Flue gas waste heat recovery system and combustion system
By introducing multi-stage heat exchange structure and countercurrent heat exchange technology into the flue gas waste heat recovery system, the problem of insufficient recovery of flue gas heat in the existing system is solved, and dust removal efficiency and energy utilization efficiency are improved.
Patent Information
- Application Number
- CN202420535188.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-19
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-03-19
AI Technical Summary
The existing flue gas waste heat recovery system cannot fully recover the heat from the flue gas after the air pre-order bypass component, affecting the dust removal efficiency and leading to heat waste.
Design a flue gas waste heat recovery system, including air pre-dump bypass assembly, dust collector, first low-temperature economizer and second low-temperature economizer, through multiple heat exchange plates and channel structures, countercurrent heat exchange technology, to realize Efficient recovery of heat from smoke.
It effectively reduces the flue gas temperature, improves dust removal efficiency, and realizes the full recycling and utilization of the flue gas waste heat, saving energy.
Smart Images

Figure CN221944261U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of waste heat recovery, and in particular to a flue gas waste heat recovery system and a combustion system. Background Art
[0002] In order to achieve energy conservation and carbon reduction, various flue gas waste heat recovery systems have emerged. At present, the air preheater bypass component that uses flue gas waste heat to heat feed water is relatively mature. It includes a bypass flue and a high-pressure economizer and a low-pressure economizer arranged in the bypass flue. The bypass flue introduces part of the flue gas flowing out of the boiler's denitrification outlet flue into the high-pressure economizer and the medium-pressure economizer. The high-pressure economizer is used to recover the heat of the flue gas to heat part of the feed water of the high-pressure heating system on the steam turbine side, and the medium-pressure economizer is used to recover the heat of the flue gas to heat part of the condensate of the low-pressure heating system on the steam turbine side, thereby displacing the steam extracted from the medium-pressure cylinder and the low-pressure cylinder on the original steam turbine side, increasing the power generation of high-quality steam on the steam turbine side, and thus improving the economic efficiency of the unit.
[0003] Usually, the downstream of the air preheater bypass assembly must be equipped with a dust collector and an induced draft fan. The dust collector removes dust from the flue gas after passing through the air preheater bypass assembly, and the induced draft fan provides power for the flow of the flue gas. In actual application, the temperature of the flue gas after passing through the air preheater bypass assembly is around 110°C, and the heat in the flue gas is not fully recovered. The flue gas at this temperature will affect the dust removal efficiency of the dust collector. In addition, when the flue gas enters the induced draft fan, it will be heated up again due to the high temperature inside the induced draft fan, and this part of the increased heat cannot be reused. Therefore, the entire air preheater bypass assembly cannot achieve efficient recovery of flue gas waste heat. Utility Model Content
[0004] The purpose of the utility model is to overcome the problem that the flue gas waste heat in the prior art cannot be efficiently utilized, and to provide a flue gas waste heat recovery system and a combustion system. The flue gas waste heat recovery system has the function of recovering the heat of the flue gas after passing through the air preheater bypass component and after the driver, so as to fully recover the flue gas waste heat and make efficient use of the flue gas waste heat.
[0005] In order to achieve the above-mentioned purpose, the first aspect of the utility model provides a flue gas waste heat recovery system, including: an air preheater bypass assembly, the air preheater bypass assembly is configured to be connected to the outlet flue of the boiler for recovering the heat of the flue gas from the outlet flue; a dust collector, the dust collector is arranged downstream of the air preheater bypass assembly, for removing dust from the flue gas from the air preheater bypass assembly; a first low-temperature economizer, the first low-temperature economizer is arranged between the air preheater bypass assembly and the dust collector, for recovering the heat of the flue gas from the air preheater bypass assembly; a driver, the driver is arranged downstream of the first low-temperature economizer, for providing flow power for the flue gas of the flue gas waste heat recovery system; and a second low-temperature economizer, the second low-temperature economizer is arranged downstream of the driver, for recovering the heat of the flue gas after passing through the driver.
[0006] Preferably, the first low-temperature economizer includes a plurality of hollow first heat exchange plates arranged at intervals perpendicular to the flow direction of the flue gas and a first inlet channel and a first outlet channel connected to the plurality of first heat exchange plates, and a first channel for the flue gas to flow is formed between adjacent first heat exchange plates; and / or, the second low-temperature economizer includes a plurality of hollow second heat exchange plates arranged at intervals perpendicular to the flow direction of the flue gas and a second inlet channel and a second outlet channel connected to the plurality of second heat exchange plates, and a second channel for the flue gas to flow is formed between adjacent second heat exchange plates.
[0007] Preferably, the distance between adjacent first heat exchange plates is greater than or equal to 25 mm; and / or the distance between adjacent second heat exchange plates is greater than or equal to 25 mm.
[0008] Preferably, the flow direction of the medium in the first heat exchange plate is opposite to the flow direction of the flue gas in the first channel; and / or the flow direction of the medium in the second heat exchange plate is opposite to the flow direction of the flue gas in the second channel.
[0009] Preferably, the flue gas waste heat recovery system also includes an output flue duct connected to the downstream of the air preheater bypass assembly, and the output flue duct is configured to be able to transport the flue gas from the air preheater bypass assembly and the air preheater, and the first low-temperature economizer, dust collector, driver and second low-temperature economizer are arranged in the output flue duct in sequence along the flow direction of the flue gas.
[0010] Preferably, the air preheater bypass assembly includes a bypass flue capable of communicating with the outlet flue and a high-pressure economizer and / or a medium-pressure economizer arranged in the bypass flue, and the bypass flue can transport the flue gas in the outlet flue to the first low-temperature economizer.
[0011] Preferably, the medium-pressure economizer includes a plurality of hollow third heat exchange plates arranged at intervals along an extension direction perpendicular to the bypass flue, and a third inlet channel and a third outlet channel connected to the plurality of third heat exchange plates, and a third channel for flue gas flow is formed between adjacent third heat exchange plates.
[0012] Preferably, the distance between adjacent third heat exchange plates is greater than or equal to 25 mm; and / or the flow direction of the medium in the third heat exchange plates is opposite to the flow direction of the flue gas in the third channel.
[0013] Preferably, the air preheater bypass assembly further comprises a baffle movably disposed in the bypass flue, and the baffle can be adjusted to allow different amounts of flue gas to enter the bypass flue.
[0014] The second aspect of the utility model provides a combustion system, comprising a boiler, an air preheater connected to an outlet flue of the boiler, and the above-mentioned flue gas waste heat recovery system, wherein an air preheater bypass component is connected to the outlet flue.
[0015] Through the above technical solution, the flue gas from the boiler outlet flue first passes through the air preheater bypass assembly to recover part of the heat. Before the flue gas enters the dust collector, it first passes through the first low-temperature economizer to fully recover the flue gas heat and then cools the flue gas to below 110°C. After the flue gas at this temperature enters the dust collector, it has little effect on the dust removal efficiency of the dust collector. After the flue gas passes through the driver, the temperature of the flue gas is increased due to the temperature inside the driver. The flue gas output from the driver then enters the second low-temperature economizer, and the heat of the flue gas increased by the driver is recovered through the second low-temperature economizer, so as to fully recycle and utilize this part of the heat. Through the cooperation of the first low-temperature economizer and the second low-temperature economizer with the air preheater bypass assembly, the flue gas heat can be fully and efficiently recovered. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the structure of the flue gas waste heat recovery system of the utility model in cooperation with the outlet flue of the boiler and the air preheater; and
[0017] Figure 2 It is a structural schematic diagram of a first low-temperature economizer, a second low-temperature economizer or a medium-pressure economizer of a flue gas waste heat recovery system.
[0018] Description of Reference Numerals
[0019] 10. Air preheater bypass assembly; 11. Bypass flue; 12. High-pressure economizer; 13. Medium-pressure economizer; 131. Third heat exchange plate; 132. Third inlet channel; 133. Third outlet channel; 14. Baffle; 20. Dust collector; 30. First low-temperature economizer; 31. First heat exchange plate; 32. First inlet channel; 33. First outlet channel; 40. Driver; 50. Second low-temperature economizer; 51. Second heat exchange plate; 52. Second inlet channel; 53. Second outlet channel; 60. Output flue; 80. Air preheater; 90. Outlet flue. DETAILED DESCRIPTION
[0020] In the present invention, unless otherwise specified, directional words such as "inside" and "outside" refer to the inside and outside of the contour of the corresponding component.
[0021] The specific implementation of the present application is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the present application, and is not used to limit the present application.
[0022] See also Figure 1 and Figure 2 As shown, the utility model provides a flue gas waste heat recovery system, including: an air preheater bypass assembly 10, the air preheater bypass assembly 10 is configured to be connected to the outlet flue 90 of the boiler, so as to recover the heat of the flue gas from the outlet flue 90; a dust collector 20, the dust collector 20 is arranged downstream of the air preheater bypass assembly 10, so as to remove dust from the flue gas from the air preheater bypass assembly 10; a first low-temperature economizer 30, the first low-temperature economizer 30 is arranged between the air preheater bypass assembly 10 and the dust collector 20, so as to recover the heat of the flue gas from the air preheater bypass assembly 10; a driver 40, the driver 40 is arranged downstream of the first low-temperature economizer 30, so as to provide flow power for the flue gas of the flue gas waste heat recovery system; and a second low-temperature economizer 50, the second low-temperature economizer 50 is arranged downstream of the driver 40, so as to recover the heat of the flue gas after passing through the driver 40.
[0023] In this embodiment, the flue gas output from the outlet flue 90 is firstly recovered through the air preheater bypass assembly 10 to form flue gas at about 110°C, and then the flue gas is recovered through the first low-temperature economizer 30 to form flue gas below 110°C, for example, 100°C. The flue gas at this temperature enters the dust collector 20, which can reduce the influence of high temperature on the dust removal efficiency of the dust collector 20. The driver 40 provides power for the flow of the flue gas. After the flue gas passes through the driver 40, the temperature rises by 3°C to 4°C. The heat of the flue gas heating and the residual heat in the flue gas are recovered through the second low-temperature economizer 50 to form flue gas below 100°C, for example, 85°C. During the flow of the flue gas, the air preheater bypass assembly 10, the first low-temperature economizer 30 and the second low-temperature economizer 50 all recover the waste heat of the flue gas, so as to achieve full and efficient recovery of the waste heat of the flue gas, avoid waste of heat in the flue gas, and save energy.
[0024] Specifically, the driver 40 may be an induced draft fan. The outlet flue 90 is a denitration outlet flue 90 of a boiler.
[0025] See also Figure 1 and Figure 2As shown, in some embodiments of the utility model, the first low-temperature economizer 30 includes a plurality of hollow first heat exchange plates 31 arranged at intervals perpendicular to the flow direction of the flue gas, and a first inlet channel 32 and a first outlet channel 33 connected to the plurality of first heat exchange plates 31, and a first channel for the flue gas to flow is formed between adjacent first heat exchange plates 31.
[0026] In this embodiment, the flue gas passing through the first low-temperature economizer 30 passes through the first channel. In this process, the heat of the flue gas is absorbed by the medium in the first heat exchange plate 31 and is taken to the external device as a heat source to realize the utilization of the heat of the flue gas, such as heating the condensed water in the combustion system where the boiler is located. The external device is connected to the first inlet channel 32 and the first outlet channel 33. Since the flue gas will generate resistance when passing through the first low-temperature economizer 30, the first low-temperature economizer 30 is set to a plate heat exchanger structure so that the path of the first channel formed by the first heat exchange plate 31 can be parallel to the flow direction of the flue gas, reducing the resistance generated when the flue gas passes through the first channel, reducing the erosion and wear of the first heat exchange plate 31, and having a uniform flow field.
[0027] Specifically, the first low-temperature economizer 30 can withstand a medium pressure within 14 MPa. The first heat exchange plate 31 can be made of corrosion-resistant 2205 steel to reduce the corrosion of the low-temperature flue gas passing through the first channel to the first heat exchange plate 31. The first inlet channel 32 and the first outlet channel 33 are formed by different pipeline cavities.
[0028] See also Figure 1 and Figure 2 As shown, in some embodiments of the present invention, the distance between adjacent first heat exchange plates 31 is greater than or equal to 25 mm.
[0029] In this embodiment, the distance between adjacent first heat exchange plates 31 is the width of the first channel. Since the flue gas contains dust, the width of the first channel is set to be greater than or equal to 25 mm. This width can prevent the flue gas from accumulating dust and bridging in the first channel, thereby preventing the flue gas from being blocked in the first channel.
[0030] Specifically, the width of the first channel is preferably 25 mm.
[0031] See also Figure 1 and Figure 2 As shown, in some embodiments of the present invention, the flow direction of the medium in the first heat exchange plate 31 is opposite to the flow direction of the flue gas in the first channel.
[0032] In this embodiment, the medium in the first heat exchange plate 31 forms a countercurrent with the flue gas in the first channel, thereby improving the heat exchange efficiency of both and increasing the flue gas heat recovery effect of the first low-temperature economizer 30, thereby achieving full recovery of flue gas heat.
[0033] See also Figure 1 and Figure 2 As shown, in some embodiments of the utility model, the second low-temperature economizer 50 includes a plurality of hollow second heat exchange plates 51 arranged at intervals perpendicular to the flow direction of the flue gas, and a second inlet channel 52 and a second outlet channel 53 connected to the plurality of second heat exchange plates 51, and a second channel for the flue gas to flow is formed between adjacent second heat exchange plates 51.
[0034] In this embodiment, the flue gas passing through the second low-temperature economizer 50 passes through the second channel. In this process, the heat of the flue gas is absorbed by the medium in the second heat exchange plate 51 and is taken to an external device as a heat source to realize the utilization of the heat of the flue gas, such as a heater of the combustion system where the heating boiler is located. The external device is connected to the second inlet channel 52 and the second outlet channel 53. Since the flue gas will generate resistance when passing through the second low-temperature economizer 50, the second low-temperature economizer 50 is set to a plate heat exchanger structure, so that the path of the second channel formed by the second heat exchange plate 51 can be parallel to the flow direction of the flue gas, reducing the resistance generated when the flue gas passes through the second channel, thereby reducing the erosion and wear of the second heat exchange plate 51, and having a uniform flow field.
[0035] Specifically, the second low-temperature economizer 50 can withstand a medium pressure within 14 MPa. The second heat exchange plate 51 can be made of corrosion-resistant 2205 steel to reduce the corrosion of the low-temperature flue gas passing through the second channel to the second heat exchange plate 51. The second inlet channel 52 and the second outlet channel 53 are formed by different pipeline cavities.
[0036] See also Figure 1 and Figure 2 As shown, in some embodiments of the present invention, the distance between adjacent second heat exchange plates 51 is greater than or equal to 25 mm.
[0037] In this embodiment, the distance between adjacent second heat exchange plates 51 is the width of the second channel. A large amount of dust in the flue gas before entering the second channel has been intercepted by the dust collector 20, and it is not easy to be blocked in the second channel. The width of the second channel is set to increase the speed of the flue gas passing through the second channel and improve the heat exchange efficiency. Since the temperature of the flue gas after passing through the driver 40 is already low, the heat that can be recovered therein is also less. Therefore, even if the flue gas passes through the second channel at a faster speed, it can ensure that the heat in the flue gas is fully recovered.
[0038] Specifically, the width of the second channel is preferably 25 mm.
[0039] See also Figure 1 and Figure 2 As shown, in some embodiments of the present invention, the flow direction of the medium in the second heat exchange plate 51 is opposite to the flow direction of the flue gas in the second channel.
[0040] In this embodiment, the medium in the second heat exchange plate 51 forms a countercurrent with the flue gas in the second channel, thereby improving the heat exchange efficiency of both and increasing the flue gas heat recovery effect of the second low-temperature economizer 50, thereby achieving full recovery of flue gas heat.
[0041] See also Figure 1 and Figure 2 As shown, in some embodiments of the utility model, the flue gas waste heat recovery system also includes an output flue 60 connected to the downstream of the air preheater bypass assembly 10, and the output flue 60 is configured to be able to transport the flue gas from the air preheater bypass assembly 10 and the air preheater 80, and the first low-temperature economizer 30, the dust collector 20, the driver 40 and the second low-temperature economizer 50 are arranged in sequence in the output flue 60 along the flow direction of the flue gas.
[0042] In this embodiment, the output flue 60 is used to guide the flow of flue gas, and at the same time, provides a space for heat exchange with flue gas for the first low-temperature economizer 30, the dust collector 20, the driver 40 and the second low-temperature economizer 50. The output flue 60 is also connected to the air preheater 80, and the flue gas discharged from the outlet flue 90 is divided into two parts, one part enters the air preheater bypass assembly 10, and the other part enters the air preheater 80. After the air preheater 80 recovers the heat, there is residual heat. This part of the flue gas continues to enter the output channel, passes through the first low-temperature economizer 30 and the second low-temperature economizer 50 for heat recovery again, avoiding the waste of residual heat and improving the recovery effect of flue gas heat.
[0043] See also Figure 1 and Figure 2 As shown, in some embodiments of the utility model, the air preheater bypass assembly 10 includes a bypass flue 11 that can be connected to the outlet flue 90 and a high-pressure economizer 12 and a medium-pressure economizer 13 arranged in the bypass flue 11. The bypass flue 11 can transport the flue gas in the outlet flue 90 to the first low-temperature economizer 30.
[0044] In this embodiment, the flue gas of the outlet flue 90 is divided into two parts, one part of which enters the bypass flue 11. During the flow in the bypass flue 11, the high-pressure economizer 12 and the medium-pressure economizer 13 recover heat, so that the temperature of the flue gas is reduced to 110±5°C when entering the output flue 60, so that the high-temperature heat in the flue gas is utilized by the high-pressure economizer 12 and the medium-pressure economizer 13. The high-pressure economizer 12 utilizes the high-temperature heat of the flue gas to heat part of the feed water of the high-pressure heating system on the steam turbine side, and the medium-pressure economizer 13 utilizes the high-temperature heat of the flue gas to heat part of the condensate of the low-pressure heating system on the steam turbine side.
[0045] Specifically, the high-pressure economizer 12 and the medium-pressure economizer 13 are arranged in sequence along the flow direction of the flue gas, and the high-pressure economizer 12, the medium-pressure economizer 13, the first low-temperature economizer 30 and the second low-temperature economizer 50 form a four-stage gradient heat recovery to make full use of the waste heat in the flue gas. The high-pressure economizer 12 is connected in parallel with the high-pressure heater on the turbine side. Since the medium (part of the feed water of the high-pressure heater system on the turbine side) that exchanges heat with the flue gas in the high-pressure economizer 12 has a high pressure, the high-pressure economizer 12 is set as a tube-in-tube heat exchanger that can withstand a pressure of 35MPa, which is sufficient to withstand the pressure of the internal medium.
[0046] In other embodiments, only the high-pressure economizer 12 or only the medium-pressure economizer 13 may be provided in the bypass flue 11 .
[0047] See also Figure 1 and Figure 2 As shown, in some embodiments of the utility model, the medium-pressure economizer 13 includes a plurality of hollow third heat exchange plates 131 arranged at intervals along an extension direction perpendicular to the bypass flue 11, and a third inlet channel 132 and a third outlet channel 133 connected to the plurality of third heat exchange plates 131, and a third channel for flue gas flow is formed between adjacent third heat exchange plates 131.
[0048] In this embodiment, in order to reduce the resistance generated when the flue gas passes through the medium-pressure economizer 13 and reduce the erosion and wear of the third heat exchange plate 131, the medium-pressure economizer 13 is set as a plate heat exchanger structure, so that the path of the third channel formed by the third heat exchange plate 131 can be parallel to the flow direction of the flue gas, and it also has the function of uniform flow field. At the same time, the pressure of the medium (part of the condensate of the low-pressure heating system on the steam turbine side) that exchanges heat with the flue gas in the medium-pressure economizer 13 is small, and the third heat exchange plate 131 is sufficient to withstand the pressure of the internal medium. The third inlet channel 132 and the third outlet channel 133 are connected in parallel with the low-pressure heater on the steam turbine side to circulate the condensate into the third heat exchange plate 131 of the medium-pressure economizer 13. The condensate is divided from the third inlet channel 132 into each third heat exchange plate 131, and after heat exchange with the flue gas in the third channel, it converges to the third outlet channel 133 and flows out from the third outlet channel 133.
[0049] Specifically, the medium-pressure economizer 13 adopts integrated welding technology and can withstand a pressure of 14 MPa. The third heat exchange plate 131 can be made of corrosion-resistant 2205 steel to prevent the low-temperature flue gas passing through the third channel from corroding the third heat exchange plate 131. The third inlet channel 132 and the third outlet channel 133 are formed by different pipeline cavities.
[0050] See also Figure 1 and Figure 2 As shown, in some embodiments of the present invention, the distance between adjacent third heat exchange plates 131 is greater than or equal to 25 mm.
[0051] In this embodiment, the distance between adjacent third heat exchange plates 131 is the width of the third channel. Since the flue gas contains dust, the width of the third channel is set to be greater than or equal to 25 mm. This width can prevent the flue gas from accumulating dust and bridging in the third channel, thereby preventing the flue gas from being blocked in the third channel.
[0052] Specifically, the width of the third channel is preferably 25 mm.
[0053] See also Figure 1 and Figure 2 As shown, in some embodiments of the present invention, the flow direction of the medium in the third heat exchange plate 131 is opposite to the flow direction of the flue gas in the third channel.
[0054] In this embodiment, the medium in the third heat exchange plate 131 forms a countercurrent with the flue gas in the third channel, thereby improving the heat exchange efficiency of both and increasing the flue gas heat recovery effect of the medium-pressure economizer 13, thereby achieving full recovery of the flue gas heat.
[0055] See also Figure 1 and Figure 2 As shown, in some embodiments of the present invention, the air preheater bypass assembly 10 further includes a baffle 14 movably disposed in the bypass flue 11 , and the baffle 14 can be adjusted to allow different amounts of flue gas to enter the bypass flue 11 .
[0056] In this embodiment, the baffle 14 is used to control the amount of flue gas entering the bypass flue 11. The opening of the baffle 14 is adjusted according to the quality of different coals burned in the boiler. The moisture content of the coal is different, and the amount of flue gas generated is different. The larger the flue gas volume, the more heat of the flue gas can be recovered and utilized by the high-pressure economizer 12 and the medium-pressure economizer 13 in the bypass flue 11, and the better the economy of the entire flue gas waste heat recovery system.
[0057] Specifically, when the moisture content of the coal is greater than 25%, the smoke entering the bypass flue 11 is adjusted to account for 18% of the smoke volume of the outlet flue 90 through the baffle 14; when the moisture content of the coal is 15% to 25%, the smoke entering the bypass flue 11 is adjusted to account for 15% of the smoke volume of the outlet flue 90 through the baffle 14; when the moisture content of the coal is less than 15%, the smoke entering the bypass flue 11 is adjusted to account for 13% of the smoke volume of the outlet flue 90 through the baffle 14. The baffle 14 is rotatably connected to the inner wall of the bypass flue 11, and the adjustment method of the baffle 14 can be the same as the adjustment method of the existing shutters.
[0058] In other embodiments, the baffle 14 is driven by a motor, and the motor can be connected to a control terminal for communication to achieve online adjustment of the baffle 14 , thereby achieving online adjustment of the smoke intake of the bypass flue 11 .
[0059] The second aspect of the utility model provides a combustion system, including a boiler, an air preheater 80 connected to an outlet flue 90 of the boiler, and the above-mentioned flue gas waste heat recovery system, wherein an air preheater bypass assembly 10 is connected to the outlet flue 90 .
[0060] In this embodiment, the waste heat of flue gas recovered by the flue gas waste heat recovery system through the four-level gradient is utilized in the combustion system, which can significantly reduce coal consumption. The flue gas waste heat recovery system of the combustion system has the same technical scheme and the same technical effect as the above-mentioned flue gas waste heat recovery system, which will not be repeated here.
[0061] The preferred embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited thereto. Within the technical concept of the present invention, the technical solution of the present invention can be subjected to a variety of simple modifications, including the combination of various specific technical features in any suitable manner. In order to avoid unnecessary repetition, the present invention will not further describe various possible combinations. However, these simple modifications and combinations should also be regarded as the contents disclosed by the present invention and belong to the protection scope of the present invention.
Claims
1. A flue gas waste heat recovery system, characterized in that: include: An air preheater bypass assembly (10), the air preheater bypass assembly (10) being configured to be in communication with an outlet flue (90) of a boiler, so as to recover heat from flue gas from the outlet flue (90); a dust collector (20), the dust collector (20) being arranged downstream of the air preheater bypass assembly (10) and being used for removing dust from the flue gas of the air preheater bypass assembly (10); a first low-temperature economizer (30), the first low-temperature economizer (30) being arranged between the air preheater bypass assembly (10) and the dust collector (20) to recover heat from the flue gas of the air preheater bypass assembly (10); A driver (40), the driver (40) being arranged downstream of the first low-temperature economizer (30) to provide a driving force for the flue gas of the flue gas waste heat recovery system to flow; as well as A second low-temperature economizer (50), wherein the second low-temperature economizer (50) is disposed downstream of the driver (40) to recover heat from the flue gas after passing through the driver (40).
2. The flue gas waste heat recovery system according to claim 1, characterized in that: The first low-temperature economizer (30) comprises a plurality of hollow first heat exchange plates (31) arranged at intervals perpendicular to the flow direction of the flue gas, and a first inlet channel (32) and a first outlet channel (33) connected to the plurality of first heat exchange plates (31), wherein a first channel for the flue gas to flow is formed between adjacent first heat exchange plates (31); and / or, The second low-temperature economizer (50) includes a plurality of hollow second heat exchange plates (51) arranged at intervals perpendicular to the direction of flue gas flow, and a second inlet channel (52) and a second outlet channel (53) connected to the plurality of second heat exchange plates (51), and a second channel for flue gas flow is formed between adjacent second heat exchange plates (51).
3. The flue gas waste heat recovery system according to claim 2, characterized in that: The distance between adjacent first heat exchange plates (31) is greater than or equal to 25 mm; and / or, The distance between adjacent second heat exchange plates (51) is greater than or equal to 25 mm.
4. The flue gas waste heat recovery system according to claim 2, characterized in that: The flow direction of the medium in the first heat exchange plate (31) is opposite to the flow direction of the flue gas in the first channel; and / or, The flow direction of the medium in the second heat exchange plate (51) is opposite to the flow direction of the flue gas in the second channel.
5. The flue gas waste heat recovery system according to claim 1, characterized in that: The flue gas waste heat recovery system also includes an output flue duct (60) connected to the downstream of the air preheater bypass assembly (10), and the output flue duct (60) is configured to be able to transport flue gas from the air preheater bypass assembly (10) and the air preheater (80), and the first low-temperature economizer (30), the dust collector (20), the driver (40) and the second low-temperature economizer (50) are sequentially arranged in the output flue duct (60) along the flow direction of the flue gas.
6. The flue gas waste heat recovery system according to any one of claims 1 to 5, characterized in that: The air preheater bypass assembly (10) comprises a bypass flue (11) capable of communicating with the outlet flue (90) and a high-pressure economizer (12) and / or a medium-pressure economizer (13) arranged in the bypass flue (11); the bypass flue (11) is capable of transporting the flue gas in the outlet flue (90) to the first low-temperature economizer (30).
7. The flue gas waste heat recovery system according to claim 6, characterized in that: The medium-pressure economizer (13) comprises a plurality of hollow third heat exchange plates (131) arranged at intervals along an extension direction perpendicular to the bypass flue (11), and a third inlet channel (132) and a third outlet channel (133) connected to the plurality of third heat exchange plates (131), and a third channel for flue gas flow is formed between adjacent third heat exchange plates (131).
8. The flue gas waste heat recovery system according to claim 7, characterized in that: The distance between adjacent third heat exchange plates (131) is greater than or equal to 25 mm; and / or, The flow direction of the medium in the third heat exchange plate (131) is opposite to the flow direction of the flue gas in the third channel.
9. The flue gas waste heat recovery system according to claim 6, characterized in that: The air preheater bypass assembly (10) further comprises a baffle (14) movably arranged in the bypass flue (11), wherein the baffle (14) is adjustable to allow different amounts of flue gas to enter the bypass flue (11).
10. A combustion system, characterized in that: It comprises a boiler, an air preheater (80) connected to an outlet flue (90) of the boiler, and a flue gas waste heat recovery system according to any one of claims 1 to 9, wherein the air preheater bypass assembly (10) is connected to the outlet flue (90).
