Blast furnace top feeding structure

By heating water in real time in the sealing valve on the top of the blast furnace and using the pressure equalization branch pipe and bag dust collector to process the gas, the sealing problem caused by water vapor condensation is solved, and the reliable sealing and gas recovery of the furnace roof is achieved, reducing waste and pollute.

CN221956137UActive Publication Date: 2024-11-05CHIFENG YUANLIAN UNITED STEEL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420479728.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-13
Publication Date
2024-11-05
Estimated Expiration
2034-03-13

AI Technical Summary

Technical Problem

During the blast furnace iron smelting process, the sealing valve on the top of the furnace is damaged due to the combination of water vapor condensation and smoke, causing gas leakage, waste and pollution of the environment.

Method used

The water tank, circulating water pump, electric heating pipe and controller system is used to heat the water in the upper sealing valve in real time to prevent water vapor from condensing, and high-pressure gas is treated through the pressure equalization branch pipe and bag dust collector to ensure sealing and gas recovery.

Benefits of technology

It effectively avoids the condensation problem of the upper sealing valve, ensures the sealing of the furnace roof, reduces gas waste, improves the iron smelting environment, and realizes energy saving through the control of the thermocouple.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221956137U_ABST
    Figure CN221956137U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of ironmaking equipment, and discloses a blast furnace top feeding structure which comprises a water tank, a water outlet of the water tank is communicated with an inlet of the circulating water pump, an outlet of the circulating water pump is communicated with one end of the water inlet pipe, the other end of the water inlet pipe is communicated with a valve seat water inlet of the upper sealing valve, a valve seat water outlet of the upper sealing valve is communicated with one end of the water return pipe, and the other end of the water return pipe is communicated with the water tank; a thermocouple and an electric heating pipe are installed in the water tank, the thermocouple is electrically connected with the input end of the controller, and the output end of the controller is electrically connected with the electric heating pipe. The device has the advantages that in the ironmaking operation process of the blast furnace, circulating water in the water tank is heated by the electric heating pipe and then is fed into the valve seat of the upper sealing valve through the water inlet pipe under the action of the circulating water pump to heat the upper sealing valve, so that water vapor in high-pressure coal gas in the furnace is prevented from being condensed at the upper sealing valve to be combined and bonded with viscous materials in smoke dust; and the reliable sealing performance of the upper sealing valve is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical field:

[0001] The utility model relates to the technical field of ironmaking equipment, in particular to a blast furnace top feeding structure. Background technology:

[0002] During the blast furnace ironmaking production process, the raw materials in the hopper at the top of the furnace enter the material tank through the drop pipe, and then enter the distributor through the down pipe, and the distributor sends the raw materials into the blast furnace; a material stop valve (loading gate) and an upper sealing valve are installed from top to bottom on the drop pipe, and a material flow valve and a lower sealing valve are installed on the down pipe in sequence; specifically, when feeding materials into the blast furnace, the material stop valve and the upper sealing valve are opened first, and after the raw materials are placed in the material tank, the material stop valve and the upper sealing valve are closed, and then the material flow valve and the lower sealing valve are opened.

[0003] During the process of charging into the blast furnace, the high-pressure coal gas in the blast furnace will carry some smoke and dust to the furnace top. Because the lower sealing valve is close to the furnace and the temperature is high, the water vapor in the coal gas is not easy to condense, and the smoke and dust will also be blown away by the high-pressure coal gas and will not fall on the lower sealing valve; while the temperature at the upper sealing valve is relatively low, the water vapor is easy to condense and combine with the sticky material in the smoke and dust to adhere to the upper sealing valve, which will affect the sealing of the upper sealing valve for a long time, causing the coal gas in the blast furnace to leak from the furnace top, which not only affects the normal charging, but also causes gas waste and pollutes the working environment. Utility model content:

[0004] The utility model aims to provide a blast furnace top feeding structure which can effectively ensure the reliable sealing performance of an upper sealing valve and avoid the waste of coal gas.

[0005] The utility model is implemented by the following technical scheme: a blast furnace top feeding structure, which includes a hopper, a material tank and a distributor; the bottom of the hopper is connected with the top of the material tank through a drop pipe, and a material blocking valve and an upper sealing valve are installed on the drop pipe in sequence, and the bottom discharge port of the material tank is connected with the feed port of the distributor through a drop pipe, and a material flow valve and a lower sealing valve are installed on the drop pipe in sequence; it also includes a water tank, a circulating water pump, a water inlet pipe, an electric heating pipe and a return pipe; the water outlet of the water tank is connected with the inlet of the circulating water pump, the outlet of the circulating water pump is connected with one end of the water inlet pipe, the other end of the water inlet pipe is connected with the valve seat water inlet of the upper sealing valve, the valve seat water outlet of the upper sealing valve is connected with one end of the return pipe, and the other end of the return pipe is connected with the water tank; a thermocouple and the electric heating pipe are installed in the water tank, the thermocouple is electrically connected to the input end of the controller, and the output end of the controller is electrically connected to the electric heating pipe.

[0006] Furthermore, it also includes a pressure equalizing branch pipe, a bag dust collector and a pressure equalizing air inlet pipe; one end of the pressure equalizing branch pipe is connected to the blast furnace, the other end of the pressure equalizing branch pipe is connected to the inlet of the bag dust collector, the air outlet of the bag dust collector is connected to one end of the pressure equalizing air inlet pipe, the other end of the pressure equalizing air inlet pipe is connected to the material tank, and a pressure equalizing valve is installed on the pressure equalizing air inlet pipe.

[0007] Furthermore, a relief pipe is connected to the top of the material tank, and a pressure equalizing relief valve is installed on the relief pipe.

[0008] Furthermore, the vent pipe is connected to the inlet of the dry bag dust removal box, the outlet of the dry bag dust removal box is connected to the external network gas pipeline, and a check valve is installed on the vent pipe.

[0009] The utility model has the advantages that during the iron-making operation of the blast furnace, the circulating water in the water tank is heated by the electric heating tube, and then, under the action of the circulating water pump, the circulating water is sent into the valve seat of the upper sealing valve through the water inlet pipe to heat the upper sealing valve, thereby preventing the water vapor in the high-pressure coal gas in the furnace from condensing at the upper sealing valve and combining with the sticky material in the smoke, thereby ensuring the reliable sealing of the upper sealing valve.

[0010] The temperature of the circulating water in the water tank is detected in real time by a thermocouple, and the signal is sent to the controller in real time. When the water temperature reaches the set lower limit, the controller controls the electric heating tube to start and heat the circulating water. When the water temperature reaches the set upper limit, the controller controls the electric heating tube to cut off the power. In this way, the water temperature requirements in the water tank can be met and electricity can be saved.

[0011] When the raw materials in the material tank enter the distributor through the discharge pipe, in order to ensure smoother material discharge, the pressure equalizing valve is opened to lead part of the high-pressure gas in the blast furnace from the pressure equalizing branch pipe to the bag dust collector. After the smoke is filtered by the bag dust collector, the gas is introduced into the material tank through the pressure equalizing air inlet pipe to play a pressure equalizing role. Description of the drawings:

[0012] Figure 1 It is a structural schematic diagram of the utility model.

[0013] The components in the accompanying drawings are marked as follows: blast furnace 1, hopper 2, drop pipe 3, material tank 4, material stop valve 5, upper sealing valve 6, drop pipe 7, distributor 8, material flow valve 9, lower sealing valve 10, water tank 11, circulating water pump 12, water inlet pipe 13, return pipe 14, thermocouple 15, electric heating pipe 16, controller 17, pressure equalizing branch pipe 18, bag filter 19, pressure equalizing air inlet pipe 20, pressure equalizing valve 21, vent pipe 22, pressure equalizing vent valve 23, dry bag filter box 24, external network gas pipeline 25, check valve 26. Specific implementation method:

[0014] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0015] In the description of the present invention, it should be noted that the terms "center", "up", "down", "front", "back", "top", "bottom", "left", "right", "vertical", "horizontal", "inside" and "outside" etc. indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.

[0016] like Figure 1 As shown, the present embodiment provides a blast furnace top feeding structure, which includes a hopper 2, a material tank 4 and a distributor 8; the bottom of the hopper 2 is connected with the top of the material tank 4 through a drop pipe 3, and the drop pipe 3 is sequentially installed with a material blocking valve 5 and an upper sealing valve 6, and the bottom discharge port of the material tank 4 is connected with the feed port of the distributor 8 through a drop pipe 7, and the drop pipe 7 is sequentially installed with a material flow valve 9 and a lower sealing valve 10; when feeding into the blast furnace 1, the material blocking valve 5 and the upper sealing valve 6 are opened first, and the raw materials enter the material tank 4 through the drop pipe 3, and then the material blocking valve 5 and the upper sealing valve 6 are closed, and then the material flow valve 9 and the lower sealing valve 10 are opened, and the raw materials in the material tank 4 enter the distributor 8 through the drop pipe 7, and the distributor 8 feeds the raw materials into the blast furnace 1 for ironmaking.

[0017] It also includes a water tank 11, a circulating water pump 12, a water inlet pipe 13, an electric heating pipe 16 and a return pipe 14; the water outlet of the water tank 11 is connected to the inlet of the circulating water pump 12, the outlet of the circulating water pump 12 is connected to one end of the water inlet pipe 13, the other end of the water inlet pipe 13 is connected to the valve seat water inlet of the upper sealing valve 6, the valve seat water outlet of the upper sealing valve 6 is connected to one end of the return pipe 14, and the other end of the return pipe 14 is connected to the water tank 11; a thermocouple 15 and an electric heating pipe 16 are installed in the water tank 11, the thermocouple 15 is electrically connected to the input end of the controller 17, and the output end of the controller 17 is electrically connected to the electric heating pipe 16; during the ironmaking operation of the blast furnace 1, the circulating water in the water tank 11 is heated by the electric heating pipe 16 After the water is heated, it is sent into the valve seat of the upper sealing valve 6 through the water inlet pipe 13 under the action of the circulating water pump 12, and the upper sealing valve 6 is heated to prevent the water vapor in the high-pressure coal gas in the furnace from condensing at the upper sealing valve 6 and combining with the sticky material in the smoke, thereby ensuring the reliable sealing of the upper sealing valve 6; in addition, the temperature of the circulating water in the water tank 11 is detected in real time by the thermocouple 15, and the signal is sent to the controller 17 in real time. When the water temperature reaches the set lower limit, the controller 17 controls the electric heating tube 16 to start and heat the circulating water. When the water temperature reaches the set upper limit, the controller 17 controls the electric heating tube 16 to cut off the power. In this way, the water temperature requirement in the water tank 11 can be guaranteed and electric energy can be saved.

[0018] It also includes a pressure-equalizing branch pipe 18, a bag-type dust collector 19 and a pressure-equalizing air inlet pipe 20; one end of the pressure-equalizing branch pipe 18 is connected to the blast furnace 1, the other end of the pressure-equalizing branch pipe 18 is connected to the inlet of the bag-type dust collector 19, the air outlet of the bag-type dust collector 19 is connected to one end of the pressure-equalizing air inlet pipe 20, the other end of the pressure-equalizing air inlet pipe 20 is connected to the material tank 4, and a pressure-equalizing valve 21 is installed on the pressure-equalizing air inlet pipe 20; when the material flow valve 9 and the lower sealing valve 10 are opened, the raw materials in the material tank 4 enter the distributor 8 through the discharge pipe 7. In order to ensure smoother discharge, the pressure-equalizing valve 21 is opened to allow part of the high-pressure coal gas in the blast furnace 1 to be drawn out from the pressure-equalizing branch pipe 18 to the bag-type dust collector 19. After the smoke is filtered by the bag-type dust collector 19, the coal gas is introduced into the material tank 4 through the pressure-equalizing air inlet pipe 20 to play a pressure-equalizing role.

[0019] A vent pipe 22 is connected to the top of the material tank 4, and a pressure-equalizing vent valve 23 is installed on the vent pipe 22; when the raw materials in the material tank 4 are discharged, the pressure-equalizing vent valve 23 is opened to release the pressure in the material tank 4 to normal pressure; the vent pipe 22 is connected to the inlet of the dry bag dust removal box 24, and the outlet of the dry bag dust removal box 24 is connected to the external network gas pipeline 25, and a check valve 26 is installed on the vent pipe 22 to prevent the gas in the external network gas pipeline 25 from flowing back into the material tank 4; the gas discharged from the vent pipe 22 in the material tank 4 will carry a small amount of dust, which is filtered out by the dry bag dust removal box 24, and the clean gas after filtration is sent to the external network gas pipeline 25 for users or production use, thereby realizing the recycling of gas and avoiding waste and pollution of the environment.

[0020] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A blast furnace top feeding structure, comprising a hopper, a material tank and a distributor; the bottom of the hopper is connected to the top of the material tank through a drop pipe, a material stop valve and an upper sealing valve are sequentially installed on the drop pipe, the bottom discharge port of the material tank is connected to the feed port of the distributor through a drop pipe, and a material flow valve and a lower sealing valve are sequentially installed on the drop pipe; characterized in that: It also includes a water tank, a circulating water pump, a water inlet pipe, an electric heating pipe and a return pipe; the water outlet of the water tank is connected to the inlet of the circulating water pump, the outlet of the circulating water pump is connected to one end of the water inlet pipe, the other end of the water inlet pipe is connected to the valve seat water inlet of the upper sealing valve, the valve seat water outlet of the upper sealing valve is connected to one end of the return pipe, and the other end of the return pipe is connected to the water tank; a thermocouple and the electric heating pipe are installed in the water tank, the thermocouple is electrically connected to the input end of the controller, and the output end of the controller is electrically connected to the electric heating pipe.

2. The blast furnace top feeding structure according to claim 1, characterized in that: It also includes a pressure equalizing branch pipe, a bag dust collector and a pressure equalizing air inlet pipe; one end of the pressure equalizing branch pipe is connected to the blast furnace, the other end of the pressure equalizing branch pipe is connected to the inlet of the bag dust collector, the air outlet of the bag dust collector is connected to one end of the pressure equalizing air inlet pipe, the other end of the pressure equalizing air inlet pipe is connected to the material tank, and a pressure equalizing valve is installed on the pressure equalizing air inlet pipe.

3. The blast furnace top feeding structure according to claim 2, characterized in that: The top of the material tank is connected with a relief pipe, and a pressure equalizing relief valve is installed on the relief pipe.

4. The blast furnace top feeding structure according to claim 3, characterized in that: The vent pipe is communicated with the inlet of the dry bag dust removal box, the outlet of the dry bag dust removal box is communicated with the external network gas pipeline, and a check valve is installed on the vent pipe.