Multi-layer mutual shearing dry spraying mixing pile drilling machine equipment

Through the upper and lower separation power device and multi-layer mutual shearing dry spray mixing pile drilling rig equipped with a multi-layer mutual shearing dry spray mixing drill bit, combined with the feed backend and control module, the operation difficulty and unstable in the construction of existing dry spray mixing piles is solved. The problem of powder blockage has achieved higher quality and safe construction results.

CN221941304UActive Publication Date: 2024-11-01浙江坤德创新岩土工程有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420366557.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-28
Publication Date
2024-11-01
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

The existing dry spray mixing pile construction equipment has problems such as difficult operation, ground depression, unstable drilling rig, poor pile quality and blocked powder in soft soil treatment, which affects the construction quality and safety.

Method used

The drilling rig is equipped with a multi-layer mutual shearing dry spray mixing pile. The center of gravity of the drilling rig is reduced through the upper and lower separation power device. The multi-layer mutual shearing mixing drill bit is used for cross-layer shearing and stirring, and the curing agent powder is realized through the feed backend and control module. Stable supply and uniform spray to reduce the risk of powder blockage.

Benefits of technology

It improves construction safety and pile quality, ensures the uniformity and strength of dry spray mixing piles, reduces internal pressure, reduces surface deformation, and improves construction efficiency and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941304U_ABST
    Figure CN221941304U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of underground engineering construction mechanical equipment, in particular to multi-layer mutual shearing dry spraying mixing pile drilling machine equipment which comprises a drilling machine body, and the drilling machine body comprises a drilling rod and a multi-layer mutual shearing mixing drill bit. The multi-layer mutual-shearing stirring drill bit is connected to the bottom of the drill rod and used for conducting staggered-layer shearing stirring on the soil body. Curing agent powder can be continuously and evenly supplied to the construction drilling machine through the gas material pipeline, the curing agent powder forms a gas-solid two-phase fluid medium in a high-pressure gas injection and pneumatic conveying mode, and the gas-solid two-phase fluid medium passes through the gas material channel of the drill rod and is injected into a foundation soil body through a gas material nozzle formed in the multi-layer mutual shearing stirring drill bit at high pressure. The curing agent powder and the in-situ soil body are fully stirred and mixed to form the dry spraying stirring pile with the pile body being uniformly stirred and high in pile body strength under the staggered layer shearing and stirring action of the multi-layer mutual shearing and stirring drill bit.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of underground engineering construction machinery and equipment, in particular to a multi-layer mutual shear dry spraying mixing pile drilling rig equipment. Background Art

[0002] There are a lot of soft soils distributed in my country's coastal areas, river and lake sedimentary areas, inland plains and low-lying areas. They are characterized by high water content, high compressibility, low strength, poor permeability, and obvious creep and thixotropy. In engineering practice, the treatment of soft soil is an important issue, and foundation treatment is required to improve its bearing capacity and stability. Dry spraying mixing piles are suitable for reinforcing saturated soft clay of various origins. They are commonly used at home and abroad to reinforce silt, silty soil, silty soil and clay soil with high water content. The dry spraying mixing pile method uses cement or lime powder as reinforcement materials. Through special construction machinery and equipment, compressed air is used to spray the powder reinforcement materials into the foundation in a mist-like rotation. With the rotation of the drill blade, the powder reinforcement materials and the in-situ foundation soil are forced to mix and stir to harden the soft soil and form a pile body with strong integrity, good water stability and high bearing capacity. This construction method uses dry spraying mixing pile technology, which has the advantages of small vibration, no pollution, fast speed, simple construction machinery, high construction efficiency and relatively low cost.

[0003] A series of construction machinery has been developed at home and abroad for the construction of dry spraying mixing piles. However, the existing construction drilling equipment still has the following technical drawbacks that affect the construction quality:

[0004] 1. Since the construction technology of dry spraying mixing piles is relatively high and difficult, it requires professional technicians to operate. In addition, the existing feeding speed and feeding amount are generally manually controlled by construction personnel, making it difficult for on-site construction to meet the design requirements, and even causing material breakage and pipe blockage.

[0005] 2. Usually, the geological conditions of the construction site are poor and the ground bearing capacity is low, so large-scale dry spraying pile construction equipment is prone to ground depression, unstable center of gravity of the drilling rig, and even safety accidents such as the drilling rig tipping over.

[0006] 3. The dry mixing pile drill bits currently used in engineering projects generally adopt the same structural form as the wet mixing pile drill bits. During dry spraying construction, it is impossible to achieve fully and evenly mixing the reinforced soil under ideal conditions, so the quality of the pile is difficult to guarantee.

[0007] 4. Since the curing agent powder is in a gas-solid two-phase mixed fluid state in the conveying pipeline, when the curing agent powder nozzle is too deep and the ground pressure is too high, it is very easy for the powder to block the pipeline, resulting in interruption of curing agent powder injection and pile quality accidents. Utility Model Content

[0008] In view of the characteristics of existing dry-spraying mixing pile construction equipment and the technical problems it faces, the utility model proposes a multi-layer mutual shearing dry-spraying mixing pile drilling equipment. The use of this construction equipment can make the upper and lower power devices of the inner and outer drill rods separately set, lower the center of gravity of the equipment, and improve the safety factor of the drilling equipment construction. The use of a multi-layer mutual shearing mixing drill bit can stir the reinforced soil more evenly. The monitoring and control of the feeding background by the control module ensures the continuous and stable supply of solidifying materials during the construction of the dry-spraying mixing pile, and can be quantitatively and evenly injected into the foundation soil, ensuring the overall construction quality of the dry-spraying mixing pile.

[0009] For the purpose of this utility model, the following technical solutions are adopted:

[0010] A multi-layer mutual shearing dry-jet mixing pile drilling rig equipment, comprising a drilling rig body; the drilling rig body comprises a drill rod and a multi-layer mutual shearing mixing drill bit; the multi-layer mutual shearing mixing drill bit is connected to the bottom of the drill rod, and the multi-layer mutual shearing mixing drill bit is used to perform staggered shear mixing on the soil; the drill rod comprises an outer rod and an inner rod; the inner rod is coaxial and rotatably connected to the outer rod; and an air material channel is arranged in the inner rod; the lower end of the air material channel extends to the multi-layer mutual shearing mixing drill bit and is provided with an air material nozzle; an auxiliary pipeline is arranged on the outer peripheral wall of the outer rod; the lower end of the auxiliary pipeline extends to An auxiliary nozzle is provided at the gas material nozzle; the auxiliary nozzle sprays medium to further disperse and mix the material sprayed from the gas material nozzle and increase the spray radius; a first protective cover for wrapping the auxiliary pipeline is provided on the outer peripheral wall of the outer rod and located outside the auxiliary pipeline, and the area formed by the difference between the first protective cover and the outer rod rotation radius is the exhaust space; the exhaust space is used to reduce the underground pressure generated after the high-pressure gas is injected into the ground; a counterweight module structure for maintaining the balance of the equipment is provided on the outer peripheral wall of the outer rod and located on the side opposite to the auxiliary pipeline.

[0011] Preferably, the multi-layer shearing mixing drill bit includes a mixing outer frame, a first mixing blade, a second mixing blade and a tunneling blade; the upper part of the mixing outer frame is fixedly connected to the lower part of the outer rod, the bottom of the mixing outer frame is rotatably connected to the inner rod through a sleeve, the first mixing blade is layered and fixedly connected to the inner side of the mixing outer frame, the second mixing blade is layered and fixedly connected to the inner rod inside the mixing outer frame, the first mixing blade and the second mixing blade are arranged in an upper and lower staggered manner, the outer rod drives the mixing outer frame and the first mixing blade to rotate, and the inner rod drives the second mixing blade to rotate; the bottom of the inner rod passes through the mixing outer frame and the The auxiliary nozzle is connected to the excavation blade; the air material nozzle is located between the mixing outer frame and the excavation blade; the auxiliary nozzle of the auxiliary pipeline passes through the top of one of the mixing wings of the mixing outer frame and extends along the inner side wall of the mixing wing, and passes through the bottom of the same mixing wing, the auxiliary nozzle is located below the mixing wing of the mixing outer frame, and the auxiliary nozzle is located above the air material nozzle; the air material nozzle and the auxiliary nozzle both adopt a contraction structure, and an overlapping area is formed between the injection range of the auxiliary nozzle and the injection range of the air material nozzle, so that the high-pressure injection of the auxiliary nozzle further disperses and mixes the curing agent powder sprayed from the air material nozzle and expands the injection radius.

[0012] Preferably, the counterweight module includes a drag reducing agent pipeline and a second protective cover; the drag reducing agent pipeline is arranged on the outer peripheral wall of the outer rod, and the drag reducing agent pipeline and the auxiliary pipeline are symmetrically arranged with the axis of the outer rod as the axis of symmetry, the lower end of the drag reducing agent pipeline extends to the multi-layer shear stirring drill bit and is provided with a drag reducing agent nozzle; the second protective cover is arranged on the outer peripheral wall of the outer rod and wraps the drag reducing agent pipeline inside; the second protective cover and the first protective cover are symmetrically arranged with the axis of the outer rod as the axis of symmetry.

[0013] Preferably, the drag reducing agent nozzle of the drag reducing agent pipeline passes through the top of another stirring wing of the stirring outer frame and extends vertically along the inner wall of the stirring wing. The drag reducing agent nozzle is arranged on the inner side of the bottom of the stirring wing, and the drag reducing agent nozzle sprays radially toward the outer rod.

[0014] Preferably, the drilling rig body also includes a tower mast, an inclined support, an equipment platform, an upper power unit and a lower power unit; the tower mast is vertically arranged on the equipment platform, the inclined support fixedly connects the tower mast and the equipment platform, the drill rod is hoisted on the front side of the tower mast through a lifting pulley, the upper power unit is suspended on the top of the tower mast, and the drill rod is driven to descend and rise through the lifting pulley, the lower power unit is installed on the front side of the equipment platform, and the upper power unit and the lower power unit are on the same vertical axis.

[0015] Preferably, the upper power device comprises a driving mechanism, a reducer, a lifting pulley and a faucet; the driving mechanism is in the form of an electric motor or a hydraulic motor, and the driving mechanism cooperates with the reducer to provide rotational power for the inner rod; the faucet is arranged at the top of the drill rod, and a gas inlet is arranged on the faucet; the lower power device adopts a grinding disc drill form, and the outer rod passes through the center hole of the lower power device, and the cross-section of the center hole is the same as the cross-section of the drill rod. The lower power device provides rotational power for the outer rod and fixes the drill rod by a limiting roller.

[0016] Preferably, when the equipment has a dual-channel structure, the gas inlet includes a feed port and an auxiliary inlet; the feed port is connected to the top of the gas channel; the auxiliary inlet is connected to the top of the auxiliary pipeline; when the equipment has a three-channel structure, the gas inlet also includes a drag reducing agent inlet; the drag reducing agent inlet is connected to the top of the drag reducing agent pipeline.

[0017] In summary, the beneficial technical effects brought about by the utility model are:

[0018] 1. The utility model adopts a multi-layer shearing dry-spraying mixing pile drilling rig equipment with upper and lower separated power devices. The upper power device and the lower power device drive the inner and outer drill rods respectively, reducing the transmission device, making the structure simpler and convenient for maintenance; at the same time, the center of gravity of the drilling rig is lowered, making the drilling rig more stable during construction and not prone to tilting and tipping, thereby improving the safety of the drilling rig equipment construction. At the same time, the construction output torque of the drilling rig can be increased to facilitate the construction of dry-spraying mixing piles with larger diameters.

[0019] 2. The utility model adopts a multi-layer mutual shearing mixing drill bit. The staggered shearing mixing between adjacent blades can make the curing agent dry material and the foundation soil mixed more evenly and improve the strength of the cured soil, while ensuring the pile quality of the dry spraying mixing pile.

[0020] 3. In the utility model, a vertical booster pipeline is added to the feeding background, which can increase the power of the curing agent powder in the vertical conveying pipeline to prevent powder accumulation or blockage in this part. At the same time, an independent auxiliary pipeline is also added. The high-pressure medium transportation through the independent auxiliary pipeline can improve the spraying uniformity of the curing agent powder and effectively increase the spraying diameter of the dry spraying mixing pile.

[0021] 4. A resistance reducing agent channel is set on the outside of the square drill pipe. The resistance reducing agent can effectively reduce the stirring resistance of the drill tool by 10% to 15% during the construction process. At the same time, the area formed by the difference between the protective cover on both sides and the sweep radius of the drill pipe can provide exhaust space for reducing the underground pressure, thereby reducing the lateral deformation of the underground and the vertical deformation of the surface, which is beneficial to the protection of nearby buildings and structures.

[0022] 5. The control module can monitor and automatically control the various monitoring instruments and meters in the equipment and the opening and closing of various valves and switches in real time according to the construction parameters during construction, thereby safely and effectively controlling the entire construction process and ensuring high-efficiency and high-quality spray-mixed pile construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the structure of the multi-layer mutual shearing dry-jet mixing pile drilling rig equipment of the utility model.

[0024] Figure 2 This is a schematic diagram of the main structure of the drilling rig of the utility model.

[0025] Figure 3 It is a schematic diagram of the structure of the upper power device of the utility model.

[0026] Figure 4 This is a schematic diagram of the structure of a faucet of the utility model.

[0027] Figure 5 It is a top view of the main equipment platform structure of the drilling rig of the utility model.

[0028] Figure 6 It is a side view of the drill rod structure of the utility model.

[0029] Figure 7 This is a cross-sectional view of the drill rod structure of the utility model.

[0030] Figure 8 This is a cross-sectional view of the drill rod structure of Example 1 of the utility model.

[0031] Fig. 9 This is a cross-sectional view of the drill rod structure of Example 2 of the utility model.

[0032] Fig.10 This is another cross-sectional view of the drill rod structure of the utility model.

[0033] Fig.11 This is a schematic diagram of the structure of a multi-layer mutual shearing and stirring drill bit of the utility model.

[0034] Fig.12 This is a schematic diagram of the cross-section of the multi-layer shear mixing drill bit structure of the utility model. Figure 1 .

[0035] Fig.13 This is a schematic diagram of the cross-section of the multi-layer shear mixing drill bit structure of the utility model. Figure 2 .

[0036] Among them: 100, drilling rig body; 110, tower mast; 120, inclined support; 130, equipment platform; 140, drill rod; 141, outer rod; 142, inner rod; 143, gas and material channel; 144, drag reducing agent pipeline; 145, auxiliary pipeline; 146, connecting pipe; 147, first protective cover; 148, second protective cover; 149, exhaust space; 150, upper power device; 151, driving mechanism; 152, reducer; 153, lifting pulley; 154, faucet; 155, feed inlet; 156, auxiliary inlet; 157 , drag reducing agent inlet; 160, lower power device; 161, limit roller; 170, multi-layer shear mixing drill bit; 171, mixing outer frame; 1711, mixing wing; 172, first mixing blade; 173, second mixing blade; 174, tunneling blade; 175, gas material nozzle; 176, auxiliary nozzle; 177, drag reducing agent nozzle; 200, feeding background; 210, feeding device; 221, air compressor A; 222, air compressor B; 231, vertical booster pipeline; 232, gas material pipeline; 233, gas pipeline; 300, control module. DETAILED DESCRIPTION

[0037] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and understandable, the specific embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0038] like Figures 1 to 13 As shown, a multi-layer mutual shearing dry spraying mixing pile drilling rig equipment includes a drilling rig body 100, a feeding backstage 200 and a control module 300; the drilling rig body 100 includes a tower mast 110, a diagonal support 120, an equipment platform 130, a drill rod 140, an upper power device 150, a lower power device 160 and a multi-layer mutual shearing mixing drill bit 170. The feeding backstage 200 controls each electric control switch and monitors each sensor in real time through the control module 300, and continuously and evenly feeds the drilling rig body 100 through the gas material pipeline 232. The curing agent powder is pneumatically conveyed to form a gas-solid two-phase fluid through the gas material channel 143 provided on the drill rod 140, and is sprayed into the foundation soil at high pressure through the gas material nozzle 175 provided on the multi-layer mutual shearing mixing drill bit 170. The staggered shearing and stirring action of the multi-layer mutual shearing mixing drill bit 170 fully stirs and mixes the curing agent powder with the original soil to form a high-quality dry spraying mixing pile.

[0039] like Figure 1 and Figure 2As shown, the tower mast 110 is vertically erected on the equipment platform 130, and the inclined support 120 connects the tower mast 110 to the equipment platform 130. The inclined support 120 is used to fix the structural stability of the tower mast 110 to prevent it from tipping over; the drill rod 140 is hoisted on the front side of the tower mast 110 through the lifting pulley 153, and the upper power device 150 is suspended on the top of the tower mast 110, and the lower power device 160 is driven to descend and rise through the lifting pulley 153. The upper power device 150 and the lower power device 160 are installed in the front position of the equipment platform 130, and the upper power device 150 and the lower power device 160 are in the same On the vertical axis, this structural form in which the upper and lower power devices are separated can install the lower power device 160 on the equipment platform 130, which greatly reduces the center of gravity of the drilling rig body 100, is beneficial to the overall construction stability of the drilling rig, and effectively reduces the possibility of its tipping over; the drill rod 140 passes through the reserved through hole of the lower power device 160 and can be connected to the multi-layer mutual shearing mixing drill bit 170 at the bottom, and the multi-layer mutual shearing mixing drill bit 170 is connected to the bottom of the drill rod 140, and the multi-layer mutual shearing mixing drill bit 170 is used to perform staggered shear mixing on the soil, so that the mixing uniformity and strength continuity of the dry spraying mixing pile are greatly improved.

[0040] like Figures 6 to 10As shown, the drill rod 140 includes an outer rod 141 and an inner rod 142; the inner rod 142 adopts a circular cross-section to ensure that it rotates in the outer rod 141, and the outer rod 141 adopts a square design, and its angular surface can be used to insert into the reserved through hole of the lower power device 160, ensuring that the lower power device 160 effectively drives the outer rod 141 and provides a large construction torque. The inner rod 142 is coaxial and rotatably connected to the outer rod 141; and a gas channel 143 is provided in the inner rod 142; the gas channel 143 is used to transport the gas-solid two-phase fluid formed by the curing agent powder and the high-pressure gas. The lower end of the gas channel 143 extends to the multi-layer shear mixing drill bit 170 and is provided with a gas nozzle 175; an auxiliary pipeline 145 is provided on the outer peripheral wall of the outer rod 141; the auxiliary pipeline 145 can realize the function of gas or liquid transmission. In this embodiment, the auxiliary pipeline 145 is used to transport high-pressure gas, and assists the curing agent powder to be sprayed uniformly inside the foundation soil through high-pressure gas transportation. The bottom of the auxiliary pipe 145 is provided with an auxiliary nozzle 176, and the auxiliary nozzle 176 sequentially passes through the top of one of the stirring wings 1711 of the stirring outer frame 171 and extends along the inner wall of the stirring wing 1711, and finally passes through the bottom of the stirring wing 1711 and close to the side of the outer rod 141. The auxiliary nozzle 176 is located below the stirring wing 1711 of the stirring outer frame 171, and the auxiliary nozzle 176 is located above the gas material nozzle 175. The auxiliary nozzle 176 radially sprays outward horizontally, and the area sprayed by the auxiliary nozzle 176 and the gas material nozzle 175 overlaps, so as to achieve the effect of uniform auxiliary spraying. On the outer peripheral wall of the outer rod 141, a first protective cover 147 for wrapping the auxiliary pipe 145 is provided on the outside of the auxiliary pipe 145. The first protective cover 147 can be in the form of a square tube, angle steel, etc., and is fixedly connected to the outer rod 141. The sweep radius of the first protective cover 147 is greater than the sweep radius of the outer rod 141. The area formed by the difference in the rotation radius between the first protective cover 147 and the outer rod 141 is the exhaust space 149; the exhaust space 149 helps to reduce the underground pressure generated after the high-pressure gas is injected into the ground. The first protective cover 147 is used to protect the auxiliary pipeline 145 from damage during the drilling tool construction process. The exhaust space 149 formed helps the high-pressure gas in the ground to be discharged smoothly, and prevents the accumulation of underground pressure from affecting the injection range of the curing agent powder. A counterweight module structure for maintaining the balance of the equipment is provided on the outer peripheral wall of the outer rod 141 and on the side opposite to the first protective cover 147; the drill rod 140 is connected in sections, and two adjacent sections of the drill rod 140 are connected by male and female hexagonal joints and pins, and two adjacent auxiliary pipelines 145 are fixedly connected by a connecting pipe 146.

[0041] like Figures 6 to 10As shown, the counterweight module structure includes a drag reducing agent pipeline 144 and a second protective cover 148; the drag reducing agent pipeline 144 is arranged on the outer peripheral wall of the outer rod 141, and the drag reducing agent pipeline 144 and the auxiliary pipeline 145 are symmetrically arranged with the axis of the outer rod 141 as the symmetry axis, and the lower end of the drag reducing agent pipeline 144 extends to the multi-layer shear stirring drill bit 170 and is provided with a drag reducing agent nozzle 177; the second protective cover 148 is arranged on the outer peripheral wall of the outer rod 141 and wraps the drag reducing agent pipeline 144 inside, and the second protective cover 148 can be in the form of a square tube, angle steel, etc., and is fixedly connected to the outer rod 141. The counterweight module structure can also have only the second protective cover 148, and the drag reducing agent pipeline 144 may not be arranged in the second protective cover 148. The second protective cover 148 and the first protective cover 147 are symmetrically arranged with the axis of the outer rod 141 as the axis of symmetry. This symmetrical structure avoids the shaking caused by eccentric force of the drill rod 140 during drilling. The exhaust space 149 formed is conducive to the discharge of high-pressure gas in the ground, preventing excessive pressure in the ground, unsmooth high-pressure powder spraying and pressure accumulation in the ground from affecting the spraying range of the curing agent powder.

[0042] like Figures 1 to 5 As shown, the upper power device 150 includes a driving mechanism 151, a speed reducer 152, a lifting pulley 153 and a faucet 154. The upper power device 150 is suspended on the tower mast 110 through the lifting pulley 153. The driving mechanism 151 adopts an electric motor or a hydraulic motor. The driving mechanism 151 cooperates with the speed reducer 152 to provide a rotation torque for the inner rod 142. The upper power device 150 uses the lifting pulley 153 to realize vertical movement on the tower mast 110 and provide vertical drilling pressure. The driving mechanism 151 determines the required driving power according to the length and diameter of the dry jet mixing pile, and the inner rod 142 is powered by the upper power device 150. The faucet 154 is arranged at the top of the drill rod 140, and a gas material inlet is arranged on the faucet 154. The lower power device 160 adopts a grinding disc transmission structure, and the square outer rod 141 passes through the center hole of the lower power device 160. The cross-sectional size of the center hole is slightly larger than the cross-sectional size of the drill rod 140. The lower power device 160 can provide a sufficiently large rotation torque for the outer rod 141, and the limit roller 161 is used to limit the drill rod 140. By adopting the lower power device 160, the drilling tool can be placed in front of the equipment platform 130, thereby lowering the center of gravity of the drilling rig as a whole, effectively reducing the shaking of the drilling rig, and improving the safety factor of the drilling rig construction. The limit roller 161 can reduce the friction between the drill rod 140 and the center hole during the lifting process. When the equipment has a dual-channel structure, the gas inlet includes a feed port 155 and an auxiliary inlet 156; when the equipment has a three-channel structure, the gas inlet also includes a drag reducing agent inlet 157; the feed port 155 of the faucet 154 is connected to the gas pipeline 232 and the gas channel 143, the auxiliary inlet 156 is connected to the gas pipeline 233 and the auxiliary pipeline 145, and the drag reducing agent inlet 157 is connected to the drag reducing agent pipeline 144.

[0043] like Figures 11 to 13 As shown, the multi-layer shearing mixing drill bit 170 includes a mixing outer frame 171, a first mixing blade 172, a second mixing blade 173 and a tunneling blade 174; the upper part of the mixing outer frame 171 is fixedly connected to the lower part of the outer rod 141, the bottom of the mixing outer frame 171 is rotatably connected to the inner rod 142 through a sleeve, the first mixing blade 172 is layered and fixedly connected to the inner side of the mixing outer frame 171, the second mixing blade 173 is layered and fixedly connected to the inner rod 142 inside the mixing outer frame 171, the first mixing blade 172 and the second mixing blade 173 are arranged in an upper and lower interval, the outer rod 141 drives the mixing outer frame 171 and the first mixing blade 172 to rotate, and the inner rod 142 drives the second mixing blade 173 to rotate; the bottom of the inner rod 142 passes through the mixing outer frame 171 and is connected to the tunneling blade 174. The gas material channel 143 extends to the bottom of the inner rod 142, and the gas material nozzle 175 is located between the mixing outer frame 171 and the tunneling blade 174. The lower end of the auxiliary pipe 145 first passes through the top plate of one of the stirring wings 1711 of the stirring outer frame 171, and extends along the inner side of the vertical plate of the stirring wing 1711 to the bottom plate of the stirring wing 1711, and finally passes through the bottom plate of the stirring wing 1711 close to the outer rod 141, and the auxiliary nozzle 176 is located below the stirring wing 1711 of the stirring outer frame 171, and the auxiliary nozzle 176 is located above the gas nozzle 175; the gas nozzle 175 and the auxiliary nozzle 176 both spray horizontally radially toward the side away from the outer rod 141, and the spray range of the auxiliary nozzle 176 and the spray range of the gas nozzle 175 form an overlapping area, so that the high-pressure spray of the auxiliary nozzle 176 further disperses and mixes the curing agent powder sprayed from the gas nozzle 175 and increases the spray radius. The gas nozzle 175 and the auxiliary nozzle 176 both adopt a reduced nozzle structure, and the reduced nozzle structure helps to increase the pressure and speed of the powder and the high-pressure gas during spraying. The drag reducing agent nozzle 177 at the lower end of the drag reducing agent pipe 144 passes through the top plate of another stirring wing 1711 of the stirring outer frame 171 and is arranged vertically along the inner wall of the stirring wing 1711. Finally, the drag reducing agent nozzle 177 is located inside the bottom of the vertical plate of the stirring wing 1711, and the drag reducing agent nozzle 177 is radially sprayed toward the outer rod 141. The three-way channel structure is independently arranged and does not interfere with each other. When the stirring resistance is large, the drag reducing agent nozzle 177 is used to spray the drag reducing agent to effectively reduce the stirring resistance of the drilling tool.

[0044] like Figure 1As shown, the feeding backstage 200 includes a feeding device 210, an air compressor A221, an air compressor B222, a vertical pressurization pipeline 231, an air material pipeline 232 and an air pipeline 233; the feeding device 210 transports the curing agent powder in the high-pressure tank to the sprayer system at the bottom of the tank in a stable manner according to the set construction parameters via a screw conveying device, and uses the high-pressure gas jetting effect generated by the air compressor A221 to fully mix with the curing agent powder in the sprayer system to form a gas-solid two-phase fluid for transportation by the air material pipeline 232. The screw conveying device can automatically match the falling speed according to the designed curing agent dosage to ensure the stability of the curing agent dosage per unit pile length of the dry spraying mixing pile. The air compressor A221 provides high-pressure gas for the transportation of curing agent powder; the gas pipeline 232 is connected to the feed port 155 on the drilling rig body 100 to supply curing agent powder, and at the same time, a vertical booster pipeline 231 supplied by the air compressor A221 is added to the vertical rising part of the gas pipeline 232. The setting of the vertical booster pipeline 231 effectively increases the vertical transportation capacity of the curing agent powder, ensuring that the curing agent powder can be carried to the top of the drilling rig. The feeding backstage 200 can be additionally equipped with the air compressor B222 connected to the auxiliary inlet 156 on the drilling rig body 100 through the gas pipeline 233 to supply high-pressure gas for blowing; the drag reducing agent is supplied through a separately arranged pipeline. The gas pipeline 233 is connected to the auxiliary nozzle 176, so that the high-pressure gas provides further material mixing uniformity after the curing agent powder is sprayed out.

[0045] like Figure 1 As shown, the control module 300 controls the monitoring, control and operation of the feeding background 200 equipment; the PLC measurement and control program of the control module 300 realizes the measurement and control of the pressure in the tank, the control of the designed rotation speed of the screw conveying device and the designed curing agent powder feeding amount, as well as the effective measurement and control of the switch valve, pressure gauge, regulating valve and flow meter in the feeding background 200, and continuously, stably, quantitatively and evenly sprays the curing agent powder into the foundation soil through the air pipeline 232, the air channel 143 and the air nozzle 175.

[0046] A construction process of a multi-layer mutual shear dry spraying mixing pile drilling rig equipment, using the multi-layer mutual shear dry spraying mixing pile drilling rig equipment, comprises the following steps:

[0047] S1. Before the construction begins, the main body of the drilling rig 100 uses the positioning system to align the multi-layer shear mixing drill bit 170 with the construction pile position, and uses the electronic leveling instrument to adjust the hydraulic legs to maintain the verticality of the tower mast 110 and the drill rod 140 within 1.5%; inject the required curing agent powder into the high-pressure tank of the feeding device 210, and close the feed and exhaust switches on the high-pressure tank. S2. Turn on the air compressor A221 to supply air, and make the air pipeline 232, the air channel 143 and the vertical booster pipeline 231 supply air smoothly according to the planned air supply pressure and air supply volume. At the same time, turn on the air compressor B222 to supply air to the air pipeline 233, the auxiliary pipeline 145 and the auxiliary nozzle 176.

[0048] S3, the drilling tool is in the downward drilling and jetting mixing stage. The lifting pulley 153 generates downward pressure on the drilling tool through a winch or chain to set the downward drilling speed for downward drilling and mixing. The upper power device 150 drives the inner rod 142 to rotate, and the lower power device 160 drives the outer rod 141 to rotate; the first mixing blade 172 and the second mixing blade 173 on the multi-layer mutual shearing mixing drill bit 170 generate relative mixing at the set rotation speed to shear and mix the foundation soil; when the multi-layer mutual shearing mixing drill bit 170 enters the soil, the material supply is immediately started The spiral conveying device of the device 210 conveys the curing agent powder to the sprayer system in a stable and quantitative manner. Under the action of the high-pressure gas injection, the curing agent powder is transported to the gas nozzle 175 through the gas pipeline 232 and the gas channel 143, and then the curing agent powder is sprayed into the foundation soil by the gas nozzle 175; at the same time, the high-pressure gas injected from the auxiliary nozzle 176 is conducive to the smooth ejection and uniform mixing of the material body and increases the injection radius; the drag reducing agent nozzle 177 injects the drag reducing agent to reduce the stirring resistance of the drill bit; the material supply is stopped when the construction reaches the designed pile bottom elevation.

[0049] S4, during the stage of lifting the drill bit upward for mixing, the outer rod 141 and the inner rod 142 rotate in opposite directions to lift the rotating drill rod 140 upward at the set drilling speed. During this process, high-pressure gas and drag reducing agent are continuously sprayed in small amounts through the gas nozzle 175, the auxiliary nozzle 176 and the drag reducing agent nozzle 177 to ensure that each nozzle will not be blocked by the soil, until the multi-layer shear mixing drill bit 170 is lifted out of the ground, the gas and material supply are stopped, and the dry spray mixing pile construction is ended.

[0050] S5. Move the machine to the next new pile position and repeat the above process steps to construct the next dry spraying mixing pile.

[0051] Example 1

[0052] The following is combined with Figures 1 to 8 , Figures 11 to 13The utility model is further explained. The engineering background of this embodiment is the embankment reinforcement project on both sides of the river estuary. Dry spraying mixing piles are used to reinforce the soft soil foundation of the embankment. The pile length is 19m, the pile diameter is 800mm, the pile spacing is 2000mm, and the 28-day unconfined compressive strength of the mixing piles is required to be not less than 1.6MPa.

[0053] The foundation soil conditions of this embodiment are as follows: there are three soil layers within 30 meters below the surface, ① miscellaneous fill soil, layer thickness 1-2m; ② silt soil, layer thickness 20-25m, moisture content 78%, porosity 1.424, standard penetration number 1-2; ③ silt clay, layer thickness 5-10m, moisture content 54%, porosity 0.875, standard penetration number 5-7. The dry spraying pile adopts PO 42.5 cement, cement content 17%, and the construction adopts the multi-layer mutual shear dry spraying pile drilling rig equipment of the utility model. The construction process adopts two mixing and one spraying, drilling and powder spraying process.

[0054] like Figure 1 Figure 2 As shown, the multi-layer inter-shear dry-spraying mixing pile drilling rig equipment includes a drilling rig body 100, a feeding backstage 200 and a control module 300. The control module 300 ensures a continuous and stable supply of cement by monitoring and controlling the feeding backstage 200. The control module 300 ensures the cement content of each linear meter of mixing pile by monitoring the construction process of the drilling rig body 100, thereby ensuring the overall construction quality of the dry-spraying mixing pile. The drilling rig body 100 includes a tower mast 110, a diagonal support 120, an equipment platform 130, a drill rod 140, an upper power device 150, a lower power device 160 and a multi-layer inter-shearing mixing drill bit 170. The inclined support 120 fixes the tower mast 110 on the equipment platform 130 to ensure the stability of the tower mast 110. The drill rod 140 is suspended on the front side of the tower mast 110. The upper power device 150 is arranged on the top of the inner drill rod 142. The lower power device 160 is arranged on the equipment platform 130. The two power devices provide rotational power for the inner and outer drill rods respectively. The multi-layer shear mixing drill bit 170 is installed at the bottom end of the drill rod 140.

[0055] like Figures 6 to 8 As shown, the drill rod 140 of this embodiment is assembled in sections, the inner rod 142 is a circular cross-section, the outer rod 141 is a rectangular cross-section, the gas channel 143 is located in the middle of the inner rod, and the two outer sides of the outer rod 141 are respectively provided with an auxiliary pipeline 145 and a drag reducing agent pipeline 144. The auxiliary pipeline 145 and the drag reducing agent pipeline 144 are wrapped with angle steel to form a first protective cover 147 and a second protective cover 148. The area formed by the difference in rotation radius between the protective cover and the outer rod 141 is an exhaust space 149, which can effectively reduce the underground pressure generated after the high-pressure gas is injected into the ground. The auxiliary pipeline 145 and the drag reducing agent pipeline 144 are connected by a connecting pipe 146, and an angle steel protective cover is set at the connecting position to prevent damage during drilling.

[0056] like Figures 3 to 5 As shown, the driving mechanism 151 of the upper power device 150 is driven by a motor with a power of 55kW. The reducer 152 cooperates with the driving mechanism 151 to provide power for the inner rod 142. The lifting pulley 153 uses a chain to hang the drill rod 140 on the tower mast 110 and provides it with downward pressure and lifting force. A feed port 155, an auxiliary inlet 156 and a drag reducing agent inlet 157 are provided on the faucet 154 connected to the drill rod 140 at the upper end of the upper power device 150, which are used to transport cement, high-pressure gas and drag reducing agent respectively. The lower power device 160 adopts a grinding disc drill structure with a power of 75kW and is placed at the front position of the equipment platform 130. The square-section outer rod 141 passes through the center hole of the grinding disc, and the mutually clamped structure provides torque for the outer rod 141. The limit roller 161 helps the outer rod 141 to descend and ascend smoothly. The use of the power down method effectively reduces the overall center of gravity of the drilling rig, making the equipment more stable, and the safety factor of the drilling rig construction is also significantly improved.

[0057] like Figures 11 to 13 As shown, the drill bit in this embodiment adopts a multi-layer mutual shearing mixing drill bit 170, wherein the upper end of the stirring outer frame 171 is fixedly connected to the outer rod 141, and the bottom of the stirring outer frame 171 is rotatably connected to the inner rod 142 through a sleeve, and a first stirring blade 172 is arranged on the inner side of the stirring outer frame 171, and the outer rod 141 drives the stirring outer frame 171 and the first stirring blade 172 to rotate, and a second stirring blade 173 is arranged on the inner rod 142, and the inner rod 142 drives the second stirring blade 173 to rotate, wherein the first stirring blade 172 and the second stirring blade 173 are spaced apart along the drill rod 140 to form a staggered mutual shearing effect. The excavation blade 174 is arranged at the bottom of the drill bit, and a gas material nozzle 175 is arranged on the inner rod 142 at the bottom of the stirring outer frame 171. An auxiliary nozzle 176 is arranged under one of the stirring wings 1711 at the bottom of the stirring outer frame 171, and a drag reducing agent nozzle 177 is arranged above another stirring wing 1711 at the bottom of the stirring outer frame 171. The auxiliary nozzle 176 is arranged above the gas material nozzle 175, and the spraying ranges of the two nozzles can overlap. The overlapping spraying range can further disperse the sprayed curing agent powder evenly inside the foundation soil, which is more conducive to the spreading of the curing agent and improves the uniformity of the pile body as a whole. The gas material nozzle 175 and the auxiliary nozzle 176 both adopt a reduced-mouth structure, and the reduced-diameter nozzle structure helps to increase the pressure and speed of the powder and gas during spraying. The drag reducing agent nozzle 177 is used to spray the drag reducing agent to reduce the stirring resistance of the drilling tool by about 16%.

[0058] like Figure 1As shown, the feeding backstage 200 includes a feeding device 210, an air compressor and a conveying pipeline. The feeding device 210 uses a high-pressure tank to hold cement, pressurizes the inside of the tank and uses a screw conveying device to transport the cement to the injection machine system at the bottom of the tank, and uses the high-pressure gas provided by the air compressor A221 to spray the cement powder into the soil through the gas pipeline 232, the feed port 155, the gas channel 143 and the gas nozzle 175; at the same time, the vertical booster pipeline 231 is set at the vertical rising part of the gas pipeline 232, which increases the vertical conveying capacity of the cement dry powder and prevents the powder from clogging the pipeline due to the aggregation of the powder. The air compressor B222 provides assistance for the uniform spraying of the cement powder through the gas pipeline 233, the auxiliary inlet 156, the auxiliary pipeline 145 and the auxiliary nozzle 176.

[0059] like Figure 1 As shown, the control module 300 is responsible for the monitoring, control and operation of the overall feeding background 200 equipment; through the PLC measurement and control program of the control module 300, the pressure inside the tank is measured and controlled, the designed rotation speed of the screw conveying device and the designed cement discharge amount are controlled, as well as the effective measurement and control of each switch valve, pressure gauge, regulating valve and flow meter in the feeding background 200, cement powder is continuously, stably and evenly injected into the foundation soil through the air pipeline 232, the air channel 143 and the air nozzle 175.

[0060] The construction method of the multi-layer inter-shear dry-spraying mixing pile drilling rig equipment in this example specifically includes the following process steps:

[0061] S1. Before construction, the drilling rig body 100 uses the positioning system to accurately align the multi-layer shear mixing drill bit 170 with the proposed construction pile position, and uses the electronic leveling instrument to adjust the hydraulic legs to keep the verticality of the tower mast 110 and the drill rod 140 within 1.5%; inject cement into the high-pressure tank body of the feeding device 210, and close the feed and exhaust switches on the high-pressure tank body. The quality of cement injected each time can ensure the construction of at least 2 dry spraying mixing piles.

[0062] S2. Turn on the air compressor A221 to supply air, and make the air pipeline 232, the air channel 143 and the vertical booster pipeline 231 supply air smoothly according to the planned air supply pressure and air supply volume; at the same time, turn on the air compressor B222 to supply air to the air pipeline 233, the auxiliary pipeline 145 and the auxiliary nozzle 176.

[0063] S3. During the drilling and mixing process, the lifting pulley 153 generates downward pressure on the drilling tool through a winch or chain, and drills downward at a set downward speed. The upper power device 150 drives the inner rod 142 to rotate, and the lower power device 160 drives the outer rod 141 to rotate, so that the first mixing blade 172 and the second mixing blade 173 on the multi-layer shear mixing drill bit 170 rotate relative to each other at the set rotation speed to achieve mixing of the foundation soil. When the multi-layer shear mixing drill bit 170 enters the soil, the spiral conveying device of the feeding device 210 is immediately turned on to quantitatively convey the curing agent powder into the sprayer system, and the cement is sprayed into the foundation soil through the gas pipeline 232 and the gas channel 143 from the gas nozzle 175 under high-pressure air spray. At the same time, the auxiliary nozzle 176 supplies high-pressure gas to help the smooth spraying and uniform mixing of the material body, and the drag reducing agent nozzle 177 sprays the drag reducing agent to reduce the mixing resistance of the drill bit. The feeding is stopped when the construction reaches the designed pile bottom elevation.

[0064] S4. During the process of lifting the drill bit upward for mixing, the outer rod 141 and the inner rod 142 rotate in opposite directions to lift the drill rod 140 upward at the set lifting speed. During this process, high-pressure gas and drag reducing agent are continuously sprayed in small amounts through the gas nozzle 175, the auxiliary nozzle 176 and the drag reducing agent nozzle 177 to ensure that each nozzle will not be blocked by the soil. The construction is carried out until the multi-layer shear mixing drill bit 170 is raised to the surface, and the gas and material supply is stopped to end the construction of the dry spraying mixing pile.

[0065] S5. Move the drilling rig to the next new pile position and repeat the above process steps to construct the next dry spraying pile.

[0066] Example 2

[0067] The following is combined with Figures 1 to 7 ,9, Figures 11 to 13 The utility model is further explained. The engineering background of this embodiment is the foundation reinforcement project of the port container stacking site. Dry spraying mixing piles are used for construction. The pile length is 25m, the pile diameter is 900mm, the pile spacing is 2400mm, the composite foundation design ultimate bearing capacity is 350kPa, and the 28-day unconfined compressive strength of the mixing piles is required to be not less than 1.2MPa.

[0068] The geological conditions of this embodiment are as follows: ① fill soil, layer thickness 0-1m; ② silty clay, layer thickness 10-14m, moisture content 70%, porosity 1.356, standard penetration number 1-2; ③ saturated soft clay, layer thickness 10-15m, moisture content 64%, porosity 1.875, standard penetration number 3-6. The dry spraying pile uses KD curing agent as the curing material, with a dosage of 17%, and is constructed using the utility model multi-layer mutual shear dry spraying pile drilling rig equipment, and the construction uses a two-mixing and one-spraying drilling and powder spraying process.

[0069] The multi-layer inter-shear dry-jet mixing pile drilling rig equipment structure in this embodiment is similar to that in Embodiment 1, except that:

[0070] 1. Since the construction pile diameter and pile length of this embodiment are relatively large, the driving mechanism 151 in the upper power device 150 adopts a hydraulic motor with a power of 75 kW. The use of a hydraulic motor can reduce the volume and weight of the upper power device 150, which is beneficial to the overall stability of the drilling rig. The lower power device 160 adopts an electric grinding disc drill with a power of 75 kW.

[0071] 2. In this embodiment, an auxiliary pipe 145 is provided on the outside of the outer rod 141 and is protected by a first protective cover 147. No resistance reducing agent pipe 144 is provided on the other side, but a second protective cover 148 is still provided to ensure the balance of the drill rod 140 during drilling rotation to prevent shaking.

[0072] 3. The faucet 154 is equipped with a feed inlet 155 and an auxiliary inlet 156, but no resistance reducing agent inlet 157 is provided.

[0073] 4. If Figures 11 to 13 As shown, in this embodiment, the drag reducing agent nozzle 177 is cancelled, and the curing agent powder is sprayed through the gas nozzle 175. The high-pressure medium sprayed from the auxiliary nozzle 176 is used to further evenly disperse the curing agent powder to make the pile body evenly distributed.

[0074] The construction process in this embodiment is the same as that in Embodiment 1 and will not be described in detail.

[0075] In summary, the beneficial technical effects brought about by the utility model are:

[0076] 1. The utility model is a multi-layer shearing dry-spraying mixing pile drilling rig equipment which adopts upper and lower separated power devices to provide a larger construction torque for the construction drilling rig; the upper power device 150 and the lower power device 160 respectively drive the inner and outer drill rods, which reduces the transmission device, has a simpler structure and is convenient for maintenance; at the same time, the center of gravity of the drilling rig is lowered, making the drilling rig safer and more stable during construction and less prone to tilting and tipping.

[0077] 2. The utility model adopts a multi-layer mutual shearing mixing drill bit 170. The offset shearing between adjacent blades can make the curing agent dry material and the foundation soil mixed more evenly and improve the strength of the cured soil, while ensuring the pile quality of the dry spraying mixing pile.

[0078] 3. In the utility model, a vertical booster pipe 231 is added to the feeding backstage 200 to increase the power of the curing agent powder in vertical transportation, prevent powder accumulation or pipe blockage at this location, and also add an independent auxiliary pipe 145 to improve the spraying uniformity of the curing agent powder and effectively increase the spraying diameter of the mixing pile.

[0079] 4. A resistance reducing agent channel is provided on the outside of the drill pipe 140. The resistance reducing agent can effectively reduce the stirring resistance of the drilling tool during the construction process. At the same time, the area formed by the difference between the sweeping radius of the protective cover on both sides and the drill pipe 140 provides an exhaust space 149 for reducing the pressure inside the ground, thereby reducing the deformation of the underground and the surface.

[0080] 5. The control module 300 can monitor and automatically control various monitoring instruments and the opening and closing of various valves and switches in the equipment in real time according to the construction parameters during construction, thereby safely and effectively controlling the entire construction process and ensuring high-efficiency and high-quality dry-spraying mixing pile construction.

[0081] Although the disclosure is disclosed as above, the protection scope of the disclosure is not limited thereto. Those skilled in the art can make various changes and modifications without departing from the spirit and scope of the disclosure, and these changes and modifications will fall within the protection scope of the utility model.

Claims

1. A multi-layer inter-shear dry spraying mixing pile drilling rig equipment, characterized in that: The invention comprises a drilling rig body (100); the drilling rig body (100) comprises a drill rod (140) and a multi-layer mutual shearing and stirring drill bit (170); the multi-layer mutual shearing and stirring drill bit (170) is connected to the bottom of the drill rod (140), and the multi-layer mutual shearing and stirring drill bit (170) is used to perform staggered shearing and stirring on soil; the drill rod (140) comprises an outer rod (141) and an inner rod (142); the inner rod (142) is coaxial and rotatably connected to the outer rod (141); and an air material channel (143) is provided in the inner rod (142); the lower end of the air material channel (143) extends to the multi-layer mutual shearing and stirring drill bit (170) and is provided with an air material nozzle (175); an auxiliary pipeline (145) is provided on the outer peripheral wall of the outer rod (141); the auxiliary pipeline (145) The lower end of the outer rod (141) extends to the gas material nozzle (175) and is provided with an auxiliary nozzle (176); the medium injection of the auxiliary nozzle (176) is conducive to further dispersing and mixing the material body ejected from the gas material nozzle (175); a first protective cover (147) for wrapping the auxiliary pipeline (145) is provided on the outer peripheral wall of the outer rod (141) and located outside the auxiliary pipeline (145); the area formed by the difference between the first protective cover (147) and the rotation radius of the outer rod (141) is the exhaust space (149); the exhaust space (149) is used to reduce the underground pressure generated after the high-pressure gas is injected into the ground; a counterweight module structure for maintaining the balance of the equipment is provided on the outer peripheral wall of the outer rod (141) and located on the side opposite to the auxiliary pipeline (145).

2. The multi-layer inter-shear dry-spraying mixing pile drilling rig equipment according to claim 1 is characterized in that: The multi-layer mutual shearing mixing drill bit (170) comprises a mixing outer frame (171), a first mixing blade (172), a second mixing blade (173) and a tunneling blade (174); the upper portion of the mixing outer frame (171) is fixedly connected to the lower portion of the outer rod (141); the bottom portion of the mixing outer frame (171) is rotatably connected to the inner rod (142) via a shaft sleeve; the first mixing blade (172) is fixedly connected to the inner side of the mixing outer frame (171) in layers; the second mixing blade (173) is fixedly connected to the inner rod (142) inside the mixing outer frame (171) in layers; the first mixing blade (172) and the second mixing blade (173) are arranged in an offset manner in the upper and lower parts; the outer rod (141) drives the mixing outer frame (171) and the first mixing blade (172) to rotate; the inner rod (142) drives the second mixing blade (173) to rotate; the bottom portion of the inner rod (142) passes through the mixing outer frame (171) and the inner rod (142) to rotate. The auxiliary pipe (145) is connected to the driving blade (174); the gas material nozzle (175) is located between the stirring outer frame (171) and the driving blade (174); the auxiliary nozzle (176) of the auxiliary pipeline (145) passes through the top of one of the stirring wings (1711) of the stirring outer frame (171) and extends vertically along the inner side wall of the stirring wing (1711), and passes through the bottom of the same stirring wing (1711). The auxiliary nozzle (176) is located between the stirring outer frame (171) and the driving blade (174). ) below the stirring wing (1711) of the gas material nozzle (175), and the auxiliary nozzle (176) is located above the gas material nozzle (175); the gas material nozzle (175) and the auxiliary nozzle (176) both adopt a constricted structure, and an overlapping area is formed between the spray range of the auxiliary nozzle (176) and the spray range of the gas material nozzle (175), so that the high-pressure spray of the auxiliary nozzle (176) further disperses and mixes the curing agent powder sprayed from the gas material nozzle (175), and expands the spray radius.

3. The multi-layer inter-shear dry-spraying mixing pile drilling rig equipment according to claim 2 is characterized in that: The counterweight module structure comprises a drag reducing agent pipeline (144) and a second protective cover (148); the drag reducing agent pipeline (144) is arranged on the outer peripheral wall of the outer rod (141), and the drag reducing agent pipeline (144) and the auxiliary pipeline (145) are symmetrically arranged with the axis of the outer rod (141) as the symmetry axis; the lower end of the drag reducing agent pipeline (144) extends to the multi-layer shear stirring drill bit (170) The second protective cover (148) is arranged on the outer peripheral wall of the outer rod (141) and wraps the drag reducing agent pipeline (144) therein; the second protective cover (148) and the first protective cover (147) are connected to each other. The outer rod (141) is symmetrically arranged with its axis as the axis of symmetry.

4. The multi-layer inter-shear dry-spraying mixing pile drilling rig equipment according to claim 3 is characterized in that: The drag reducing agent nozzle (177) of the drag reducing agent pipeline (144) passes through the top of another stirring wing (1711) of the stirring outer frame (171) and extends vertically along the inner wall of the stirring wing (1711). The drag reducing agent nozzle (177) is arranged on the inner side of the bottom of the stirring wing (1711), and the drag reducing agent nozzle (177) sprays radially toward the outer rod (141).

5. The multi-layer inter-shear dry-spraying mixing pile drilling rig equipment according to claim 3 is characterized in that: The drilling rig body (100) further comprises a tower mast (110), a diagonal support (120), an equipment platform (130), and an upper power device (150). and a lower power device (160); the tower mast (110) is vertically arranged on the equipment platform (130); the inclined support (120) fixedly connects the tower mast (110) and the equipment platform (130); the drill rod (140) is hoisted on the front side of the tower mast (110) through a lifting pulley (153); the upper power device (150) is suspended on the top of the tower mast (110) and drives the drill rod (140) to descend and rise through the lifting pulley (153); the lower power device (160) is installed on the front side of the equipment platform (130); and the upper power device (150) and the lower power device (160) are on the same vertical axis.

6. The multi-layer inter-shear dry-spraying mixing pile drilling rig equipment according to claim 5 is characterized in that: The upper power device (150) comprises a driving mechanism (151), a speed reducer (152), a lifting pulley (153) and a faucet (154); the driving mechanism (151) is in the form of an electric motor or a hydraulic motor; the driving mechanism (151) and the speed reducer (152) are connected to each other. The transmission cooperation provides rotational power for the inner rod (142); the faucet (154) is arranged on the drill rod (140) The faucet (154) is provided with a gas inlet at the top; the lower power device (160) is in the form of a grinding disc drill, the outer rod (141) passes through the center hole of the lower power device (160), the cross section of the center hole is the same as the cross section of the drill rod (140), the lower power device (160) provides rotational power for the outer rod (141), and fixes and limits the drill rod (140) through a limiting roller (161).

7. The multi-layer inter-shear dry-spraying mixing pile drilling rig equipment according to claim 6 is characterized in that: When the equipment has a dual-channel structure, the gas inlet includes a feed port (155) and an auxiliary inlet (156); the feed port (155) is connected to the top of the gas channel (143); the auxiliary inlet (156) is connected to the top of the auxiliary pipeline (145); when the equipment has a three-channel structure, the gas inlet also includes a drag reducing agent inlet (157); the drag reducing agent inlet (157) is connected to the top of the drag reducing agent pipeline (144).