cured tobaccos, soil is gathered to the green manure from two sides of the green manure to bury the green manure and ridge for planting flue-cured tobaccos. The method effectively improves soil, lowers production investment, ensures high yield, improves the physical properties of the soil, and increases organic matters and nutrients of the tobacco-planting soil. Moreover, the microbe amount and enzyme activity of the soil and the tobacco leaves quality are improved, the soil quality is retained and improved, and continuous flue-cured tobacco production and development in tobacco areas are facilitated.
Owner:HUNAN AGRICULTURAL UNIV

Riverside ecological multi-dimensional circulating type wet land slow-flow infiltration pollutant intercepting system

The invention discloses a riverside ecological multi-dimensional circulating type wet land slow-flow infiltration pollutant intercepting system which mainly comprises a primary vegetation buffer zone, a hydrophilic platform, an adjusting pond, an ecological retention system and a secondary vegetation buffer zone. The primary vegetation buffer zone is arranged on one river-ward side along the riverside road surface, the gradient is consistent to the gradient of an original bank slope, the downward width along the bank slope is 1.0-1.2m, and the length is 800-1000m. The ecological retention system is provided with a planting soil layer, a filler layer, a reverse osmosis layer and a gravel layer which are sequentially arranged from top to bottom. The riverside ecological multi-dimensional circulating type wet land slow-flow infiltration pollutant intercepting system reduces pollution load caused by surface source runoff flowing into a river channel during the rainy season, achieves the synergic purpose of water channel water quality circulating purification and wet land conservation during the non-rainy season, has good landscape effect and has the reference and guidance effects on surface source pollutant intercepting and river and lake water purification.
Owner:TIANJIN UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products