Temporary protection device used under dredging condition of natural gas pipeline in river channel
By burying vertical steel sheet piles downstream of the natural gas pipeline in the river, the problem of shallow burial or exposed by the pipeline due to water flow erosion is solved, the siltation effect is achieved during the flood season, preventing the pipeline from floating or suspending, and providing temporary emergency protection measures.
Patent Information
- Application Number
- CN202420113213.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-17
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-01-17
AI Technical Summary
When existing natural gas pipelines are buried in rivers, they are prone to shallow buried or exposed due to water flow erosion and lateral erosion, and the construction period of permanent protection projects is tight as the flood season is approaching, which cannot effectively ensure pipeline safety.
The first steel sheet pile and the second steel sheet pile are buried downstream of the natural gas pipeline in the river. The top end face of the first steel sheet pile is higher than or equal to the original ground line, and the top end face of the second steel sheet pile is higher than or equal to the silting line. These steel sheet piles play a silt role during flood season or during dredging to prevent pipelines from floating or suspending.
Effectively ensure the burial depth of natural gas pipelines, prevent the phenomenon of floating pipes or suspended pipes caused by floods and other disasters, and provide temporary emergency rescue and emergency protection measures.
Smart Images

Figure CN221956777U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of geological disaster prevention and control devices, in particular to a temporary protection device used for desilting a natural gas pipeline in a river. Background Art
[0002] A natural gas pipeline refers to a pipeline that transports natural gas (including associated gas produced in oil fields) from the production site or processing plant to urban gas distribution centers or industrial enterprise users. It is also called a gas transmission pipeline. Using a natural gas pipeline to transport natural gas is a way to transport large quantities of natural gas on land.
[0003] During the laying of natural gas pipelines, due to geographical restrictions, some natural gas pipelines need to cross rivers. Existing natural gas pipelines usually cross rivers by excavation and bury the natural gas pipelines in the riverbed of the river. The burial depth is generally 1.0m-1.5m. However, this method is easily affected by local river water conservancy construction, widening and dredging of river channels. There is a risk that the pipelines will be affected by water scouring and lateral erosion during flood season, resulting in shallow burial of pipelines or even exposure of pipelines, threatening the safe operation of pipelines.
[0004] However, the construction of permanent protection projects near the flood season is tight and the task is heavy, which cannot meet the protection requirements. In view of this, temporary protection measures such as steel sheet pile support are built on the riverbed. This type of protection device has a faster construction process than mortar masonry or concrete structures, and can effectively play a role in siltation, ensuring the effective burial depth of the pipeline. This protection is suitable for emergency rescue and emergency treatment of pipelines to prevent pipelines from floating or hanging due to disasters such as floods. Utility Model Content
[0005] In view of the above problems in the prior art, the utility model provides a temporary protective device for natural gas pipelines in rivers under dredging conditions, which solves the problem that the existing natural gas pipelines are buried in the riverbed of the river, resulting in shallow burial or even exposure of the pipelines during flood season.
[0006] In order to achieve the above purpose, the technical solution adopted by the utility model is as follows:
[0007] A temporary protective device for desilting a natural gas pipeline in a river channel is provided, comprising a first steel sheet pile and a second steel sheet pile which are buried in the river channel and connected to each other, the first steel sheet pile and the second steel sheet pile are both perpendicular to the flow direction of the river channel, and the first steel sheet pile and the second steel sheet pile are both located downstream of the natural gas pipeline in the river channel, the top end surface of the first steel sheet pile is higher than or equal to the original ground line, and the top end surface of the second steel sheet pile is higher than or equal to the desilting line.
[0008] The utility model buries a first steel sheet pile and a second steel sheet pile connected to each other downstream of the natural gas pipeline in the river channel. The first steel sheet pile and the second steel sheet pile can play a siltation role during the flood season of the river channel or when the river channel is dredged, thereby ensuring the effective burial depth of the natural gas pipeline and preventing the natural gas pipeline from floating or hanging due to disasters such as floods.
[0009] Furthermore, the first steel sheet piles and the second steel sheet piles each include a plurality of connected steel sheet positive piles and steel sheet reverse piles; adjacent steel sheet positive piles are connected via steel sheet reverse piles to form the first steel sheet piles and the second steel sheet piles.
[0010] Furthermore, first buckling grooves are provided at both ends of the steel plate positive pile, and second buckling grooves are provided at both ends of the steel plate reverse pile; the steel plate positive pile and the steel plate reverse pile are buckled and connected to each other through the first buckling groove and the second buckling groove.
[0011] Furthermore, a first steel perimeter purlin is arranged on the inner side of each steel sheet main pile on the first steel sheet pile, and the first steel perimeter purlin is connected to the second steel perimeter purlin through a plurality of first steel supports; the second steel perimeter purlin is installed on the steel sheet main pile on the second steel sheet pile.
[0012] Furthermore, a reinforcement plate is provided between adjacent first steel supports.
[0013] Furthermore, steel casings are provided on the inner sides of the steel sheet piles located on the second steel sheet piles.
[0014] Furthermore, slope protection components installed on the slope are provided on both sides of the first steel sheet pile and the second steel sheet pile; the slope protection components are connected to the first steel sheet pile and the second steel sheet pile.
[0015] Furthermore, the slope protection assembly includes a third steel purlin installed on the first steel sheet piles and the second steel sheet piles, and a slope protection board installed on the slope; a plurality of fixed piles buried in the slope are evenly arranged on the lower surface of the slope protection board; the third steel purlin is connected to the slope protection board through a plurality of second steel supports.
[0016] The utility model discloses a temporary protective device for desilting a natural gas pipeline in a river, and its beneficial effects are:
[0017] The utility model buries a first steel sheet pile and a second steel sheet pile connected to each other downstream of the natural gas pipeline in the river channel. The first steel sheet pile and the second steel sheet pile can play a siltation role during the flood season of the river channel or when the river channel is dredged, thereby ensuring the effective burial depth of the natural gas pipeline and preventing the natural gas pipeline from floating or hanging due to disasters such as floods. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 The utility model is a structural schematic diagram of a temporary protective device used for desilting a natural gas pipeline in a river.
[0019] Figure 2 It is a cross-sectional schematic diagram of a temporary protective device used for desilting a natural gas pipeline in a river channel according to the utility model.
[0020] Figure 3 It is a cross-sectional schematic diagram from another angle of a temporary protective device used for desilting a natural gas pipeline in a river according to the utility model.
[0021] Figure 4 It is a structural schematic diagram of the steel plate positive pile and the steel plate reverse pile of the utility model.
[0022] Among them, 1. the first steel sheet pile; 2. the second steel sheet pile; 3. the river channel; 4. the natural gas pipeline; 5. the original ground line; 6. the dredging line; 7. the steel sheet positive pile; 8. the steel sheet reverse pile; 91. the first snap-fit groove; 92. the second snap-fit groove; 10. the first steel purlin; 11. the first steel support; 12. the second steel purlin; 13. the reinforcement plate; 14. the steel casing; 15. the slope; 16. the slope protection assembly; 17. the third steel purlin; 18. the slope protection board; 19. the fixed pile; 20. the second steel support. DETAILED DESCRIPTION
[0023] The specific implementation modes of the present invention are described to facilitate the understanding of the present invention by those skilled in the art. However, it should be clear that the present invention is not limited to the scope of the specific implementation modes. For those skilled in the art, as long as various changes are within the spirit and scope of the present invention as defined and determined by the attached claims, these changes are obvious, and all utility model creations utilizing the concept of the present invention are protected.
[0024] Example 1
[0025] refer to Figure 1 and Figure 3 , which is a structural schematic diagram of a temporary protective device for desilting a natural gas pipeline in a river channel in this embodiment. Its purpose is to solve the problem that the existing natural gas pipeline is buried in the riverbed of the river channel, causing the pipeline to be shallowly buried or even exposed during the flood season. The specific structure of this embodiment will be described in detail below.
[0026] A temporary protective device for desilting a natural gas pipeline in a river channel comprises a first steel sheet pile 1 and a second steel sheet pile 2 which are buried in a river channel 3 and connected to each other.
[0027] Specifically, the first steel sheet pile 1 and the second steel sheet pile 2 are both perpendicular to the flow direction of the river channel 3, and the first steel sheet pile 1 and the second steel sheet pile 2 are both located downstream of the natural gas pipeline 4 in the river channel 3, the top end surface of the first steel sheet pile 1 is higher than or equal to the original ground line 5, and the top end surface of the second steel sheet pile 2 is higher than or equal to the dredging line 6.
[0028] In this embodiment, the first steel sheet pile 1 and the second steel sheet pile 2 are buried downstream of the natural gas pipeline 4 in the river channel 3, and the first steel sheet pile 1 and the second steel sheet pile 2 are perpendicular to the flow direction of the river channel 3, wherein the bottom of the first steel sheet pile 1 is buried in the river channel 3, and the top end surface of the first steel sheet pile 1 is higher than or equal to the original ground line 5, and the bottom of the second steel sheet pile 2 is buried in the river channel 3, and the top end surface of the second steel sheet pile 2 is higher than or equal to the dredging line 6.
[0029] In addition, the second steel sheet pile 2 can provide support for the first steel sheet pile 1, so that the first steel sheet pile 1 and the second steel sheet pile 2 can play a siltation role during the flood season or river dredging, ensuring the effective burial depth of the natural gas pipeline and preventing the natural gas pipeline from floating or hanging due to disasters such as floods.
[0030] Example 2
[0031] refer to Figure 1 and Figure 4 , which is a structural schematic diagram of a temporary protective device for desilting a natural gas pipeline in a river channel in this embodiment, and its purpose is to solve the problem that the existing natural gas pipeline is buried in the riverbed of the river channel, causing the pipeline to be shallowly buried or even exposed during the flood season. Based on Example 1, the specific structure of this embodiment will be described in detail below.
[0032] The first steel sheet pile 1 and the second steel sheet pile 2 each include a plurality of connected steel sheet positive piles 7 and steel sheet reverse piles 8; adjacent steel sheet positive piles 7 are connected via steel sheet reverse piles 8 to form the first steel sheet pile 1 and the second steel sheet pile 2.
[0033] Specifically, the two ends of the steel plate positive pile 7 are provided with a first buckling groove 91, and the two ends of the steel plate reverse pile 8 are provided with a second buckling groove 92. The steel plate positive pile 7 and the steel plate reverse pile 8 are buckled and connected with each other through the first buckling groove 91 and the second buckling groove 92.
[0034] In this embodiment, the first steel sheet pile 1 and the second steel sheet pile 2 have the same structure, and both the first steel sheet pile 1 and the second steel sheet pile 2 include a plurality of connected steel sheet positive piles 7 and steel sheet reverse piles 8.
[0035] Thus, the first buckling groove 91 and the second buckling groove 92 are buckled with each other to connect a plurality of steel sheet positive piles 7 and steel sheet reverse piles 8 to form a first steel sheet pile 1 and a second steel sheet pile 2.
[0036] Specifically, a first steel purlin 10 is arranged on the inner side of each steel sheet pile 7 on the first steel sheet pile 1. The first steel purlin 10 is connected to the second steel purlin 12 through a plurality of first steel supports 11. The second steel purlin 12 is installed on the steel sheet pile 7 on the second steel sheet pile 2.
[0037] In this embodiment, a first steel purlin 10 is installed on the inner side of each steel sheet pile 7 located on the first steel sheet pile 1, and the first steel purlin 10 can be fixed to the inner side of the steel sheet pile 7 by welding. An integral second steel purlin 12 is fixed to all the steel sheet piles 7 located on the second steel sheet pile 2. A plurality of first steel purlins 10 and an integral second steel purlin 12 are connected through a plurality of first steel supports 11, so that the first steel purlin 10 and the second steel purlin 12 connect the first steel sheet pile 1 and the second steel sheet pile 2, thereby achieving the effect of strengthening the stability of the first steel sheet pile 1 through the second steel sheet pile 2.
[0038] Specifically, a reinforcing plate 13 is provided between adjacent first steel supports 11 .
[0039] In this embodiment, a reinforcing plate 13 is provided between adjacent first steel supports 11 , and the reinforcing plate 13 is used to improve the stability of the connection between the first steel purlin 10 and the second steel purlin 12 .
[0040] Specifically, steel casings 14 are provided on the inner sides of the steel sheet piles 7 located on the second steel sheet piles 2 .
[0041] In this embodiment, concrete may be poured into the steel casing 14 to improve the stability of the steel casing 14 , thereby strengthening the stability of the second steel sheet pile 2 through the steel casing 14 .
[0042] Example 3
[0043] refer to Figure 1 and Figure 2 , which is a structural schematic diagram of a temporary protective device for desilting a natural gas pipeline in a river channel in this embodiment, and its purpose is to solve the problem that the existing natural gas pipeline is buried in the riverbed of the river channel, causing the pipeline to be shallowly buried or even exposed during the flood season. Based on Example 1, the specific structure of this embodiment will be described in detail below.
[0044] Slope protection components 16 installed on the slope 15 are provided on both sides of the first steel sheet pile 1 and the second steel sheet pile 2 , and the slope protection components 16 are connected to the first steel sheet pile 1 and the second steel sheet pile 2 .
[0045] Specifically, the slope protection assembly 16 includes a third steel purlin 17 installed on the first steel sheet piles 1 and the second steel sheet piles 2, and a slope protection board 18 installed on the slope 15, and the lower surface of the slope protection board 18 is evenly provided with a plurality of fixed piles 19 buried in the slope 15, and the third steel purlin 17 is connected to the slope protection board 18 through a plurality of second steel supports 20.
[0046] In this embodiment, the slope protection plate 8 is fixed to the slope 15 by a plurality of fixed piles 19 buried in the slope 15, and the third steel purlin 17 can be installed on the first buckling groove 91 of the steel sheet main pile 7 at the outermost side of the first steel sheet pile 1 and the second steel sheet pile 2 by welding. Finally, the slope protection plate 18 and the third steel purlin 17 are connected by a plurality of second steel supports 20, so that the first steel sheet pile 1 and the second steel sheet pile 2 are further supported by the slope protection plate 18, thereby improving the stability of the first steel sheet pile 1 and the second steel sheet pile 2.
[0047] The working principle of this scheme's temporary protection device for desilting natural gas pipelines in rivers is as follows:
[0048] In practical application, the utility model refers to Figure 1-Figure 3 The first steel sheet pile 1 and the second steel sheet pile 2 are buried in the river channel 3 downstream of the natural gas pipeline 4, and the first steel sheet pile 1 and the second steel sheet pile 2 are perpendicular to the flow direction of the river channel 3, wherein the bottom of the first steel sheet pile 1 is buried in the river channel 3, and the top end surface of the first steel sheet pile 1 is higher than or equal to the original ground line 5, and the bottom of the second steel sheet pile 2 is buried in the river channel 3, and the top end surface of the second steel sheet pile 2 is higher than or equal to the dredging line 6.
[0049] In addition, the second steel sheet pile 2 can provide support for the first steel sheet pile 1, so that the first steel sheet pile 1 and the second steel sheet pile 2 can play a siltation role during the flood season or river dredging, thereby ensuring the effective burial depth of the natural gas pipeline 4 and preventing the natural gas pipeline 4 from floating or hanging due to disasters such as floods.
[0050] Although the specific implementation of the utility model is described in detail in conjunction with the drawings, it should not be understood as limiting the scope of protection of this patent. Within the scope described in the claims, various modifications and variations that can be made by those skilled in the art without creative work still fall within the scope of protection of this patent.
Claims
1. A temporary protective device for desilting a natural gas pipeline in a river, characterized by: It comprises a first steel sheet pile (1) and a second steel sheet pile (2) which are connected and buried in a river channel (3); the first steel sheet pile (1) and the second steel sheet pile (2) are both perpendicular to the flow direction of the river channel (3), and the first steel sheet pile (1) and the second steel sheet pile (2) are both located downstream of a natural gas pipeline (4) in the river channel; The top end surface of the first steel sheet pile (1) is higher than or equal to the original ground line (5), and the top end surface of the second steel sheet pile (2) is higher than or equal to the desilting line (6).
2. The temporary protection device for desilting natural gas pipelines in rivers according to claim 1 is characterized in that: The first steel sheet pile (1) and the second steel sheet pile (2) both comprise a plurality of connected steel sheet positive piles (7) and steel sheet reverse piles (8); adjacent steel sheet positive piles (7) are connected via the steel sheet reverse piles (8) to form the first steel sheet pile (1) and the second steel sheet pile (2).
3. The temporary protection device for desilting natural gas pipelines in rivers according to claim 2 is characterized in that: The two ends of the steel plate positive pile (7) are provided with first buckling grooves (91), and the two ends of the steel plate reverse pile (8) are provided with second buckling grooves (92); The steel plate positive pile (7) and the steel plate reverse pile (8) are connected to each other by buckling through a first buckling groove (91) and a second buckling groove (92).
4. The temporary protection device for desilting natural gas pipelines in rivers according to claim 2 is characterized in that: A first steel purlin (10) is arranged on the inner side of each steel sheet pile (7) located on the first steel sheet pile (1), and the first steel purlin (10) is connected to a second steel purlin (12) via a plurality of first steel supports (11); The second steel perimeter purlin (12) is installed on the steel sheet main pile (7) on the second steel sheet pile (2).
5. The temporary protection device for desilting natural gas pipelines in rivers according to claim 4 is characterized in that: A reinforcing plate (13) is arranged between adjacent first steel supports (11).
6. The temporary protection device for desilting natural gas pipelines in rivers according to claim 2 is characterized in that: Steel casings (14) are provided on the inner sides of the steel sheet piles (7) located on the second steel sheet piles (2).
7. The temporary protection device for desilting natural gas pipelines in rivers according to claim 2 is characterized in that: Both sides of the first steel sheet pile (1) and the second steel sheet pile (2) are provided with slope protection components (16) installed on the slope (15); the slope protection components (16) are connected to the first steel sheet pile (1) and the second steel sheet pile (2).
8. The temporary protection device for desilting natural gas pipelines in rivers according to claim 7 is characterized in that: The slope protection assembly (16) comprises a third steel purlin (17) mounted on a first steel sheet pile (1) and a second steel sheet pile (2), and a slope protection plate (18) mounted on a slope (15); a plurality of fixed piles (19) buried in the slope (15) are evenly arranged on the lower surface of the slope protection plate (18); the third steel purlin (17) and the slope protection plate (18) are connected via a plurality of second steel supports (20).