Automatic sand laying device for directly-buried cable trench

By using inclined sand paving channels driven by buckets and forklifts in the photovoltaic pile environment, the problem of interference between the base round wheel and the prefabricated pile space is solved, and the effect of effective sand paving in the photovoltaic pile environment is achieved.

CN221989423UActive Publication Date: 2024-11-12中国电建集团贵州工程有限公司
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323516230.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-22
Publication Date
2024-11-12
Estimated Expiration
2033-12-22

AI Technical Summary

Technical Problem

In the construction environment of photovoltaic piles, the existing sand laying device will have spatial interference with the prefabricated piles when the circular wheels on both sides of the base roll, resulting in the inability to spread sand through the circular wheels on both sides of the base with the central sand outlet.

Method used

A forklift including a bucket and a roller is designed. An inclined sand-paving channel is installed on the side of the bucket. One end of the sand-paving channel is connected to the bucket and the other end is closed, suspended on the cable trench, and leaks are distributed between intervals. The hole and flow regulation plate regulate the gravel flow, and the forklift drives the bucket to walk between the photovoltaic piles to solve the problem of space interference.

Benefits of technology

It realizes the sand laying without space interference in the photovoltaic pile environment, and the sand and gravel in the bucket can leak into the cable trench smoothly, solving the problem of the inability to lay sand when the base wheel rolls.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221989423U_ABST
    Figure CN221989423U_ABST
Patent Text Reader

Abstract

The utility model discloses an automatic sand laying device for a directly-buried cable trench. The automatic sand laying device comprises a bucket on a construction site between photovoltaic piles; the bottom of the sand laying channel is provided with leakage holes, the sand laying channel is obliquely fixed to the side edge of the bucket, and an opening of the sand laying channel is communicated with the bucket space. The bucket is driven by a forklift to roll and walk in a construction site between photovoltaic piles, grit in the bucket is leaked into the cable trench by a sand laying channel suspended above the cable trench to embed a current collection circuit, and as the bucket is located between the photovoltaic piles and does not have spatial interference, the problem that the circular wheels on the two sides of the base can generate spatial interference with the precast piles when rolling is solved, and the construction efficiency is improved. The middle sand outlet cannot be driven by round wheels on the two sides of the base for sand laying.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to an automatic sand-laying device for a direct-buried cable trench, belonging to the technical field of cable construction equipment. Background Art

[0002] The photovoltaic power generation collection line 11 needs to be directly buried in the cable trench 13 excavated in the construction site 12, such as Figure 3 During construction, the collector line is laid in the cable trench and then backfilled with gravel. In order to reduce the labor intensity of manual gravel backfilling, a sand spreading device is required to backfill gravel into the cable trench 13 to bury the collector line 11.

[0003] The existing sand-laying device is shown in Chinese patent publication number CN218522259U, which discloses the following technology: round wheels are installed on both sides of the base, and a sand outlet is installed in the middle of the base through an output pipe; although the round wheels on both sides of the base can drive the movement, and the sand and gravel are discharged from the sand outlet in the middle of the base to bury the collector line, but for the construction environment where there are photovoltaic piles 14 supporting photovoltaic panels 15 on one side of the cable trench 13, the round wheels on both sides of the base will cause spatial interference with the prefabricated piles when rolling, and there is a problem that sand cannot be spread through the central sand outlet with the round wheels on both sides of the base. Utility Model Content

[0004] In order to solve the above technical problems, the utility model provides an automatic sand-laying device for a direct-buried cable trench.

[0005] The utility model is realized through the following technical solutions.

[0006] The utility model provides an automatic sand-laying device for a direct buried cable trench, comprising:

[0007] Buckets on the construction site between photovoltaic piles;

[0008] A sand-laying channel with leakage holes is arranged at the bottom, the sand-laying channel is obliquely fixed at the side of the bucket, and the opening of the sand-laying channel is communicated with the bucket space.

[0009] Also included is a forklift with built-in rollers, on which the bucket is mounted.

[0010] One end of the sand-laying channel is provided with an opening connected to the bucket space, and the other end of the sand-laying channel is closed, so that the sand-laying channel is a closed tube at one end. The sand-laying channel is installed obliquely from the side of the bucket and is suspended on the cable trench when in use.

[0011] The leakage holes are multiple and distributed at intervals.

[0012] A flow regulating plate for regulating the flow rate leaking from the leakage hole is installed at the bottom of the sand-laying channel.

[0013] The two ends of the bottom of the sand-laying channel are fixed with limiting frames, and there is a gap between the limiting frames and the bottom surface of the sand-laying channel. The flow regulating plate is movably and adjustably installed between the gap between the limiting frames and the bottom surface of the sand-laying channel. The flow regulating plate moves its position with the limiting frames as the force basis to block the outlet opening of the leakage hole on the bottom surface of the sand-laying channel, thereby controlling the flow of sand and gravel leaking from the leakage hole in the sand-laying channel.

[0014] The flow regulating plate is fastened to the leakage hole outlet at the bottom of the sand-laying channel by bolts.

[0015] The limiting frame is provided with a threaded through hole for screwing with a bolt.

[0016] The beneficial effect of the utility model is that the bucket is driven by the forklift to roll in the construction site between the photovoltaic piles, so that the sand-laying channel suspended above the cable trench leaks the sand and gravel in the bucket into the cable trench to bury the collector line. Since the bucket is between the photovoltaic piles and there is no spatial interference, the problem that the circular wheels on both sides of the base will cause spatial interference with the prefabricated piles when rolling, and the problem that sand cannot be spread through the central sand outlet with the circular wheels on both sides of the base. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the structure of the utility model when it is used in construction;

[0018] Figure 2 It is a structural schematic diagram of the sand-laying channel of the utility model;

[0019] Figure 3 It is a structural diagram of the construction site distribution;

[0020] In the figure: 1-forge; 2-bucket; 3-sand laying channel; 31-leak hole; 4-limiting frame; 5-flow regulating plate; 6-bolt;

[0021] 11-collection line; 12-construction site; 13-cable trench; 14-photovoltaic pile; 15-photovoltaic panel. DETAILED DESCRIPTION

[0022] The technical solution of the utility model is further described below, but the scope of protection required is not limited to the description.

[0023] like Figure 1 to Figure 2 shown.

[0024] The present invention discloses an automatic sand-laying device for direct buried cable trenches, comprising:

[0025] The bucket 2 is used to contain sand and gravel. The bucket 2 is installed on the forklift 1. The forklift 1 with its own rollers drives the bucket 2 to roll in the construction site 12 between the photovoltaic piles 14.

[0026] The side of the bucket 2 is welded and fixed with a round tube to form a sand-laying channel 3. One end of the sand-laying channel 3 is provided with an opening to communicate with the space of the bucket 2, and the other end of the sand-laying channel 3 is closed, so that the sand-laying channel 3 is a closed tube at one end; the bottom of the sand-laying channel 3 is provided with a leakage hole 31, and the leakage holes 31 are distributed at intervals. The sand-laying channel 3 is installed obliquely from the side of the bucket 2 and is suspended on the cable trench 13 when in use.

[0027] The two ends of the bottom of the sand-laying channel 3 are welded and fixed with limiting frames 4 at intervals, and there is a gap between the limiting frame 4 and the bottom surface of the sand-laying channel 3. The gap between the limiting frame 4 and the bottom surface of the sand-laying channel 3 is movably adjusted, and a flow regulating plate 5 is installed. The flow regulating plate 5 moves with the limiting frame 4 as the force basis to block the outlet opening of the leakage hole 31 on the bottom surface of the sand-laying channel 3, so as to control the flow of sand and gravel leaking from the leakage hole 31 of the sand-laying channel 3.

[0028] The flow regulating plate 5 is tightened to the outlet of the leakage hole 31 at the bottom of the sand-laying channel 3 by means of bolts 6 ; the limit frame 4 is provided with a threaded through hole for screwing with the bolts 6 .

[0029] The shovel 1 with built-in rollers drives the bucket 2 to roll in the construction site 12 between the photovoltaic piles 14, so that the sand-laying channel 3 suspended above the cable trench 13 leaks the sand and gravel in the bucket 2 into the cable trench 13 to bury the collector line 11. Since the bucket 2 is between the photovoltaic piles 14 and there is no spatial interference, the problem that the circular wheels on both sides of the base will cause spatial interference with the prefabricated piles when rolling, and the problem that sand cannot be laid through the central sand outlet with the circular wheels on both sides of the base is solved.

Claims

1. An automatic sand-laying device for direct buried cable trenches, characterized in that: include: A bucket (2) on a construction site (12) between photovoltaic piles (14); A sand-laying channel (3) with a leaking hole (31) is provided at the bottom, the sand-laying channel (3) is tilted and fixed on the side of the bucket (2), and the opening of the sand-laying channel (3) is communicated with the space of the bucket (2).

2. The automatic sand-laying device for direct buried cable trenches according to claim 1, characterized in that: It also includes a forklift (1) with rollers, and a bucket (2) is installed on the forklift (1).

3. The automatic sand-laying device for direct buried cable trenches according to claim 1, characterized in that: One end of the sand-laying channel (3) is provided with an opening which is communicated with the space of the bucket (2), and the other end of the sand-laying channel (3) is closed, so that the sand-laying channel (3) is a closed tube at one end. The sand-laying channel (3) is installed obliquely from the side of the bucket (2) and is suspended on the cable trench (13) when in use.

4. The automatic sand-laying device for direct buried cable trenches according to claim 1, characterized in that: The leakage holes (31) are multiple and distributed at intervals.

5. The automatic sand-laying device for direct buried cable trenches according to claim 1, characterized in that: A flow regulating plate (5) for regulating the flow rate leaking from the leakage hole (31) is installed at the bottom of the sand-laying channel (3).

6. The automatic sand-laying device for direct buried cable trenches according to claim 5, characterized in that: The two ends of the bottom of the sand-laying channel (3) are fixed with a limiting frame (4), the limiting frame (4) and the bottom surface of the sand-laying channel (3) are spaced apart, and a flow regulating plate (5) is movably and adjustably installed between the limiting frame (4) and the bottom surface of the sand-laying channel (3), and the flow regulating plate (5) moves with the limiting frame (4) as a force basis to block the outlet opening of the leakage hole (31) on the bottom surface of the sand-laying channel (3), thereby controlling the flow of sand and gravel leaking from the leakage hole (31) in the sand-laying channel (3).

7. The automatic sand-laying device for direct buried cable trenches according to claim 6, characterized in that: The flow regulating plate (5) is fastened to the outlet of the leakage hole (31) at the bottom of the sand-laying channel (3) by means of bolts (6).

8. The automatic sand-laying device for direct buried cable trenches according to claim 6, characterized in that: The limiting frame (4) is provided with a threaded through hole for screwing with the bolt (6).