Laminated thick plate conversion structure for building continuous construction

Through the superimposed thick plate conversion structure, the flexible layout and anchoring of the continuous columns is achieved by using embedded parts and connecting steel bars, which solves the problems of insufficient structural bearing capacity and concrete loss during continuous construction, reduces carbon emissions and is suitable for subway vehicles. Section and other projects.

CN221941724UActive Publication Date: 2024-11-01EAST CHINA ARCHITECTURE DESIGN AND RESEARCH INSTITUTE CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420253171.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-01
Publication Date
2024-11-01
Estimated Expiration
2034-02-01

AI Technical Summary

Technical Problem

In construction projects, the layout of the second stage of construction is often different from the layout of the first stage, which makes the reserved connecting components unavailable, and the vertical connecting components need to be reset, resulting in insufficient structural bearing capacity and concrete loss. Especially in subway depots and other projects, there are problems of removing a large number of reserved connecting components and structural reinforcement.

Method used

Adopt a superimposed thick plate conversion structure, including the first-stage thick plate and the second-stage thick plate. Through the installation of embedded parts and connecting steel bars, flexible arrangement and anchoring of the continuous columns can be achieved, reducing the amount of concrete materials and carbon emissions. .

Benefits of technology

It realizes flexible layout of the continued building, avoids the demolition of connecting components and structural reinforcement, reduces carbon emissions, improves the stability and shear resistance of the building, and is suitable for projects such as subway depots.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941724U_ABST
    Figure CN221941724U_ABST
Patent Text Reader

Abstract

The utility model discloses a laminated thick plate conversion structure for building continuous construction, and relates to the technical field of building structures, the laminated thick plate conversion structure comprises a continuous construction column, a first-stage thick plate, a second-stage thick plate, longitudinal steel bars and connecting steel bars, the first-stage thick plate is poured on the top surface of an existing building, is completed at the same time with the existing building and is a part of the existing building, and the second-stage thick plate is poured on the top surface of the existing building; a plurality of embedded parts are fixed in the first-stage thick plate; the second-stage thick plate is poured on the plate surface of the first-stage thick plate and wraps the column foot of the continuous building column; one end of the longitudinal steel bar in the continuous column concrete extends into the concrete of the second-stage thick plate; the connecting steel bar is arranged in the second-stage thick plate, one end of the connecting steel bar is overlapped with the longitudinal steel bar, and the other end is fixedly connected with the embedded part. According to the method, the mode of post-pouring overlapping and reserving conversion is adopted, flexible arrangement of the upper continuous building is achieved, the method is particularly suitable for two-stage development projects similar to subway depot upper cover development, concrete material consumption is effectively reduced, and carbon emission is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building engineering structures, and more particularly to a composite thick plate conversion structure for continued construction of buildings, which is suitable for flexible arrangement of upper continued construction structures. Background Art

[0002] In construction projects, sometimes we encounter the problem of secondary construction, where the second phase of construction is based on the top surface of the first phase. Moreover, there is usually a certain time interval between the first and second phases of construction, which can be as short as a few months or as long as several years. For example, in projects such as real estate development on the top cover of a subway depot, the two phases are generally separated by several years.

[0003] After the completion of the first phase of construction, the layout of the upper continued building in the second phase is often quite different from the layout or apartment type originally designed, so the connection components reserved in the first phase of construction cannot be aligned with the column grid of the upper continued building in the second phase or cannot be used at all. In this case, it is necessary to re-set the vertical connection components to connect with the lower existing building, which will cause the lower structure of the first phase construction to fail to meet the bearing capacity of the upper continued building. Especially in projects such as the upper cover structure of the subway depot, the lower existing building used for subway functions needs to be completed in the first phase, and certain connection components should be reserved for the upper continued building for subsequent construction; while the upper continued structure used for office, residential or commercial purposes generally needs to be developed and constructed after the developer is determined. Therefore, there is a great deal of uncertainty in the structure of the upper continued building in the second phase of construction. The reserved connection components made in the first phase often cannot meet the needs of the second phase of construction, which will cause a large number of problems such as the removal of reserved connection components and structural reinforcement.

[0004] In response to the above problems, current solutions include beam conversion, thick plate conversion, seismic isolation conversion, etc. Among them, in the thick plate conversion reservation, in order to meet the problem of tension in the columns or walls of the continued construction, some experts and scholars proposed to solve it by reserving dowels or stirrups, but the dowels or stirrups need to be wrapped and protected and chiseled out later. At the same time, the uneven top surface in the first stage caused by the reservation will affect the construction of the second stage of the continued construction.

[0005] Therefore, how to provide a composite thick plate conversion structure for continued construction to achieve flexible layout of the upper continued construction so that the building products can adapt to current social needs while facilitating construction, reducing concrete loss and reducing carbon emissions is an urgent problem that technical personnel in this field need to solve. Summary of the invention

[0006] In view of this, the present invention provides a composite thick plate conversion structure for continued construction of buildings, aiming to solve the above-mentioned technical problems.

[0007] In order to achieve the above object, the present invention adopts the following technical solution:

[0008] A composite thick plate conversion structure for continued construction of a building, comprising:

[0009] Continue to build the column;

[0010] The first-stage thick slab is cast on the top surface of the existing building, the first-stage thick slab is constructed at the same time as the existing building, the first-stage thick slab is a part of the existing building, and a plurality of embedded parts are fixed in the first-stage thick slab;

[0011] The second-stage thick slab is poured on the surface of the first-stage thick slab during the subsequent construction and wraps the column foot of the continued column;

[0012] Longitudinal steel bars, the longitudinal steel bars are parallel to the length direction of the continued column and cast in the concrete thereof, and one end of the longitudinal steel bars extends into the concrete of the second-stage thick slab;

[0013] A connecting steel bar is arranged in the second stage thick plate, one end of which is overlapped with the longitudinal steel bar and the other end is fixedly connected with the embedded part.

[0014] The beneficial effect of the above technical solution is that when the existing building is constructed, the first-stage thick slab is cast at the same time as the existing building. The first-stage thick slab is used as a part of the existing building. When the construction is continued, the second-stage thick slab is cast, so that the column bases of the continued columns can be flexibly arranged without having to correspond one-to-one with the structural columns of the existing building. The effective anchoring capacity between the continued columns and the first-stage thick slab is guaranteed by the setting of embedded parts and connecting steel bars, and the problem of dismantling the connecting components of the existing building and strengthening the structure will not occur.

[0015] Preferably, the plurality of embedded parts are in the shape of a bench, including a panel and an L-shaped bent steel bar, the top surface of the panel is at the same level as the top surface of the first-stage thick plate; the vertical sections of the plurality of bent steel bars are perpendicular to the plate surface of the panel and fixed to the lower plate surface, and the horizontal sections are embedded in the concrete of the first-stage thick plate. The panel can be welded and fixed to the connecting steel bar, and the bent steel bar is embedded in the concrete of the first-stage thick plate, which enhances the pull-out resistance and anchoring performance of the panel, and ensures the overall stability of the continued column and the effectiveness of the force-bearing performance.

[0016] Preferably, the longitudinal steel bars, the connecting steel bars and the panel form a force transmission system, and the connecting steel bars transmit the force of the longitudinal steel bars to the embedded parts.

[0017] When embedded parts are provided in the concrete of the first-stage thick slab corresponding to the column foot of the continued column, the connecting steel bars can be straight hook steel bars, one end of which is welded to the panel and the other end is tied and fixed to the longitudinal steel bars in the continued column;

[0018] When there are no embedded parts in the concrete of the first-stage thick slab corresponding to the base of the continued column, the connecting steel bars are set to a trapezoidal shape, the top end is tied and fixed to the longitudinal steel bars, and the bottom end is welded to the panels of the two adjacent embedded parts, so that the connecting steel bars can be effectively anchored to the embedded parts.

[0019] According to the relative position relationship between the continued construction column and the embedded parts in the first-stage thick plate below it, the form of connecting steel bars is selected to ensure that the connecting steel bars can effectively connect the longitudinal steel bars and the panel, so that the longitudinal steel bars, connecting steel bars and embedded parts form a force transmission system. The connecting steel bars can transfer the force of the longitudinal steel bars to the embedded parts, ensuring effective anchoring and force transmission between the continued construction and the existing building, and forming a stable overall building system between the continued construction and the existing building.

[0020] Preferably, the panel is made of galvanized steel plate, which can reduce the corrosion of embedded parts, eliminate the need for plain concrete wrapping and protection, reduce the amount of concrete material used, and reduce carbon emissions.

[0021] Preferably, shear steel bars are welded on the top surfaces of the plurality of panels, and the end of the shear steel bars away from the panel is anchored in the concrete of the second-stage thick plate to meet the shear force requirements of the second-stage thick plate and the first-stage thick plate. When the shear force transmission between the first-stage thick plate and the second-stage thick plate is large, shear steel bars can be welded on the top surface of the embedded parts and anchored in the concrete of the second-stage thick plate to improve the shear resistance between the second-stage thick plate and the first-stage thick plate. According to the force requirements of the continued construction structure, some or all of the top surfaces of the embedded parts are selected to be welded with shear steel bars. When the force requirements are not large, the shear force transmission can be achieved by connecting the steel bars, and there is no need to weld shear steel bars on the top surface of the embedded parts.

[0022] Preferably, the thickness of the first stage thick plate is 0.25m to 0.5m. The thickness of the first stage thick plate needs to meet the bearing capacity requirements of the existing building substructure and be able to withstand the construction load of the second stage thick plate.

[0023] Preferably, the thickness of the second-stage thick plate is the total calculated thickness of the thick plate minus the thickness of the first-stage thick plate.

[0024] Preferably, the top surface of the first-stage thick plate is roughened to increase the interface bonding strength with the second-stage thick plate.

[0025] Preferably, the plurality of embedded parts are evenly arranged on the plate surface of the first-stage thick plate, and the interval between two adjacent embedded parts is 3.0 m to 4.0 m.

[0026] It can be known from the above technical solutions that, compared with the prior art, the present invention discloses a composite thick plate conversion structure for continued construction. The first stage thick plate is constructed at the same time as the existing building. As a part of the existing building, the second stage thick plate is cast during the continued construction. The present invention firstly realizes the flexible arrangement of the upper continued construction by adopting the post-casting superposition and reserved conversion method, which is particularly suitable for two-stage development projects such as the development of the upper cover of the subway depot; secondly, by adopting bench-shaped embedded parts, the surface is flat and does not affect the second stage pouring construction of the thick plate; thirdly, by combining the use of bench-shaped embedded parts, connecting steel bars, interface roughening and other technologies, the continuity and effectiveness of the force transmission of the composite thick plate can be met; finally, the panel of the embedded parts is made of galvanized steel plate, which does not need to be wrapped with plain concrete for protection, avoiding the removal of the wrapped concrete when pouring the second stage thick plate, reducing the consumption of concrete materials and reducing carbon emissions. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0028] Figure 1 A schematic diagram of the existing building and the building to be built provided by the present invention;

[0029] Figure 2 A schematic diagram of a conversion structure of a laminated thick plate provided by the present invention;

[0030] Figure 3 for Figure 1 A magnified schematic diagram of part A in FIG.

[0031] Figure 4 A schematic diagram of the structure of the embedded parts provided by the present invention;

[0032] Figure 5 This is a schematic diagram of the structure of the existing building provided by the present invention after the simultaneous construction of the first-stage thick slab is completed.

[0033] in:

[0034] 1-first stage thick plate; 2-second stage thick plate; 3-embedded parts; 31-panel; 32-bent steel bars; 4-continued columns; 5-longitudinal steel bars; 6-connecting steel bars; 7-shear steel bars; 8-existing buildings. DETAILED DESCRIPTION

[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0036] See attached Figures 1 to 5 The embodiment of the present invention discloses a composite thick plate conversion structure for continued construction, which can realize the flexible arrangement of the upper continued construction, so that the building products can adapt to the current social needs, and at the same time facilitate construction, reduce concrete loss, and reduce carbon emissions, including:

[0037] Continue to build column 4;

[0038] The first-stage thick plate 1 is cast on the top surface of the existing building 8 and is completed at the same time as the existing building 8. The first-stage thick plate 1 is a part of the existing building 8. A plurality of embedded parts 3 are fixed in the first-stage thick plate 1;

[0039] The second stage thick slab 2 is cast on the slab surface of the first stage thick slab 1 during the continued construction and wraps the column foot of the continued column 4;

[0040] Longitudinal steel bars 5, which are parallel to the length direction of the continued column 4 and cast in the concrete thereof, and one end of the longitudinal steel bars 5 extends into the concrete of the second-stage thick slab 2;

[0041] The connecting steel bar 6 is arranged in the second stage thick plate 2, one end of which is overlapped with the longitudinal steel bar 5, and the other end is fixedly connected with the embedded part 3.

[0042] In this embodiment, see the attached Figure 4 , multiple embedded parts 3 are in the shape of a bench, including a panel 31 and L-shaped bent steel bars 32, the top surface of the panel 31 is at the same level as the top surface of the first-stage thick plate 1; the vertical sections of the multiple bent steel bars 32 are perpendicular to the plate surface of the panel 31 and fixed to the lower plate surface, and the horizontal sections are embedded in the concrete of the first-stage thick plate 1. The panel is kept horizontal with the top surface of the first-stage thick plate, and does not affect the pouring construction of the second-stage thick plate.

[0043] In order to further optimize the above technical solution, the panel 31 is made of galvanized steel plate. To reduce the rust of the panel, there is no need to wrap the panel with plain concrete for protection. During the second stage of thick plate construction, there is no need to chisel out the plain concrete, which reduces the waste of concrete and reduces carbon emissions.

[0044] In some other specific embodiments, when there is an embedded part in the concrete of the first-stage thick slab corresponding to the column foot of the continued column, see the attached Figure 3 The connecting steel bar 6 adopts a straight hook steel bar, which is arranged vertically and disposed in the column foot of the continued column 4. One end of the connecting steel bar 6 is tied and fixed to the longitudinal steel bar 5, and the other end is welded to the top surface of the panel 31.

[0045] When there are no embedded parts in the concrete of the first-stage thick slab corresponding to the base of the continued column, the connecting steel bar 6 is trapezoidal and arranged in the second-stage thick slab 2, with its top surface tied and fixed to the longitudinal steel bar 5, and its two ends of the bottom surface welded and fixed to the top surfaces of the two adjacent panels 31.

[0046] The form of connecting steel bars is selected according to the relative position of the continued construction column and the embedded parts to ensure that the longitudinal steel bars, connecting steel bars and embedded parts can form a force transmission system, and the connecting steel bars can transfer the force of the longitudinal steel bars to the embedded parts.

[0047] In some other specific embodiments, when the shear force transmission between the second stage thick plate and the first stage thick plate is large, according to the force requirement, the top surface of part or all of the panels 31 is selected to be welded with shear steel bars 7, and the end of the shear steel bars 7 away from the panel 31 is anchored in the concrete of the second stage thick plate 2. The shear resistance between the second stage thick plate and the first stage thick plate is improved by the shear steel bars; when the shear force transmission between the second stage thick plate and the first stage thick plate is not large, the top surface of the embedded part does not need to be welded with shear steel bars.

[0048] In order to further optimize the above technical solution, the thickness of the first-stage thick plate 1 is 0.25m to 0.5m, which needs to meet the functional requirements of the original building substructure and be able to withstand the construction load of the second-stage thick plate.

[0049] In order to further optimize the above technical solution, the thickness of the second-stage thick plate 2 is the total calculated thickness of the thick plate minus the thickness of the first-stage thick plate.

[0050] In order to further optimize the above technical solution, the top surface of the first-stage thick plate 1 is roughened to increase the interface bonding strength between the first-stage thick plate 1 and the second-stage thick plate 2.

[0051] In order to further optimize the above technical solution, a plurality of embedded parts 3 are evenly arranged on the plate surface of the first-stage thick plate 1, and the interval between two adjacent embedded parts 3 is 3.0 m to 4.0 m.

[0052] The composite thick plate conversion structure for continued construction provided by the present invention can be flexibly arranged, and the positions of continued construction columns do not need to correspond one-to-one with the lower structure of the original building, which can meet the needs of different functional uses and is particularly suitable for two-stage development projects such as the development of the upper cover of a subway depot.

[0053] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.

[0054] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A composite thick plate conversion structure for continued construction of a building, characterized in that: include: Continued construction column (4); A first-stage thick slab (1), wherein the first-stage thick slab (1) is cast on the top surface of an existing building (8), the first-stage thick slab (1) and the existing building (8) are constructed at the same time, and a plurality of embedded parts (3) are fixed inside the first-stage thick slab (1); The second-stage thick slab (2) is cast on the surface of the first-stage thick slab (1) during the continued construction and wraps around the column foot of the continued column (4); Longitudinal steel bars (5), the longitudinal steel bars (5) are parallel to the length direction of the continued column (4) and cast in the concrete thereof, and one end of the longitudinal steel bars (5) extends into the concrete of the second-stage thick slab (2); A connecting steel bar (6), wherein the connecting steel bar (6) is arranged in the second stage thick plate (2), one end of which is overlapped with the longitudinal steel bar (5) and the other end is fixedly connected to the embedded part (3).

2. A composite thick plate conversion structure for continued construction of a building according to claim 1, characterized in that: The plurality of embedded parts (3) are in the shape of a bench, including a panel (31) and L-shaped bent steel bars (32), the top surface of the panel (31) being on the same horizontal plane as the top surface of the first-stage thick plate (1); the vertical sections of the plurality of bent steel bars (32) are perpendicular to the plate surface of the panel (31) and fixed to the lower plate surface, and the horizontal sections are embedded in the concrete of the first-stage thick plate (1).

3. A composite thick plate conversion structure for continued construction of a building according to claim 2, characterized in that: The panel (31) is made of galvanized steel plate.

4. The composite thick plate conversion structure for continued construction of a building according to claim 2, characterized in that: Shear steel bars (7) are welded to the top surfaces of the plurality of panels (31), and one end of the shear steel bars (7) away from the panel (31) is anchored in the concrete of the second-stage thick plate (2) to meet the shear force requirements of the second-stage thick plate (2) and the first-stage thick plate (1).

5. The composite thick plate conversion structure for continued construction of a building according to claim 1, characterized in that: The thickness of the first-stage thick plate (1) is 0.25m to 0.5m.

6. The composite thick plate conversion structure for continued construction of a building according to claim 1, characterized in that: The top surface of the first-stage thick plate (1) is roughened to increase the interface bonding strength with the second-stage thick plate (2).

7. The composite thick plate conversion structure for continued construction of a building according to claim 1, characterized in that: The plurality of embedded parts (3) are evenly arranged on the plate surface of the first-stage thick plate (1), and the interval between two adjacent embedded parts (3) is 3.0 m to 4.0 m.