Protective frame for track construction
By designing protective frames for track construction, including roadbed boxes, support frames and top platforms, the problem that conventional scaffolding cannot construct the top of the track without affecting the operation of subway tracks is solved, and the stability and safety of construction are achieved to ensure that The normal operation of subway tracks.
Patent Information
- Application Number
- CN202420033155.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-05
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-01-05
AI Technical Summary
During subway track construction, conventional scaffolding cannot repair the top of the track without affecting the normal operation of the subway track, resulting in construction obstruction.
A protective frame for track construction was designed, including a roadbed box fixed on the platform on both sides of the track, a vertically installed support frame and a top platform. The right-angle triangle support structure is formed through the outer lifting beams and oblique braces to ensure the stability of the top platform. and increase the stability of the support frame by connecting multiple sets of steel frames and cross beams, and improve construction safety with climbing structures and guardrails.
It realizes construction directly above the track without affecting the normal operation of the subway track, reducing the impact on the track, and improving the safety and convenience of construction personnel through multi-layer structures and protective measures.
Smart Images

Figure CN221941867U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of building construction, and in particular to a protective frame for track construction. Background Art
[0002] With the development of the city, transportation has become more developed, and more and more subway tracks are being built. In order not to affect the transportation in the central urban area, the lines located in the central urban area are basically located in underground tunnels. The underground tunnels will be subject to pressure from the soil layer above when in use, so subway construction workers are required to carry out regular maintenance and inspection to ensure their good structural support.
[0003] During the maintenance process, if damage is found on the top of the subway tunnel, it needs to be repaired in time. Usually, during construction, it is necessary to ensure that the normal operation of the subway track is not affected, that is, it is necessary to avoid the area where the track is located when building the construction platform, and at the same time ensure that there is appropriate safety space on the ground for construction personnel to pass. The commonly used construction method is usually to build scaffolding for subway tunnel top construction. Conventional scaffolding only supports construction in the area directly above the scaffolding construction position. If construction is to be carried out in the area directly above the subway track, it is necessary to build scaffolding on the subway track. In order to ensure safe construction without affecting the normal operation of the subway track, conventional scaffolding cannot be used, which leads to construction obstruction. Summary of the invention
[0004] In order to solve the above problems, the present application provides a protective frame for track construction.
[0005] The present application provides a protective frame for track construction, which adopts the following technical solution:
[0006] A protective frame for track construction, comprising a roadbed box fixed on platforms on both sides of the track, a support frame fixed on the roadbed box, and a top platform arranged on the top of the support frame, the support frame is vertically arranged to the roadbed box, an end of the support frame away from the roadbed box is fixed with a cantilever beam, the cantilever beam is vertically arranged to the support frame, the top platform is fixedly connected to the cantilever beam, and a plurality of diagonal braces are arranged on the support frame, one end of the diagonal brace is fixed to the cantilever beam, and the other end is fixed to the support frame.
[0007] By adopting the above technical solution, when in use, the roadbed box is fixed on the platform on the side of the track, and the support frame is fixed on the roadbed box to realize the construction of the support frame, and then a right-angled triangle support structure is formed by the cantilever beam, the support frame and the diagonal brace, and the top platform is installed on the cantilever beam, so that an avoidance space for avoiding the track is formed under the top platform, thereby realizing construction of the top area directly above the track without affecting the normal operation of the subway track.
[0008] Preferably, the support frame includes a plurality of groups of steel frames arranged at intervals, and a crossbeam for connecting the plurality of groups of the steel frames together, a plurality of the crossbeams are arranged at intervals along the height direction of the steel frames, and the steel frames are fixedly connected to the roadbed box.
[0009] By adopting the above technical solution, the overall structure of the support frame is made more stable by connecting multiple groups of steel frames and beams during use, thereby increasing the supporting stability of the support frame.
[0010] Preferably, the steel frame includes two steel frame columns arranged side by side under the top platform, and a connecting plate fixed to the bottom ends of the steel frame columns, a connecting rod is arranged between the two steel frame columns, both ends of the connecting rod are respectively fixed to the two steel frame columns, a plurality of connecting rods are evenly spaced along the height direction of the steel frame columns, and the connecting plate is connected to the roadbed box by bolts.
[0011] By adopting the above technical solution, the steel frame is selected to be supported by two steel frame columns when in use, and the two steel frame columns are connected by a connecting rod, which increases the supporting stability of the steel frame, thereby making the installation of the support frame more stable.
[0012] Preferably, platform planks are provided on some of the cross beams, and the platform planks divide the support frame into a multi-layer structure. A climbing structure is provided between every two layers of the platform planks. Passageways for construction workers to pass through are formed on the platform planks and the top platform, and the climbing structure is located below the passageways. The platform planks are also provided with a plurality of groups of clamping components for clamping the platform planks onto the cross beams.
[0013] By adopting the above technical solution, the platform planks are installed on the support frame through the snap-on components during use, the layer structure of the support frame is increased by the platform planks, and a climbing structure is provided between every two layer structures, so that construction workers can take a short rest through the platform structure when climbing up and down the support frame, which facilitates climbing.
[0014] Preferably, the clamping assembly includes a first clamping block fixed on the platform decking, a second clamping block hinged at one end of the first clamping block, and a bolt arranged between the first clamping block and the second clamping block, a limiting space for limiting the cross beam is formed between the first clamping block and the second clamping block, and the bolt is locked by a nut after passing through the first clamping block and the second clamping block.
[0015] By adopting the above technical solution, when in use, the first clamping block and the second clamping block are hingedly closed to form a limiting space, so that the first clamping block and the second clamping block are sleeved on the crossbeam, and then the first clamping block and the second clamping block are locked by the coordinated use of bolts and nuts, thereby realizing the clamping and fixing of the clamping assembly and the crossbeam, thereby realizing the installation of the platform decking.
[0016] Preferably, a cover plate is hinged at the passage on the top platform, and the cover plate is overlapped on the top platform on all sides.
[0017] By adopting the above technical solution, when construction workers climb to the top platform through the passage, the passage can be blocked by the cover plate, thereby avoiding the passage from affecting the safety of the construction project during construction.
[0018] Preferably, the climbing structure is a straight ladder, which is installed at the end of the platform decking, and the straight ladder is vertically arranged to the platform decking.
[0019] By adopting the above technical solution, a straight ladder is set up during use, so that construction workers can climb the protective frame through the straight ladder. At the same time, the straight ladder occupies a small space, which is conducive to reducing the space occupied by the overall protective frame installation.
[0020] Preferably, the straight ladder is provided with a guardrail, and the guardrail and the straight ladder are combined to form a passage for construction workers to climb.
[0021] By adopting the above technical solution, a passage is formed by enclosing the guardrail and the straight ladder during use, so that when construction workers are climbing, the climbing process is protected to a certain extent, thereby increasing the safety of the climbing process.
[0022] Preferably, the climbing structure is a step ladder, which is obliquely arranged between two adjacent platform planks, and one end of the step ladder is overlapped with one platform plank, and the other end is bolted to the other platform plank.
[0023] By adopting the above technical solution, the step ladder is set at an angle during use, making it easier and more convenient for construction workers to climb the protective frame, and the step ladder is fixed to the platform plank by bolts, making installation easier.
[0024] Preferably, a protective railing is provided on the top platform.
[0025] By adopting the above technical solution, since the top platform is located at a high altitude during use, the top platform can be protected by guardrails, which is beneficial to improving the safety of the construction process.
[0026] In summary, the present application includes at least one of the following beneficial technical effects:
[0027] 1. During use, a steel frame is formed by lap-jointing two steel frame columns and connecting rods, and a support frame is formed by connecting multiple groups of steel frames and beams to improve the stability of the support frame. Then, a right-angled triangle support structure is formed by combining the support frame, the cantilever beam and the diagonal brace. The top platform is then installed on the cantilever beam, thereby ensuring the installation stability of the top platform. At the same time, an avoidance space for avoiding the subway track is formed under the top platform, thereby reducing the impact on the normal use of the track during construction;
[0028] 2. When in use, the platform deck is installed on the support frame through the clamping assembly, so that the support frame is divided into a multi-layer structure, and then matched with a climbing structure, which is conducive to construction workers climbing the support frame and facilitating construction;
[0029] 3. When in use, the cover plate and protective railings can increase the safety during the construction process, thus facilitating the construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is an axonometric diagram mainly showing the overall structure in the first embodiment of the present application;
[0031] Figure 2 It is an axonometric diagram mainly showing the steel frame structure in the first embodiment of the present application;
[0032] Figure 3 This is an axonometric diagram mainly showing the connection structure of the cantilever beam and the diagonal brace in the first embodiment of the present application;
[0033] Figure 4 It is an axonometric diagram mainly showing the platform decking and beam connection structure in the first embodiment of the present application;
[0034] Figure 5 This is an axonometric diagram mainly showing the clamping structure in the first embodiment of the present application;
[0035] Figure 6 This is an axonometric diagram mainly showing the top platform structure in the first embodiment of the present application;
[0036] Figure 7 It is an axonometric diagram mainly showing the overall structure in the second embodiment of the present application.
[0037] Figure numerals: 1. roadbed box; 2. support frame; 21. steel frame; 211. steel frame column; 212. connecting plate; 213. connecting rod; 22. crossbeam; 3. top platform; 4. cantilever beam; 5. diagonal brace; 6. platform decking; 7. climbing structure; 71. straight ladder; 72. guardrail; 73. passage; 74. step ladder; 8. passage; 9. snap-on assembly; 91. first clamp block; 92. second clamp block; 93. bolt; 94. limit space; 10. cover plate; 20. guardrail. DETAILED DESCRIPTION
[0038] The following is combined with Figure 1 -Attached Figure 7 This application is described in further detail.
[0039] The embodiment of the present application discloses a protective frame for track construction.
[0040] Embodiment 1:
[0041] Reference Figure 1 A protective frame for track construction comprises a roadbed box 1 fixed on platforms on both sides of the track and placed horizontally, a support frame 2 vertically installed on the roadbed box 1, and a top platform 3 arranged on the top of the support frame 2. The support frame 2 comprises multiple groups of steel frames 21 fixed on the roadbed box 1. In this embodiment, the steel frames 21 are preferably arranged in three groups, and the three groups of steel frames 21 are arranged at intervals along the length direction of the roadbed box 1. The multiple groups of steel frames 21 are connected with cross beams 22, and multiple cross beams 22 are evenly arranged along the height direction of the steel frames 21. In this embodiment, the cross beams 22 are preferably arranged in six groups, and the six groups of cross beams 22 are evenly arranged along the height direction of the steel frames 21. When in use, the support frame 2 is formed by combining the multiple groups of steel frames 21 and the multiple cross beams 22 fixed on the roadbed box 1, which strengthens the support structure of the support frame 2 and ensures that the construction of the support frame 2 will not be too cumbersome.
[0042] Reference Figure 1 and Figure 2 The steel frame 21 includes a plurality of steel frame columns 211 spaced apart along the width direction of the roadbed box 1. In the present embodiment, two steel frame columns 211 are preferably provided. A connecting plate 212 is welded to the bottom end of the steel frame column 211. The connecting plate 212 is fixed to the roadbed box 1 by bolts. A connecting rod 213 is welded between the two steel frame columns 211. A plurality of connecting rods 213 are evenly spaced apart along the height direction of the steel frame columns 211. In the present embodiment, six connecting rods 213 are preferably provided, i.e., the number of connecting rods 213 is the same as the number of cross beams 22. When in use, two steel frame columns 211 and a plurality of connecting rods 213 are combined into a trapezoidal connecting structure, so that the support of the steel frame 21 is more stable. At the same time, the steel frame columns 211 are fixed to the roadbed box 1 by bolts passing through the connecting plate 212, so as to realize the installation of the steel frame 21 and ensure the stability of the use of the steel frame 21.
[0043] Reference Figure 3A plurality of cantilever beams 4 are fixed on the top of the support frame 2. In the present embodiment, three cantilever beams 4 are preferably provided, that is, the number of cantilever beams 4 is the same as the number of steel frames 21, and the cantilever beams 4 and the steel frames 21 are vertically provided. In order to ensure the connection stability of the cantilever beams 4, diagonal braces 5 are connected between the cantilever beams 4 and the steel frames 21. One end of the diagonal brace 5 is fixed to the end of the cantilever beam 4 away from the steel frame 21, and the other end is fixed to the steel frame 21, so that the cantilever beams 4, the diagonal braces 5 and the steel frame 21 are combined to form a right-angled triangle support structure, and the top platform 3 is installed on the cantilever beams 4; when in use, the cantilever beams 4 are supported by the diagonal braces 5 and the steel frames 21, thereby ensuring the stability of the cantilever beam 4 support structure, thereby making the installation of the top platform 3 more stable.
[0044] Reference Figure 1 , a plurality of platform planks 6 are arranged on the support frame 2. In the present embodiment, the platform planks 6 are preferably arranged in three. The three platform planks 6 and the top platform 3 together divide the support frame 2 into a four-layer structure. A climbing structure 7 for construction workers to climb is arranged between every two layers of platform planks 6. The climbing structure 7 is located below the platform planks 6. Therefore, passages 8 are provided on the platform planks 6 and the top platform 3, and the passages 8 are located above the climbing structure 7. When in use, the construction workers climb the support frame 2 through the climbing structure 7, and take a short rest for the construction workers during the climbing process through the plurality of platform planks 6, thereby facilitating the construction workers to climb.
[0045] Reference Figure 4 and Figure 5 The platform deck 6 is provided with a plurality of groups of clamping components 9 for clamping the platform deck 6 on the cross beam 22 at the bottom. The clamping components 9 include a first clamping block 91 for fixing the bottom of the platform deck 6, a second clamping block 92 hinged at one end of the first clamping block 91, and a bolt 93 arranged between the first clamping block 91 and the second clamping block 92. The first clamping block 91 and the second clamping block 92 are both U-shaped, and the first clamping block 91 and the second clamping block 92 are arranged opposite to each other. A limiting space 94 is formed between the first clamping block 91 and the second clamping block 92. The cross beam 22 is located in the limiting space 94, and the side wall of the cross beam 22 abuts against the first clamping block 91 and the second clamping block 92. One end of the bolt 93 passes through the first clamping block 91 and the second clamping block 92 and is locked by a nut; when in use, the first clamping block 91 and the second clamping block 92 are abutted against the cross beam 22 by tightening the nut, thereby fixing the platform deck 6 on the support frame 2, thereby improving the installation stability of the platform deck 6.
[0046] Reference Figure 6In order to increase the safety of construction, a guardrail 20 is fixed around the top platform 3, and a cover plate 10 is provided at the passage 8 on the top platform 3. The cover plate 10 is hinged on the top platform 3, and the cover plate 10 is overlapped on the top surface of the top platform 3 on all sides; when the construction workers stand on the top platform 3 during use, the passage 8 is blocked by the cover plate 10 to prevent the passage 8 from affecting the safety of construction, and the surrounding side of the top platform 3 is protected by the guardrail 20, thereby increasing the safety protection of the top platform 3.
[0047] Reference Figure 1 The climbing structure 7 is a straight ladder 71. When the straight ladder 71 is installed, it is arranged at the end of the platform deck 6, and one end of the straight ladder 71 is located on the platform deck 6, and the other end passes through the platform deck 6 and is connected to the platform deck 6 of the bottom layer. A U-shaped guardrail 72 is arranged on the straight ladder 71, and the guardrail 72 and the straight ladder 71 are enclosed to form a passage 73 for construction workers to climb. When in use, the straight ladder 71 is used to reduce the space occupied by the climbing structure 7. At the same time, due to the high height of the straight ladder 71, the guardrail 72 can provide a certain protection for the climbing process.
[0048] The implementation principle of the embodiment of the present application is as follows: when in use, the roadbed box 1 is fixed on the platforms on both sides of the track, and the support frame 2 is fixedly connected to the roadbed box 1 to realize the installation of the support frame 2. By fixing the cantilever beam 4 on the top of the support frame 2, and fixing the top platform 3 on the cantilever beam 4, an escape space for avoiding the track is formed under the top platform 3, so that construction above the track is realized, and the supporting structure of the top platform 3 is strengthened by arranging the diagonal brace 5 to make the installation more stable. By arranging the straight ladder 71, it is convenient for construction workers to climb. By arranging the guardrail 20 and the cover plate 10, the safety of the top platform 3 is enhanced, thereby making the construction process safer.
[0049] The difference between Example 2 and Example 1 is that:
[0050] Reference Figure 7 The climbing structure 7 is a step ladder 74, which is arranged in the middle position of the platform deck 6, and the top of the step ladder 74 is overlapped on the platform deck 6 of the top layer, and the bottom end is fixed to the platform deck 6 of the bottom layer by bolts; when in use, the step ladder 74 makes it more convenient for construction workers to climb, and the step ladder 74 is overlapped at one end and bolted at the other end to make the installation simpler and more convenient.
[0051] The implementation principle of the embodiment of the present application is: when in use, the roadbed box 1 is fixed on the platform on both sides of the track, the support frame 2 is fixedly connected to the roadbed box 1, the cantilever beam 4 is fixed on the support frame 2, and the top platform 3 is fixed on the cantilever beam 4, so that an avoidance space for avoiding the track is formed under the top platform 3, so as to realize the construction above the track, and the supporting structure of the top platform 3 is strengthened by setting the diagonal brace 5 to make the installation more stable, and the climbing of the construction workers is simpler and more labor-saving by setting the step ladder 74.
[0052] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A protective frame for track construction, characterized in that: The invention comprises a roadbed box (1) fixed on platforms at both sides of a track, a support frame (2) fixed on the roadbed box (1), and a top platform (3) arranged at the top of the support frame (2); the support frame (2) and the roadbed box (1) are arranged vertically; an outer cantilever beam (4) is fixed on one end of the support frame (2) away from the roadbed box (1); the outer cantilever beam (4) and the support frame (2) are arranged vertically; the top platform (3) is fixedly connected to the outer cantilever beam (4); a plurality of diagonal braces (5) are arranged on the support frame (2); one end of the diagonal brace (5) is fixed on the outer cantilever beam (4) and the other end is fixed on the support frame (2).
2. A protective frame for track construction according to claim 1, characterized in that: The support frame (2) comprises a plurality of groups of steel frames (21) arranged at intervals, and a crossbeam (22) for connecting the plurality of groups of the steel frames (21) together, wherein a plurality of the crossbeams (22) are arranged at intervals along the height direction of the steel frames (21), and the steel frames (21) are fixedly connected to the roadbed box (1).
3. A protective frame for track construction according to claim 2, characterized in that: The steel frame (21) comprises two steel frame (21) columns arranged side by side under the top platform (3), and a connecting plate (212) fixed to the bottom end of the steel frame (21) column, a connecting rod (213) is arranged between the two steel frame (21) columns, and the two ends of the connecting rod (213) are respectively fixed to the two steel frame (21) columns, and a plurality of connecting rods (213) are evenly spaced along the height direction of the steel frame (21) columns, and the connecting plate (212) is connected to the roadbed box (1) by bolts (93).
4. A protective frame for track construction according to claim 2, characterized in that: A platform deck (6) is provided on part of the cross beams (22), and the platform deck (6) divides the support frame (2) into a multi-layer structure. A climbing structure (7) is provided between every two layers of the platform deck (6). A passage (8) for construction workers to pass through is formed on the platform deck (6) and the top platform (3), and the climbing structure (7) is located below the passage (8). The platform deck (6) is also provided with a plurality of groups of clamping components (9) for clamping the platform deck (6) on the cross beam (22).
5. A protective frame for track construction according to claim 4, characterized in that: The clamping assembly (9) comprises a first clamping block (91) fixed on the platform deck (6), a second clamping block (92) hinged at one end of the first clamping block (91), and a bolt (93) arranged between the first clamping block (91) and the second clamping block (92), a limiting space (94) for limiting the cross beam (22) is formed between the first clamping block (91) and the second clamping block (92), and the bolt (93) passes through the first clamping block (91) and the second clamping block (92) and is locked by a nut.
6. A protective frame for track construction according to claim 4, characterized in that: A cover plate (10) is hingedly connected to the passageway (8) on the top platform (3), and the cover plate (10) is overlapped on the top platform (3) on all sides.
7. A protective frame for track construction according to claim 4, characterized in that: The climbing structure (7) is a straight ladder (71), which is installed at the end of the platform deck (6), and the straight ladder (71) is arranged vertically to the platform deck (6).
8. A protective frame for track construction according to claim 7, characterized in that: The straight ladder (71) is provided with a guardrail (72), and the guardrail (72) and the straight ladder (71) are combined to form a passage (73) for construction workers to climb.
9. A protective frame for track construction according to claim 4, characterized in that: The climbing structure (7) is a step ladder (74), which is obliquely arranged between two adjacent platform planks (6), and one end of the step ladder (74) is overlapped with one platform plank (6), and the other end is bolted to the other platform plank (6).
10. A protective frame for track construction according to claim 1, characterized in that: A protective railing (20) is provided on the top platform (3).