Whole bathroom docking device and whole bathroom chassis

Through the joint device with a reduced diameter eccentric structure and the reserved drain tank design, the measurement inaccurate and ground above problems in the installation of the overall bathroom are solved, and efficient butt and beautiful overall bathroom renovation effects are achieved.

CN221972594UActive Publication Date: 2024-11-08WANHUA ECOLOGICAL NEW HOME IMPROVEMENT (HEZE) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420967592.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-09-13
Publication Date
2024-11-08
Estimated Expiration
2033-09-13

AI Technical Summary

Technical Problem

In the renovation of the bathroom in the old house, the installation of the integrated bathroom has a hidden danger of water leakage due to inaccurate measurements, and when the horizontal drainage method is used, the bathroom floor is higher than the external floor, causing poor appearance and inconvenient use.

Method used

The joint device adopts a reduced diameter eccentric structure, and the drainage hole of the reserved drain tank and the drainage pipe are connected without dead zones through the rotation of the first joint and the second joint, avoiding the increase of the overall bathroom chassis and through the reservation The drainage tank and floor tiles are designed to match the overall bathroom chassis with the bathroom floor size.

Benefits of technology

It effectively avoids the hidden danger of water leakage caused by inaccurate measurement and the problem that the overall bathroom floor is higher than the external floor, improves installation efficiency and appearance aesthetics, and ensures construction quality and convenience of use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972594U_ABST
    Figure CN221972594U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of integral bathrooms, and provides an integral bathroom docking device and an integral bathroom chassis, the integral bathroom docking device is suitable for being installed on a reserved drainage groove of the integral bathroom chassis, the central axis of a drainage hole of the reserved drainage groove is spatially isolated from the axis of a drainage pipeline of a toilet to be transformed, and the drainage pipeline of the toilet to be transformed is arranged in the reserved drainage groove. Comprising a first joint which is of a reducing eccentric structure and is rotatably mounted at the upper end of a drainage pipeline; the second connector is of a reducing eccentric structure, and one end of the second connector penetrates through the drainage hole and is rotatably mounted on the first connector so as to be communicated with the drainage pipeline; sewage in the toilet is discharged to the drainage pipeline after passing through the second connector and the first connector in sequence.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] This application is a divisional application of a patent application with application date of September 13, 2023, application number 202322488878.1, and name “Integrated bathroom docking device and integrated bathroom”. Technical Field

[0002] The utility model relates to the technical field of integrated bathrooms, in particular to an integrated bathroom docking device and an integrated bathroom chassis. Background Art

[0003] At present, in the renovation of old house bathrooms, integrated bathrooms are widely used because of their advantage of quick installation.

[0004] There are currently two solutions for integrated bathrooms: the first is to transform the integrated bathroom using direct drainage and sewage discharge methods. This solution requires docking with the existing basin drainage pipe outlets, floor drain drainage pipe outlets, and toilet sewage pipe outlets. It is difficult to measure the location and size of each pipe outlet on site or accurately measure it, and there is an unreasonable phenomenon of multiple points as the benchmark. When installing the product, the reserved interface of the integrated bathroom is difficult to dock with the existing drainage pipe outlets and sewage pipe outlets, and workers need to temporarily use hose connections or other non-standard operations to complete the project, resulting in potential water leakage, difficulty in construction, long construction period, and low construction quality.

[0005] The second is that the overall bathroom adopts a horizontal connection of the drainage and sewage pipes. This solution is to run the drainage and sewage pipes above the ground and under the overall bathroom chassis. The overall bathroom needs to be elevated to leave enough space for the arrangement of drainage and sewage pipes. This solution will cause the finished surface of the bathroom chassis to be higher than the ground outside the bathroom, forming a step at the door of the bathroom, which has a poor appearance and is inconvenient to use. Especially at night or when the elderly use it, there is a risk of tripping and falling, and the product cost is high. Utility Model Content

[0006] In view of this, an embodiment of the utility model provides an integrated bathroom docking device. Using an integrated bathroom to renovate an old house can avoid the situation where the bathroom floor is higher than the outside ground of the toilet due to inaccurate measurement or the risk of water leakage after installation.

[0007] As one aspect of the embodiment of the utility model, a whole bathroom docking device is provided, which is suitable for docking between a reserved drainage groove of the whole bathroom chassis and a drainage pipe of a toilet to be remodeled, wherein the central axis of the drainage hole of the reserved drainage groove is spatially isolated from the axis of the drainage pipe of the toilet to be remodeled, and comprises:

[0008] A first joint, which is a different-diameter eccentric structure and is rotatably mounted on the upper end of the drainage pipe; and

[0009] The second joint is a different-diameter eccentric structure, one end of which passes through the drainage hole and is rotatably mounted on the first joint to communicate with the drainage pipe;

[0010] By rotating the first joint and the second joint respectively, a dead zone-free docking between the drainage hole and the drainage pipe is achieved within the range of the sum of the eccentric distance of the first joint and the eccentric distance of the second joint.

[0011] As another aspect of the utility model, there is provided an integrated bathroom chassis, which is constructed to be substantially the same size as the floor of the bathroom to be renovated, and includes: a reserved drainage trough, floor tiles, chassis filling material and a chassis back plate;

[0012] Among them, the reserved drainage groove is suitable for docking with the drainage pipe through any one of the above-mentioned integrated bathroom docking devices, the floor tile is the upper surface of the integrated bathroom chassis, serving as the floor of the renovated bathroom; the chassis back plate is in contact with the floor of the bathroom to be renovated, the chassis filler is filled between the chassis back plate and the floor tile, providing an installation plane for the floor tile, and the reserved drainage groove is pre-buried between the floor tile and the chassis back plate, penetrating the upper surface of the floor tile and the lower surface of the chassis back plate.

[0013] According to the integrated bathroom docking device of the embodiment of the utility model, by setting the first joint and the second joint into a different diameter eccentric structure, the first joint is installed in the drainage pipe, and the second joint is inserted into the first joint. The drainage pipe and the drainage hole can be matched and installed when the central axis of the drainage hole of the reserved drainage groove deviates from the axis of the drainage pipe. At the same time, since the first joint is installed as a whole in the upper end of the drainage pipe and is located in the drainage pipe, the second eccentric joint is inserted in the first eccentric joint. There is no need to raise the overall bathroom chassis to arrange pipes, and there will be no situation where the floor of the installed bathroom is higher than the ground outside the toilet. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] The above and other purposes, features and advantages of the present invention will become more apparent through the following description of the embodiments of the present invention with reference to the accompanying drawings, in which:

[0015] Figure 1 The exploded view of the integrated bathroom of the embodiment of the utility model is schematically shown;

[0016] Figure 2 A three-dimensional diagram of an integrated bathroom according to an embodiment of the utility model is schematically shown;

[0017] Figure 3 Schematically shows Figure 2 A partial cross-sectional view of part A of the integral bathroom docking device shown;

[0018] Figure 4 Schematically shows Figure 2 A partial cross-sectional view of part B of the integral bathroom docking device shown;

[0019] Figure 5 Schematically shows Figure 2 A partial cross-sectional view of portion C of the integrated bathroom docking device is shown.

[0020] [Description of Reference Numerals]

[0021] 1- Overall bathroom;

[0022] 11-Integrated bathroom chassis;

[0023] 12- Drainage hole;

[0024] 13- first connector;

[0025] 131-First tube body;

[0026] 132-upper cover;

[0027] 133- protrusion;

[0028] 14- second connector;

[0029] 141-Second tube body;

[0030] 142-Third tube body;

[0031] 143- flange;

[0032] 144- extension;

[0033] 15- third connector;

[0034] 16- Anti-odor gasket;

[0035] 161-semi-conical part;

[0036] 17- Reserve drainage grooves;

[0037] 171-support platform;

[0038] 18- Rotation space;

[0039] 19-Floor drain cover;

[0040] 110-decorative cover;

[0041] 111-groove;

[0042] 112- baffle;

[0043] 113-floor drain filter cover;

[0044] 114- floor tiles;

[0045] 115-chassis filler;

[0046] 116- chassis back plate;

[0047] 2- Ground;

[0048] 21-Drainage pipes. DETAILED DESCRIPTION

[0049] In order to make the purpose, technical scheme and advantages of the utility model clearer, the utility model is further described in detail below in conjunction with specific embodiments and with reference to the accompanying drawings. However, the utility model can be implemented in different forms and should not be interpreted as being limited to the embodiments presented here. On the contrary, providing these embodiments will make the utility model thorough and complete, and fully convey the scope of the utility model to those skilled in the art. In the accompanying drawings, for clarity, the sizes and relative sizes of layers and regions may be exaggerated, and the same reference numerals represent the same elements throughout.

[0050] In the related art, when an integrated bathroom is used to renovate an old house, the drainage pipes (including one or more of the drainage and sewage pipes, collectively referred to as drainage pipes in the utility model) are not re-laid. When measuring, due to the uneven ground and the measurement error of the measuring tool, the drainage holes on the integrated bathroom chassis will not be aligned with the drainage pipes, affecting the installation of the integrated bathroom chassis. Due to the limitations of the building structure, the floor tiles can generally only be removed 2-3 cm below the surface of the tiles. If they are removed further, the floor structure will be damaged. Therefore, the installation height of the integrated bathroom chassis is particularly important for the renovation of old houses. If the height of the integrated bathroom chassis after installation is too high (greater than 5 cm), the bathroom floor will be higher than the ground outside the bathroom.

[0051] Figure 1 The exploded view of the overall bathroom of the embodiment of the utility model is schematically shown. Figure 2 The three-dimensional diagram of the integrated bathroom according to the embodiment of the utility model is schematically shown.

[0052] As one aspect of the embodiment of the utility model, a whole bathroom docking device is provided, which is suitable for installation on the reserved drainage groove 17 of the whole bathroom chassis 11, and the central axis of the drainage hole 12 of the reserved drainage groove 17 is allowed to be spatially isolated from the axis of the drainage pipe 21 of the bathroom to be modified. Figure 1 and Figure 2As shown, the integrated bathroom docking device includes a first joint 13 and a second joint 14. The first joint 13 is a different-diameter eccentric structure, which is rotatably mounted on the upper end of the drainage pipe 21. The second joint 14 is a different-diameter eccentric structure, one end of which passes through the drainage hole 12 and is rotatably mounted on the first joint 13 to communicate with the drainage pipe 21. The sewage in the bathroom is discharged to the drainage pipe 21 through the second joint 14 and the first joint 13 in sequence.

[0053] According to the integrated bathroom docking device of the embodiment of the utility model, by setting the first joint and the second joint into a different diameter eccentric structure, the first joint is installed in the drainage pipe, and the second joint is inserted into the first joint. It can be installed in matching with the drainage hole when the central axis of the drainage hole deviates from the axis of the drainage pipe. At the same time, since the first joint is installed as a whole in the upper end of the drainage pipe and is located in the drainage pipe, the second joint is inserted in the first joint. There is no need to raise the overall bathroom chassis to arrange pipes, and there will be no situation where the floor of the installed bathroom is higher than the ground outside the toilet.

[0054] According to an embodiment of the utility model, the ground 2 can be a cement floor, and the drainage pipe 21 is a building component or an internal component of the room before the renovation, and is preset in the ground 2 of the bathroom to be renovated. For example, it can be one or more of the 50PVC drainage pipe and 110PVC sewage pipe used for general drainage or sewage pipes.

[0055] According to the embodiment of the utility model, the first joint, the second joint and the drainage pipe are sealed and connected by sealant to prevent sewage leakage.

[0056] In an exemplary embodiment, the sealant may include PVC glue.

[0057] According to an embodiment of the present invention, the first joint 13 includes a first tube body 131 and an upper cover 132. The upper cover 132 is disposed on the upper end of the first tube body 131, and a through hole is formed on the upper cover 132, wherein the axis of the through hole is spatially isolated from the axis of the first tube body 131.

[0058] According to the embodiment of the utility model, the first joint and the second joint are injection molded by engineering plastics, adopt a core, and an eccentric structure design of the upper and lower holes. The through hole on the upper cover of the first joint is not concentric with the drainage pipe, and the relative position of the central axis of the through hole of the first joint and the central axis of the drainage pipe can be adjusted by rotating the second joint, and the second joint is connected with the drainage pipe in the reserved drainage groove. Among them, the drainage pipe is a drainage pipe fitting that already exists in the old renovation house, and can include one or more of the drainage pipe and the sewage pipe.

[0059] According to the embodiment of the present invention, the adjustment range of the first joint 13 is the distance between the axis of the first tube body 131 and the axis of the through hole on the upper cover 132 .

[0060] According to an embodiment of the utility model, the diameter of the through hole is greater than the radius of the first tube body to ensure a good drainage effect.

[0061] According to some other embodiments of the present invention, the diameter of the through hole on the upper cover 132 is greater than two-thirds of the diameter of the first tube body.

[0062] In an illustrative embodiment, the inner diameter of the sewage pipe is 50 mm, the outer diameter of the first pipe body is 49 mm, and the inner diameter of the through hole is 30 mm.

[0063] According to the embodiment of the present disclosure, the upper cover 132 extends downward from the through hole to form a tubular body to sleeve the second tube body 141. According to the embodiment of the present utility model, the first joint 13 also includes a protrusion 133, which is formed by extending radially outward from the upper end of the first tube body 131. The protrusion 133 is suitable for being placed on the top of the drainage pipe 2 to prevent the first joint 13 from falling into the drainage pipe 21.

[0064] According to an embodiment of the utility model, the second joint 14 includes a second tube body 141 and a third tube body 142. The second tube body 141 is installed in the drain hole 12, the third tube body 142 is connected to the lower end of the second tube body 141 and extends out of the bottom of the integrated bathroom chassis 11, the axis of the third tube body 142 is configured to deviate from the axis of the second tube body 141, and the rotation of the second tube body 141 drives the third tube body 142 to rotate so that the third tube body 142 is installed on the first joint 13.

[0065] According to the embodiment of the utility model, the through hole on the upper cover 132 is installed in the drainage pipe 21 through the first tube body 131, the third tube body 142 is formed at the lower end of the second tube body 141, and the third tube body is inserted in the upper cover 132, so that when the integral bathroom chassis is placed on the floor 2 of the bathroom to be renovated, there is no need to elevate it on the basis of the integral bathroom chassis. On the basis of allowing a certain deviation between the drainage hole and the sewage pipe, the height of the bathroom floor after the renovation (that is, the top surface of the integral bathroom chassis) can be increased as little as possible.

[0066] According to the embodiment of the utility model, through the coordinated rotation of the second joint 14 and the first joint 13, dead-zone-free docking can be achieved within the sum of the eccentric distance of the first joint 13 (the distance between the axis of the first tube body 131 and the axis of the upper cover 132) and the eccentric distance of the second joint 14 (the distance between the axis of the second tube body 141 and the axis of the third tube body 142), with a large fault tolerance distance and more flexible use.

[0067] According to the embodiment of the present invention, the outer diameter of the third tube body 142 does not exceed the diameter of the through hole of the upper cover 132 .

[0068] Figure 3 Schematically shows Figure 2 A partial cross-sectional view of part A of the integrated bathroom docking device is shown.

[0069] According to the embodiments of the present utility model, Figures 1 to 3 As shown, the top of the second tube body 141 extends upward to form an extension portion 144, and the extension portion 144 is suitable for connecting to an external sewage pipe. The integrated bathroom docking device also includes a floor drain cover 19 and a decorative cover 110. The floor drain cover 19 is sleeved on the periphery of the extension portion 144 and is located on the integrated bathroom chassis 11, and the decorative cover 110 is sleeved on the periphery of the extension portion 144 and is located on the floor drain cover. Among them, a groove 111 surrounding the drain hole 12 is formed on the reserved drainage groove 17, and the floor drain cover 19 is installed in the groove 111.

[0070] According to an embodiment of the utility model, the extension portion 144 can be connected to the sewage pipe of the wash basin, so that the water in the wash basin is guided to the drainage pipe 21 through the extension portion for discharge.

[0071] According to an embodiment of the present invention, the diameter of the second tube body 141 is greater than the diameter of the third tube body 142 to facilitate sewage discharge.

[0072] According to an embodiment of the utility model, the floor drain cover 19 is made of engineering plastic injection molding, with an adjustment hole designed in the middle. The extension part 144 passes through the adjustment hole to be connected to the external sewage pipe, and an adjustment space is formed between the adjustment hole and the extension part to ensure that the direction of the second joint 14 can be adjusted.

[0073] According to the embodiment of the utility model, the edge of the adjustment hole of the floor drain cover 19 is formed with a flange upward, which acts as a water-stopping step to prevent sewage from leaking into the adjustment hole.

[0074] According to the embodiment of the utility model, the decorative cover 110 is injection molded by engineering plastic, the inner hole is designed to fit tightly with the eccentric joint of the basin drain, and has a good appearance. The lower part is designed as a hole position, which cooperates with the floor drain cover to form a gap. When the direction of the eccentric joint of the basin drain is adjusted, the decorative cover will have space to move, ensuring better fault-tolerant assembly.

[0075] In an illustrative embodiment, Figure 5 As shown, the second joint 14 is integrally injection molded with engineering plastics, and the relative position and direction between the reserved drainage groove 17 of the integral bathroom chassis 11 and the first joint 13 can be adjusted by rotation. A sunken step is formed on the second tube body, which is conducive to the installation and positioning of the deodorizing gasket.

[0076] According to the embodiment of the utility model, the first joint 13 is injection molded by engineering plastics and adopts a different diameter eccentric design to achieve non-concentricity between the through holes of the tube body 131 and the upper cover 132. By rotating, the relative position of the second joint 14 and the center of the first joint 13 is adjusted to achieve fault-tolerant docking.

[0077] Figure 4 Schematically shows Figure 2 A partial cross-sectional view of part B of the integrated bathroom docking device is shown.

[0078] According to the embodiments of the present utility model, Figure 4 As shown, the integrated bathroom docking device also includes a third joint 15, which is a different diameter eccentric structure, installed between the first joint 13 and the second joint 14, and is suitable for cooperating with the first joint 13 so that the second pipe body 141 is located at the center of the reserved drainage groove 17.

[0079] According to an embodiment of the utility model, the third joint 15 includes a fourth tube body and a fifth tube body, the fourth tube body is sleeved outside the third tube body 142, and the fifth tube body is sleeved in the through hole of the upper cover 132, wherein the fifth tube body and the fourth tube body are integrally formed.

[0080] According to an embodiment of the utility model, the integrated bathroom docking device further includes an anti-odor gasket 16, which is arranged in the third tube body 142. The anti-odor gasket 16 is concave and extends downward near the center of the circle to form two semi-conical parts 161. The two semi-conical parts 161 are attached to each other to form a closed conical structure to prevent the gas in the drainage pipe 21 from entering the second tube body 141. In response to sewage entering the second joint, the two semi-conical parts 161 are deformed and separated to facilitate the sewage to be discharged into the drainage pipe 21.

[0081] According to the embodiment of the utility model, by providing the third joint 15, the center of the second pipe body can be roughly located on the center of the drainage hole 12, which is convenient for the discharge of sewage.

[0082] According to the embodiments of the present utility model, Figure 4 As shown, the integrated bathroom docking device also includes a floor drain filter cover 113, which covers the top of the second tube body 141 and is suitable for filtering sewage from the integrated bathroom base and discharging it into the drainage pipe 21.

[0083] According to the embodiments of the present utility model, Figure 5 As shown, the top end of the second pipe body is suitable for connecting to a sewage discharge device, such as a toilet or a bedpan.

[0084] As another aspect of the embodiment of the present utility model, Figure 1 and Figure 2As shown, a complete bathroom 1 is provided, comprising a complete bathroom base 11 and any of the above-mentioned complete bathroom docking devices. The complete bathroom base 11 has a reserved drainage groove 17, and one end of a second joint 14 of the complete bathroom docking device passes through a drainage hole 12 on the reserved drainage groove 17.

[0085] According to an embodiment of the utility model, the reserved drainage groove 17 is pre-buried in the integrated bathroom chassis 11. According to an embodiment of the utility model, the integrated bathroom chassis 11 is constructed to be substantially the same size as the floor 2 of the bathroom to be renovated, and the integrated bathroom chassis 11 is integrally formed. The reserved drainage groove is arranged in the integrated bathroom chassis 11 and is located above the drainage pipe 21 of the bathroom, and the central axis of the drainage hole 12 of the reserved drainage groove 17 is allowed to deviate from the axis of the drainage pipe 21.

[0086] According to the embodiment of the utility model, the third tube body rotates in the rotating space 18 to achieve docking with the through hole on the upper cover.

[0087] According to the embodiment of the utility model, by setting the rotating space 18, the connection part of the third tube body 142 and the second tube body 141 can be deflected in the overall bathroom chassis 11, so that the third tube body extends downward to below the overall bathroom chassis 11, and the third tube body is inserted into the through hole of the upper cover, thereby realizing fault-tolerant docking without raising the overall bathroom chassis 11.

[0088] According to the embodiments of the present utility model, Figure 4 and Figure 5 As shown, the upper portion of the reserved drainage groove 17 extends radially inward to form a support platform 171 , and the second joint 14 is radially provided with a flange 143 , which cooperates with the support platform 171 to install the second joint 14 in the reserved drainage groove 17 .

[0089] According to the embodiments of the present utility model, Figure 1-Figure 5 As shown, the integrated bathroom chassis 11 includes a reserved drainage groove 17, floor tiles 114, chassis filler 115 and chassis back plate 116, wherein the floor tiles are the upper surface of the integrated bathroom chassis, serving as the floor of the renovated bathroom. The chassis back plate 116 is in contact with the floor of the bathroom to be renovated, and the chassis filler 115 is filled between the chassis back plate 116 and the floor tiles 114, providing an installation plane for the floor tiles 114 and ensuring the strength of the integrated bathroom chassis 1. The reserved drainage groove 17 is pre-buried between the floor tiles 114 and the chassis back plate 116, penetrating the upper surface of the floor tiles 114 and the lower surface of the chassis back plate 116.

[0090] In an exemplary embodiment, the floor tiles 114 may be ceramic tiles.

[0091] According to the embodiments of the present utility model, Figure 4 and Figure 5 As shown, the second joint 14 can be snapped into the reserved drainage groove 17 by cooperating with the flange 143 and the support platform 171 .

[0092] According to the embodiment of the utility model, the edge of the integrated bathroom chassis 11 extends upward to form a baffle 112 to prevent sewage on the integrated bathroom chassis 11 from flowing out through the edge.

[0093] In an illustrative embodiment, the baffle 112 is surrounded by a profile.

[0094] According to an embodiment of the utility model, the baffle 112 can be formed by extending upwardly from the profile forming the chassis of the integral bathroom chassis 11, and the baffle 112 is connected to the wall by filling glue between the baffle 112 and the wall.

[0095] According to the embodiment of the utility model, based on the size of the bathroom to be renovated, as well as the position and size of the sewage pipe of the bathroom to be renovated, the overall bathroom chassis and the fault-tolerant overall bathroom docking device are prefabricated in the factory and then sent to the project site of the bathroom to be renovated.

[0096] According to the embodiment of the utility model, the reserved drainage groove 17 on the integral bathroom chassis 11 is injection molded with engineering plastics, with a hole design in the middle and a lower adjustment hole design, and the lower adjustment hole design increases the operating space, increases the rotation space of the second joint and the acceptance of the misalignment of the drainage pipe and the drainage hole. The circumference of the reserved drainage groove 17 is designed with reinforcing ribs to increase strength.

[0097] According to the embodiment of the utility model, the floor tiles of the bathroom to be renovated are removed and the distance between each pipe opening and the ground is cut and cleaned according to the needs, and each drainage and sewage pipe opening is processed and cleaned.

[0098] According to the embodiment of the utility model, the integral bathroom chassis is placed according to the pre-measured positioning dimensions.

[0099] According to the embodiments of the present utility model, it is confirmed that the basin drainage pipe, floor drain drainage pipe and sewage pipe after the transformation are basically connected with each opening of the bath bottom plate, and there is no obvious deviation (the error range is within the allowable range).

[0100] According to the embodiment of the utility model, the drainage pipe opening of the wash basin or washing machine is docked, and the first joint 13 is inserted into the corresponding drainage pipe 21, and the insertion depth is appropriately adjusted according to the actual on-site ground cleaning situation (the height relationship between the pipe fitting and the ground). Then the third pipe body 142 of the second joint 14 is inserted into the through hole of the upper cover 132 of the first joint 13. According to the central hole position (that is, the drainage hole 12) of the reserved drainage groove 17 on the overall bathroom chassis 11, the direction of the first joint 13 and the second joint 14 is rotated, and the second joint 14 is adjusted to be assembled with the floor drain cover 19 without abnormality, and then the decorative cover 110 is placed.

[0101] According to the embodiment of the utility model, the installation and adjustment of the floor drain joints are as follows: insert the first joint 13 into the corresponding drainage pipe 21, and adjust the insertion depth appropriately according to the actual on-site ground cleaning conditions (the height relationship between the pipe fitting and the ground). Then insert the fifth tube body of the third joint 15 into the through hole of the upper cover 132 of the first joint 13, and insert the third tube body of the second joint into the fourth tube body of the third joint. According to the center hole position (that is, the drainage hole 12) of the reserved drainage groove 17 on the overall bathroom chassis 11, rotate the directions of the first joint 13, the second joint 14 and the third joint 15 so that the second tube body 142 is assembled and matched with the reserved drainage groove 17 of the overall bathroom chassis 11, and cover the floor drain filter cover 113.

[0102] According to the embodiment of the utility model, the adjustment of the installation of the sewage outlet joint is as follows: insert the first joint 13 into the corresponding drainage pipe 21, and adjust the insertion depth appropriately according to the actual on-site ground cleaning conditions (the height relationship between the pipe fitting and the ground). Then insert the third tube body 142 of the second joint 14 into the through hole of the upper cover 132 of the first joint 13. According to the center hole position (that is, the drainage hole 12) of the reserved drainage groove 17 on the integrated bathroom chassis 11, rotate the direction of the first joint 13 and the second joint 14, so that the eccentric joint of the sewage pipe is completely in contact with the end face of the reserved drainage groove 17 of the integrated bathroom chassis 11.

[0103] According to the embodiment of the utility model, after the assembly and direction adjustment of each drainage pipeline and joint are completed, the plug-in ports are taken out in turn and coated with PVC glue to prevent leakage.

[0104] According to the embodiment of the utility model, through the eccentric reducing diameter design of at least two joints, the joints are relatively rotated, and the relative positions between the joints, the drainage pipe 21 and the drainage hole 12 are adjusted to achieve fault-tolerant docking of erroneous parameters generated when the measured dimensions are inaccurate, thereby improving the installation efficiency of the overall bathroom chassis and effectively avoiding leakage.

[0105] The utility model adopts an integral bathroom to renovate an old house, which can include the connection of one or more of the drainage pipes such as basin drainage, floor drain drainage and toilet sewage drainage. The connection of the drainage pipes can be designed to be used with 2 or 3 joints with different diameter eccentric structures. Each joint is injection molded by engineering plastics, hard-connected, fixed and sealed with PVC glue, and there is no hidden danger of water leakage.

[0106] According to the embodiment of the utility model, the second joint 14 is designed with the reserved drainage groove 17 to ensure that the height of the installation surface of the integrated bathroom chassis can be controlled after installation. The fault-tolerant design of the drainage pipe in the case of inaccurate measurement can effectively avoid the situation where the installation cannot be performed due to inaccurate measurement or there is a hidden danger of water leakage after installation.

[0107] According to the embodiments of the utility model, the connection between the joints and the connection between the joints and the external pipes are evenly connected in a straight row, and there is no need to arrange the pipes by suspending the whole bathroom chassis, so that the bathroom floor will not be higher than the external floor of the toilet after installation. It solves the problem that the hole positions of the existing basin drainage, floor drain drainage, sewage pipe, etc. are difficult to accurately measure when renovating old houses, and it is difficult to match and install with the assembled whole bathroom chassis. At the same time, it also solves the problem that after the whole bathroom chassis is installed, the installation surface of the whole bathroom will be raised due to the sewage and drainage horizontal drainage system, thereby causing the bathroom floor to be higher than the external ground.

[0108] The terms used herein are only for describing specific embodiments and are not intended to limit the present invention. The terms "include", "comprises", etc. used herein indicate the existence of features, steps, operations and / or components, but do not exclude the existence or addition of one or more other features, steps, operations or components.

[0109] The ordinal numbers used in the specification and claims, such as "first", "second", "third", etc., to modify the corresponding elements, do not themselves mean that the elements have any ordinal numbers, nor do they represent the order of one element and another element, or the order in the manufacturing method. The use of these ordinal numbers is only used to clearly distinguish a component with a certain name from another component with the same name.

[0110] The specific embodiments described above further illustrate the purpose, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above are only specific embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A unitized bathroom docking device, suitable for docking a reserved drainage groove (17) of a unitized bathroom chassis (11) with a drainage pipe (21) of a toilet to be renovated, wherein the central axis of the drainage hole (12) of the reserved drainage groove (17) is spatially isolated from the axis of the drainage pipe (21), and characterized in that: include: The first joint (13) is a different-diameter eccentric structure and is rotatably mounted on the upper end of the drainage pipe (21); as well as The second joint (14) is a different-diameter eccentric structure, one end of which passes through the drainage hole (12) and is rotatably mounted on the first joint (13) to communicate with the drainage pipe (21); By rotating the first joint (13) and the second joint (14) respectively, a dead zone-free docking between the drainage hole (12) and the drainage pipe (21) is achieved within the range of the sum of the eccentric distance of the first joint (13) and the eccentric distance of the second joint (14).

2. The integrated bathroom docking device according to claim 1, characterized in that: The first connector (13) comprises: The first tube body (131); An upper cover (132) is arranged at the upper end of the first tube body (131), and a through hole is opened on the upper cover (132). The diameter of the through hole is larger than the radius of the first tube body (131), wherein the axis of the through hole is spatially isolated from the axis of the first tube body (131).

3. The integrated bathroom docking device according to claim 2, characterized in that: The first connector (13) further comprises: The protrusion (133) is formed by extending radially outward from the upper end of the first tube body (131), and the protrusion (133) is suitable for being mounted on the top end of the drainage pipe (21).

4. The integrated bathroom docking device according to claim 1, characterized in that: The second connector (14) comprises: A second tube (141) passes through the drainage hole (12); and The third tube body (142) is connected to the lower end of the second tube body (141) and extends out of the bottom of the integrated bathroom chassis (11); the axis of the third tube body (142) is configured to deviate from the axis of the second tube body (141); the rotation of the second tube body (141) drives the third tube body (142) to rotate so that the third tube body (142) is installed on the first joint (13).

5. The integrated bathroom docking device according to claim 4, characterized in that: The top of the second tube body (141) extends upward to form an extension portion (144), and the extension portion (144) is suitable for connecting to an external sewage pipe. The integrated bathroom docking device also includes: A floor drain cover plate (19) is sleeved on the periphery of the extension portion (144) and is located on the integrated bathroom base plate (11); and A decorative cover (110) is sleeved around the periphery of the extension portion (144) and is located on the floor drain cover plate; Wherein, a groove (111) surrounding the drainage hole (12) is formed on the reserved drainage groove (17), and the floor drain cover (19) is installed in the groove (111).

6. The integrated bathroom docking device according to claim 4, characterized in that: Also includes: The third joint (15) is a different-diameter eccentric structure, installed between the first joint (13) and the second joint (14), and suitable for cooperating with the first joint (13) so that the second pipe body (141) is located at the center of the reserved drainage groove (17).

7. The integrated bathroom docking device according to claim 6, characterized in that: Also includes: An anti-odor gasket (16) is mounted on the third tube body (142), and a region near the center of the circle on the anti-odor gasket (16) is concave and extends downward to form two semi-conical portions (161); The two semi-conical portions (161) are pressed against each other to form a closed conical structure to prevent gas in the drainage pipe (21) from entering the second pipe body (141); in response to sewage entering the second joint (14), the two semi-conical portions (161) are deformed and separated to facilitate the drainage of sewage into the drainage pipe (21).

8. An integrated bathroom chassis, characterized in that: The floor (2) is constructed to be approximately the same size as the floor of the bathroom to be renovated, and includes: a reserved drainage trough (17), floor tiles (114), a bottom plate filling material (115) and a bottom plate back plate (116); The reserved drainage groove (17) is suitable for docking with the drainage pipe (21) through the integrated bathroom docking device described in any one of claims 1 to 7; the floor tile (114) is the upper surface of the integrated bathroom chassis (11), serving as the floor of the renovated bathroom; the chassis back plate (116) is in contact with the floor (2) of the bathroom to be renovated; the chassis filler (115) is filled between the chassis back plate (116) and the floor tile (114) to provide an installation plane for the floor tile (114); the reserved drainage groove (17) is pre-buried between the floor tile (114) and the chassis back plate (116), and passes through the upper surface of the floor tile (114) and the lower surface of the chassis back plate (116).

9. The integrated bathroom chassis according to claim 8, characterized in that: The edge of the integrated bathroom base (11) extends upward to form a baffle (112) to prevent sewage on the integrated bathroom base (11) from flowing out through the edge.

10. The integrated bathroom chassis according to claim 8, characterized in that: The upper portion of the reserved drainage groove (17) extends radially inward to form a support platform (171), and the second joint (14) is provided with a flange (143) in the radial direction, and the flange (143) cooperates with the support platform (171) to install the second joint (14) in the reserved drainage groove (17).