Automatic steel bar dismantling device for high-altitude building

By designing automatic demolition devices in high altitude buildings and using the combination of lifting and rotary driving mechanisms, the problems of high risks and low efficiency in the steel rod removal process are solved, and the safe and efficient demolition of steel rods is achieved, reducing costs and risks.

CN222025511UActive Publication Date: 2024-11-19CHONGQING JIAOTONG UNIV TRAFFIC SAFETY TECH RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420380539.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-28
Publication Date
2024-11-19
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

In high-altitude buildings, there are problems of high risks and low efficiency in the process of steel rod removal. It is difficult for the existing technology to remove steel rods safely and efficiently, especially because the cage platform shakes when subjected to reverse force, which increases the risk of falling , and it is not suitable for steel rods after the construction of the steel rod method.

Method used

An automatic removal device including a lifting mechanism, a steel rod receiving platform frame and a steel rod removal mechanism is designed. Through the lifting driving mechanism and a rotary driving mechanism, the steel rod is clamped and gradually pulled out to avoid high-altitude operations, which improves the Dismantling efficiency and safety.

Benefits of technology

It realizes convenient and safe dismantling of steel rods, reduces operating costs, avoids risks for high-altitude workers, improves the efficiency of steel rod removal, and reduces dependence on large engineering vehicles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222025511U_ABST
    Figure CN222025511U_ABST
Patent Text Reader

Abstract

An automatic steel bar dismantling device for a high-altitude building comprises a lifting mechanism, a steel bar receiving platform frame and a steel bar dismantling mechanism, the steel bar dismantling mechanism is installed on the steel bar receiving platform frame and close to one end of the building, and the lifting mechanism is composed of a lifting supporting frame and a lifting driving mechanism. The lifting driving mechanism is used for driving the steel bar receiving platform frame to move up and down in the lifting supporting frame. The steel bar dismounting device is simple in structure, the steel bar dismounting efficiency can be improved, and steel bar dismounting operation is more convenient and safer.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building demolition equipment, and in particular relates to an automatic steel rod demolition device for high-altitude buildings. Background Art

[0002] When the steel rod method is used to construct high-altitude buildings such as pier column tie beams and cap beams, the steel rod removal process is often extremely risky. At this time, there are no up and down passages and work platforms for high-altitude workers on the building. During the steel rod removal process, a crane and a cage can only be used as a way for the demolition workers to move up and down at high altitudes and as a construction work platform. During the process of removing the steel rods, the cage platform has to withstand irregular reverse forces and continue to shake. Therefore, not only is there a high risk of construction workers falling from heights, but the work platform cannot withstand too much reverse force of removal, and the efficiency of steel rod removal is also extremely low.

[0003] In the prior art, a patent document with a publication number of CN 113152928 B discloses a method for demolishing a super high-rise building, comprising the following steps: step 1, setting up an operating platform outside the building; step 2, pre-demolition; step 3, perforating and charging; step 4, safety protection; step 5, dust reduction and noise reduction protection; step 6, detonating explosives; step 7, after the blasting is completed, the slag removal team enters the site to clean up the slag; step 8, after the slag removal is completed, a temporary support for this layer is set up, and the top plate structure of the first demolition unit is cut and hoisted down; step 9, static cutting and demolition of the static cutting area and hoisting and lowering; step 10, construction in a construction cycle mode until the first floor is completed. The above scheme is applied to the demolition of abandoned high-rise buildings, and is not suitable for the removal of steel bars remaining after the steel bar method of construction, because the steel bars are the supporting structure of the molds and construction platforms during the construction process, and the removal of steel bars can only be carried out after the pier formwork and the construction platform are completely removed. It is impossible to build a complex working platform for the removal of steel bars, otherwise the use of the steel bar method of construction would be putting the cart before the horse. Utility Model Content

[0004] 1. Technical Problems Solved

[0005] In view of the deficiencies in the prior art, the utility model provides an automatic steel bar removal device for high-altitude buildings which has a simple structure, can improve the efficiency of steel bar removal, and is more convenient and safer to remove the steel bar.

[0006] 2. Specific technical solutions

[0007] An automatic steel bar removal device for high-altitude buildings, comprising a lifting mechanism, a steel bar receiving platform frame and a steel bar removal mechanism, wherein the steel bar removal mechanism is mounted on the steel bar receiving platform frame and is arranged close to one end of the building, wherein the lifting mechanism is composed of a lifting support frame and a lifting drive mechanism, wherein the lifting drive mechanism is used to drive the steel bar receiving platform frame to move up and down in the lifting support frame;

[0008] The steel rod removal mechanism includes a fulcrum base, a left support frame A, a left support frame B, a right support frame A, a right support frame B and a clamping body structure, wherein one end of the left support frame A and the right support frame A are rotatably installed in the middle of the fulcrum base, and the other ends of the left support frame A and the right support frame A are respectively installed with a left rotating shaft structure and a right rotating shaft structure, and one end of the left support frame B and the right support frame B are rotatably connected to the left support frame A and the right support frame A through the left rotating shaft structure and the right rotating shaft structure respectively, and the other ends of the left support frame B and the right support frame B are rotatably installed on the side of the clamping body structure, and a positive threaded hole and a reverse threaded hole are respectively opened in the left rotating shaft structure and the right rotating shaft structure, and a rotating screw structure is installed in the positive threaded hole and the reverse threaded hole, and the rotating screw structure has a positive screw portion and a reverse screw portion, and the positive threaded hole and the reverse threaded hole are respectively matched with the positive screw portion and the reverse screw portion, and the rotating screw structure is also connected to a rotating drive mechanism.

[0009] Preferably: a limited slide rod structure and a rack guide rail structure are provided in the lifting support frame, the limited slide rod structure and the rack guide rail structure are vertically parallel, the lifting drive mechanism includes a driving motor, a speed transmission box and a driving gear, the driving motor, the speed transmission box and the driving gear are sequentially connected in transmission, and the driving gear is meshed with the rack guide rail structure, the driving motor and the speed transmission box are installed on the steel rod receiving platform frame, and a sliding sleeve structure is also provided on the steel rod receiving platform frame, and the sliding sleeve structure is slidably matched with the limited slide rod structure.

[0010] Preferably, the limit sliding rod structure comprises two limit sliding rods, which are symmetrically arranged on both sides of the rack guide rail structure, and the sliding sleeve structure comprises two sliding sleeves, which are respectively sleeved on the two limit sliding rods.

[0011] Preferably, the rack guide rail structure includes at least one rack guide rail.

[0012] Preferably, the lifting support frame is fixedly mounted on the outer wall of the building by pre-embedded high-strength bolts.

[0013] Preferably, a rubber pad is provided on the fulcrum base, and the fulcrum base is pressed tightly against the outer wall of the building through the rubber pad.

[0014] Preferably, sliding slots are provided on both sides of the steel bar receiving platform frame, a sliding mounting plate is slidably installed in the sliding slots, a return spring structure is also installed in the sliding slots, and the return spring structure is connected to the side of the sliding mounting plate.

[0015] Preferably, the rotary drive mechanism is composed of a rotary motor and a reduction box structure, the rotary motor, the reduction box structure and the rotary screw structure are sequentially connected in transmission, and the rotary motor and the reduction box structure are mounted on a sliding mounting plate;

[0016] A rotating support seat is also installed on the sliding mounting plate, and the rotating screw structure is rotatably installed in the rotating support seat.

[0017] Preferably, the clamp body structure is provided with a clamp base, a fixed clamp body is provided at one end of the clamp base, a threaded hole platform is provided at the other end of the clamp base, a threaded hole is provided in the middle of the threaded hole platform, a screw structure is installed in the threaded hole, one end of the screw structure is connected to a clamping drive mechanism, the other end of the screw structure is connected to a movable clamp body, the movable clamp body is slidably installed on the clamp base, and the movable clamp body is arranged opposite to the fixed clamp body.

[0018] Preferably, the clamping drive mechanism is composed of a motor and a transmission gear box, the motor, the transmission gear box and the screw structure are sequentially connected in transmission, and jaw plates are installed on the opposite surfaces of the movable jaw body and the fixed jaw body.

[0019] The beneficial effects of the utility model are as follows: the steel bar receiving platform frame is moved upward in the lifting support frame through the lifting drive mechanism, and the upper lifting support frame is built and installed section by section through pre-buried high-strength bolts during the construction of the high pier, which will not cause additional construction time and processes, and is beneficial to improving the efficiency of steel bar removal; the steel bar receiving platform frame moves to the bottom of one end of the steel bar to be removed, at which time the steel bar to be removed is located in the clamping mouth between the movable clamp body and the fixed clamp body in the clamp body structure, and the rotating screw structure is driven by the rotating drive mechanism to rotate forward or reversely, so that the left rotating shaft structure and the right rotating shaft structure are simultaneously opened outward or contracted inward, so that the left support frame A and the left support frame B, and the right support frame A and the right support frame B are contracted or elongated, that is, the distance between the clamp body structure and the fulcrum base is contracted. Or stretched, the rubber pad of the fulcrum base is pressed tightly against the outer wall of the building. Because the sliding mounting plate will be as close to the outer wall of the building as possible under the action of the reset spring structure, after the clamping concrete structure clamps the steel rod to be removed, the fulcrum base is pressed tightly against the outer wall of the building as a fixed fulcrum to avoid stress on the steel rod receiving platform frame. The operation of removing the steel rod is more convenient and safer. The process of continuously pulling out the steel rod with the clamping concrete structure is repeated, and the steel rod is pulled out until the steel rod is completely pulled out of the building. The steel rod is placed on the steel rod receiving platform frame, and then the steel rod receiving platform frame moves down under the action of the lifting drive mechanism to complete the steel rod removal work. The whole process does not require operators to operate at high altitudes. The operation of removing the steel rod is more convenient and safer, and there is no need to use large engineering vehicles such as cranes. The efficiency of steel rod removal can be improved, and the removal cost is lower. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the cross-sectional structure of the overall installation of the utility model.

[0021] Figure 2 It is a structural schematic diagram of the steel rod removal mechanism at the top of the lifting mechanism in the utility model.

[0022] Figure 3 It is a structural schematic diagram of the steel rod removal mechanism in the utility model.

[0023] In the figure: lifting mechanism 1; steel bar receiving platform frame 2; steel bar removal mechanism 3; clamping body structure 4;

[0024] Lifting support frame 11; lifting drive mechanism 12; limiting slide rod structure 13; rack guide rail structure 14;

[0025] Sliding sleeve structure 21; sliding slot 22; sliding mounting plate 23; return spring structure 24; rotating support seat 25;

[0026] Fulcrum base 31; left support frame A32; left support frame B33; right support frame A34; right support frame B35; left rotating shaft structure 36; right rotating shaft structure 37; rotating screw structure 38; rotating drive mechanism 39;

[0027] Clamp base 41; fixed clamp body 42; threaded hole platform 43; screw structure 44; clamping drive mechanism 45; movable clamp body 46. DETAILED DESCRIPTION

[0028] The preferred embodiments of the present invention are described in detail below in conjunction with the accompanying drawings so that the advantages and features of the present invention can be more easily understood by those skilled in the art, thereby making a clearer and more definite definition of the protection scope of the present invention.

[0029] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, it should also be noted that, unless otherwise clearly specified and limited, the terms "set", "install", and "connect" should be understood in a broad sense.

[0030] Example:

[0031] like Figure 1 , Figure 2 and Figure 3 As shown: an automatic steel bar removal device for high-altitude buildings is provided with a lifting mechanism 1, a steel bar receiving platform frame 2 and a steel bar removal mechanism 3. The steel bar removal mechanism 3 is installed on the steel bar receiving platform frame 2 and is arranged near one end of the building. The lifting mechanism 1 is composed of a lifting support frame 11 and a lifting drive mechanism 12. The lifting drive mechanism 12 is used to drive the steel bar receiving platform frame 2 to move up and down in the lifting support frame 11. The lifting support frame 11 is fixedly installed on the outer wall of the building by pre-embedded high-strength bolts. After the pier formwork is demolded, the staff will install the lifting support frame 11 by the pre-embedded high-strength bolts. The high pier involves multiple tie beams and cap beams. The lifting support frame 11 is extended up section by section during the construction process. Therefore, the upper lifting support frame 11 is usually spliced ​​together in sections, which will not cause additional construction time and processes, and is conducive to improving the efficiency of steel bar removal.

[0032] The above-mentioned steel bar removal mechanism 3 includes a fulcrum base 31, a left support frame A32, a left support frame B33, a right support frame A34, a right support frame B35 and a clamping body structure 4. One end of the left support frame A32 and the right support frame A34 are respectively rotatably installed in the middle of the fulcrum base 31, and can also be installed on the same rotating shaft, but it is easy to cause interference or insufficient supporting strength, which is generally not adopted. A rubber pad is arranged on the fulcrum base 31, and the fulcrum base 31 is pressed tightly against the outer wall of the building through the rubber pad.

[0033] A left rotating shaft structure 36 and a right rotating shaft structure 37 are respectively installed at the other end of the left support frame A32 and the right support frame A34. One end of the left support frame B33 and the right support frame B35 are rotatably connected to the left support frame A32 and the right support frame A34 through the left rotating shaft structure 36 and the right rotating shaft structure 37 respectively. The other ends of the left support frame B33 and the right support frame B35 are rotatably installed on the side of the clamping body structure 4. A positive threaded hole and a negative threaded hole are respectively opened in the left rotating shaft structure 36 and the right rotating shaft structure 37. A rotating screw structure 38 is installed in the positive threaded hole and the negative threaded hole. The rotating screw structure 38 has a positive screw portion and a negative screw portion. The positive threaded hole and the negative threaded hole are respectively matched with the positive screw portion and the negative screw portion. The rotating screw structure 38 is also connected to a rotating drive mechanism 39.

[0034] The above-mentioned rotary drive mechanism 39 is composed of a rotary motor and a reduction box structure, which are sequentially connected to the rotary screw structure 38 in a transmission manner, and the rotary motor and the reduction box structure are installed on the sliding mounting plate 23.

[0035] Sliding slots 22 are provided on both sides of the steel rod receiving platform frame 2, and sliding mounting plates 23 are slidably installed in the sliding slots 22. A return spring structure 24 is also installed in the sliding slots 22, and the return spring structure 24 is connected to the side of the sliding mounting plate 23. A rotating support seat 25 is also installed on the sliding mounting plate 23, and a rotating screw structure 38 is rotatably installed in the rotating support seat 25.

[0036] The above-mentioned lifting drive mechanism 12 includes a driving motor, a speed transmission box and a driving gear. The driving motor, the speed transmission box and the driving gear are connected in sequence, and the driving gear is engaged with the rack guide structure 14. The driving motor and the speed transmission box are installed on the steel bar receiving platform frame 2. A sliding sleeve structure 21 is also provided on the steel bar receiving platform frame 2. The sliding sleeve structure 21 is slidably matched with the limiting slide rod structure 13.

[0037] A limited sliding rod structure 13 and a rack guide rail structure 14 are arranged in the lifting support frame 11. The limited sliding rod structure 13 is arranged vertically and parallel to the rack guide rail structure 14. The rack guide rail structure 14 includes a rack guide rail, and multiple rack guide rails can also be arranged, but the necessity is not great; the limited sliding rod structure 13 includes two limited sliding rods, and the two limited sliding rods are symmetrically arranged on both sides of the rack guide rail structure 14. The sliding sleeve structure 21 includes two sliding sleeves, and the two sliding sleeves are respectively arranged on the two limited sliding rods. The sliding limit of the steel bar receiving platform frame 2 during the up and down movement can also be achieved by arranging limiting sliding grooves on both sides of the rack guide rail structure 14. However, this method has a simpler structure, but generally can bear a relatively small torque, and is not suitable for use when the steel bar receiving platform frame 2 carries steel bars with a heavier weight.

[0038] The above-mentioned clamp body structure 4 is provided with a clamp base 41, a fixed clamp body 42 is provided at one end of the clamp base 41, and a threaded hole platform 43 is provided at the other end of the clamp base 41. A threaded hole is provided in the middle of the threaded hole platform 43, and a screw structure 44 is installed in the threaded hole. A clamping drive mechanism 45 is connected to one end of the screw structure 44, and a movable clamp body 46 is connected to the other end of the screw structure 44. The movable clamp body 46 is slidably installed on the clamp base 41, and the movable clamp body 46 is arranged opposite to the fixed clamp body 42, wherein the clamping drive mechanism 45 is composed of a motor and a transmission gear box, and the motor, the transmission gear box and the screw structure 44 are sequentially connected in transmission, and jaw plates are installed on the opposite surfaces of the movable clamp body 46 and the fixed clamp body 42, and the motor, the transmission gear box and the screw structure 44 can also be replaced by an electric push rod to achieve the same clamping function.

[0039] The utility model is implemented as follows: the steel bar receiving platform frame 2 is moved upward in the lifting support frame 11 by the lifting drive mechanism 12, and the upper lifting support frame 11 is built and installed section by section by pre-buried high-strength bolts during the construction of the high pier column, which will not cause additional construction time and processes, and is conducive to improving the efficiency of steel bar removal; the steel bar receiving platform frame 2 moves to the bottom of one end of the steel bar to be removed, at which time the steel bar to be removed is located in the clamping opening between the movable clamp body 46 and the fixed clamp body 42 in the clamp body structure 4, and is rotated The driving mechanism 39 drives the rotating screw structure 38 to rotate forward, so that the left rotating shaft structure 36 and the right rotating shaft structure 37 are simultaneously opened outward, so that the left support frame A32 and the left support frame B33, the right support frame A34 and the right support frame B35 are contracted, that is, the distance between the clamping structure 4 and the fulcrum base 31 is contracted, and at this time, the rubber pad of the fulcrum base 31 is pressed tightly against the outer wall of the building. Because the sliding mounting plate 23 will be as close to the outer wall of the building as possible under the action of the reset spring structure 24, the clamping structure 4 is clamped to be disassembled. The steel rod is removed, and the rotating screw structure 38 is driven to rotate in the opposite direction by the rotating drive mechanism 39, so that the left rotating shaft structure 36 and the right rotating shaft structure 37 are simultaneously contracted inward, so that the left support frame A32 and the left support frame B33, the right support frame A34 and the right support frame B35 are opened, that is, the distance between the clamping structure 4 and the fulcrum base 31 is pulled apart, and the fulcrum base 31 is pressed tightly against the outer wall of the building as a fixed fulcrum, so as to avoid the steel rod receiving platform frame 2 from being stressed, and the operation of removing the steel rod is more convenient and safe. During the outward expansion process under the action of the left support frame B33, the right support frame A34 and the right support frame B35, the steel rods are pulled outwards, and this process is repeated until the steel rods are completely removed from the building, and the steel rods are placed on the steel rod receiving platform frame 2. Then, the steel rod receiving platform frame moves downward under the action of the lifting drive mechanism to complete the steel rod removal work. The whole process does not require operators to operate at high altitudes. The steel rod removal operation is more convenient and safer, and there is no need to use large engineering vehicles such as cranes. The efficiency of steel rod removal can be improved, and the removal cost is lower.

[0040] Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention shall be defined by the appended claims.

Claims

1. An automatic steel bar removal device for high-altitude buildings, characterized in that: The invention comprises a lifting mechanism (1), a steel bar receiving platform frame (2) and a steel bar removing mechanism (3), wherein the steel bar removing mechanism (3) is installed on the steel bar receiving platform frame (2) and is arranged close to one end of a building, wherein the lifting mechanism (1) is composed of a lifting support frame (11) and a lifting drive mechanism (12), wherein the lifting drive mechanism (12) is used to drive the steel bar receiving platform frame (2) to move up and down in the lifting support frame (11); The steel bar removal mechanism (3) comprises a fulcrum base (31), a left support frame A (32), a left support frame B (33), a right support frame A (34), a right support frame B (35) and a clamping body structure (4), wherein one end of the left support frame A (32) and the right support frame A (34) are rotatably mounted on the middle part of the fulcrum base (31), and the other ends of the left support frame A (32) and the right support frame A (34) are respectively mounted with a left rotating shaft structure (36) and a right rotating shaft structure (37), and one end of the left support frame B (33) and the right support frame B (35) are respectively mounted with a left rotating shaft structure (36) and a right rotating shaft structure (37). The left support frame A (32) and the right support frame A (34) are rotatably connected, and the other ends of the left support frame B (33) and the right support frame B (35) are rotatably mounted on the side of the clamp body structure (4). A positive threaded hole and a negative threaded hole are respectively opened in the left rotating shaft structure (36) and the right rotating shaft structure (37), and a rotating screw structure (38) is installed in the positive threaded hole and the negative threaded hole. The rotating screw structure (38) has a positive screw part and a negative screw part. The positive threaded hole and the negative threaded hole are respectively matched with the positive screw part and the negative screw part. The rotating screw structure (38) is also connected to a rotation driving mechanism (39).

2. The automatic steel bar removal device for high-altitude buildings according to claim 1 is characterized in that: The lifting support frame (11) is provided with a limited sliding rod structure (13) and a rack guide rail structure (14), the limited sliding rod structure (13) and the rack guide rail structure (14) are arranged vertically and parallel, the lifting drive mechanism (12) comprises a driving motor, a speed transmission box and a driving gear, the driving motor, the speed transmission box and the driving gear are sequentially connected in transmission, and the driving gear is meshed with the rack guide rail structure (14), the driving motor and the speed transmission box are installed on the steel bar receiving platform frame (2), and a sliding sleeve structure (21) is also provided on the steel bar receiving platform frame (2), and the sliding sleeve structure (21) is slidably matched with the limited sliding rod structure (13).

3. The automatic steel bar removal device for high-altitude buildings according to claim 2 is characterized in that: The limiting sliding rod structure (13) comprises two limiting sliding rods, which are symmetrically arranged on both sides of the rack-type guide rail structure (14); the sliding sleeve structure (21) comprises two sliding sleeves, which are respectively sleeved on the two limiting sliding rods.

4. The automatic steel bar removal device for high-altitude buildings according to claim 2 is characterized in that: The rack guide rail structure (14) comprises at least one rack guide rail.

5. The automatic steel bar removal device for high-altitude buildings according to any one of claims 1 to 4, characterized in that: The lifting support frame (11) is fixedly mounted on the outer wall of the building by means of pre-embedded high-strength bolts.

6. The automatic steel bar removal device for high-altitude buildings according to claim 5 is characterized in that: A rubber pad is arranged on the fulcrum base (31), and the fulcrum base (31) is tightly pressed against the outer wall of the building through the rubber pad.

7. The automatic steel bar removal device for high-altitude buildings according to claim 1 or 6, characterized in that: Sliding slots (22) are provided on both sides of the steel bar receiving platform frame (2), and sliding mounting plates (23) are slidably installed in the sliding slots (22). A return spring structure (24) is also installed in the sliding slots (22), and the return spring structure (24) is connected to the side of the sliding mounting plate (23).

8. The automatic steel bar removal device for high-altitude buildings according to claim 7 is characterized in that: The rotary drive mechanism (39) is composed of a rotary motor and a reduction box structure, wherein the rotary motor, the reduction box structure and the rotary screw structure (38) are sequentially connected in a transmission manner, and the rotary motor and the reduction box structure are mounted on a sliding mounting plate (23); A rotating support seat (25) is also mounted on the sliding mounting plate (23), and the rotating screw structure (38) is rotatably mounted in the rotating support seat (25).

9. The automatic steel bar removal device for high-altitude buildings according to claim 1 or 8, characterized in that: The clamp body structure (4) is provided with a clamp base (41), a fixed clamp body (42) is provided at one end of the clamp base (41), and a threaded hole platform (43) is provided at the other end of the clamp base (41). A threaded hole is provided in the middle of the threaded hole platform (43), and a screw structure (44) is installed in the threaded hole. One end of the screw structure (44) is connected to a clamping drive mechanism (45), and the other end of the screw structure (44) is connected to a movable clamp body (46). The movable clamp body (46) is slidably installed on the clamp base (41), and the movable clamp body (46) is arranged opposite to the fixed clamp body (42).

10. The automatic steel bar removal device for high-altitude buildings according to claim 9 is characterized in that: The clamping drive mechanism (45) is composed of a motor and a transmission gear box, and the motor, the transmission gear box and the screw structure (44) are sequentially connected in transmission, and jaw plates are installed on the opposite surfaces of the movable clamp body (46) and the fixed clamp body (42).