High-performance liquefied natural gas loading and unloading arm

By using columns, annular rotating blocks and damping connectors in the liquefied natural gas loading and unloading arms, the problems of complex structure and narrow application scope in the existing technology are solved, and the convenient use and stability of the equipment are improved, which is suitable for a variety of purposes. Liquid and gas delivery.

CN221943930UActive Publication Date: 2024-11-01LIANYUNGANG QISHENG FLUID TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420159170.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-23
Publication Date
2024-11-01
Estimated Expiration
2034-01-23

AI Technical Summary

Technical Problem

The existing high-performance liquefied natural gas loading and unloading arms have complex structures, many components and a narrow range of application. They are prone to insufficient lifting capacity due to gravity or external factors, and cannot effectively load and unload other liquids or gases, and have poor stability.

Method used

A liquefied natural gas loading and unloading arm including columns, annular rotating blocks, fixed plates, L-shaped support columns and damping connectors was designed. Through the coordination of rotating blocks and bolts, the coordination of support columns and threaded rods, the flexibility of transportation pipelines is realized. Adjustment and stabilization of support increase the range of movement and stability of the loading and unloading arm.

Benefits of technology

It improves the convenience and diversity of equipment, enhances the stability and lifting capacity of loading and unloading arms, solves the equipment breakage caused by gravity during the transportation process, and expands the scope of application.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221943930U_ABST
    Figure CN221943930U_ABST
Patent Text Reader

Abstract

The utility model discloses a high-performance liquefied natural gas loading and unloading arm, which relates to the technical field of industrial appliances and comprises a stand column, a plurality of rotatable annular rotating blocks are sleeved on the upper portion of the stand column at equal intervals, hexagon bolts are arranged at the rear ends of the annular rotating blocks, and a plurality of annular grooves matched with the annular rotating blocks are formed in the stand column at equal intervals. Fixing blocks are mounted between the two annular rotating blocks below the middle of the stand column, through holes are formed in the front ends of the tops of the fixing blocks, and conveying pipelines are vertically mounted in the through holes; through the arrangement of the damping connector, vertical angle adjustment of the overhanging arm is facilitated, the efficiency of mechanism adjustment is improved, the function of vertical adjustment of the overhanging arm can be further achieved, the threaded rod on the supporting column is matched with the C-shaped hoop, the overhanging arm is conveniently supported, the stability of the mechanism is improved, and the service life of the mechanism is prolonged. And therefore, the function of stabilizing equipment can be achieved, and the problem that conveying is affected by gravity is finally solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of industrial tools, in particular to a high-performance liquefied natural gas loading and unloading arm. Background Art

[0002] The structure of a high-performance LNG loading and unloading arm usually consists of columns, support arms, movable supports and flexible connectors. Its main function is to transport LNG from storage tanks to tankers or other means of transport. The existing LNG loading and unloading arm structure is relatively complex and requires more components to complete. Secondly, the existing LNG loading and unloading arm is mainly used for spring cylinder adjustment, so its application range is relatively narrow, resulting in the transfer of other liquids or gases. Other types of loading and unloading equipment may be required, which increases the limitations of equipment use. Finally, the lifting capacity of the high-performance LNG loading and unloading arm depends on its design and structure. It is very likely to be broken due to gravity or other external factors during the transportation process. Therefore, the above technical problems need to be solved. Utility Model Content

[0003] The utility model aims to solve the shortcomings in the prior art and proposes a high-performance liquefied natural gas loading and unloading arm.

[0004] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a high-performance liquefied natural gas loading and unloading arm, including a column, a fixed plate is fixedly connected to the lower end of the column, a plurality of rotatable annular rotating blocks are equidistantly sleeved above the column, the rear ends of the annular rotating blocks are provided with hexagonal bolts, a plurality of annular grooves matching the annular rotating blocks are equidistantly opened on the column, and the annular rotating blocks are rotatably sleeved inside the annular grooves, a fixed block is installed between the two annular rotating blocks on the upper part of the column and between the two annular rotating blocks at the lower middle part of the column, a through hole is vertically opened at the front end of the top of the fixed block, and a transport pipeline is vertically installed in the through hole; L-shaped support columns are horizontally installed on the annular rotating block above the middle part of the column and the annular rotating block at the bottom of the column, and support components are installed on the vertical rod sections of the support columns.

[0005] Preferably, the transport pipeline is composed of a first L-shaped tube, a U-shaped tube, a second L-shaped tube, an extended tube arm and an outlet connecting tube located inside the through hole, and a first connector is provided between the top end of the first L-shaped tube and one end of the U-shaped tube, a second connector is installed between the other end of the U-shaped tube and one end of the second L-shaped tube, and a damping connector is installed between the other end of the second L-shaped tube and one end of the extended tube arm; a third connector is installed between the other end of the extended tube arm and the outlet connecting tube.

[0006] Preferably, the support assembly includes a mounting groove vertically opened on the front end surface of the support column upright section, a threaded rod vertically rotatably arranged inside the mounting groove, and a threaded tube sleeved on the threaded rod, a C-shaped clamp is installed on the front end surface of the threaded tube, and the tube body of the extended tube arm is clamped in the C-shaped clamp.

[0007] Preferably, the top end of the threaded rod movably passes through the installation slot and is fixedly connected with a knob.

[0008] Preferably, a plurality of positioning grooves cooperating with the hexagonal bolts are equidistantly formed on the inner wall of the annular groove.

[0009] Preferably, a flange is installed at the other end of the outlet connecting pipe, and a connecting plate is provided at the other end of the first L-shaped pipe.

[0010] Compared with the prior art, the beneficial effects of the utility model are as follows: in the utility model, the connector and the connecting pipe cooperate with each other, which facilitates the rotation adjustment between the pipes, improves the convenience during use, and thus can realize the diversity of equipment use; through the setting of the damping connector, it is convenient to adjust the up and down angles of the outrigger arm, improves the efficiency of the mechanism adjustment, and thus can realize the function of up and down adjustment of the outrigger arm, and then the threaded rod on the support column cooperates with the C-type clamp, which facilitates the support of the outrigger arm, improves the stability of the mechanism, and thus can realize the function of stabilizing the equipment, and finally solves the problem of the influence of conveying gravity. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:

[0012] Figure 1 This is a schematic diagram of the overall three-dimensional structure proposed by the utility model;

[0013] Figure 2 This is a schematic diagram of the overall three-dimensional structure of the rear side proposed by the utility model;

[0014] Figure 3 This is a front structural schematic diagram of the utility model;

[0015] Figure 4 This is a front cross-sectional structural schematic diagram of the utility model;

[0016] Figure 5 The utility model proposed Figure 4 A magnified schematic diagram of the structure in the middle.

[0017] Serial numbers in the figure: 1. column; 2. rotating block; 3. fixed block; 4. connecting plate; 5. first connector; 7. damping connector; 8. extension pipe arm; 9. outlet connecting pipe; 10. support column; 11. C-type clamp; 12. threaded rod; 13. hexagonal bolt. DETAILED DESCRIPTION

[0018] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0019] Example: See Figure 1-5 A high-performance liquefied natural gas loading and unloading arm in the utility model comprises a column 1, a fixed plate is fixedly connected to the lower end of the column 1, a plurality of rotatable annular rotating blocks 2 are equidistantly sleeved above the column 1, and the rear ends of the annular rotating blocks 2 are provided with hexagonal bolts 13, a plurality of annular grooves matching the annular rotating blocks 2 are equidistantly opened on the column 1, and the annular rotating blocks 2 are rotatably sleeved inside the annular grooves, and a fixed block 3 is installed between the two annular rotating blocks 2 on the upper part of the column 1 and between the two annular rotating blocks 2 at the lower middle part of the column 1, a through hole is vertically opened at the front end of the top of the fixed block 3, and a transport pipeline is vertically installed in the through hole; an L-shaped support column 10 is horizontally installed on the annular rotating block 2 above the middle part of the column 1 and the annular rotating block 2 at the bottom of the column 1, and a support assembly is installed on the vertical rod section of the support column 10, and the range of motion of the loading and unloading arm can be effectively expanded by rotating the annular rotating block 2 on the column 1.

[0020] In the utility model, the transport pipeline is composed of a first L-shaped tube, a U-shaped tube, a second L-shaped tube, an extended tube arm 8 and an outlet connecting tube 9 located inside the through hole, and a first connector 5 is provided between the top end of the first L-shaped tube and one end of the U-shaped tube, a second connector is installed between the other end of the U-shaped tube and one end of the second L-shaped tube, and a damping connector 7 is installed between the other end of the second L-shaped tube and one end of the extended tube arm 8; a third connector is installed between the other end of the extended tube arm 8 and the outlet connecting tube 9, and the damping on the inner side of the damping connector 7 blocks each other, which facilitates the up and down angle adjustment of the extended arm, and can effectively improve the convenience of operation.

[0021] In the utility model, the support assembly includes a mounting groove vertically opened on the front end surface of the upright section of the support column 10, a threaded rod 12 vertically rotatably arranged inside the mounting groove, and a threaded tube sleeved on the threaded rod 12, a C-shaped clamp 11 is installed on the front end surface of the threaded tube, and the tube body of the extended tube arm 8 is clamped in the C-shaped clamp 11; the top end of the threaded rod 12 movably passes through the outside of the mounting groove and is fixed with a knob; a plurality of positioning grooves cooperating with hexagonal bolts 13 are equidistantly opened on the inner wall of the annular groove; a flange is installed on the other end of the outlet connecting pipe 9, and a connecting plate 4 is provided at the other end of the first L-shaped tube. By rotating the knob at the top of the threaded rod 12, the up and down positions of the C-shaped clamp 11 can be easily adjusted, so that effective support for the tube body can be achieved.

[0022] Working principle: When the utility model is used, first fix the column 1 in the working area, then rotate the fixed block 3 to the connection surface through the annular rotating block 2, and then connect the connecting plate 4 to the rear transport pipe, and then adjust the position of the first L-shaped pipe by rotating the first connector 5, and then align the connecting pipe by rotating the second connector; secondly, adjust the up and down angles of the outrigger arm 8 through the damping connector 7 to facilitate the connection of pipes at different heights, and then through the damping on the inside of the damping connector 7, the convenience of work can be effectively improved, and then the flange at the rear end of the outlet connecting pipe 9 is connected to other devices; finally, rotate the support column 10 on the lower side of the conveying pipe to one side of the outrigger arm, and then adjust the height of the moving block by rotating the threaded rod 12, and then fix and support the outrigger arm 8 through the C-type clamp 11, and finally, the annular rotating block 2 can be fixed to the column 1 through the hexagonal bolt 13 set on the rear side of the column 1 to prevent it from rotating, which can make the next loading and unloading work more convenient.

[0023] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A high-performance liquefied natural gas loading and unloading arm, comprising a column (1), Features: A fixing plate is fixedly connected to the lower end of the column (1); a plurality of rotatable annular rotating blocks (2) are equidistantly sleeved on the upper part of the column (1); the rear ends of the annular rotating blocks (2) are provided with hexagonal bolts (13); a plurality of annular grooves cooperating with the annular rotating blocks (2) are equidistantly provided on the column (1); and the annular rotating blocks (2) are rotatably sleeved inside the annular grooves; a fixing block (3) is installed between the two annular rotating blocks (2) at the upper part of the column (1) and between the two annular rotating blocks (2) at the lower middle part of the column (1); a through hole is vertically opened at the front end of the top of the fixing block (3), and a transport pipeline is vertically installed in the through hole; an L-shaped support column (10) is horizontally installed on the annular rotating block (2) at the upper middle part of the column (1) and the annular rotating block (2) at the bottom of the column (1), and a support assembly is installed on the vertical rod section of the support column (10).

2. A high performance liquefied natural gas loading and unloading arm according to claim 1, Features: The transport pipeline is composed of a first L-shaped tube, a U-shaped tube, a second L-shaped tube, an extended tube arm (8) and an outlet connecting tube (9) located inside the through hole, and a first connector (5) is provided between the top end of the first L-shaped tube and one end of the U-shaped tube, a second connector is installed between the other end of the U-shaped tube and one end of the second L-shaped tube, and a damping connector (7) is installed between the other end of the second L-shaped tube and one end of the extended tube arm (8); a third connector is installed between the other end of the extended tube arm (8) and the outlet connecting tube (9).

3. A high performance liquefied natural gas loading and unloading arm according to claim 2, Features: The support assembly comprises a mounting groove vertically provided on the front end surface of the upright section of the support column (10), a threaded rod (12) vertically rotatably arranged inside the mounting groove, and a threaded tube sleeved on the threaded rod (12); a C-shaped clamp (11) is installed on the front end surface of the threaded tube, and the tube body of the extended tube arm (8) is clamped in the C-shaped clamp (11).

4. A high performance liquefied natural gas loading and unloading arm according to claim 3, Features: The top end of the threaded rod (12) movably passes through the installation groove and is fixedly connected with a knob.

5. A high performance liquefied natural gas loading and unloading arm according to claim 3, Features: A plurality of positioning grooves matching with the hexagonal bolts (13) are equidistantly formed on the inner wall of the annular groove.

6. A high performance liquefied natural gas loading and unloading arm according to claim 2, Features: The other end of the outlet connecting pipe (9) is provided with a flange, and the other end of the first L-shaped pipe is provided with a connecting plate (4).