Continuous slurry supply tool for desulfurization

By designing a continuous slurry supply tool, the problem of shortening the contact time of the desulfurizer and flue gas caused by intermittent slurry supply is solved, and the automatic circulating slurry supply of the slurry is realized, ensuring the desulfurization effect and pH stability, improving the desulfurization efficiency and Equipment reliability.

CN222056932UActive Publication Date: 2024-11-26SHANDONG SHIHENG SPECIAL STEEL GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323667691.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-11-26
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

During the desulfurization process, the contact time between the desulfurization agent and the flue gas is shortened, which affects the desulfurization effect and pH stability, thereby affecting the reaction conversion rate and sulfate generation amount, resulting in a decrease in the desulfurization efficiency and equipment reliability.

Method used

A desulfurization continuous slurry supply tool is designed, including a desulfurizer slurry tank and a slurry pump. The continuous slurry supply of slurry is realized through an automatic circulation system to ensure stable contact between the desulfurizer and the flue gas. The flow is controlled by stainless steel material and electric regulating valves. Ensure pH stability.

Benefits of technology

The stability of the desulfurization effect and the continuous pH value are achieved, the stability of the desulfurization liquid is improved, the risk of equipment scaling is reduced, and the utilization rate of lime and equipment reliability are enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222056932U_ABST
    Figure CN222056932U_ABST
Patent Text Reader

Abstract

The utility model relates to a continuous slurry supply tool for desulfurization, which belongs to the technical field of desulfurization equipment and comprises a desulfurizer slurry box, a slurry pump and a slurry box, the slurry pump is communicated with a first feeding pipeline connected with a discharging car through a first feeding port, and the slurry pump is communicated with a second feeding pipeline through a second feeding port; a slurry tank discharge hole is formed in the side wall of the desulfurizing agent slurry tank, and the desulfurizing agent slurry tank is connected with the slurry pump through a second feeding pipeline; the slurry pump is communicated with a first vertical pipeline through a slurry pump discharge hole; the first vertical pipeline is communicated with a first inclined pipeline, the first inclined pipeline is communicated with a second vertical pipeline, and the lower end of the second vertical pipeline extends into the desulfurizing agent slurry box; the middle part of the first vertical pipeline is communicated with a second inclined pipeline, and the second inclined pipeline is communicated with a slurry box. The desulfurizer slurry tank and the slurry pump realize slurry circulation, so that the slurry is not precipitated and is always in a circular flow state, and the desulfurizer is continuously supplied to the desulfurizer slurry tank, so that the stability of the PH value is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of desulfurization equipment, in particular to a desulfurization continuous slurry supply tooling. Background Art

[0002] At present, the desulfurization process of the desulfurization production line adopts the limestone gypsum method, using limestone or lime as the desulfurization absorbent. The limestone is crushed and ground into powder and mixed with water to form an absorbent slurry. When lime is used as the absorbent, the lime powder is digested and then added with water to form an absorbent slurry. In the desulfurization tower, the absorbent slurry contacts and mixes with the flue gas, and the sulfur dioxide in the flue gas reacts chemically with the calcium carbonate in the slurry and the oxidizing air blown in, thereby being removed. The final reaction product is gypsum.

[0003] In the desulfurization process, the use of intermittent slurry supply will reduce the contact time between the desulfurizer and the flue gas, thus affecting the desulfurization effect and the change of pH value. The desulfurizer (such as limestone or gypsum) reacts with sulfur dioxide (SO2) in the flue gas during the desulfurization process to produce calcium sulfate (CaSO4) or other sulfates. These reactions are a chemical process that takes a certain amount of time to complete. When the intermittent slurry supply method is adopted, that is, the supply and feeding of the desulfurizer will be intermittently stopped and resumed, the contact time between the desulfurizer and the flue gas will be shortened. In this way, the reaction time of the desulfurization reaction is reduced, so the reaction conversion rate may also be reduced. This will result in less SO2 being removed and a decrease in the amount of sulfate generated. At the same time, the sulfate generated in the desulfurization reaction will dissolve in the desulfurization liquid, increasing the pH value of the desulfurization liquid. However, in the case of intermittent slurry supply, there is not enough desulfurizer in the desulfurization liquid to react with SO2 to form sulfate, so the rate of increase of the pH value will slow down or decrease.

[0004] As a measure of the acidity and alkalinity of gypsum slurry, pH value is an operating parameter that must be paid attention to in the desulfurization system. In the operation of the wet flue gas desulfurization system, the operating status of the desulfurization equipment and the desulfurization efficiency are directly related to the changes in pH value. If the pH value is too high, the alkalinity of the wet flue gas desulfurization system will be increased, thereby improving the desulfurization efficiency, but it will reduce the utilization rate of lime, increase the tendency of scaling, and easily cause the risks of spray pipe slab formation, tower wall scaling and demister blockage, and will also affect the quality of gypsum. If the pH value is too low, the acidity of the wet flue gas desulfurization system will be increased, the utilization rate of lime will be improved, and it will be beneficial to the formation of gypsum crystals, but it will increase the tendency of corrosion and reduce the reliability and desulfurization efficiency of the equipment in the wet flue gas desulfurization system.

[0005] Therefore, intermittent slurry supply will affect the reaction conversion rate and sulfate generation in the desulfurization process, and further affect the desulfurization effect and the pH value change of the desulfurization liquid. In order to ensure the desulfurization effect and stable pH value, the desulfurization agent supply method and slurry supply rate need to be comprehensively considered when operating the desulfurization process. Utility Model Content

[0006] The utility model provides a desulfurization continuous slurry supply tool, comprising a desulfurization agent slurry box, a slurry box and a slurry pump, the slurry pump is provided with a first feed inlet, a second feed inlet and a slurry pump discharge port, the side wall of the slurry box is provided with a slurry box discharge port, and the top wall of the slurry box is provided with a slurry box feed inlet;

[0007] The slurry pump is connected to a first feed pipeline connected to the unloading vehicle through the first feed port, and the slurry box is connected to the second feed port of the slurry pump through the slurry box outlet and the second feed pipeline;

[0008] The slurry pump is connected to a first vertical pipeline through a slurry pump discharge port;

[0009] The upper end of the first vertical pipe is connected to the first inclined pipe, the end of the first inclined pipe away from the first vertical pipe is connected to the second vertical pipe, and the lower end of the second vertical pipe extends into the slurry tank;

[0010] The middle part of the first vertical pipeline is connected with a second inclined pipeline, and the second inclined pipeline is connected to the desulfurization agent slurry tank through the slurry tank feed port.

[0011] Furthermore, a third valve is provided on the second feed pipeline;

[0012] A fifth valve is provided on one end of the first vertical pipeline close to the slurry pump;

[0013] A sixth valve is provided on the second vertical pipeline;

[0014] A seventh valve is arranged on the second inclined pipeline.

[0015] Furthermore, a fourth valve is provided on the second feed pipeline.

[0016] Furthermore, a first valve and a second valve are provided on the first feed pipeline;

[0017] An exhaust pipeline is arranged between the first valve and the second valve, and an exhaust valve is arranged on the exhaust pipeline.

[0018] Furthermore, the first valve, the second valve, the third valve, the fourth valve, the fifth valve, the sixth valve and the exhaust valve are all manually adjustable valves;

[0019] The seventh valve adopts an electric regulating valve.

[0020] Furthermore, the first valve, the second valve, the third valve, the fourth valve, the fifth valve, the sixth valve and the exhaust valve are all ball valves made of 304 stainless steel.

[0021] Furthermore, the first feed pipe and the second feed pipe are both arranged horizontally;

[0022] The slope of the first inclined pipeline and the second inclined pipeline is at least 7 degrees;

[0023] An end of the first inclined pipe close to the second vertical pipe is lower than an end of the first inclined pipe away from the second vertical pipe;

[0024] One end of the second inclined pipeline close to the desulfurizer slurry tank is lower than one end of the second inclined pipeline far from the desulfurizer slurry tank.

[0025] Furthermore, the distance between the second feed pipe and the bottom of the slurry box is at least 300 mm.

[0026] Furthermore, the slurry tank is made of stainless steel 304;

[0027] The first feed pipe, the second feed pipe, the first vertical pipe, the first inclined pipe, the second vertical pipe and the second inclined pipe are made of 304 stainless steel.

[0028] Furthermore, the volume of the slurry tank is 10m 3 .

[0029] The utility model has the beneficial effects that the desulfurization agent slurry box, the slurry pump and the slurry box are used in combination to realize the automatic circulation and continuous slurry supply system of the slurry. The continuous slurry supply can improve the stability of the pH value of the desulfurization liquid and ensure the stability and continuity of the desulfurization effect;

[0030] When the equipment is operating normally, the seventh valve is used to adjust the flow, which is convenient for adjusting the flow of the second inclined pipeline.

[0031] These and other purposes, features and advantages of the present invention are fully reflected in the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 The schematic diagram of the framework of the desulfurization continuous slurry supply tooling of the utility model is shown.

[0033] Figure markings: 1-slurry box, 2-slurry pump, 201-first feed pipeline, 202-second feed pipeline, 203-first vertical pipeline, 204-first inclined pipeline, 205-second vertical pipeline, 206-second inclined pipeline, 3-desulfurizer slurry box, 4-unloading truck, 5-first valve, 6-second valve, 7-exhaust valve, 8-exhaust pipeline, 9-third valve, 10-fourth valve, 11-fifth valve, 12-sixth valve, 13-seventh valve, 14-first feed port, 15-second feed, 16-slurry pump discharge port, 17-slurry box discharge port, 18-slurry box feed port. DETAILED DESCRIPTION

[0034] The following description is used to disclose the utility model so that those skilled in the art can implement the utility model. The preferred embodiments described below are only examples, and those skilled in the art can think of other obvious variations. The basic principles of the utility model defined in the following description can be applied to other embodiments, variations, improvements, equivalents, and other technical solutions that do not deviate from the spirit and scope of the utility model.

[0035] Those skilled in the art should understand that, in the disclosure of the specification, the orientation or position relationship indicated by the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc. are based on the orientation or position relationship shown in the drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, the above terms should not be understood as limiting the present invention.

[0036] It is to be understood that the term "one" should be understood as "at least one" or "one or more", that is, in one embodiment, the number of an element may be one, while in another embodiment, the number of the element may be multiple, and the term "one" should not be understood as a limitation on the quantity.

[0037] refer to Figure 1 A desulfurization continuous slurry supply tooling according to a preferred embodiment of the utility model will be described in detail below, wherein the tooling includes a desulfurization agent slurry tank 3, and also includes a slurry tank 1 for storing slurry and a slurry pump 2, and the slurry pump 2 is provided with a first feed port 14, a second feed port 15 and a slurry pump discharge port 16. The slurry pump 2 is connected to a first feed pipeline 201 connected to a discharge vehicle 4 through the first feed port 14, and a first valve 5 and a second valve 6 are provided on the first feed pipeline 201, and an exhaust pipeline 8 is provided between the first valve 5 and the second valve 6, and an exhaust valve 7 is provided on the exhaust pipeline 8. The slurry pump 2 is connected to a second feed pipeline 202 through the second feed port 15, and a third valve 9 and a fourth valve 10 are provided on the second feed pipeline 202. From the maintenance point of view, the third valve 9 and the fourth valve 10 are provided on the second feed pipeline 202 for easy adjustment and maintenance.

[0038] The side wall of the slurry box 1 is provided with a slurry box outlet 17, and the top wall of the slurry box 1 is provided with a slurry box feed port 18. The slurry box 1 is connected to the second feed port 15 of the slurry pump 2 through the slurry box outlet 17 and the second feed pipe 202. The first feed pipe 201 and the second feed pipe 202 are both arranged horizontally. To prevent the slurry from settling in the slurry box 1, the second feed pipe 202 is at least 300 mm away from the bottom of the slurry box 1, and the slurry box 1 and the slurry pump 2 realize slurry circulation, so that the slurry does not settle and is always in a circulating flow state.

[0039] The slurry pump 2 is connected to the first vertical pipeline 203 through the slurry pump discharge port 16, and a fifth valve 11 is provided on the end of the first vertical pipeline 203 close to the slurry pump 2. The upper end of the first vertical pipeline 203 is connected to the first inclined pipeline 204, and the end of the first inclined pipeline 204 away from the first vertical pipeline 203 is connected to the second vertical pipeline 205, and a sixth valve 12 is provided on the second vertical pipeline 205. The lower end of the second vertical pipeline 205 extends into the slurry tank 1 through the slurry tank feed port 18. The middle part of the first vertical pipeline 203 is connected to the second inclined pipeline 206, and a seventh valve 13 is provided on the second inclined pipeline 206. The second inclined pipeline 206 is connected to the desulfurizer slurry tank 3. The slope of the first inclined pipeline 204 and the second inclined pipeline 206 is at least 7 degrees, and the end of the first inclined pipeline 204 close to the second vertical pipeline 205 is lower than the end of the first inclined pipeline 204 away from the second vertical pipeline 205. The end of the second inclined pipe 206 close to the desulfurizer slurry tank 3 is lower than the end of the second inclined pipe 206 away from the desulfurizer slurry tank 3. It is ensured that the slurry in the pipe flows smoothly into the desulfurizer slurry tank 3 and the slurry tank 1, and the stability of the pH value in the desulfurizer slurry tank 3 can be achieved with the continuous adjustment of the slurry supply.

[0040] Considering that lime slurry is corrosive and abrasive, the first valve 5, the second valve 6, the third valve 9, the fourth valve 10, the fifth valve 11, the sixth valve 12 and the exhaust valve 7 are all ball valves made of 304 stainless steel. The slurry tank 1, the first feed pipeline 201, the second feed pipeline 202, the first vertical pipeline 203, the first inclined pipeline 204, the second vertical pipeline 205 and the second inclined pipeline 206 are all made of stainless steel 304. The first valve 5, the second valve 6, the third valve 9, the fourth valve 10, the fifth valve 11, the sixth valve 12 and the exhaust valve 7 are all manually adjustable valves, and the seventh valve 13 is an electric adjustable valve. The valves are all adjustable to control the supply rate of the slurry.

[0041] The volume of slurry tank 1 is 110% of the maximum daily usage, and the effective volume is 10m 3 .

[0042] Working process: the slurry tank 1 is used to store slurry to provide desulfurization slurry for the desulfurizer slurry tank 3. The slurry enters the desulfurizer slurry tank 3 and undergoes a desulfurization reaction. When the slurry in the slurry tank 1 is about to be exhausted, the slurry is filled into the slurry tank 1 through the unloading vehicle 4. The end of the first feed pipeline 201 away from the slurry pump 2 is connected to the discharge port of the unloading vehicle 4 through a hose. The slurry pump 2 is powered on and starts working, opens the first valve 5, and then opens the exhaust valve 7. When slurry is found to flow through the exhaust valve 7, the exhaust valve 7 is immediately closed and the second valve 6 is opened.

[0043] Then open the fifth valve 11, the sixth valve 12 and the seventh valve 13, and the slurry coming out of the unloading truck 4 flows through the slurry pump 2 through the first feed pipe 201. After passing through the slurry pump 2, the power is increased and flows through the first vertical pipe 203. One way passes through the first inclined pipe 204 and the second vertical pipe 205 and flows into the slurry tank 1 through the slurry tank feed port 18, and the other way passes through the second inclined pipe 206 and flows into the desulfurizer slurry tank 3 for desulfurization reaction.

[0044] While unloading, the third valve 9 and the fourth valve 10 on the second feed pipe 202 are opened, and the size is adjusted to 50%, so as to ensure that the slurry in the slurry tank 1 flows back to the slurry tank 1 through the second feed pipe 202, the slurry pump 2, the first vertical pipe 203, the first inclined pipe 204 and the second vertical pipe 205, so as to realize self-circulation stirring, and ensure that the slurry does not precipitate and is always in a circulating flow state to achieve the stability of the pH value. The other way flows into the desulfurizer slurry tank 3 through the second feed pipe 202, the slurry pump 2, the first vertical pipe 203 and the second inclined pipe 206 for desulfurization reaction, so as to ensure that the slurry required for the desulfurization reaction is continuously provided to the desulfurizer slurry tank 3, and the desulfurization work is continuously carried out.

[0045] The unloading vehicle 4 is automatically unloaded by the operation of the slurry pump 2. When the unloading vehicle 4 completes unloading, the first valve 5 and the second valve 6 are closed, and the third valve 9 and the fourth valve 10 are opened, and the size is adjusted to 100%.

[0046] The first valve 5, the second valve 6 and the exhaust valve 7 are all closed, and the third valve 9, the fourth valve 10, the fifth valve 11, the sixth valve 12 and the seventh valve 13 are all opened to realize the self-circulation of the slurry.

[0047] It should be noted that the terms "first, second" in the present invention are only used for descriptive purposes and do not indicate any order. They cannot be understood as indicating or implying relative importance. These terms can be interpreted as names.

[0048] It should be understood by those skilled in the art that the embodiments of the present invention described above and shown in the accompanying drawings are only examples and do not limit the present invention. The advantages of the present invention have been fully and effectively realized. The functions and structural principles of the present invention have been demonstrated and explained in the embodiments, and the embodiments of the present invention may be deformed or modified in any way without departing from the principles.

Claims

1. A desulfurization continuous slurry supply tool, comprising a desulfurization agent slurry tank (3), characterized in that: It also includes a slurry box (1) and a slurry pump (2), the slurry pump (2) is provided with a first feed port (14), a second feed port (15) and a slurry pump discharge port (16), the side wall of the slurry box (1) is provided with a slurry box discharge port (17), and the top wall of the slurry box (1) is provided with a slurry box feed port (18); The slurry pump (2) is connected to a first feed pipe (201) connected to a discharge vehicle (4) via a first feed port (14); the slurry tank (1) is connected to a second feed port (15) of the slurry pump (2) via a slurry tank discharge port (17) and a second feed pipe (202); The slurry pump (2) is connected to a first vertical pipeline (203) via a slurry pump discharge port (16); The upper end of the first vertical pipe (203) is connected to the first inclined pipe (204), the end of the first inclined pipe (204) away from the first vertical pipe (203) is connected to the second vertical pipe (205), and the lower end of the second vertical pipe (205) extends into the slurry tank (1); The middle part of the first vertical pipeline (203) is connected to a second inclined pipeline (206), and the second inclined pipeline (206) is connected to the desulfurization agent slurry tank (3) through the slurry tank feed port (18).

2. The desulfurization continuous slurry supply tooling according to claim 1, characterized in that: A third valve (9) is provided on the second feed pipe (202); A fifth valve (11) is provided on one end of the first vertical pipeline (203) close to the slurry pump (2); A sixth valve (12) is provided on the second vertical pipeline (205); A seventh valve (13) is provided on the second inclined pipeline (206).

3. The desulfurization continuous slurry supply tooling according to claim 2, characterized in that: A fourth valve (10) is also provided on the second feed pipeline (202).

4. The desulfurization continuous slurry supply tooling according to claim 3, characterized in that: The first feed pipeline (201) is provided with a first valve (5) and a second valve (6); An exhaust pipe (8) is provided between the first valve (5) and the second valve (6), and an exhaust valve (7) is provided on the exhaust pipe.

5. The desulfurization continuous slurry supply tooling according to claim 4, characterized in that: The first valve (5), the second valve (6), the third valve (9), the fourth valve (10), the fifth valve (11), the sixth valve (12) and the exhaust valve (7) are all manually adjustable valves; The seventh valve (13) is an electric regulating valve.

6. The desulfurization continuous slurry supply tooling according to claim 5, characterized in that: The first valve (5), the second valve (6), the third valve (9), the fourth valve (10), the fifth valve (11), the sixth valve (12) and the exhaust valve (7) are all ball valves made of 304 stainless steel.

7. The desulfurization continuous slurry supply tooling according to claim 1, characterized in that: The first feed pipe (201) and the second feed pipe (202) are both arranged horizontally; The slope of the first inclined pipeline (204) and the second inclined pipeline (206) is at least 7 degrees; An end of the first inclined pipe (204) close to the second vertical pipe (205) is lower than an end of the first inclined pipe (204) away from the second vertical pipe (205); An end of the second inclined pipe (206) close to the desulfurizing agent slurry tank (3) is lower than an end of the second inclined pipe (206) away from the desulfurizing agent slurry tank (3).

8. The desulfurization continuous slurry supply tooling according to claim 7, characterized in that: The distance between the second feed pipe (202) and the bottom of the slurry tank (1) is at least 300 mm.

9. The desulfurization continuous slurry supply tooling according to claim 1, characterized in that: The slurry tank (1) is made of 304 stainless steel; The first feed pipe (201), the second feed pipe (202), the first vertical pipe (203), the first inclined pipe (204), the second vertical pipe (205) and the second inclined pipe (206) are made of 304 stainless steel.

10. The desulfurization continuous slurry supply tooling according to claim 9, characterized in that: The volume of the slurry tank (1) is 10m 3 .