External water stop steel box for full-section pressure-bearing water-containing sand layer shield launching
By designing a fully-sectional pressure-bearing water-bearing sand layer shield starting external water-stop steel box, using the combined structure of embedded steel rings, water-stop plates and galvanized steel pipes, injecting inert slurry for sealing, the entire shield project was solved. The problem of water leakage in the section pressure-bearing aquatic sand layer has significantly improved the water-stop effect.
Patent Information
- Application Number
- CN202323100311.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-17
- Publication Date
- 2024-11-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the full-section sand layer subway shield project, conventional water stop devices are difficult to effectively control the leakage risk of full-section pressure-bearing aquatic sand layer.
Design a fully-sectional pressure-bearing water-bearing sand layer shield-initiated external water-stop steel box, adopts annularly arranged embedded steel ring and water-stop plate, combined with galvanized steel pipes and one-way ball valves, and layered by injecting inert slurry. Layer sealing to enhance sealing effect.
It effectively avoids the risk of initial leakage and significantly improves the water stop effect, especially when facing a full-section pressure-bearing aqueous sand layer.
Smart Images

Figure CN221942466U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of shield engineering, in particular to an external water-stopping steel box for starting a full-section pressure-bearing water-containing sand layer shield. Background Art
[0002] During the initial operation of the full-section sand layer subway shield project, the risk of water leakage from the tunnel portal often occurs. According to conventional construction techniques, water-stop curtains and pressure plates need to be installed at the tunnel portal as initial water-stopping devices. However, the water-stopping effect of such water-stop curtains and pressure plates is poor. They have a certain effect on ordinary clay layers and shallow aquifers, but there is still a great risk of water leakage in the face of full-section pressure-bearing water-bearing sand layers. Utility Model Content
[0003] The utility model aims to solve the above problems, thereby providing a full-section pressure-bearing water-containing sand layer shield starting external water-stop steel box with enhanced sealing effect.
[0004] The utility model solves the above problems and adopts the following technical solutions:
[0005] A full-section pressurized water-containing sand layer shield starting external waterstop steel box, including a waterstop steel box annularly arranged on the outside of a pre-buried steel ring of a tunnel portal, a first waterstop plate is fixed on the pre-buried steel ring of the tunnel portal, a plurality of fixing rings are arranged at intervals on the inner side of the waterstop steel box, a second waterstop plate is fixed on the outside of the fixing ring, the first waterstop plate and the second waterstop plate are of equal width, galvanized steel pipes are connected on the waterstop steel box and between the first waterstop plate and the second waterstop plate and between adjacent second waterstop plates, and a one-way ball valve is arranged on the galvanized steel pipe.
[0006] Compared with the prior art, the utility model adopting the above technical solution has the following outstanding features:
[0007] After the shield contacts the water-stop steel box and before the cutterhead cuts the soil, inert slurry is injected into the interior through a galvanized steel pipe. Through the cooperation of the first waterstop plate and several second waterstop plates, it is sealed layer by layer. Facing the full-section pressurized aquifer, the risk of initial water leakage can be more effectively avoided.
[0008] As a preferred embodiment, a further technical solution of the utility model is:
[0009] The first water stop plate comprises a first rubber curtain plate and a first flap plate on the outer side. The first rubber curtain plate, the first flap plate, the embedded steel ring and the upper edge of the portal are commonly provided with expansion bolts in the circumferential direction.
[0010] A pad is arranged between the first cord rubber plate and the vertical section of the first flap.
[0011] The second water stop plate comprises a second rubber fabric plate and a second flap plate on the outer side. The second rubber fabric plate, the second flap plate and the fixing ring are commonly provided with fixing bolts along the circumferential direction.
[0012] A pad is provided between the second cord rubber plate and the vertical section of the second flap.
[0013] Four galvanized steel pipes are arranged in the circumferential direction between the first water stop plate and the second water stop plate and between adjacent second water stop plates.
[0014] A first rib plate is arranged between the outer peripheral surface of the water-stop steel box and the tunnel door.
[0015] A second rib plate is arranged between the inner side surface of the fixing ring and the water-stopping steel box. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic diagram of the structure of an embodiment of the utility model;
[0017] Figure 2 This is a schematic diagram of the main cross-sectional structure of the water-stop steel box of the utility model embodiment;
[0018] Marked in the figure are: embedded steel ring 1, tunnel door 2, fixing ring 3, galvanized steel pipe 4, one-way ball valve 5, first curtain rubber sheet 6, first flap 7, second curtain rubber sheet 8, second flap 9, pad 10, first rib plate 11, second rib plate 12, water-stop steel box 13. DETAILED DESCRIPTION
[0019] The present invention is further described below in conjunction with embodiments, the purpose of which is only to provide a better understanding of the content of the present invention. Therefore, the examples given do not limit the protection scope of the present invention.
[0020] A full-section pressurized water-bearing sand layer shield starting external water-stop steel box, including a water-stop steel box 13 annularly arranged on the outside of a pre-buried steel ring 1 of a tunnel portal 2, the water-stop steel box 13 is made of a 1 cm thick steel plate, a first water-stop plate is fixed on the pre-buried steel ring 2 of the tunnel portal 2, a plurality of fixing rings 3 are arranged at intervals on the inner side of the water-stop steel box 13, a second water-stop plate is fixed on the outside of the fixing ring 3, the first water-stop plate and the second water-stop plate are equal in width, the first water-stop plate and the plurality of second water-stop plates form a plurality of water-stop lines, galvanized steel pipes 4 are connected on the water-stop steel box 13 and between the first water-stop plate and the second water-stop plate and between adjacent second water-stop plates, a one-way ball valve 5 is arranged on the galvanized steel pipe 4, and an inert liquid is injected into the interior through the one-way ball valve 5 and the galvanized steel pipe 4.
[0021] The first water stop plate includes a first fabric rubber plate 6 and a first flap plate 7 on the outside. Expansion bolts are commonly arranged along the annular direction on the first fabric rubber plate 6, the first flap plate 7, the embedded steel ring 1 and the portal 2. The first water stop plate is fixed to the embedded steel ring 1 by the expansion bolts.
[0022] A gasket is provided between the vertical sections of the first rubber cord sheet 6 and the first flap 7. The first flap 7 includes a vertical section at the outer periphery and a folded section at the inner periphery. The gasket is used to seal the first rubber cord sheet 6 and the first flap 7.
[0023] The second water stop plate comprises a second rubber fabric plate 8 and a second flap plate 9 on the outer side. The second rubber fabric plate 8 , the second flap plate 9 and the fixing ring 3 are commonly provided with fixing bolts along the circumferential direction.
[0024] A gasket is provided between the second rubber cord sheet 8 and the vertical section of the second flap 9. The second flap 9 includes a vertical section at the outer periphery and a folded section at the inner periphery. The second rubber cord sheet 8 and the second flap 9 are sealed by the gasket.
[0025] Four galvanized steel pipes 4 are arranged circumferentially between the first waterstop plate and the second waterstop plate and between adjacent second waterstop plates. Inert liquid is injected circumferentially to speed up the injection of the inert liquid and prevent incomplete injection of the inert liquid.
[0026] A first rib plate 11 is disposed between the outer circumference of the water-stop steel box 13 and the tunnel door 2 , and the first rib plate 11 strengthens the fixation of the water-stop steel box 13 .
[0027] A second rib plate 14 is disposed between the inner side surface of the fixing ring 3 and the water-stop steel box 13 , and the fixing of the fixing ring 3 is strengthened by the second rib plate 14 .
[0028] After the shield contacts the water-stop steel box and before the cutterhead cuts the soil, inert slurry is injected into the interior through a galvanized steel pipe. Through the cooperation of the first waterstop plate and several second waterstop plates, it is sealed layer by layer. Facing the full-section pressurized aquifer, the risk of initial water leakage can be more effectively avoided.
[0029] The above description is only a preferred feasible embodiment of the present utility model, and does not limit the scope of rights of the present utility model. All equivalent changes made using the contents of the present utility model specification and its drawings are included in the scope of rights of the present utility model.
Claims
1. A full-section pressure-bearing water-bearing sand layer shield starting external water-stop steel box, including a water-stop steel box annularly arranged outside the embedded steel ring of the tunnel door, characterized in that: A first waterstop plate is fixed on the embedded steel ring of the tunnel portal, and several fixing rings are arranged at intervals on the inner side of the waterstop steel box. A second waterstop plate is fixed on the outer side of the fixing ring. The first waterstop plate and the second waterstop plate are of equal width. Galvanized steel pipes are connected on the waterstop steel box and between the first waterstop plate and the second waterstop plate and between adjacent second waterstop plates. One-way ball valves are arranged on the galvanized steel pipes.
2. The external water-stop steel box for starting the full-section pressure-bearing water-bearing sand layer shield according to claim 1 is characterized by: The first water stop plate comprises a first rubber curtain plate and a first flap plate on the outer side. The first rubber curtain plate, the first flap plate, the embedded steel ring and the upper edge of the portal are commonly provided with expansion bolts in the circumferential direction.
3. The external water-stop steel box for starting the full-section pressure-bearing water-bearing sand layer shield according to claim 2 is characterized by: A pad is arranged between the first cord rubber plate and the vertical section of the first flap.
4. The external water-stop steel box for starting the full-section pressure-bearing water-bearing sand layer shield according to claim 1 is characterized by: The second water stop plate comprises a second rubber fabric plate and a second flap plate on the outer side. The second rubber fabric plate, the second flap plate and the fixing ring are commonly provided with fixing bolts along the circumferential direction.
5. The external water-stop steel box for starting the full-section pressure-bearing water-bearing sand layer shield according to claim 3 is characterized by: A pad is provided between the second cord rubber plate and the vertical section of the second flap.
6. The external water-stop steel box for starting the full-section pressure-bearing water-bearing sand layer shield according to claim 1 is characterized by: Four galvanized steel pipes are arranged in the circumferential direction between the first water stop plate and the second water stop plate and between adjacent second water stop plates.
7. The external water-stop steel box for starting the full-section pressure-bearing water-bearing sand layer shield according to claim 1 is characterized by: A first rib plate is arranged between the outer peripheral surface of the water-stop steel box and the tunnel door.
8. The external water-stop steel box for starting the full-section pressure-bearing water-bearing sand layer shield according to claim 1 is characterized by: A second rib plate is arranged between the inner side surface of the fixing ring and the water-stopping steel box.