Foundation compression layer settlement monitoring device
By using anchor head and wire-pull displacement meter in the settlement monitoring of foundation compression layer, combined with an automated data acquisition system, the problem of synchronization and measurement error between soil layer and monitoring components is solved, and high-precision and continuous settlement monitoring is achieved, which can be achieved in real time Reflects the change law of settlement.
Patent Information
- Application Number
- CN202420226542.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-30
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-01-30
AI Technical Summary
In the existing foundation compression layer settlement monitoring technology, the soil layer and the monitoring components cannot be synchronized, and the measurement error of the traditional method is large and affected by the weather, so continuous monitoring cannot be achieved, and the law of changing settlement with time cannot be obtained.
A measuring device including anchor head, tie rod, wire-type displacement meter, settlement disc, settlement telescopic tube and instrument installation box was designed. The anchor head and the real soil layer are reinforced by cement mortar, and the wire-type displacement meter is used for monitoring. An automated data acquisition system is also set up to fill the drill holes with fine sand to reduce damage.
The stability of the anchor head is achieved, the accuracy and continuity of settlement monitoring is improved, artificial errors are reduced, and the time variation pattern of settlement amount can be reflected in real time, avoiding the tension rod breakage and damage to the monitoring device.
Smart Images

Figure CN221945202U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building settlement monitoring, in particular to a foundation compression layer settlement monitoring device. Background Art
[0002] Under the action of building foundation load, the sum of the soil layers that produce most of the settlement in the foundation soil is called the foundation compression layer. The settlement of the foundation compression layer is an important monitoring indicator in geotechnical engineering. The purpose is to determine the settlement or the change law of settlement over time, so as to find hidden dangers early and take timely maintenance measures. Through long-term data accumulation, the future settlement trend can be predicted and corresponding preventive measures can be formulated to effectively protect the integrity and long-term performance of the project. The monitoring of the settlement of the foundation compression layer currently has the following defects: First, when using a settlement meter for settlement monitoring, a small settlement plate is placed at the bottom of the displacement transfer rod during the burial process, which can be considered to form a whole. In fact, the small and medium settlement plates cannot be completely synchronized with the deep immovable soil layer; second, the traditional deep marking method uses a protective casing to lead the settlement changes of soil layers at different depths to the ground through a measuring rod, and uses the leveling height measurement method for observation. The artificial measurement error is large, and it is greatly affected by the weather, so continuous monitoring cannot be achieved, and the complete change law of settlement over time cannot be obtained. Utility Model Content
[0003] Aiming at the problem in the prior art that the soil layer and the monitoring components cannot be synchronized and the monitoring data is discontinuous, the utility model provides a foundation compression layer settlement monitoring device.
[0004] The utility model is realized by the following technical solutions:
[0005] A foundation compression layer settlement monitoring device comprises a measuring device and a data processing module. The measuring device comprises an anchor head, a pull rod, a wire displacement meter, a settlement plate, a settlement telescopic tube and an instrument installation box. The anchor head is buried in the bottom immovable soil layer of a pre-dug hole in the foundation. The anchor head is integrally connected with the immovable soil layer through cement mortar. One end of the pull rod is connected to the anchor head, and the other end is connected to the wire of the wire displacement meter through an instrument connector.
[0006] The settlement plate is fixed at the opening of the borehole; the wire displacement meter is set above the borehole through the instrument installation box, and the wire of the wire displacement meter is coaxial with the borehole; the wire runs through the settlement plate and is connected to the top of the instrument joint; after installation, the wire is in a stretched state; the gap in the borehole is filled with fine sand;
[0007] One end of the sedimentation telescopic tube is connected to the instrument joint, and the other end is connected to the sedimentation plate;
[0008] The data processing module includes a data acquisition system and a power supply system. The output end of the wire-drawing displacement meter is connected to the data acquisition system, and the output end of the power supply system is connected to the input end of the data acquisition system; the output end of the data acquisition system is connected to the monitoring interface of the external monitoring center.
[0009] Preferably, the drilled hole is a straight hole, and the verticality deviation thereof is no more than 1%.
[0010] Preferably, the depth of the anchor head in the immovable soil layer is 0.3m to 0.5m.
[0011] Preferably, the strength grade of cement mortar is not less than M5.
[0012] Preferably, the pull rod is formed by splicing a plurality of marking rods, and two adjacent marking rods are connected via a pull rod joint.
[0013] Preferably, the sedimentation plate includes a coaxial and integrally formed top annular structure and a hollow tube, the top annular structure is fixed at the borehole opening, the hollow tube is located inside the borehole, and the sedimentation telescopic tube is connected to the hollow tube; the pull wire passes through the center of the top annular structure and extends along the hollow tube and the sedimentation telescopic tube, and then is connected to the top of the instrument connector.
[0014] Preferably, a mounting groove lower than the ground is dug at the top of the drill hole, and the top annular structure of the sedimentation plate is fixed to the bottom of the mounting groove.
[0015] Preferably, the settlement telescopic tube is connected to the hollow tube of the settlement plate by a telescopic tube joint, and the hollow tube is embedded in the top of the settlement telescopic tube.
[0016] Preferably, a connecting telescopic tube is sleeved on the outside of the pull rod, one end of the connecting telescopic tube is connected to the bottom of the instrument joint, and the other end is fixed to the outside of the pull rod by cement mortar.
[0017] Preferably, the fineness modulus of the fine sand is 2.2 to 1.6, and the average particle size is 0.25 mm to 0.125 mm.
[0018] Compared with the prior art, the utility model has the following beneficial effects:
[0019] The utility model is a foundation compression layer settlement monitoring device. First, cement mortar is used to reinforce the anchor head and the immovable soil layer to achieve the integrity of the two and ensure the stability of the bottom of the settlement mark. The bottom of the anchor head can be considered as the immovable soil layer to avoid affecting the accuracy of the settlement monitoring results due to the movement of the anchor head. Secondly, a pull-wire displacement meter is used for settlement monitoring. It has high sensitivity to settlement changes, high monitoring accuracy and adjustable range. Thirdly, an automatic acquisition system is set up to transmit the monitoring data to the monitoring center. It is less affected by severe weather such as strong winds, rain and snow, and reduces the error of manual readings, ensuring the continuity, accuracy and real-time nature of the monitoring data, and can reflect the amount of settlement and the law of change over time. Finally, fine sand is used instead of backfill soil to reduce the serious damage caused by soil blocks and stones to the settlement mark and telescopic tube.
[0020] Furthermore, the telescopic tube is arranged so that the deformation of the telescopic tube is synchronized with the settling of fine sand in the hole, thereby avoiding excessive development of settlement causing the pull rod to break and thus damaging the monitoring device. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 This is a schematic diagram of the foundation compression layer settlement measurement device of the utility model;
[0022] Figure 2 This is a schematic diagram of the anchor head top pressing into place of the foundation compression layer settlement device of the utility model;
[0023] Figure 3 For this utility model Figure 2 Enlarged view of point A in the middle;
[0024] Figure 4 This is a schematic diagram of cement mortar pouring in the foundation compression layer settlement device of the utility model.
[0025] In the figure, 1. anchor head; 2. grouting tube; 3. pull rod; 4. fine sand; 5. connecting telescopic tube; 6. settlement telescopic tube; 7. pull rod joint; 8. instrument joint; 9. pull-wire displacement meter; 10. telescopic tube joint; 11. instrument installation box; 12. settlement plate; 13. bolt; 14. cement mortar; 15. wire rope; 16. drilling hole; 17. pull wire; 18. installation groove; 19. installation hole; 20. lifting ring; 21. installation auxiliary rod; 22. data acquisition system; 23. data cable; 24. monitoring center; 25. power supply system. DETAILED DESCRIPTION
[0026] The present invention will be further described in detail below in conjunction with specific embodiments, which are intended to explain the present invention rather than to limit it.
[0027] The utility model discloses a foundation compression layer settlement monitoring device, referring to Figure 1 , including measuring devices and data processing modules, refer to Figure 2 The measuring device includes an anchor head 1, a pull rod 3, a pull-wire displacement meter 9, a settlement plate 12, a connecting telescopic tube 5, a settlement telescopic tube 6 and an instrument installation box 11.
[0028] The anchor head 1 is buried in the bottom immovable soil layer of the pre-drilled borehole 16 of the foundation. The anchor head 1 forms an integral body with the immovable soil layer through cement mortar 14 to ensure the stability of the bottom of the measuring device; wherein the borehole 16 is a straight hole with a diameter of 150-180 mm, and its verticality deviation is not more than 1%; the depth of the anchor head 1 in the immovable soil layer is 0.3m-0.5m. A slot is provided at the top of the anchor head 1 for connecting with the grouting tube 2 so that the cement mortar 14 can be injected through the grouting tube 2. The slot can prevent the cement mortar 14 from leaking out when grouting into the tube and installing the settlement mark. The strength grade of the cement mortar 14 is not less than M5. Two symmetrical holes are provided at the top of the grouting tube 2, and a steel wire rope 15 at least 3m longer than the hole depth is connected at the two holes. The diameter of the steel wire rope 15 is between 2.0 and 3.0 mm, so that the grouting tube 2 can be extracted after grouting.
[0029] The settling plate 12 is fixed at the opening of the borehole 16; the settling plate 12 includes a coaxial and integrally formed top annular structure and a hollow tube, and a mounting groove 18 below the ground is excavated at the top of the borehole 16 for mounting the top annular structure of the settling plate 12. The top annular structure of the settling plate 12 is fixed to the bottom of the mounting groove 18 by bolts or anchor structures. In this embodiment, the mounting groove 18 is 300 to 500 mm deep, the outer diameter of the top annular structure is 60 to 80 cm, and the hollow tube is located inside the borehole 16.
[0030] Reference Figure 3 One end of the settlement telescopic tube 6 is connected to the instrument connector 8, and the other end is connected to the hollow tube of the settlement plate 12 by a telescopic tube connector 10, and the hollow tube is embedded in the top of the settlement telescopic tube 6. The hollow tube extends into the settlement telescopic tube 6, firstly, it can play a role in sharing the burden. The surface working conditions are complicated, and the hollow tube can protect the top of the settlement telescopic tube 6. Secondly, the settlement plate 12 is an integral body, which can prevent the orifice debris from falling into the protection tube and having an adverse effect on the settlement measuring device.
[0031] One end of the tie rod 3 is connected to the anchor head 1, and the other end is connected to the tie wire 17 of the tie wire displacement meter 9 through the instrument connector 8. The tie rod 3 is formed by splicing a plurality of benchmarks, and two adjacent benchmarks are connected through a tie rod connector 7.
[0032] Reference Figure 4, the wire-drawing displacement meter 9 is arranged above the borehole 16 through the instrument installation box 11. The instrument installation box 11 is an open cylinder, which is inverted on the settlement plate 12 and fixed on the settlement plate 12 through bolts 13 and the installation holes 19 on the settlement plate 12; the wire-drawing displacement meter 9 is fixed to the inner top of the instrument installation box 11 by screws, and the wire 17 of the wire-drawing displacement meter 9 is coaxial with the borehole 16. The wire 17 runs through the center of the top annular structure and extends along the hollow tube and the settlement telescopic tube 6, and then connects to the top of the instrument connector 8. In order to facilitate the installation of the wire-drawing displacement meter 9, first connect the wire 17 of the wire-drawing displacement meter 9 to the lifting ring 20, and place the wire-drawing displacement meter 9 in the orifice first. At this time, the wire 17 is in a stretched state, and the stretched range is about 2 / 3 of the maximum range.
[0033] A connecting telescopic tube 5 is sleeved on the outside of the tie rod 3, one end of the connecting telescopic tube 5 is connected to the bottom of the instrument joint 8, and the other end is fixed to the outside of the tie rod 3 by cement mortar 14. In this embodiment, the connecting telescopic tube 5 and the settlement telescopic tube 6 are coaxial, and both are connected to the side of the instrument joint 8. The connecting telescopic tube 5 is sleeved on the outer sleeve of the tie rod 3, and the deformation of the connecting telescopic tube 5 is synchronized with the settlement of the fine sand 4 in the hole, which avoids the breakage of the tie rod 3 caused by excessive settlement development and the damage to the monitoring device. The gap part of the borehole 16 is filled with fine sand 4, which can reduce the serious damage caused by soil and stones to the settlement mark and the connecting telescopic tube 5.
[0034] The data processing module includes a data acquisition system 22 and a power supply system 25. The output end of the pull-wire displacement meter 9 is connected to the data acquisition system 22 through a data cable 23, and the output end of the power supply system 25 is connected to the input end of the data acquisition system 22 through a data cable 23; the output end of the data acquisition system 22 is connected to the monitoring interface of the external monitoring center 24 through a wireless network.
[0035] The utility model provides a construction method of a foundation compression layer settlement monitoring device as follows:
[0036] Step 1: Drilling of buried holes
[0037] Step 101: Survey and lay out. Use GNSSRTK to locate and lay out the settlement monitoring holes. The hole position deviation should be controlled within 200 mm.
[0038] Step 102, determine the designed settlement measurement depth and diameter, use the drilling equipment 16 to drill the buried hole, the verticality deviation of the straight hole is not more than 1%, clean the bottom of the buried hole, and excavate the installation groove 18. In this embodiment, the depth of the installation groove 18 is 0.5m below the ground, the diameter is 0.7m, and the buried hole diameter is 150mm.
[0039] Step 2: Installation of displacement transmission device
[0040] Step 201, pre-installation inspection, first measure the wire displacement meter 9 to ensure it is intact, then check the installation accessories, such as the pull rod 3, the connecting telescopic tube 5, the installation auxiliary rod 21, etc., and finally check the installation tools.
[0041] Step 202, connect the two sections of the tie rod 3 through the tie rod joint 7, then fix one end of the tie rod with the anchor head 1, then put the connecting telescopic tube 5 on the tie rod 3, then put the grouting tube 2 on the anchor head 1, connect the wire rope 15 with the two symmetrical holes on the grouting tube 2, tie a knot, and then inject cement mortar 14 into the tube, insert the anchor assembly filled with cement mortar into the hole to the hole mouth, connect the next section of the tie rod 3 and the protective tube, and continue to insert it into the hole. During grouting, use a tool to knock on the outside of the cement mortar 14 tube to ensure that the tube is filled with cement mortar 14, and the length of the wire rope 15 is at least 3m longer than the hole depth. In this embodiment, the top slot width of the anchor head 1 is 3.5mm, the diameter of the cement mortar 14 tube is 100mm, the thickness is 3.0mm, and the length is 1.2m. The wire rope 15 connected to the symmetrical holes on the cement mortar 14 tube has a diameter of 2mm.
[0042] Step 203, after all the benchmarks are connected, the pull rod 3 (single section length is 1.5m and diameter is 16mm in this embodiment) and the connecting telescopic tube 5 are connected to the bottom of the instrument joint 8, and one end of the pull wire 17 of the wire displacement meter 9 (the wire displacement meter 9 is a YT-DG-1000 wire displacement meter in this embodiment, with a measuring range of 0-3000mm) and a nylon rope are connected to the upper ring 20 of the instrument joint 8, and then the settlement telescopic tube 6 (a metal telescopic tube with an inner diameter of 58mm is used in this embodiment) is connected to the upper part of the instrument joint 8, and the measuring device is continuously suspended into the hole through the nylon rope until the anchor head 1 reaches the bottom of the hole and the nylon rope is cut. When the measuring device is suspended with a nylon rope, it must be ensured that the nylon rope can bear the weight of the measuring device during the suspension process.
[0043] Step 204, press the installation auxiliary rod 21 hard until the anchor head 1 is pressed to the designed soil layer depth, and continue to press the auxiliary rod, and at the same time pull the wire rope 15 hard to pull out the grouting tube 2, and the cement mortar 14 sinks into the bottom layer of the anchor head 1 at the bottom of the hole, so that the anchor head 1 can form a whole with the immovable soil layer at the bottom of the hole, ensuring the stability of the bottom of the settlement mark. The bottom of the anchor head 1 can be considered as the immovable soil layer, avoiding the movement of the anchor head 1 and affecting the accuracy of the settlement monitoring results.
[0044] A small opening with an arc length of 1 / 6 of the circumference of the bottom hollow circular tube is opened on the side of the installation auxiliary rod 21 (the inner diameter of the bottom hollow circular tube of the installation auxiliary rod 21 is 38mm, and the upper part is a solid rod with a diameter of 16mm). The bottom hollow circular tube of the installation auxiliary rod 21 is connected to the upper solid rod by bolts. When the installation auxiliary rod 21 is pressed, the operator only needs to lead the wire 17 of the pull-wire displacement meter 9 out of the small opening on the side when pressing the anchor head 1, and then press the installation auxiliary rod 21 to ensure that the bottom anchor head 1 is pressed into place and avoid adverse effects on the wire 17.
[0045] Step 205, connect the settlement telescopic tube 6 and the settlement plate 12 with a hollow circular tube in the center (in this embodiment, the diameter of the settlement plate 12 is a thick steel plate of 0.6m, and the inner diameter of the hollow circular tube in the middle of the settlement plate 12 is 40mm and the thickness is 3.0mm) using a telescopic pipe joint 10, insert the middle hollow circular tube of the settlement plate 12 into the settlement telescopic tube 6, and then fix it in the installation groove 18, and finally backfill the drilled hole 16 with fine sand 4 filler.
[0046] Step 3: Installation of the wire displacement meter 9
[0047] After the top plate of the instrument installation box 11 is disassembled, it is fixed on the settlement plate 12 at the bottom of the installation groove 18 through the bolts 13 and the installation holes 19, and then the wire-drawing displacement meter 9 is fixed on the top plate of the instrument installation box 11, and finally the top plate of the installation instrument box is covered and locked with the bolts 13. After the wire 17 is installed, the wire-drawing displacement meter 9 is in a stretched state.
[0048] Step 4: Backfill with fine sand
[0049] Since the backfill soil is coarse, there will be large-diameter lumps of soil and stones in the backfill soil. If these backfill soils are used to backfill the buried holes, these lumps of soil and stones will cause serious damage to the settlement mark and the telescopic tube. Therefore, fine sand 4 is used for backfilling. In this embodiment, the fineness modulus of the fine sand 4 is 2.2-1.6, the mass of particles with a particle size greater than 0.075 mm exceeds 85% of the total mass, and the average particle size is 0.25 mm-0.125 mm.
[0050] Step 5: Settlement data collection
[0051] The output end of the wire displacement meter 9 is connected to the data acquisition system 22, which is sent to the monitoring center 24 via a wireless network, and a solar power supply system is used to power the data acquisition system 22. The monitoring data is transmitted to the monitoring center 24 through the data acquisition system 22, which is less affected by severe weather such as strong winds, rain and snow, and reduces the error of manual readings, ensuring the continuity, accuracy and real-time nature of the monitoring data, and can reflect the change pattern of settlement over time.
[0052] The functions of the wire-drawn displacement meter (YT-DG-1000), data acquisition system 22 (YT-ZD-05) and wireless transmission (YT-ZD-02) can realize data acquisition, storage, processing, transmission, etc. The output end of the wireless wire-drawn displacement meter can be connected to the computer software (mysq1-5.5.62-winx64) through a wireless network, and then edited, processed and viewed.
[0053] The above description is only a preferred embodiment of the present invention and is not intended to impose any limitation on the technical solution of the present invention. Those skilled in the art should understand that, without departing from the spirit and principles of the present invention, the technical solution can also be subjected to several simple modifications and replacements, and these modifications and replacements are also within the scope of protection covered by the claims.
Claims
1. A device for monitoring the settlement of a foundation compression layer, It is characterized in that The invention comprises a measuring device and a data processing module. The measuring device comprises an anchor head (1), a pull rod (3), a pull-wire displacement meter (9), a settlement plate (12), a settlement telescopic tube (6) and an instrument installation box (11). The anchor head (1) is buried in the bottom immovable soil layer of a pre-dug hole (16) in the foundation. The anchor head (1) forms a whole with the immovable soil layer through cement mortar (14). One end of the pull rod (3) is connected to the anchor head (1), and the other end is connected to the pull wire (17) of the pull-wire displacement meter (9) through an instrument connector (8). The sedimentation plate (12) is fixed at the opening of the borehole (16); the wire-type displacement meter (9) is arranged above the borehole (16) through the instrument installation box (11), and the wire (17) of the wire-type displacement meter (9) is coaxial with the borehole (16), and the wire (17) passes through the sedimentation plate (12) and is connected to the top of the instrument connector (8); after installation, the wire (17) is in a stretched state; the gap of the borehole (16) is filled with fine sand (4); One end of the settling telescopic tube (6) is connected to the instrument connector (8), and the other end is connected to the settling plate (12); The data processing module comprises a data acquisition system (22) and a power supply system (25); the output end of the wire-type displacement meter (9) is connected to the data acquisition system (22); the output end of the power supply system (25) is connected to the input end of the data acquisition system (22); and the output end of the data acquisition system (22) is connected to the monitoring interface of an external monitoring center (24).
2. The foundation compression layer settlement monitoring device according to claim 1, It is characterized in that The drilled hole (16) is a straight hole, and its verticality deviation is no more than 1%.
3. The foundation compression layer settlement monitoring device according to claim 1, It is characterized in that The depth of the anchor head (1) in the immovable soil layer is 0.3m to 0.5m.
4. The ground compression layer settlement monitoring device according to claim 1, It is characterized in that The strength grade of the cement mortar (14) is not less than M5.
5. The ground compression layer settlement monitoring device according to claim 1, It is characterized in that The pull rod (3) is formed by splicing a plurality of marking rods, and two adjacent marking rods are connected via a pull rod joint (7).
6. The device for monitoring settlement of a foundation compression layer according to claim 1, It is characterized in that The sedimentation plate (12) includes a coaxial and integrally formed top annular structure and a hollow tube. The top annular structure is fixed at the opening of the borehole (16). The hollow tube is located inside the borehole (16). The sedimentation telescopic tube (6) is connected to the hollow tube. The pull wire (17) passes through the center of the top annular structure and extends along the hollow tube and the sedimentation telescopic tube (6), and then is connected to the top of the instrument connector (8).
7. The device for monitoring settlement of a foundation compression layer according to claim 6, It is characterized in that A mounting groove (18) lower than the ground is dug at the top of the borehole (16), and the top annular structure of the sedimentation plate (12) is fixed to the bottom of the mounting groove (18).
8. The device for monitoring settlement of a foundation compression layer according to claim 6, It is characterized in that The settling telescopic pipe (6) and the hollow pipe of the settling plate (12) are connected by a telescopic pipe joint (10), and the hollow pipe is embedded in the top of the settling telescopic pipe (6).
9. The ground compression layer settlement monitoring device according to claim 1, It is characterized in that A connecting telescopic tube (5) is sleeved on the outside of the pull rod (3), one end of the connecting telescopic tube (5) is connected to the bottom of the instrument joint (8), and the other end is fixed to the outside of the pull rod (3) through cement mortar (14).
10. The device for monitoring settlement of a foundation compression layer according to claim 1, It is characterized in that The fine sand (4) has a fineness modulus of 2.2 to 1.6 and an average particle size of 0.25 mm to 0.125 mm.