Tool for improving embedding precision of long foundation bolt

By designing a tool that includes base, positioning steel plate, slide rod and electric telescopic rod, the problem of easy deviation of anchor bolts during concrete pouring is solved, and the precise embedding and stability of anchor bolts is achieved, ensuring that Installation quality of the upper steel structure.

CN221973057UActive Publication Date: 2024-11-08CHINA CONSULTING ENG MANAGEMENT CONSULTING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420174455.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-24
Publication Date
2024-11-08
Estimated Expiration
2034-01-24

AI Technical Summary

Technical Problem

During the installation process, longer anchor bolts are easily offset due to the impact and vibration of concrete, which affects their plane position and level, and thus affects the installation quality of the upper steel structure.

Method used

A tool including a base, positioning steel plate, slide rod, electric telescopic rod and clamp are designed. The anchor bolts are fixed in the embedded pothole through the motor drive screw and the drive block to ensure that their positioning is stable and prevent deviation.

Benefits of technology

It effectively improves the pre-embedding accuracy of anchor bolts, ensures the accuracy of their height and plane position, reduces manual operation, saves manpower, and maintains the stability of anchor bolts during the concrete pouring process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221973057U_ABST
    Figure CN221973057U_ABST
Patent Text Reader

Abstract

The utility model discloses a tool for improving the embedding precision of a longer foundation bolt, and particularly relates to the technical field of building construction, the tool comprises a base, a positioning steel plate and a foundation bolt, the interiors of the left end and the right end of a supporting plate are both connected with sliding rods in a sliding mode, and the ends, away from the base, of the sliding rods are both fixedly provided with side edge bases; a supporting plate is fixedly mounted in the middle of the upper end of the base. According to the tool for improving the embedding precision of the long foundation bolt, firstly, the foundation bolt is fixedly installed on the positioning steel plate, then the foundation bolt is placed in an embedding pit hole through mutual cooperation of the motor, the screw rod, the driving block, the transverse plate, the longitudinal plate, the electric telescopic rod and the clamping block, and in the concrete pouring process, the foundation bolt is placed in the embedding pit hole, so that the embedding precision of the long foundation bolt is improved. The clamping blocks clamp the positioning steel plate all the time, so that the positioning stability of the foundation bolt is effectively guaranteed, the foundation bolt is prevented from deviating during concrete pouring and vibrating, the pre-embedding precision of the foundation bolt is improved, and the height of the foundation bolt and the precision of the plane position are guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a tool for improving the embedding accuracy of longer anchor bolts. Background Art

[0002] Embedded bolts, also known as anchor bolts, are actually tools that are buried in the ground or foundation to connect the ground or foundation to machinery and equipment. They are generally made of Q235 steel. Embedding is one of the methods of installing anchor bolts. The anchor bolts are buried in the ground through concrete pouring. According to different shapes, they are divided into: L-shaped embedded bolts, 9-shaped embedded bolts, U-shaped embedded bolts, welded embedded bolts, and bottom plate embedded bolts.

[0003] When some existing longer anchor bolts are embedded and installed in the ground, the contact area between the outer surface of the anchor bolt and the ground is small. When pouring concrete for the steel column foundation, the lower part of the anchor bolt is easily offset due to the impact of the concrete and the vibration during vibration, resulting in deviations in the plane position and horizontality of the anchor bolt, which seriously affects the installation quality of the upper steel structure. Therefore, we provide a tool to improve the pre-embedding accuracy of longer anchor bolts, which can effectively solve the problems in the background technology. Utility Model Content

[0004] The main purpose of the utility model is to provide a tool for improving the embedding accuracy of longer anchor bolts, which can effectively solve the problems in the background technology.

[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0006] A tool for improving the pre-embedding accuracy of longer anchor bolts, comprising a base, a positioning steel plate and anchor bolts, wherein sliding rods are slidably connected to the left and right ends of the support plate, and a side seat is fixedly installed on the end of the slide rod away from the base, a support plate is fixedly installed on the middle part of the upper end of the base, and a top plate is fixedly installed on the upper end of the support plate. A movable groove is opened at the front end of the support plate, and a lifting device is fixedly installed in the movable groove. A cross plate is arranged at the front end of the lifting device, and longitudinal plates are fixedly installed on the left and right sides of the front end of the cross plate, and a plurality of electric telescopic rods are fixedly installed on the ends of the two longitudinal plates close to each other, and a clamping block is fixedly installed on the electric telescopic rods on the same side, and the positioning steel plate is located between the two clamping blocks.

[0007] Preferably, the lifting device includes a motor, a screw and two limiting rods, the screw is rotatably connected in the movable groove, the limiting rod is fixedly connected to the side wall of the movable groove, and the screw is located between the two limiting rods, the motor is fixedly installed on the upper end of the top plate, the output end of the motor is fixedly connected to the screw, the screw and the limiting rod are commonly connected with a driving block, the screw is threadedly connected to the driving block, the limiting rod and the driving block are slidably connected, and the front end of the driving block is fixedly connected to the cross plate.

[0008] Preferably, a plurality of pulleys are fixedly mounted on the lower end of the side seat.

[0009] Preferably, a handle is fixedly mounted on the rear end of the top plate.

[0010] Preferably, a plurality of mounting holes are formed on the positioning steel plate, and the anchor bolts are fixedly installed in the mounting holes by nuts.

[0011] Preferably, a rubber pad is provided on the surface of the clamping block.

[0012] Compared with the prior art, the utility model has the following beneficial effects:

[0013] The utility model discloses a tool for improving the pre-embedding accuracy of longer anchor bolts. The anchor bolts are first fixedly installed on a positioning steel plate. Then, the positioning steel plate and the anchor bolts are placed into a pre-embedded pit through the cooperation of a motor, a screw rod, a driving block, a horizontal plate, a longitudinal plate, an electric telescopic rod and a clamping block. During the concrete pouring process, the clamping block always clamps the positioning steel plate, effectively ensuring the positioning stability of the anchor bolts, preventing the anchor bolts from being offset during concrete pouring and vibration, improving the pre-embedding accuracy of the anchor bolts, and ensuring the accuracy of the height and plane position of the anchor bolts. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0015] Figure 2 It is a schematic diagram of the top structure of the utility model.

[0016] In the figure: 1. base; 2. support plate; 3. top plate; 4. motor; 5. screw; 6. limit rod; 7. drive block; 8. horizontal plate; 9. vertical plate; 10. electric telescopic rod; 11. clamping block; 12. positioning steel plate; 13. anchor bolt; 14. side seat; 15. pulley; 16. handle; 17. slide rod; 21. movable slot. DETAILED DESCRIPTION

[0017] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.

[0018] like Figure 1-2 As shown, a tool for improving the pre-embedding accuracy of longer anchor bolts comprises a base 1, a positioning steel plate 12 and an anchor bolt 13, wherein the left and right ends of the support plate 2 are slidably connected with slide rods 17, and the end of the slide rod 17 away from the base 1 is fixedly installed with a side seat 14, and the length of the slide rod 17 inside the base 1 is adjusted as needed to improve the stability of the entire device, a support plate 2 is fixedly installed in the middle of the upper end of the base 1, and a top plate 3 is fixedly installed on the upper end of the support plate 2, a movable groove 21 is opened at the front end of the support plate 2, and a lifting device is fixedly installed in the movable groove 21, a transverse plate 8 is arranged at the front end of the lifting device, and longitudinal plates 9 are fixedly installed on the left and right sides of the front end of the transverse plate 8, and a plurality of electric telescopic rods 10 are fixedly installed at the ends of the two longitudinal plates 9 close to each other, and the electric telescopic rods 10 on the same side are fixedly installed with a clamping block 11, and the positioning steel plate 12 is located between the two clamping blocks 11.

[0019] The lifting device includes a motor 4, a screw 5 and two limiting rods 6. The screw 5 is rotatably connected in the movable groove 21, the limiting rod 6 is fixedly connected to the side wall of the movable groove 21, and the screw 5 is located between the two limiting rods 6. The motor 4 is fixedly installed on the upper end of the top plate 3, the output end of the motor 4 is fixedly connected to the screw 5, the screw 5 and the limiting rod 6 are connected through a driving block 7, the screw 5 is threadedly connected to the driving block 7, the limiting rod 6 is slidably connected to the driving block 7, the front end of the driving block 7 is fixedly connected to the cross plate 8, and the motor 4 is started to drive the screw 5 to rotate The screw rod 5 rotates to drive the driving block 7 to move downward, and the driving block 7 drives the horizontal plate 8, the vertical plate 9, the electric telescopic rod 10, the clamping block 11, the positioning steel plate 12 and the anchor bolt 13 to move downward, and the anchor bolt 13 is embedded in the pre-buried pit, and concrete is poured into the pre-buried pit. During the solidification of the concrete, the clamping block 11 fixes the positioning steel plate 12 to prevent the anchor bolt 13 from tilting due to the impact of the concrete, thereby improving the pre-embedding accuracy of the anchor bolt 13 and ensuring the accuracy of the height and plane position of the anchor bolt 13. At the same time, there is no need to manually embed the anchor bolt 13, saving manpower.

[0020] A plurality of pulleys 15 are fixedly mounted on the lower end of the side seat 14 to facilitate the movement of the entire device.

[0021] A handle 16 is fixedly mounted on the rear end of the top plate 3 to facilitate the movement of the entire device to the pre-buried location.

[0022] The positioning steel plate 12 is provided with a plurality of mounting holes, and the anchor bolts 13 are fixedly installed in the mounting holes by nuts. The positions and number of the mounting holes can be adjusted as required.

[0023] A rubber pad is provided on the surface of the clamp block 11 to increase the friction between the clamp block 11 and the positioning steel plate 12 and better clamp the positioning steel plate 12 .

[0024] The working principle of the utility model is as follows: first, the anchor bolt 13 is fixedly installed on the positioning steel plate 12, and then the anchor bolt 13 is placed in the pre-buried pit through the cooperation of the motor 4, the screw 5, the driving block 7, the horizontal plate 8, the longitudinal plate 9, the electric telescopic rod 10 and the clamping block 11. During the concrete pouring process, the clamping block 11 always clamps the positioning steel plate 12, effectively ensuring the positioning stability of the anchor bolt 13, preventing the anchor bolt 13 from being offset during the concrete pouring and vibration, and ensuring the accuracy of the height and plane position of the anchor bolt 13.

[0025] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.

Claims

1. A tool for improving the embedding accuracy of longer anchor bolts, comprising a base (1), a support plate (2), a positioning steel plate (12) and an anchor bolt (13), Features: The left and right ends of the support plate (2) are slidably connected with sliding rods (17), and the ends of the sliding rods (17) away from the base (1) are fixedly installed with side seats (14). The support plate (2) is fixedly installed in the middle of the upper end of the base (1), and the top plate (3) is fixedly installed on the upper end of the support plate (2). The front end of the support plate (2) is provided with a movable groove (21), and a lifting device is fixedly installed in the movable groove (21). The front end of the lifting device is provided with a horizontal plate (8), and the left and right sides of the front end of the horizontal plate (8) are fixedly installed with longitudinal plates (9). The ends of the two longitudinal plates (9) close to each other are fixedly installed with a plurality of electric telescopic rods (10), and the electric telescopic rods (10) located on the same side are fixedly installed with a clamping block (11), and the positioning steel plate (12) is located between the two clamping blocks (11).

2. A tool for improving the embedding accuracy of longer anchor bolts according to claim 1, Features: The lifting device comprises a motor (4), a screw rod (5) and two limiting rods (6); the screw rod (5) is rotatably connected in the movable groove (21); the limiting rod (6) is fixedly connected to the side wall of the movable groove (21), and the screw rod (5) is located between the two limiting rods (6); the motor (4) is fixedly installed on the upper end of the top plate (3); the output end of the motor (4) is fixedly connected to the screw rod (5); the screw rod (5) and the limiting rod (6) are connected to a driving block (7) through and through; the screw rod (5) and the driving block (7) are threadedly connected; the limiting rod (6) and the driving block (7) are slidably connected; and the front end of the driving block (7) is fixedly connected to the cross plate (8).

3. A tool for improving the embedding accuracy of longer anchor bolts according to claim 1, Features: A plurality of pulleys (15) are fixedly mounted on the lower end of the side seat (14).

4. A tool for improving the embedding accuracy of longer anchor bolts according to claim 1, Features: A handle (16) is fixedly mounted on the rear end of the top plate (3).

5. A tool for improving the embedding accuracy of longer anchor bolts according to claim 1, Features: The positioning steel plate is provided with a plurality of mounting holes, and the anchor bolts (13) are fixedly mounted in the mounting holes by nuts.

6. A tool for improving the embedding accuracy of longer anchor bolts according to claim 1, Features: A rubber pad is provided on the surface of the clamping block (11).