Novel integrated device of tunnel air supply pipe, water supply pipe and excavation trolley
By designing the new integrated device of the tunnel air supply duct, water supply pipe and excavation trolley, using U-shaped seamless steel pipe and fixing mechanism, the problems of air leakage in ventilation ducts and random pipes during tunnel construction are solved, and construction efficiency is improved Safety ensures air pressure stability and the firmness of the pipeline joints.
Patent Information
- Application Number
- CN202420785986.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-16
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-04-16
AI Technical Summary
During the construction of existing tunnels, the ventilation pipes with fully welded steel splicing combinations are prone to air leakage, and the pipes are pulled randomly, resulting in low construction efficiency and safety hazards, affecting construction efficiency and safety.
A new integrated device for tunnel air supply duct, water supply pipe and excavation trolley was designed, using U-shaped seamless steel pipe and fixing mechanism. Through incomplete ring buckles, threaded rods and pipe limiting mechanisms, the air pressure is ensured to be stable and Avoid random pulling of pipelines and fix the water and air inlet ducts of the air leg drilling machine.
The air pressure is stable to meet the construction requirements, avoiding the random pulling of pipelines, improving construction efficiency and safety, ensuring the firmness of pipeline joints, providing an open construction space, and reducing safety hazards.
Smart Images

Figure CN221957507U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of building construction, in particular to a new integrated device of a tunnel air supply pipe, a water supply pipe and an excavation trolley. Background Art
[0002] With the rapid development of transportation and new energy infrastructure, tunnel construction has become a key solution for opening up underground caverns in engineering construction. At present, most underground cavern excavation still adopts the New Austrian Tunneling Method. In order to reduce construction costs, the manual drilling and blasting method still dominates the tunnel excavation. This method requires an excavation support trolley as a construction platform, and construction workers use an air-leg rock drill on the platform to carry out construction. During the construction process, high-pressure air and high-pressure water are connected to the air-leg rock drill.
[0003] In the excavation of railway tunnels, the excavation trolley is composed of steel sections fully welded and spliced together, a ventilation duct for air circulation is formed between two opposite steel sections, the bottoms of the two opposite steel sections are sealed and valves connected to the air supply pipe are installed, and corresponding air outlet interfaces are opened in each level of platform, and the air outlets are all arranged close to the heading face; after the water pipe is longitudinally extended to the heading face along the low beam of the excavation trolley, it is vertically extended upward to the bottom of the top platform, and then longitudinally extended again to the side of the excavation trolley away from the heading face.
[0004] However, the ventilation duct composed of two relative steel sections fully welded together is prone to weld defects, which can easily cause air leakage, resulting in the air pressure of the air-leg rock drill failing to meet the construction requirements. In addition, due to the large number of pipelines, they need to be pulled and tugged at random, and a certain amount of time is required to organize the pipelines during use, which wastes the effective time of the operators and poses certain safety hazards to the operators, which is not conducive to civilized construction on site. Utility Model Content
[0005] The utility model aims to provide a new integrated device of tunnel air supply pipe, water supply pipe and excavation trolley to solve the technical problems that the ventilation pipeline composed of two opposite steel sections fully welded and spliced is easy to leak and the pipeline is pulled and pulled randomly, which reduces the construction efficiency.
[0006] The utility model provides a technical solution to the above-mentioned technical problems as follows: a new integrated device of tunnel air supply pipe, water supply pipe and excavation trolley, comprising a trolley keel, a first platform is fixedly arranged on the upper side of the trolley keel, a second platform is fixedly arranged on the upper parts of the left and right sides of the trolley keel, a third platform is fixedly arranged on the middle parts of the left and right sides of the trolley keel, a fourth platform is fixedly arranged on the lower parts of the left and right sides of the trolley keel, a U-shaped water pipe and a U-shaped air duct are fixedly arranged on the front end of the trolley keel, one end of the U-shaped water pipe is fixedly connected to a water inlet joint, one end of the U-shaped air duct is fixedly connected to an air inlet joint, the U-shaped water pipe is fixedly connected to a water outlet joint on the upper sides of the first platform, the second platform, the third platform and the fourth platform, and the U-shaped air duct is fixedly connected to an air outlet joint on the upper sides of the first platform, the second platform, the third platform and the fourth platform.
[0007] The trolley keel is provided with a water pipe fixing mechanism on the rear side of each water outlet joint, the trolley keel is provided with an air duct fixing mechanism on the rear side of each air outlet joint, and the trolley keel is provided with a pipe limiting mechanism at the middle and rear part of the upper sides of the second platform, the third platform and the fourth platform.
[0008] The utility model adopts the above-mentioned new integrated device for tunnel air supply pipes, water supply pipes and excavation trolleys, and further: the air duct fixing mechanism includes an incomplete ring buckle, the incomplete ring buckle is fixedly connected to the trolley keel, one side of the incomplete ring buckle is provided with a card entrance, one side of the card entrance is rotatably connected to a threaded rod, the other side of the card entrance is provided with a reserved groove, the threaded rod can be rotated into the reserved groove, and the end of the threaded rod away from the card entrance is threadedly connected to a nut.
[0009] The utility model adopts the above-mentioned new integrated device for tunnel air supply pipes, water supply pipes and excavation trolleys, and further: the inner side walls on both sides of the card entrance are arranged as a slope structure.
[0010] The utility model adopts the above-mentioned new integrated device for tunnel air supply pipes, water supply pipes and excavation trolleys, and further: the water pipe fixing mechanism and the air pipe fixing mechanism have the same structure but different sizes.
[0011] The utility model adopts the above-mentioned new integrated device for tunnel air supply pipes, water supply pipes and excavation trolleys, and further: the pipe limiting mechanism includes an inverted L-shaped limiting rod and a movable rod, the lower end of the inverted L-shaped limiting rod is fixedly connected to one side of the trolley keel, the lower end of the movable rod can touch the inner upper end of the inverted L-shaped limiting rod, the middle part of the movable rod is rotatably connected with a connecting block, the connecting block is fixedly connected to the trolley keel, and a spring is fixedly connected between the upper end of the movable rod and the trolley keel.
[0012] The utility model adopts the above-mentioned new integrated device for tunnel air supply pipes, water supply pipes and excavation trolleys, and further: the upper end of the inverted L-shaped limit rod is fixedly connected to a slope block, and the slope block is inclined in the direction away from the trolley keel.
[0013] The utility model adopts the above-mentioned new integrated device for tunnel air supply pipes, water supply pipes and excavation trolleys, and further: a crossbeam is fixedly connected to the middle part of the inner side of the trolley keel, a first diagonal brace is fixedly connected between the two ends of the crossbeam and the inner upper side of the trolley keel, and a second diagonal brace is fixedly connected between the lower side of the crossbeam and the left and right sides of the trolley keel.
[0014] The utility model adopts the above-mentioned new integrated device for tunnel air supply pipes, water supply pipes and excavation trolleys, and further: the trolley keel is welded from I-beams, and the U-shaped air duct is made of seamless steel pipes.
[0015] The beneficial effects of the utility model are:
[0016] 1. The U-shaped air duct in the utility model is made of seamless steel pipe, which is not easy to leak, thereby ensuring that the air pressure of the air-leg rock drill can meet the construction requirements, and the device can constrain the water inlet pipe and the air inlet pipe of the air-leg rock drill to the side of the second platform, the third platform or the fourth platform close to the trolley keel through the pipe limiting mechanism, avoiding the occurrence of random pulling of pipelines, greatly reducing the space occupied by pipelines on the platform, providing an open construction space for construction, and avoiding the occurrence of pipelines tripping construction workers, greatly improving the safety of construction.
[0017] 2. The utility model can fix the water inlet pipe and the air inlet pipe of the air-leg rock drill near the joints respectively through the water pipe fixing mechanism and the air pipe fixing mechanism, thereby preventing the pipeline joints from loosening due to dragging, thereby ensuring the firmness of the connection at the pipeline joints. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The above and / or other advantages of the present invention will become clearer and easier to understand through the detailed description made in conjunction with the following drawings, which are only schematic and do not limit the present invention, wherein:
[0019] Figure 1 This is a three-dimensional schematic diagram of an embodiment of the utility model from a front left top view;
[0020] Figure 2 for Figure 1 A local enlarged schematic diagram of the middle A;
[0021] Figure 3 for Figure 1 A local enlarged schematic diagram of point B in the middle.
[0022] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0023] 1. Trolley keel; 2. First platform; 3. Second platform; 4. Third platform; 5. Fourth platform; 6. U-shaped water pipe; 7. U-shaped air duct; 8. Water inlet joint; 9. Air inlet joint; 10. Water outlet joint; 11. Air outlet joint; 12. Incomplete buckle; 13. Card entrance; 14. Threaded rod; 15. Reserved groove; 16. Nut; 17. Inverted L-shaped limit rod; 18. Movable rod; 19. Connecting block; 20. Spring; 21. Inclined block; 22. Crossbeam; 23. First diagonal brace; 24. Second diagonal brace. DETAILED DESCRIPTION
[0024] Hereinafter, an embodiment of the novel integrated device of tunnel air supply pipe, water supply pipe and excavation trolley of the utility model will be described with reference to the accompanying drawings.
[0025] The embodiments described herein are specific embodiments of the present invention, which are used to illustrate the concept of the present invention, are explanatory and exemplary, and should not be interpreted as limiting the embodiments of the present invention and the scope of the present invention. In addition to the embodiments described herein, those skilled in the art can also adopt other obvious technical solutions based on the claims and the contents disclosed in the specification of this application, including technical solutions that adopt any obvious replacement and modification of the embodiments described herein.
[0026] The drawings of this specification are schematic diagrams, which assist in explaining the concept of the utility model and schematically show the shapes of various parts and their mutual relationships. Please note that in order to clearly show the structure of various components of the embodiments of the utility model, the drawings are not drawn according to the same scale. The same reference numerals are used to represent the same parts.
[0027] Figure 1-3 A new integrated device of tunnel air supply pipe, water supply pipe and excavation trolley according to an embodiment of the utility model is shown, which comprises: a trolley keel 1, a first platform 2 is fixedly arranged on the upper side of the trolley keel 1, a second platform 3 is fixedly arranged on the upper parts of the left and right sides of the trolley keel 1, a third platform 4 is fixedly arranged in the middle part of the left and right sides of the trolley keel 1, and a fourth platform 5 is fixedly arranged on the lower parts of the left and right sides of the trolley keel 1, a U-shaped water pipe 6 and a U-shaped air duct 7 are fixedly arranged at the front end of the trolley keel 1, one end of the U-shaped water pipe 6 is fixedly connected to a water inlet joint 8, one end of the U-shaped air duct 7 is fixedly connected to an air inlet joint 9, the U-shaped water pipe 6 is fixedly connected to a water outlet joint 10 on the upper sides of the first platform 2, the second platform 3, the third platform 4 and the fourth platform 5, and the U-shaped air duct 7 is fixedly connected to an air outlet joint 11 on the upper sides of the first platform 2, the second platform 3, the third platform 4 and the fourth platform 5.
[0028] The trolley keel 1 is provided with a water pipe fixing mechanism on the rear side of each water outlet joint 10, the trolley keel 1 is provided with an air duct fixing mechanism on the rear side of each air outlet joint 11, and the trolley keel 1 is provided with a pipe limiting mechanism at the middle and rear parts of the upper sides of the second platform 3, the third platform 4 and the fourth platform 5.
[0029] The air duct fixing mechanism includes an incomplete ring buckle 12, which is fixedly connected to the trolley keel 1. A card entrance 13 is provided on one side of the incomplete ring buckle 12. A threaded rod 14 is rotatably connected to one side of the card entrance 13. A reserved groove 15 is provided on the other side of the card entrance 13. The threaded rod 14 can be rotated into the reserved groove 15. A nut 16 is threadedly connected to the end of the threaded rod 14 away from the card entrance 13.
[0030] The inner side walls on both sides of the card entrance 13 are both configured as sloped structures; during operation, the inner side walls on both sides of the card entrance 13 are configured as symmetrical sloped structures, which can facilitate the U-shaped air duct 7 to be inserted into the incomplete ring buckle 12.
[0031] The water pipe fixing mechanism and the air pipe fixing mechanism have the same structure but different sizes.
[0032] The pipe limiting mechanism includes an inverted L-shaped limiting rod 17 and a movable rod 18. The lower end of the inverted L-shaped limiting rod 17 is fixedly connected to one side of the trolley keel 1, and the lower end of the movable rod 18 can touch the inner upper end of the inverted L-shaped limiting rod 17. The middle part of the movable rod 18 is rotatably connected to a connecting block 19, and the connecting block 19 is fixedly connected to the trolley keel 1. A spring 20 is fixedly connected between the upper end of the movable rod 18 and the trolley keel 1.
[0033] The upper end of the inverted L-shaped limit rod 17 is fixedly connected with an inclined block 21 , and the inclined block 21 is inclined in a direction away from the trolley keel 1 ; during operation, the arrangement of the inclined block 21 can facilitate the insertion of the pipeline into the inverted L-shaped limit rod 17 .
[0034] A crossbeam 22 is fixedly connected to the middle part of the inner side of the trolley keel 1, a first diagonal brace 23 is fixedly connected between the two ends of the crossbeam 22 and the inner upper side of the trolley keel 1, and a second diagonal brace 24 is fixedly connected between the lower side of the crossbeam 22 and the left and right sides of the trolley keel 1; during operation, the structural firmness of the trolley keel 1 can be improved by arranging the crossbeam 22, the first diagonal brace 23 and the second diagonal brace 24.
[0035] The trolley keel 1 is welded from I-beams, and the U-shaped air duct 7 is made of seamless steel pipes. During operation, the trolley keel 1 welded from I-beams can provide stable and firm support for the platform; the U-shaped air duct 7 made of seamless steel pipes can ensure air tightness.
[0036] Working principle:
[0037] When the device is in use, high-pressure water can be connected to the U-shaped water pipe 6 through the water inlet joint 8, and high-pressure gas can be connected to the U-shaped air duct 7 through the air inlet joint 9. During construction, the construction personnel can first connect the water inlet pipe and the air inlet pipe of the air-leg type rock drill with the water outlet joint 10 and the air outlet joint 11 respectively, and then fix the water inlet pipe and the air inlet pipe of the air-leg type rock drill near the joint through the water pipe fixing mechanism and the air duct fixing mechanism respectively. Specifically, first loosen the nut 16, then rotate the threaded rod 14 to avoid the card entrance 13, and then insert the air inlet pipe of the air-leg type rock drill into the incomplete ring buckle 12 through the card entrance 13, then rotate the threaded rod 14 into the reserved groove 15, and finally tighten the nut 16, so that the air inlet pipe of the air-leg type rock drill is The air inlet pipe of the leg-type rock drill is fixed. Similarly, the water inlet pipe of the air-leg type rock drill can be fixed by a water pipe fixing mechanism. In addition, during construction, the water inlet pipe and the air inlet pipe of the air-leg type rock drill can be constrained on the side of the second platform 3, the third platform 4 or the fourth platform 5 close to the trolley keel 1 by a pipe limiting mechanism. Specifically, the water inlet pipe and the air inlet pipe of the air-leg type rock drill are sequentially inserted into the inverted L-shaped limiting rod 17 through the gap between the movable rod 18 and the inclined block 21. After the water inlet pipe and the air inlet pipe are inserted into the inverted L-shaped limiting rod 17, the movable rod 18 will be reset under the pulling force of the spring 20 to block the upper port of the U-shaped air duct 7, thereby realizing the restraining effect on the water inlet pipe and the air inlet pipe of the air-leg type rock drill.
[0038] To sum up, the U-shaped air duct 7 in the device is made of seamless steel pipe, which is not prone to air leakage, thereby ensuring that the air pressure of the air-leg rock drill can meet the construction requirements, and the device can constrain the water inlet pipe and air inlet pipe of the air-leg rock drill on the side of the second platform 3, the third platform 4 or the fourth platform 5 close to the trolley keel 1 through the pipe limiting mechanism, avoiding the occurrence of random pulling of pipelines, greatly reducing the space occupied by pipelines on the platform, providing an open construction space for construction, and avoiding the situation where pipelines trip construction workers, greatly improving the safety of construction; the device can fix the water inlet pipe and air inlet pipe of the air-leg rock drill near the joint through the water pipe fixing mechanism and the air duct fixing mechanism, respectively, thereby avoiding the situation where the pipeline joints become loose due to dragging, thereby ensuring the firmness of the connection at the pipeline joints.
[0039] The technical features disclosed above are not limited to the disclosed combinations with other features. Those skilled in the art may also make other combinations between the technical features according to the purpose of the utility model to achieve the purpose of the utility model.
Claims
1. A new integrated device for tunnel air supply pipe, water supply pipe and excavation trolley, characterized in that: include: A trolley keel (1), wherein a first platform (2) is fixedly arranged on the upper side of the trolley keel (1), a second platform (3) is fixedly arranged on the upper parts of the left and right sides of the trolley keel (1), a third platform (4) is fixedly arranged on the middle parts of the left and right sides of the trolley keel (1), and a fourth platform (5) is fixedly arranged on the lower parts of the left and right sides of the trolley keel (1), a U-shaped water pipe (6) and a U-shaped air pipe (7) are fixedly arranged on the front end of the trolley keel (1), one end of the U-shaped water pipe (6) is fixedly connected to a water inlet joint (8), and one end of the U-shaped air pipe (7) is fixedly connected to an air inlet joint (9), and the U-shaped water pipe (6) is fixedly connected to the first platform (2), The upper sides of the second platform (3), the third platform (4) and the fourth platform (5) are all fixedly connected with a water outlet joint (10); the U-shaped air duct (7) is fixedly connected with an air outlet joint (11) on the upper sides of the first platform (2), the second platform (3), the third platform (4) and the fourth platform (5); a water pipe fixing mechanism is provided on the trolley keel (1) at the rear side of each water outlet joint (10); an air duct fixing mechanism is provided on the trolley keel (1) at the rear side of each air outlet joint (11); and a pipe limiting mechanism is provided on the trolley keel (1) at the middle and rear parts of the upper sides of the second platform (3), the third platform (4) and the fourth platform (5).
2. The new integrated device of tunnel air supply pipe, water supply pipe and excavation trolley according to claim 1 is characterized in that: The air duct fixing mechanism comprises an incomplete ring buckle (12), the incomplete ring buckle (12) is fixedly connected to the trolley keel (1), a card-entry opening (13) is provided on one side of the incomplete ring buckle (12), a threaded rod (14) is rotatably connected to one side of the card-entry opening (13), a reserved groove (15) is provided on the other side of the card-entry opening (13), the threaded rod (14) can be rotated into the reserved groove (15), and a nut (16) is threadedly connected to one end of the threaded rod (14) away from the card-entry opening (13).
3. The new integrated device of tunnel air supply pipe, water supply pipe and excavation trolley according to claim 2 is characterized in that: The inner side walls on both sides of the card entrance (13) are both arranged as slope structures.
4. The new integrated device of tunnel air supply pipe, water supply pipe and excavation trolley according to claim 1 is characterized in that: The water pipe fixing mechanism and the air pipe fixing mechanism have the same structure but different sizes.
5. The new integrated device of tunnel air supply pipe, water supply pipe and excavation trolley according to claim 1 is characterized in that: The pipe limiting mechanism comprises an inverted L-shaped limiting rod (17) and a movable rod (18); the lower end of the inverted L-shaped limiting rod (17) is fixedly connected to one side of the trolley keel (1); the lower end of the movable rod (18) can touch the inner upper end of the inverted L-shaped limiting rod (17); the middle part of the movable rod (18) is rotatably connected to a connecting block (19); the connecting block (19) is fixedly connected to the trolley keel (1); and a spring (20) is fixedly connected between the upper end of the movable rod (18) and the trolley keel (1).
6. The new integrated device of tunnel air supply pipe, water supply pipe and excavation trolley according to claim 5 is characterized in that: The upper end of the inverted L-shaped limiting rod (17) is fixedly connected to an inclined surface block (21), and the inclined surface block (21) is inclined in a direction away from the trolley keel (1).
7. The new integrated device of tunnel air supply pipe, water supply pipe and excavation trolley according to claim 1 is characterized in that: A crossbeam (22) is fixedly connected to the middle of the inner side of the trolley keel (1), first diagonal braces (23) are fixedly connected between the two ends of the crossbeam (22) and the inner upper side of the trolley keel (1), and second diagonal braces (24) are fixedly connected between the lower side of the crossbeam (22) and the left and right sides of the trolley keel (1).
8. The new integrated device of tunnel air supply pipe, water supply pipe and excavation trolley according to claim 1 is characterized in that: The trolley keel (1) is made of welded I-beams, and the U-shaped air duct (7) is made of a seamless steel pipe.