Lifting hook mechanism for bridge crane

By using cross plate, support rod and support plate structure in the hook mechanism of the bridge crane, the wear and mounting instability caused by excessive stress of the wire rope is solved, and higher safety and lower wire rope replacement are achieved cost.

CN221955625UActive Publication Date: 2024-11-05HENAN KUANGGUANG CRANE MECHANICAL
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422425989.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-09
Publication Date
2024-11-05
Estimated Expiration
2034-10-09

AI Technical Summary

Technical Problem

When the bridge crane hook mechanism is working, the wire rope is easily worn by tension greater than the weight of the heavy object, and a single wire rope is easily shaken when the heavy object is attached, affecting safety.

Method used

A cross plate, support rod and support plate structure is adopted to form a stable hooking system through components such as movable rod, support plate, compression spring and connecting rope to avoid sudden stress on the wire rope and ensure the stability of the heavy objects on the hooking ring. .

Benefits of technology

It reduces the risk of wear and breaking of the wire rope, improves work safety, and ensures stable attachment of heavy objects through four connecting ropes, improves the safety of use and extends the service life of the wire rope.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221955625U_ABST
    Figure CN221955625U_ABST
Patent Text Reader

Abstract

The utility model discloses a lifting hook mechanism for a bridge crane, and relates to the related technical field of hoisting equipment. A movable rod is fixed to the center of the top of the cross plate, the supporting plate is movably connected to the upper portion of the peripheral side of the movable rod, the supporting rod is fixed to the top end of the movable rod, a fixed disc is fixed to the top end of the supporting rod, and a compressed spring is fixed to the outer side of the supporting rod at the lower end of the fixed disc. Through the arrangement of the cross plate, the supporting rod and the supporting plate, the problems that the lifting hook mechanism for the bridge crane is easily subjected to tensile force larger than the gravity of a heavy object during working, a steel wire rope of the crane is more easily damaged, and the safety in the operation process is influenced by adopting a single steel wire rope to maintain hanging of the heavy object are solved; the lifting hook mechanism for the bridge crane has the advantages that impact generated by acceleration during working is smaller, abrasion of the steel wire ropes is reduced, the steel wire ropes assist in maintaining balance of heavy objects, and operation is safer.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field related to lifting equipment, in particular to a hook mechanism for a bridge crane. Background Art

[0002] A bridge crane is a type of bridge crane that runs on an elevated track, also known as an overhead crane. The bridge of a bridge crane runs longitudinally along the tracks laid on the elevated tracks on both sides, and the hoisting trolley runs horizontally along the tracks laid on the bridge, forming a rectangular working range. The hook device of a bridge crane is a component in the lifting system. When performing lifting and loading and unloading operations, it is the direct working part and is frequently used in daily work. When working, it needs to ensure the hanging effect of heavy objects well, but it still has the following disadvantages in actual use:

[0003] When the hook mechanism of the bridge crane is working, it is directly hung. When the hook mechanism is working, the wire rope is directly tightened. When working, the time interval from the free fall to the tightening of the wire rope is shorter. When in use, the wire rope will bear a pulling force greater than the gravity of the heavy object, causing the wire rope to be more easily worn during the work process, affecting the safety of use;

[0004] When the hook mechanism of a bridge crane is working, a single steel wire rope is used for hanging and limiting. When in use, after the crane lifts a heavy object, when the heavy object moves, it is easy to cause shaking, affecting the safety during operation. Utility Model Content

[0005] The purpose of the utility model is to provide a hook mechanism for a bridge crane. By arranging a cross plate, a support rod and a support plate, the problem that the hook mechanism for a bridge crane is easily subjected to a pulling force greater than the gravity of the heavy object when working, the steel wire rope of the crane is more easily damaged, and the use of a single steel wire rope to maintain the hanging of the heavy object affects the safety during operation is solved.

[0006] In order to solve the above technical problems, the utility model is realized by the following technical solutions:

[0007] The utility model discloses a hook mechanism for a bridge crane, comprising a cross plate, a support rod and a support plate, a movable rod is fixed at the top center of the cross plate, the upper part of the peripheral side of the movable rod is movably connected with the support plate, the top end of the movable rod is fixed with a support rod, the top end of the support rod is fixed with a fixed plate, the outer side of the support rod at the lower end of the fixed plate is fixed with a compression spring, the bottom end of the compression spring is fixed to the top of the support plate, when working, the corresponding structure for hanging heavy objects is connected to the bottom thereof through the cross plate, and then supported thereon by the support rod, and the corresponding structure is supported at the corresponding position by the support plate.

[0008] Furthermore, connecting blocks are fixed at the four protruding positions at the bottom of the cross plate, and a connecting rope is fixed at the bottom center of each connecting block. When the cross plate is working, it is connected to the connecting rope through the connecting block and connected to the fixed plate through the connecting rope.

[0009] Furthermore, a fixing plate is commonly fixed to the bottom ends of the four connecting ropes, a hanging ring is fixed to the bottom center of the fixing plate, and corresponding equipment is hung through the fixing plate and the hanging ring.

[0010] Furthermore, extension plates are fixed on the four outer surfaces of the support plate, a through hole is opened in the center of the top of the support plate, the movable rod is movably connected in the through hole, and the support plate is connected to the fixed column through the extension plate when working.

[0011] Furthermore, the bottom end of the compression spring is fixed to the outside of the movable rod at the top of the support plate, and a fixing column is fixed at one end of the top of each extension plate away from the support plate, and the four fixing columns have the same length. When the compression spring is working, it is connected to the lower part of the top plate through the fixing column.

[0012] Furthermore, a top plate is commonly fixed to the top ends of the four fixing columns, a top hanging ring is fixed to the center of the top end surface of the top plate, and when the fixing columns are working, they are hung on the steel wire below the electric hoist through the top hanging ring on the top plate.

[0013] The utility model has the following beneficial effects:

[0014] The utility model solves the problem that the hook mechanism of the bridge crane is easily subjected to a pulling force greater than the weight of the heavy object during operation, and the steel wire rope of the crane is more easily damaged by arranging a cross plate, a support rod and a support plate. After the corresponding heavy object is hung on the hanging structure at the bottom of the cross plate, the hanging rope will not suddenly bounce when pulled under the action of the compression spring, so that the hanging rope and the steel wire rope of the crane will not be suddenly subjected to pulling force immediately, and the breakage of the rope caused by excessive instantaneous pulling force is reduced. When working, safety can be well guaranteed. When working, the safety factor is higher, and the replacement cost of the steel wire rope is reduced.

[0015] The utility model solves the problem that the hook mechanism of a bridge crane uses a single steel wire rope to maintain the hanging of heavy objects during operation, which affects the safety during operation, by arranging a cross plate. After the hanging is completed, the electric hoist is started to drive the top plate and the corresponding structure at the bottom of the top plate to rise as a whole. When rising, the stability of the hanging of the heavy object on the hanging ring is guaranteed by four connecting ropes, so that the safety of the operation process affected by the hanging of the heavy object can be well guaranteed during operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a three-dimensional diagram of the assembly structure of a hook mechanism for a bridge crane;

[0017] Figure 2 It is a three-dimensional diagram of the cross plate structure;

[0018] Figure 3 It is a three-dimensional diagram of the support rod structure;

[0019] Figure 4 It is a three-dimensional diagram of the support plate structure;

[0020] Figure 5 This is a three-dimensional diagram of the top plate structure.

[0021] Reference numerals:

[0022] 1. Cross plate; 101. Connecting block; 102. Connecting rope; 103. Fixed plate; 104. Hanging ring; 2. Support rod; 201. Movable rod; 202. Compression spring; 203. Fixed plate; 3. Support plate; 301. Through hole; 302. Extension plate; 4. Top plate; 401. Top hanging ring; 402. Fixed column. DETAILED DESCRIPTION

[0023] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0024] See also Figure 1-4 As shown, the utility model is a hook mechanism for a bridge crane, comprising a cross plate 1, a support rod 2 and a support plate 3. A movable rod 201 is fixed to the top center of the cross plate 1. When the cross plate 1 is working, the corresponding structure to be hung is supported on it. The cross plate 1 is hung on the support plate 3 through the movable rod 201. The upper part of the peripheral side of the movable rod 201 is movably connected with the support plate 3. When the support plate 3 is working, the support rod 2 is supported on it. The top of the movable rod 201 is fixed with the support rod 2. A fixed plate 203 is fixed to the top of the rod 2, and a compression spring 202 is fixed to the outer side of the support rod 2 at the lower end of the fixed plate 203. The bottom end of the compression spring 202 is fixed to the top of the support plate 3. During operation, after the corresponding heavy object is hung on the hanging structure at the bottom of the cross plate 1, the hanging rope will not bounce suddenly when pulled under the action of the compression spring 202, so that the hanging rope and the steel wire rope of the crane will not be suddenly subjected to tension immediately, thereby reducing the breakage of the rope due to excessive instantaneous tension, and ensuring safety during work.

[0025] Among them Figure 1 , 2As shown, connecting blocks 101 are fixed at the four protruding positions at the bottom of the cross plate 1, and a connecting rope 102 is fixed at the bottom center of each connecting block 101. When the cross plate 1 is working, the connecting rope 102 is connected through the connecting block 101, and the fixing plate 103 is connected to the bottom of the cross plate 1 through the connecting rope 102.

[0026] Among them Figure 1 , 2 As shown, a fixing plate 103 is fixed to the bottom ends of the four connecting ropes 102, and a hanging ring 104 is fixed to the bottom center of the fixing plate 103. The connecting ropes 102 connect the fixing plate 103 under the cross plate 1, and when working, the hanging ring 104 provides a connecting belt hanging function for hanging heavy objects.

[0027] Among them Figure 1 , 4 As shown, extension plates 302 are fixed on the four outer sides of the support plate 3, a through hole 301 is opened in the center of the top of the support plate 3, and the movable rod 201 is movably connected in the through hole 301. When the support plate 3 is working, the fixed column 402 is connected through the extension plate 302, and the support plate 3 is movably connected to the movable rod 201 through the through hole 301.

[0028] Among them Figure 1 , 4 As shown in Figures 5 and 6, the bottom end of the compression spring 202 is fixed to the outside of the movable rod 201 at the top of the support plate 3, and a fixing column 402 is fixed at one end of the top of each extension plate 302 away from the support plate 3, and the four fixing columns 402 have the same length. When the compression spring 202 is working, the top plate 4 is connected to the top of the fixed plate 203 through the fixing column 402.

[0029] Among them Figure 1 , 5 As shown, a top plate 4 is commonly fixed to the top ends of the four fixed columns 402, and a top hanging ring 401 is fixed to the center of the top end surface of the top plate 4. When the fixed columns 402 are working, the top hanging ring 401 is connected thereto through the top plate 4, and the top hanging ring 401 provides a connection between the structure below and the wire rope lifting structure, so that when working, the electric hoist of the crane drives the top plate 4 and the structure below to rise and fall.

[0030] The specific working principle of the utility model is as follows: when working, firstly, the steel wire rope at the bottom of the electric hoist of the crane is passed through the top hanging ring 401, and when working, it is connected to the position of the corresponding pulley on the electric hoist, and then the work is carried out. When working, firstly, after the lifting equipment is guided to a suitable position, the hanging belt for hanging the corresponding heavy object is guided to the bottom of the hanging ring 104, and the hanging belt is passed through the hanging ring 104. After the hanging is completed, the electric hoist is started to drive the top plate 4 and the corresponding structure at the bottom of the top plate 4 to rise as a whole. When rising, the four connecting ropes 1 02, to ensure the stability of the heavy objects hanging on the hanging ring 104, the position of the cross plate 1 is temporarily unchanged through the heavy objects under the cross plate 1, so that the movable rod 201 pulls the support rod 2 down and compresses the compression spring 202. In this process, the connecting rope 102 and the steel wire rope of the heavy objects will not be suddenly tightened and produce a large bounce, so that there will be no sudden bounce when pulling, so that the hanging rope and the steel wire rope of the crane will not be suddenly subjected to tension immediately, reducing the breakage of ropes due to excessive instantaneous tension, and can ensure safety during work.

[0031] The above are only preferred embodiments of the present invention and do not limit the present invention. Any modification to the technical solutions recorded in the aforementioned embodiments and any equivalent replacement of some of the technical features therein, any modification, equivalent replacement, and improvement made are all within the protection scope of the present invention.

Claims

1. A hook mechanism for a bridge crane, comprising a cross plate (1), a support rod (2) and a support plate (3), characterized in that: A movable rod (201) is fixed at the center of the top of the cross plate (1); the upper part of the peripheral side of the movable rod (201) is movably connected to a support plate (3); a support rod (2) is fixed at the top of the movable rod (201); a fixed plate (203) is fixed at the top of the support rod (2); a compression spring (202) is fixed to the outside of the support rod (2) at the lower end of the fixed plate (203); and the bottom end of the compression spring (202) is fixed to the top of the support plate (3).

2. A hook mechanism for a bridge crane according to claim 1, characterized in that: Connecting blocks (101) are fixed at four protruding positions on the bottom of the cross plate (1), and a connecting rope (102) is fixed at the center of the bottom of each connecting block (101).

3. A hook mechanism for a bridge crane according to claim 2, characterized in that: A fixing plate (103) is commonly fixed to the bottom ends of the four connecting ropes (102), and a hanging ring (104) is fixed to the center of the bottom of the fixing plate (103).

4. The hook mechanism for a bridge crane according to claim 1, characterized in that: Extension plates (302) are fixed to the four outer surfaces of the support plate (3), a through hole (301) is provided through the center of the top of the support plate (3), and the movable rod (201) is movably connected in the through hole (301).

5. A hook mechanism for a bridge crane according to claim 4, characterized in that: The bottom end of the compression spring (202) is fixed to the outside of the movable rod (201) at the top of the support plate (3), and a fixing column (402) is fixed at one end of the top of each extension plate (302) away from the support plate (3), and the four fixing columns (402) have the same length.

6. A hook mechanism for a bridge crane according to claim 5, characterized in that: A top plate (4) is commonly fixed to the top ends of the four fixing columns (402), and a top hanging ring (401) is fixed to the center of the top end surface of the top plate (4).