Polar plate conveying system

By setting up tracks between the fireworks workshop and the electrolysis workshop and using control devices to dispatch the transport trolleys, the problems of low automation and poor environmental protection of the existing plate transport system are solved, efficient and safe plate transport is achieved, and the system is reduced Energy consumption and investment costs.

CN222023482UActive Publication Date: 2024-11-19JIANGXI NERIN EQUIPMENT CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420713070.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-08
Publication Date
2024-11-19
Estimated Expiration
2034-04-08

AI Technical Summary

Technical Problem

The existing plate transport system has low degree of automation, poor environmental protection, high labor costs, and has safety hazards. Forklifts need to shuttle back and forth between inside and outside the workshop, occupy ground traffic, affecting efficiency and safety.

Method used

Design a plate transport system, including a conveyor trolley that sets tracks between the pyrotechnic workshop and the electrolysis workshop and runs on the track, and uses the control device to dispatch the trolley to transport plates on the track, reducing ground occupation and energy consumption. Ensure smooth and safe operation.

Benefits of technology

The track transportation system saves land area, reduces investment costs, avoids idleness, improves transportation efficiency and safety, reduces system energy consumption, and improves the flexibility of transporting trolleys.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222023482U_ABST
    Figure CN222023482U_ABST
Patent Text Reader

Abstract

The utility model belongs to the field of metallurgy, and provides a polar plate conveying system, which comprises a track arranged between a pyrogenic process workshop and an electrolysis workshop; a control device; and the conveying trolley runs on the track, receives an instruction of the control device, and conveys polar plates between the pyrogenic process workshop and the electrolysis workshop. According to the polar plate conveying system, the occupied area can be saved, and other traffic equipment on the ground cannot be affected for a long time in the running process of the conveying trolley; and meanwhile, the investment cost of the conveying system is also low. Besides, the conveying trolley runs on the track for a circle, polar plate conveying from the pyrogenic process workshop to the electrolysis workshop or from the electrolysis workshop to the pyrogenic process workshop can be completed, the idling phenomenon is avoided, the energy consumption of the system is further reduced, and meanwhile the control device can dispatch the operation system so that the trolley can run stably and safely.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of metallurgy, and in particular to an electrode plate conveying system. Background Art

[0002] In the copper smelting system, after the copper liquid in the anode furnace in the pyrometallurgical workshop is cast into plates through discs, it needs to be transported to the electrolysis workshop as anodes to be energized for electrolysis; and the qualified plates in the electrolysis workshop will form residual plates after the electrolysis cycle is completed. The residual plates need to be transported to the pyrometallurgical workshop for melting and processing to form qualified plates. Generally speaking, the pyrometallurgical workshop and the electrolysis workshop are not designed and built together, and there is a distance in between that requires equipment to transport the plates.

[0003] At present, the most common transportation scheme is to transport the plates by forklift. After the forklift takes the plates out of the water tank of the disc casting machine, it is transported to the plate yard or directly sent to the anode unit receiving device in the electrolysis workshop. The residual plates formed after electrolysis are first stacked on the residual electrode unit, and then transported by forklift to the residual electrode feeder in the pyrometallurgical workshop, and then transported to the metallurgical furnace for melting. The scheme of transporting plates by forklift has a low degree of automation, poor environmental protection, and high labor costs. The forklift needs to shuttle back and forth in and out of the workshop, which poses a safety hazard.

[0004] Therefore, the current plate transport system still needs to be improved. Utility Model Content

[0005] The utility model aims to solve one of the technical problems in the related art at least to a certain extent.

[0006] The utility model provides a plate transport system, which comprises: a track, which is arranged between a pyrometallurgical workshop and an electrolytic workshop; a control device; and a transport trolley, which runs on the track and receives instructions from the control device to transport the plates between the pyrometallurgical workshop and the electrolytic workshop.

[0007] The plate transport system of the utility model can save floor space by arranging tracks in the pyrometallurgical workshop and the electrolytic workshop, and the transport trolley will not affect other ground transportation equipment for a long time during operation; at the same time, the investment cost of the transport system is disclosed. In addition, the transport trolley can complete the transport of the plates from the pyrometallurgical workshop to the electrolytic workshop or from the electrolytic workshop to the pyrometallurgical workshop after running one circle on the track, that is, the transport trolley is always loaded with plates during operation, and no idling will occur, thereby reducing the energy consumption of the system. At the same time, the control device can dispatch the operating system to make the trolley run smoothly and safely. Specifically, a continuous track is arranged between the pyrometallurgical workshop and the electrolytic workshop, and a transport trolley is arranged on the track. The transport trolley takes the plates from the pyrometallurgical workshop, transports them to the electrolytic workshop area, and then unloads the plates; the transport trolley loads the plates from the electrolytic workshop area, and then transports them to the pyrometallurgical workshop area to unload the corresponding plates, thus completing a material transport cycle.

[0008] According to an embodiment of the utility model, the electrode plate includes an anode plate and / or a residual electrode plate.

[0009] According to an embodiment of the utility model, the control device is used to control the transport trolley to transport the anode plate from the pyrometallurgical workshop to the electrolysis workshop.

[0010] According to an embodiment of the utility model, the control device is used to control the conveying trolley to transport the residual electrode plates from the electrolysis workshop to the pyrometallurgical workshop.

[0011] According to an embodiment of the utility model, the conveying trolley is provided with a distance detection sensor.

[0012] According to an embodiment of the utility model, a storage yard for storing the residual plates and / or the anode plates is also included.

[0013] According to an embodiment of the utility model, the stacking yard has a stacking rack and a transfer trolley, and the transfer trolley receives the residual plates and / or the anode plates and transfers them to the stacking rack.

[0014] According to an embodiment of the present invention, the track comprises a closed single-line track.

[0015] According to an embodiment of the present invention, the track comprises a closed double-line track.

[0016] According to an embodiment of the utility model, the transport trolley is powered by rails or is equipped with batteries. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0018] Figure 1 Some embodiments of the plate operation system are shown;

[0019] Description of reference numerals:

[0020] 1: Track; 2: Conveying trolley; 3: Pyrometallurgical workshop; 4: Electrolysis workshop; 5: First unloader; 6: First charger; 7: Second unloader; 8: Second charger; 9: Stockyard; 10: Third charger; 11: Third unloader; 12: Stacking rack; 13: Transfer trolley. DETAILED DESCRIPTION

[0021] The following describes the implementation of the present invention in detail. The implementation described below is exemplary and is only used to explain the present invention, and cannot be understood as limiting the present invention.

[0022] The inventor of the utility model discovered that in the currently adopted conveyor line solution, the plate and residual plate conveying equipment are designed separately, resulting in low track utilization of the equipment. At the same time, the conveyor line is continuously installed on the ground, which has a certain blocking effect on ground traffic within the factory. At the same time, the equipment is huge and the investment is high.

[0023] Accordingly, in one aspect of the utility model, the utility model proposes a plate transport system, which includes a track, which is arranged between the pyrometallurgical workshop and the electrolysis workshop; a control device; a transport trolley, which runs on the track and receives instructions from the control device to transport the plates between the pyrometallurgical workshop and the electrolysis workshop.

[0024] refer to Figure 1 The plate transport system of the utility model includes a track 1 arranged between the pyrometallurgical workshop 3 and the electrolysis workshop 4; a transport trolley 2, the transport trolley 2 running on the track 1; and a control device, the control device is used to control the transport trolley 2 to transport the plates between the pyrometallurgical workshop 3 and the electrolysis workshop 4.

[0025] The plate transport system of the utility model can save floor space by arranging tracks in the pyrometallurgical workshop and the electrolytic workshop, and the transport trolley will not affect other ground transportation equipment for a long time during operation; at the same time, the investment cost of the transport system is also low. In addition, the transport trolley can complete the transport of the plate from the pyrometallurgical workshop to the electrolytic workshop or from the electrolytic workshop to the pyrometallurgical workshop after running one circle on the track, that is, the transport trolley is always loaded with plates during operation, and no idling will occur, thereby reducing the energy consumption of the system. At the same time, the control device can dispatch the operating system to make the trolley run smoothly and safely. Specifically, a continuous track is arranged between the pyrometallurgical workshop and the electrolytic workshop, and a transport trolley is arranged on the track. The transport trolley takes the plate from the pyrometallurgical workshop area, transports it to the electrolytic workshop area, and then unloads the plate; the transport trolley loads the plate from the electrolytic workshop area, and then transports it to the pyrometallurgical workshop area to unload the corresponding plate, thus completing a material transport cycle.

[0026] In some embodiments, the track is a closed single line, and the transport vehicle can complete the transportation of the plates between the two workshops by running one circle on the circular track. The continuous closed circular route is conducive to the continuous transportation work of the transport vehicle.

[0027] In other embodiments, the track is a closed circular double-line structure, and the transport trolley running on one line can realize the plate transport between the electrolysis workshop and the pyrometallurgical workshop, and the other line can realize the plate transport between the pyrometallurgical workshop and the electrolysis workshop. The transport trolley between the two lines can realize cross-track operation through a turntable or a switch mechanism. In this way, the transport of the plates between the electrolysis workshop and the pyrometallurgical workshop and the transport of the plates between the pyrometallurgical workshop and the electrolysis workshop will not cross or collide, and the transport capacity of the attribute trolley can be dispatched according to the production capacity of the pyrometallurgical workshop or the electrolysis workshop.

[0028] In some embodiments, the electrode plate includes an anode plate and a residual electrode plate. The anode plate refers to an electrode plate produced by a pyrometallurgical workshop, and the anode plate is used in an electrolysis workshop. The residual electrode plate refers to an electrode plate used in the electrolysis process of the electrolysis workshop.

[0029] According to the utility model, reference Figure 1 As shown by the arrow direction, the plate transport system includes utilizing the control device to control the conveyor 2 to transport the anode plate from the pyrometallurgical workshop 3 to the electrolysis workshop 4.

[0030] According to the utility model, reference Figure 1 As shown by the arrow direction, the plate transport system also includes using the control device to control the transport trolley 2 to transport the residual plate from the electrolysis workshop 4 to the pyrometallurgical workshop 3.

[0031] As an example, the track is a closed double-line structure, and the conveyor trolley running on one line can realize the transportation of residual plates between the electrolysis workshop and the pyrometallurgical workshop, and the other line can realize the transportation of anode plates between the pyrometallurgical workshop and the electrolysis workshop. The conveyor trolley between the two lines can realize cross-track operation through a turntable or a switch mechanism. In this way, the cyclic transportation of the conveyor trolley on the track can be realized, and the operation efficiency can be improved.

[0032] In some embodiments, the transport cart is provided with a distance detection sensor.

[0033] In some embodiments, reference Figure 1 , the conveying trolley 2 is provided with a distance detection sensor, and the electrolysis workshop 4 is provided with a first discharger 5, the distance detection sensor is used to detect the first distance between the conveying trolley 2 and the first discharger 5, and send the first distance to the control device, the control device is used to control the first discharger 5 to unload the residual plate onto the conveying trolley 2 when it is determined that the first distance is less than or equal to the preset distance threshold, so that the conveying trolley 2 transports the residual plate to the pyrometallurgical workshop 3. Thus, the conveying trolley completes the transportation of the residual plate under the control of the control device, which improves the transportation efficiency. And the distance detection sensor can improve the safety of the operation process.

[0034] In some embodiments, reference Figure 1 , a first feeder 6 is provided in the pyrometallurgical workshop 3; the distance detection sensor is used to detect the second distance between the conveying trolley 2 and the first feeder 6, and send the second distance to the control device; the control device is used to control the first feeder 6 to load the residual plates on the first feeder 6 when it is determined that the second distance is less than or equal to the preset distance threshold. In this way, the residual plates on the first feeder can be remelted in the pyrometallurgical workshop to obtain anode plates. As a result, the conveying trolley completes the conveyance of the residual plates under the control of the control device, which improves the transportation efficiency.

[0035] Furthermore, the residual plates transported from the electrolysis workshop can be first piled in the pyrometallurgical workshop, or directly added from the first feeder to the smelting furnace of the pyrometallurgical workshop for smelting.

[0036] In some embodiments, reference Figure 1, a second unloader 7 is provided in the pyrometallurgical vehicle 3, the distance detection sensor is used to detect the third distance between the conveying trolley 2 and the second feeder 7, and send the third distance to the control device; the control device is used to control the second unloader 7 to unload the anode plate onto the conveying trolley 2 when it is determined that the third distance is less than or equal to the preset distance threshold, so that the conveying trolley 2 transports the anode plate to the electrolysis workshop 4. Thus, the conveying trolley completes the conveyance of the anode plate under the control of the control device, which improves the transportation efficiency.

[0037] In some embodiments, reference Figure 1 , a second feeder 8 is provided in the electrolysis workshop 4; the distance detection sensor is used to detect the fourth distance between the conveying trolley 2 and the second feeder 8, and send the fourth distance to the control device; the control device is used to control the second feeder 8 to unload the anode plate onto the second feeder 8 when it is determined that the fourth distance is less than or equal to the preset distance threshold. In this way, the second feeder can unload the anode plate into the electrolytic cell to use the plate for the electrolysis process. As a result, the conveying trolley completes the conveyance of the anode plate under the control of the control device, thereby improving the transportation efficiency.

[0038] Furthermore, the electrode plates transported from the pyrometallurgical workshop can be stacked in the electrolysis workshop, or can be directly placed in the electrolytic cell using the second charging machine.

[0039] In some embodiments, reference Figure 1 The plate transport system further includes a storage yard 9 for storing the residual plates and / or the anode plates.

[0040] In some embodiments, reference Figure 1 The stacking yard 9 has a stacking rack 12 and a transfer trolley 13 , and the transfer trolley 13 receives the spent plates and / or the anode plates and transfers them to the stacking rack 12 .

[0041] In some embodiments, reference Figure 1 The stacking yard is also provided with a third feeder 10 and a third unloader 11. Thus, the third feeder and the third unloader can transfer the residual plates or plates to the stacking area, and the transfer vehicle can transfer and arrange the materials in the stacking area to make the stacking area neat and orderly and reduce the stacking space.

[0042] In some embodiments, reference Figure 1, the yard 9 is used to store the residual plates and / or the plates, a third feeder 10 is provided in the yard 9, the distance detection sensor is used to detect the fifth distance between the conveyor trolley and the third feeder 10, and send the fifth distance to the control device, the control device is used to control the conveyor trolley 2 to transport the residual plates to the yard 9 when it is determined that the discharge amount of the first unloader 5 is greater than the loading amount of the first feeder 6, and control the third feeder 10 to unload the residual plates onto the third feeder 10 when it is determined that the fifth distance is less than or equal to the preset distance threshold. In this way, under the control of the control device, the conveyor trolley can transport the residual plates to the stacking yard, reducing the stacking space of the pyrometallurgical workshop or the electrolysis workshop.

[0043] Furthermore, the third feeder can stack the spent plates on a stacking rack.

[0044] In some embodiments, reference Figure 1 The distance detection sensor is used to detect the sixth distance between the conveying trolley 2 and the first feeder 10, and send the sixth distance to the control device. The control device is used to control the conveying trolley 2 to transport the electrode plate to the yard 9 when it is determined that the discharge amount of the second unloader 7 is greater than the loading amount of the second feeder 8; and control the third feeder 10 to unload the anode plate onto the third feeder 10 when it is determined that the sixth distance is less than or equal to a preset distance threshold.

[0045] Furthermore, the third feeder can stack the anode plates on a stacking rack.

[0046] In some embodiments, reference Figure 1 A third unloader 11 is provided in the yard 9, and the distance detection sensor is used to detect the seventh distance between the conveying trolley 2 and the third unloader 11, and send the seventh distance to the control device. The control device is used to control the third unloader 11 to unload the residual electrode plates onto the conveying trolley 2 when it is determined that the unloading amount of the first unloader 5 is less than the loading amount of the first feeder 6, and when it is determined that the seventh distance is less than or equal to a preset distance threshold, so that the conveying trolley 2 transports the residual electrode plates to the pyrometallurgical workshop 3.

[0047] In some embodiments, reference Figure 1The distance detection sensor is used to detect the eighth distance between the conveyor trolley 2 and the third unloader 11, and send the eighth distance to the control device. The control device is used to control the third unloader 11 to unload the anode plate onto the conveyor trolley 2 when it is determined that the unloading amount of the second unloader 7 is less than the loading amount of the second feeder 8, and when it is determined that the fifth distance is less than or equal to the preset distance threshold, so that the conveyor trolley 2 transports the anode plate to the electrolysis workshop 4.

[0048] In some embodiments, the transport trolley is powered by rails or equipped with batteries, thereby improving the flexibility of the transport trolley.

[0049] Unless otherwise specified, all technical terms used in this utility model have the same meaning as those generally understood by technicians in the field to which this utility model belongs. All patents and publications related to this utility model are incorporated into this utility model by reference as a whole. The term "comprising" or "including" is an open expression, that is, including the content specified in this utility model, but does not exclude other aspects of the content.

[0050] In the description of this specification, the description with reference to the terms "one embodiment", "another embodiment" and the like means that the specific features, structures, materials or characteristics described in conjunction with the embodiment are included in at least one embodiment of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in a suitable manner in any one or more embodiments or examples. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of different embodiments or examples, unless they are contradictory. In addition, it should be noted that in this specification, the terms "first" and "second" are used only for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated.

[0051] Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations of the present invention. Ordinary technicians in the field can change, modify, replace and modify the above embodiments within the scope of the present invention.

Claims

1. A plate transport system, It is characterized in that include: Tracks, which are arranged between the pyrometallurgical workshop and the electrolysis workshop; Control devices; A transport trolley runs on the track and receives instructions from the control device to transport the pole plates between the pyrometallurgical workshop and the electrolysis workshop.

2. The plate transport system according to claim 1, It is characterized in that The electrode plate includes an anode plate and / or a residual electrode plate.

3. The plate transport system according to claim 2, It is characterized in that The control device is used to control the transport trolley to transport the anode plate from the pyrometallurgical workshop to the electrolysis workshop.

4. The plate transport system according to claim 2, It is characterized in that The control device is used to control the transport trolley to transport the residual electrode plates from the electrolysis workshop to the pyrometallurgical workshop.

5. The plate transport system according to any one of claims 2 to 4, It is characterized in that The conveying trolley is provided with a distance detection sensor.

6. The plate transport system according to claim 5, It is characterized in that It also includes a storage yard for storing the residual plates and / or the anode plates.

7. The plate transport system according to claim 6, It is characterized in that The stacking yard has a stacking rack and a transfer trolley. The transfer trolley receives the residual plates and / or the anode plates and transfers them to the stacking rack.

8. The plate transport system according to claim 1, It is characterized in that The track comprises an enclosed single line track.

9. The plate transport system according to claim 1, It is characterized in that The track comprises an enclosed dual-lane track.

10. The plate transport system according to claim 1, It is characterized in that The conveying trolley is powered by rails or is equipped with batteries.