Filling pipeline capable of preventing pipe blockage

By setting up a multi-stage pressure relief and splash-proof design on the filling pipeline, combining short-term and long-term pressure relief valves, knife gate valves, pinch valves, and pressure sensors, the excessive impact force and high-pressure slurry injection during the filling pipeline are solved. The problem of this problem has achieved safe pressure release and rapid positioning of the pipe blocking position, and improved the efficiency of handling pipe blocking accidents.

CN221943593UInactive Publication Date: 2024-11-01刘立辉 +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420752942.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-12
Publication Date
2024-11-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the pressure relief process, existing filling pipelines have problems such as excessive impact force and high-pressure slurry injection poses safety hazards to staff, making it difficult to effectively prevent pipe blocking accidents.

Method used

A filling pipe prevents the blockage of the pipe is designed. By setting a pressure relief pipe part on each filling pipe section, multiple pressure relief valves and splash-proof pressure relief holes are provided in the pressure relief pipe part, and multi-stage pressure relief and pressure relief The splash design combines short-term and long-term pressure relief valves, knife gate valves and pinch valves, and pressure sensors to gradually reduce the pressure relief pressure and prevent slurry from being sprayed.

Benefits of technology

It effectively avoids the safety hazards of direct pressure relief impact force and high-pressure slurry injection to staff, ensures the safe release of pressure in the filling pipeline and personnel safety, and improves the rapid positioning and dredging efficiency of the blocked pipe position.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221943593U_ABST
    Figure CN221943593U_ABST
Patent Text Reader

Abstract

The utility model discloses a filling pipeline for preventing pipe blockage, which comprises a plurality of filling pipe sections which are sequentially connected end to end, each filling pipe section is at least provided with a pressure relief pipe part with a pressure relief end arranged upwards, a plurality of pressure relief valves are arranged in the pressure relief pipe part, the pressure relief valves divide the pressure relief pipe part into a plurality of pressure relief sections along a pressure relief path, and the pressure relief sections are communicated with the pressure relief pipe part. And a splash-proof pressure relief hole is formed in each pressure relief section. A plurality of pressure relief valves are arranged in a pressure relief pipe part and are used for dividing the pressure relief pipe part into a plurality of pressure relief sections, so that multi-stage pressure relief is formed; in-pipe space of each pressure relief section is a single-time pressure relief space, the pressure relief valves are sequentially opened along the pressure relief path, and the in-pipe space communicated with the filling pipe section is gradually increased, so that the pressure in the filling pipe section is gradually relieved, the unloading pressure at the pressure relief end of the pressure relief pipe part is reduced, and the pressure in the filling pipe section can be safely released.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of filling pipeline dredging, in particular to a filling pipeline capable of preventing pipe blockage. Background Art

[0002] The effective transportation of filling slurry plays a very important role in mine filling. According to the different properties of filling slurry, pipe blockage may occur during the transportation of filling slurry, whether it is gravity flow or pumping. If it is not handled in time or not handled properly, it may cause more serious pipe burst accidents. For mines that partially rely on filling mining or mines without tailings ponds, production can only be resumed after the accident is handled. It can take as short as 3 to 5 days or as long as more than half a month, causing huge economic losses to the mine. Therefore, a method is needed to prevent pipe blockage or quickly deal with pipe blockage accidents.

[0003] At present, there is a lack of corresponding measures for the prevention of pipeline blockage. Most of them are achieved through the conventional form of timely cleaning of the pipeline after the filling slurry is delivered. As for the methods of dealing with pipe blockage accidents, most of them require experienced workers to knock on the pipeline and identify the different tones of the blocked part and other parts to determine the location of the blockage. After finding the location of the blockage, disassemble the flange near the pipeline and clean the pipeline near the blockage to achieve pipeline dredging.

[0004] The following situations may occur during this process:

[0005] 1. The prevention of pipeline blockage is relatively weak. If the prevention is only based on whether the pipeline is blocked, the blockage of the pipeline may not be caused by the single reason of pipeline blockage alone for slurries with high concentration or coarse particles.

[0006] 2. The use of knocking to determine the location of pipe blockage is only applicable to situations where the pipeline distance is not long. For mines with long pipeline transportation distances, it takes a long time to determine the location of the pipe blockage.

[0007] 3. If a pipe is blocked during gravity conveying, knocking on it may cause the blockage to become even more severe.

[0008] 4. After determining the location of the pipe blockage, for pipes that are transported by filling slurry pumping, the pipe pressure at the blocked location is often high. Removing the pipe flange without relieving the pressure of the pipeline may cause harm to personnel.

[0009] The invention patent with patent number CN202011490653.4 discloses a pipeline pressure regulating device and a pipeline pressure regulating method, which relates to the technical field of filling pipelines, including: a pipeline main body, a resistance-increasing pipeline and a pressure relief pipeline; it connects the resistance-increasing pipeline in parallel with the pipeline main body, and when the slurry shows a pipeline high-pressure state in the pipeline main body due to the high drop, the slurry flows into the resistance-increasing pipeline, and the resistance-increasing section reduces the pipeline high pressure of the slurry to prevent pipe burst, and when the pipeline main body is partially blocked, the pressure relief pipeline is opened, and the slurry in the pipeline main body is discharged through the pressure relief pipeline, effectively preventing the occurrence of pipe blockage. However, the above scheme also directly opens the pressure relief pipeline during the pressure relief process. In this way, the direct valve opening pressure relief operation will have the problem of excessive impact force and the risk of pressure relief, and the direct injection of high-pressure slurry will cause safety hazards to the staff.

[0010] Based on this, it is urgent to provide a filling pipeline that can prevent pipe blockage, so that it can effectively avoid the problem of excessive impact force of direct pressure relief and the danger of pressure relief, and at the same time avoid the problem of safety hazards to workers caused by direct injection of high-pressure slurry. Utility Model Content

[0011] In order to overcome the shortcomings of the prior art, the utility model provides a filling pipe for preventing pipe blockage, which can effectively avoid the problem of excessive impact force of direct pressure relief and the danger of pressure relief, and also avoid the problem of safety hazards to workers caused by direct injection of high-pressure slurry.

[0012] In order to solve the above technical problems, the technical solution adopted by the utility model is: to provide a filling pipe for preventing pipe blockage, the filling pipe includes multiple filling pipe sections connected end to end in sequence, each filling pipe section is provided with at least one pressure relief pipe portion with a pressure relief end arranged upward, and multiple pressure relief valves are arranged in the pressure relief pipe portion. The multiple pressure relief valves divide the pressure relief pipe portion into multiple pressure relief segments along the pressure relief path, and each pressure relief segment is provided with a splash-proof pressure relief hole.

[0013] Preferably, the tube body of the pressure relief tube portion is vertically arranged to the tube body of the filling tube section.

[0014] Preferably, a short-term pressure relief valve and a long-term pressure relief valve are sequentially provided in the pressure relief pipe portion along the pressure relief path, the short-term pressure relief valve and the long-term pressure relief valve divide the pressure relief pipe portion into two pressure relief sections, and a splash-proof pressure relief hole is provided on the pipe wall of the pressure relief pipe portion between the short-term pressure relief valve and the long-term pressure relief valve.

[0015] Preferably, the pressure relief direction of the splash-proof pressure relief hole is arranged perpendicular to the pressure relief direction of the pressure relief pipe portion.

[0016] Preferably, a blocking grid is provided on the opening of the anti-splash pressure relief hole.

[0017] Preferably, a shielding brim extends radially outward from the upper end of the opening of the splash-proof pressure relief hole, and the shielding brim is arranged to be inclined downward.

[0018] Preferably, a knife gate valve and a pinch valve are sequentially provided in the pressure relief pipe portion along the pressure relief direction, wherein the knife gate valve is arranged close to one end of the pressure relief pipe portion connected to the filling pipe section, and the pinch valve is arranged close to the pressure relief end of the pressure relief pipe portion.

[0019] Preferably, each filling pipe section is provided with a pressure sensor, and the pressure sensor is arranged close to the pressure relief pipe portion.

[0020] Preferably, the pressure relief pipe portion is arranged away from the connecting flange of the adjacent filling pipe section.

[0021] Preferably, on the filling pipeline, a pressure relief pipe portion is arranged at intervals of 200 to 500 m, and a pressure sensor is arranged at intervals of 500 to 1000 m.

[0022] The beneficial effects of the utility model are:

[0023] The utility model provides a plurality of pressure relief valves in the pressure relief pipe part to divide the pressure relief pipe part into a plurality of pressure relief sections, thereby forming multi-stage pressure relief; the inner space of each pressure relief section is a single pressure relief space, and the pressure relief valves are opened in sequence along the pressure relief path to gradually increase the inner space of the pipe connected with the filling pipe section, thereby gradually releasing the pressure in the filling pipe section, reducing the unloading pressure at the pressure relief end of the pressure relief pipe part, and ensuring that the pressure in the filling pipe section can be released safely; avoiding the problem of excessive impact force of direct pressure relief and the risk of pressure relief, and also avoiding the problem of potential safety hazards to workers caused by direct injection of high-pressure slurry.

[0024] The utility model is provided with a short-term pressure relief valve and a long-term pressure relief valve in sequence along the pressure relief path in the pressure relief pipe part, and the short-term pressure relief valve and the long-term pressure relief valve divide the pressure relief pipe part into two pressure relief sections. When it is necessary to relieve pressure in the filling pipeline, the short-term pressure relief valve is first opened to allow the high-pressure slurry in the filling pipeline to enter the first pressure relief section to achieve pressure relief in the pipe; when the pressure in the first pressure relief section is reduced, the long-term pressure relief valve is opened to make the pressure inside the filling pipeline consistent with the pressure outside.

[0025] The utility model has a shielding brim radially extending outward from the upper end of the opening of the anti-splash pressure relief hole, and the shielding brim is arranged to be inclined downward to block the high-pressure slurry sprayed from the grid of the blocking grille in the air, and at the same time guide the slurry overflowing from the anti-splash pressure relief hole to fall downward, thereby further preventing the slurry spraying from posing a safety hazard to the staff. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a cross-sectional view of a filling pipeline for preventing pipe blockage according to the utility model.

[0027] The markings of the components in the accompanying drawings are as follows:

[0028] 1. Filling pipe section; 2. Pressure relief pipe section; 201. Anti-splash pressure relief hole; 21. Short-term pressure relief valve; 22. Long-term pressure relief valve; 23. Blocking grille; 24. Shielding brim; 3. Pressure sensor. DETAILED DESCRIPTION

[0029] The preferred embodiments of the present invention are described in detail below in conjunction with the accompanying drawings so that the advantages and features of the present invention can be more easily understood by those skilled in the art, thereby making a clearer and more definite definition of the protection scope of the present invention.

[0030] The utility model embodiment provides a filling pipeline for preventing pipe blockage, such as Figure 1 As shown, the filling pipeline includes multiple filling pipe sections 1 connected end to end in sequence, each filling pipe section 1 is provided with at least one pressure relief pipe section 2 with the pressure relief end facing upward, and multiple pressure relief valves are provided in the pressure relief pipe section 2. The multiple pressure relief valves divide the pressure relief pipe section 2 into multiple pressure relief sections along the pressure relief path, and each pressure relief section is provided with a splash-proof pressure relief hole 201. Preferably, on the filling pipeline, a pressure relief pipe section 2 is arranged at intervals of 200 to 500 m, and the pressure relief pipe section 2 is arranged away from the connecting flange of the adjacent filling pipe section 1.

[0031] By providing a plurality of pressure relief valves in the pressure relief pipe section 2, the pressure relief pipe section 2 is divided into a plurality of pressure relief sections, thereby forming a multi-stage pressure relief; the space inside the pipe of each pressure relief section is a single pressure relief space, and the pressure relief valves are opened in sequence along the pressure relief path, and the space inside the pipe connected to the filling pipe section 1 is gradually increased, thereby gradually reducing the pressure in the filling pipe section 1, reducing the unloading pressure at the pressure relief end of the pressure relief pipe section 2, and ensuring that the pressure in the filling pipe section 1 can be safely released; avoiding the problem of excessive impact force of direct pressure relief and the risk of pressure relief, and also avoiding the problem of safety hazards to the staff caused by direct injection of high-pressure slurry. Preferably, the diameter of the pressure relief section between adjacent pressure relief valves is larger than the diameter of the pressure relief pipe section 2, so that the single pressure relief space of the pressure relief pipe section 2 can be increased, and the unloading pressure at the pressure relief end of the pressure relief pipe section 2 can be further reduced.

[0032] like Figure 1As shown, the pipe body of the pressure relief pipe section 2 is arranged vertically with the pipe body of the filling pipe section 1, which can avoid the slurry in the filling pipe from accumulating in the pressure relief pipe as much as possible. Specifically, a short-term pressure relief valve 21 and a long-term pressure relief valve 22 are sequentially arranged along the pressure relief path in the pressure relief pipe section 2, and the short-term pressure relief valve 21 and the long-term pressure relief valve 22 divide the pressure relief pipe section 2 into two pressure relief sections. When it is necessary to relieve the pressure in the filling pipe, first open the short-term pressure relief valve 21 to allow the high-pressure slurry in the filling pipe to enter the first pressure relief section to achieve pressure relief in the pipe; when the pressure in the first pressure relief section is reduced, open the long-term pressure relief valve 22 to make the pressure inside the filling pipe consistent with the pressure outside.

[0033] Among them, the short-term pressure relief valve 21 only needs to control the pressure in the filling pipeline for a short period of time before the long-term pressure relief valve 22 is opened, while the long-term pressure relief valve 22 needs to control it all the time during the process of pressure relief in the filling pipeline. The long-term pressure relief valve 22 needs to be able to work under high pressure for a long time. Therefore, according to the difference in the functions of the pressure relief valve, such as Figure 1 As shown, a knife gate valve and a pinch valve are sequentially arranged in the pressure relief pipe section 2 along the pressure relief direction. The knife gate valve is used to perform short-term control of the pressure in the filling pipe before the pinch valve is opened, and the pinch valve is used to control it all the time during the pressure relief process of the filling pipe to ensure that the pressure relief end is normally opened. Preferably, in order to prevent the slurry in the filling pipe from entering the pressure relief pipe section 2 and solidifying in the pressure relief pipe section 2, the knife gate valve is arranged near one end of the pressure relief pipe section 2 connected to the filling pipe section 1; at the same time, in order to maximize the pressure relief space between the knife gate valve and the pinch valve, the pinch valve is arranged near the pressure relief end of the pressure relief pipe section 2.

[0034] like Figure 1 As shown, a splash-proof pressure relief hole 201 is provided on the wall of the pressure relief pipe 2 between the short-term pressure relief valve 21 and the long-term pressure relief valve 22, which is used to perform primary pressure relief on the pressure in the filling pipe after the short-term pressure relief valve 21 is opened; the pressure relief direction of the splash-proof pressure relief hole 201 is perpendicular to the pressure relief direction of the pressure relief pipe 2, and a blocking grid 23 is provided on the orifice of the splash-proof pressure relief hole 201. In this way, when the short-term pressure relief valve 21 is opened, the high-pressure slurry in the filling pipe enters the first pressure relief section to achieve pressure relief in the pipe, and the slurry sprayed in a straight line is blocked by the long-term pressure relief valve 22 and falls, and the blocking grid 23 at the orifice of the splash-proof pressure relief hole 201 also blocks part of the sprayed slurry to prevent it from being directly sprayed out and splashing the staff. The slurry blocked by the long-term pressure relief valve 22 is weakened after being blocked and relieved, and overflows from the splash-proof pressure relief hole 201.

[0035] Further preferably, a shielding brim 24 extends radially outward from the upper end of the opening of the splash-proof pressure relief hole 201, and the shielding brim is tilted downward to block the high-pressure slurry ejected from the grid of the blocking grille 23 in the air, while guiding the slurry overflowing from the splash-proof pressure relief hole 201 to fall downward, thereby further preventing the slurry injection from posing a safety hazard to the workers.

[0036] like Figure 1 As shown, each filling pipe section 1 is provided with a pressure sensor 3, which is arranged close to the pressure relief pipe section 2, and is used to monitor the pressure in the filling pipe section 1, and judge whether the filling pipeline is blocked and the location of the blocked pipe body by the monitored pressure value. Preferably, a pressure sensor 3 is arranged at intervals of 500m to 1000m.

[0037] Specifically, during the normal slurry transportation process, pay attention to the pressure changes of the pressure sensor 3 in real time. If the pressure of some pressure sensors 3 is abnormally high, and the pressure value of the pressure sensor 3 at the end of the pipeline decreases or even reaches 0, it indicates that a pipe blockage accident has occurred. By checking the pressure values ​​of each pressure sensor 3, the pipe section with the largest pressure value change can be quickly found. The pipe section with the largest pressure value change is the blocked pipe section.

[0038] After determining the blocked pipe section, slowly open the knife gate valve on the pressure relief pipe part 2 of the blocked pipe section, and use the pressure relief space and pressure relief hole between the knife gate valve and the pinch valve to release part of the pressure; after the knife gate valve is fully opened, slowly open the manual pinch valve to make the internal and external pressures of the pipeline consistent. After the pressure relief pipe part 2 of the blocked pipe section is fully opened, remove the flanges at both ends of the blocked pipe section and clean the pipeline in multiple sections.

[0039] The above are only embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A filling pipeline for preventing pipe blockage, characterized in that: The filling pipeline includes multiple filling pipe sections connected end to end in sequence, each filling pipe section is provided with at least one pressure relief pipe portion with a pressure relief end facing upward, multiple pressure relief valves are provided in the pressure relief pipe portion, and the multiple pressure relief valves divide the pressure relief pipe portion into multiple pressure relief sections along the pressure relief path, and each pressure relief section is provided with a splash-proof pressure relief hole.

2. The filling pipe for preventing pipe blockage according to claim 1, characterized in that: The pipe body of the pressure relief pipe portion is vertically arranged with respect to the pipe body of the filling pipe section.

3. The filling pipe for preventing pipe blockage according to claim 1, characterized in that: A short-term pressure relief valve and a long-term pressure relief valve are sequentially arranged inside the pressure relief pipe portion along the pressure relief path. The short-term pressure relief valve and the long-term pressure relief valve divide the pressure relief pipe portion into two pressure relief sections, and a splash-proof pressure relief hole is arranged on the pipe wall of the pressure relief pipe portion between the short-term pressure relief valve and the long-term pressure relief valve.

4. The filling pipeline for preventing pipe blockage according to claim 3, characterized in that: The pressure relief direction of the anti-splash pressure relief hole is arranged perpendicular to the pressure relief direction of the pressure relief pipe portion.

5. The filling pipeline for preventing pipe blockage according to claim 3, characterized in that: A blocking grid is provided on the opening of the anti-splash pressure relief hole.

6. The filling pipeline for preventing pipe blockage according to claim 3, characterized in that: A shielding brim is radially extended outward from the upper end of the opening of the anti-splash pressure relief hole, and the shielding brim is arranged to be inclined downward.

7. The filling pipeline for preventing pipe blockage according to claim 3, characterized in that: A knife gate valve and a pinch valve are sequentially arranged in the pressure relief pipe along the pressure relief direction, wherein the knife gate valve is arranged near one end of the pressure relief pipe connected to the filling pipe section, and the pinch valve is arranged near the pressure relief end of the pressure relief pipe.

8. The filling pipeline for preventing pipe blockage according to claim 1, characterized in that: Each filling pipe section is provided with a pressure sensor, and the pressure sensor is arranged close to the pressure relief pipe portion.

9. The filling pipeline for preventing pipe blockage according to claim 1, characterized in that: The pressure relief pipe portion is arranged away from the connecting flange of the adjacent filling pipe section.

10. The filling pipeline for preventing pipe blockage according to claim 1, characterized in that: On the filling pipeline, a pressure relief pipe portion is arranged at intervals of 200 to 500 m, and a pressure sensor is arranged at intervals of 500 to 1000 m.