Rubber product processing and calendaring forming device
By designing an automatic adjustment rubber product processing and calendering molding device, the distance and height of the calendering rollers are adjusted by using electric push rods and transmission systems, the time-consuming and labor-intensive problem of manual adjustment in the prior art is solved, and a more efficient and flexible rubber product forming process is achieved. , ensuring stable molding of rubber sheets of different thicknesses.
Patent Information
- Application Number
- CN202420660993.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-02
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-04-02
AI Technical Summary
The calender roll adjustment distance of the existing rubber product processing calendering device has a small distance and requires manual adjustment, which is time-consuming and labor-intensive, and is not flexible enough to use.
A workbench, conveyor belt, control box, first and second rolling rollers, support plate, slider, slider, electric push rod, transmission box, main gear, tensioner, synchronous belt, frame, The device of threaded rod and metal rollers realizes automatic adjustment of the distance and height of the calender roller through electric adjustment and transmission system, improves the flexibility and stability of use, and has the smoothing and finishing function of rubber sheets.
It realizes rapid and flexible adjustment of the distance of the calendering roller, saves manpower and time, improves the flexibility and stability of the device, avoids the bulging and folding of rubber sheets, and ensures efficient molding of rubber products of different thicknesses.
Smart Images

Figure CN222079871U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of rubber calendering, in particular to a rubber product processing calendering molding device. Background Art
[0002] Rubber products refer to various rubber products produced with natural and synthetic rubber as raw materials, which are widely used in the fields of automobiles, electronics, medical treatment, aerospace, construction, etc. In the process of rubber product processing, rubber blocks or rubber sheets need to be calendered to the required thickness. Generally, a calendering device is used to process the rubber. In actual use, the adjustment spacing of the calendering roller is small, and manual adjustment is used, which is time-consuming, labor-intensive, and not flexible enough. Therefore, a rubber product processing calendering molding device is provided. Utility Model Content
[0003] The utility model aims to provide a rubber product processing calendering molding device to solve the problems raised in the above background technology.
[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a rubber product processing and calendering molding device, comprising a workbench, a conveyor belt is installed on one side of the top of the workbench, a control box is installed on the outside of the workbench, a first calendering roller is installed inside the workbench, and a driving assembly is installed at one end of the first calendering roller, a second calendering roller is arranged at the top of the first calendering roller, and support plates are arranged on both sides of the first calendering roller, a slide groove is arranged inside the support plate, and a slider is installed inside the slide groove, the slider is installed at both ends of the second calendering roller, an electric push rod is installed on the top of the support plate, and a fixed connection is formed between the bottom end of the electric push rod and the slider.
[0005] Preferably, the first calendering roller and the second calendering roller are parallel to each other, and the support plates are symmetrically distributed on both sides of the second calendering roller.
[0006] Preferably, the cross section of the slider is "H"-shaped, and a sliding structure is formed between the slider and the slide groove.
[0007] Preferably, a main gear is installed on the other side of the first calendering roller, and a secondary pulley is installed on one side of the main gear, a pinion is installed on one side of the secondary pulley, and a meshing connection is formed between the pinion and the main gear, a synchronous belt is installed on the other side of the second calendering roller, and a synchronous belt is installed on the outer side of the synchronous belt and the secondary pulley, a transmission box is installed on the outer side of the workbench and the support plate, and the transmission box is arranged on the outer side of the main gear and the main pulley.
[0008] Preferably, a tensioning wheel is installed inside the transmission box, and the tensioning wheel is arranged between the main pulley and the secondary pulley, a support rod is installed on one side of the tensioning wheel, and the support rod runs through one side of the transmission box, and a spring is sleeved on the outer side of the support rod.
[0009] Preferably, a frame is installed on the top of the workbench, and a pressure plate is installed inside the frame. A threaded rod is installed at the center position of the top of the pressure plate, and the threaded rod passes through the top of the frame, and a threaded connection is formed between the threaded rod and the frame.
[0010] Preferably, four groups of guide columns are installed on the top of the pressure plate, and the guide columns are distributed in a rectangular shape.
[0011] Preferably, a plurality of groups of metal rollers are installed inside the pressing plate, and the metal rollers are arranged and distributed, and the pressing plate and the conveyor belt are parallel to each other.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] (1) The calendering thickness can be adjusted by providing a support plate, a slide groove, an electric push rod and a slider. The slider is in an "H" shape and is stuck inside the slide groove. It can slide vertically inside the slide groove. The operation of the electric push rod can drive the slider to move, indirectly changing the horizontal height of the second calendering roller and adjusting the distance between the second calendering roller and the first calendering roller. The electric adjustment method saves manpower and time, facilitates rapid adjustment, and adapts to the calendering requirements of different thicknesses, thereby improving the flexibility of use;
[0014] (2) By providing a transmission box, a main gear, a tensioning wheel, a synchronous belt, a main pulley, a support rod and a secondary pulley, the first calendering roller and the second calendering roller can rotate in opposite directions. The operation of the driving component can drive the first calendering roller to rotate, drive the main gear to rotate, cooperate with the meshing connection between the main gear and the pinion gear, drive the secondary pulley to rotate, indirectly control the rotation of the main pulley, drive the second calendering roller to rotate in the opposite direction, and rotate in opposite directions with the first calendering roller to roll the mixed rubber product. When the second calendering roller moves up, the synchronous belt will be tightened, pushing the tensioning wheel to compress the spring, and the action of the spring will push the tensioning wheel to one side to tighten the synchronous belt, so that the lifting and lowering of the second calendering roller does not affect the transmission effect, thereby improving the stability of use;
[0015] (3) The rubber sheet can be smoothed by providing a frame, a threaded rod, a guide column, a pressure plate and a metal roller. The rotation of the threaded rod, in coordination with the distribution of the guide column, can drive the pressure plate to move vertically inside the frame, thereby changing the distance between the pressure plate and the conveyor belt to accommodate rubber sheets of different thicknesses. The distribution of the metal rollers can roll the surface of the rubber sheet to avoid bulging or folding of the rubber sheet, thereby enabling the device to have a smoothing function. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0017] Figure 1 This is a front view structural schematic diagram of the utility model;
[0018] Figure 2 It is a front view cross-sectional structural schematic diagram of the utility model;
[0019] Figure 3 It is a side view structural schematic diagram of the utility model;
[0020] Figure 4 This is a schematic diagram of the partial structure of the support plate of the utility model;
[0021] Figure 5 This is a schematic diagram of a partial cross-sectional structure of the frame of the utility model;
[0022] Figure 6 It is a schematic diagram of a partial cross-sectional structure of a transmission box of the utility model in a front view.
[0023] Description of reference numerals in the figures:
[0024] 1. Workbench; 2. Drive assembly; 3. Control box; 4. Support plate; 5. Slide; 6. Electric push rod; 7. Frame; 8. Threaded rod; 9. Conveyor belt; 10. First calendering roller; 11. Second calendering roller; 12. Guide column; 13. Pressing plate; 14. Transmission box; 15. Slider; 16. Main gear; 17. Tensioner; 18. Synchronous belt; 19. Main pulley; 20. Support rod; 21. Secondary pulley; 22. Metal roller. DETAILED DESCRIPTION
[0025] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0026] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0027] See also Figure 1-6 The utility model provides an embodiment: a rubber product processing and calendering device, comprising a workbench 1, a conveyor belt 9 is installed on one side of the top of the workbench 1, a control box 3 is installed on the outside of the workbench 1, a first calendering roller 10 is installed inside the workbench 1, and a driving component 2 is installed at one end of the first calendering roller 10, a second calendering roller 11 is arranged on the top of the first calendering roller 10, and support plates 4 are arranged on both sides of the first calendering roller 10, a chute 5 is arranged inside the support plate 4, and a drive assembly 2 is installed inside the chute 5. Slide block 15, the slide block 15 is installed at both ends of the second calendering roller 11, an electric push rod 6 is installed on the top of the support plate 4, and a fixed connection is formed between the bottom end of the electric push rod 6 and the slide block 15, the first calendering roller 10 and the second calendering roller 11 are parallel to each other, the support plate 4 is symmetrically distributed on both sides of the second calendering roller 11, the cross section of the slide block 15 is "H" shaped, and a sliding structure is formed between the slide block 15 and the chute 5, the slide block 15 is "H" shaped, stuck inside the chute 5, and can slide vertically inside the chute 5;
[0028] Specifically, as shown in the figure, when in use, the electric push rod 6 is operated to drive the slider 15 to move, thereby indirectly changing the horizontal height of the second calendering roller 11 and adjusting the distance between the second calendering roller 11 and the first calendering roller 10. The electric adjustment method saves manpower and time, and is convenient for rapid adjustment to meet the calendering requirements of different thicknesses.
[0029] A main gear 16 is installed on the other side of the first calendering roller 10, and a secondary pulley 21 is installed on one side of the main gear 16, and a pinion is installed on one side of the secondary pulley 21, and a meshing connection is formed between the pinion and the main gear 16, a synchronous belt 18 is installed on the other side of the second calendering roller 11, and a synchronous belt 18 is installed on the outer side of the synchronous belt 18 and the secondary pulley 21, a transmission box 14 is installed on the outer side of the workbench 1 and the support plate 4, and the transmission box 14 is arranged on the outer side of the main gear 16 and the main pulley 19, a tensioning wheel 17 is installed inside the transmission box 14, and the tensioning wheel 17 is arranged between the main pulley 19 and the secondary pulley 21, a support rod 20 is installed on one side of the tensioning wheel 17, and the support rod 20 runs through one side of the transmission box 14, and a spring is sleeved on the outer side of the support rod 20, and the action force of the spring will push the tensioning wheel 17 to tighten the synchronous belt 18 to one side to prevent the synchronous belt 18 from loosening;
[0030] Specifically, as shown in the figure, when in use, the operation of the driving assembly 2 drives the first calendering roller 10 to rotate, driving the main gear 16 to rotate, and the meshing connection between the main gear 16 and the pinion gear drives the secondary pulley 21 to rotate, and indirectly controls the main pulley 19 to rotate, driving the second calendering roller 11 to rotate in the opposite direction, and rotating in the opposite direction to the first calendering roller 10, so as to roll the mixed rubber product;
[0031] A frame 7 is installed on the top of the workbench 1, and a pressing plate 13 is installed inside the frame 7. A threaded rod 8 is installed at the center of the top of the pressing plate 13, and the threaded rod 8 penetrates the top of the frame 7. A threaded connection is formed between the threaded rod 8 and the frame 7. Four groups of guide columns 12 are installed on the top of the pressing plate 13, and the guide columns 12 are distributed in a rectangular shape. Multiple groups of metal rollers 22 are installed inside the pressing plate 13, and the metal rollers 22 are arranged and distributed. The pressing plate 13 and the conveyor belt 9 are parallel to each other. The distribution of the metal rollers 22 can roll and tidy up the surface of the rubber sheet.
[0032] Specifically, as shown in the figure, when in use, through the rotation of the threaded rod 8 and the distribution of the guide column 12, the pressure plate 13 can be driven to move vertically inside the frame 7, changing the distance between the pressure plate 13 and the conveyor belt 9 to adapt to rubber sheets of different thicknesses.
[0033] Working principle: When in use, first, the calendering forming device is transported to the target area, and the rubber plate or rubber sheet to be processed is taken out and placed above the conveyor belt 9. According to the thickness of the rubber, the height of the pressing plate 13 is adjusted, and the threaded rod 8 is rotated to drive the pressing plate 13 to move vertically inside the frame 7, and the distance between the pressing plate 13 and the conveyor belt 9 is changed. Then, according to the calendering requirements, the height of the second calendering roller 11 is adjusted, and the electric push rod 6 is controlled to operate to drive the slider 15 to move, change the horizontal height of the second calendering roller 11, and adjust the distance between the second calendering roller 11 and the first calendering roller 10. Then, the conveyor belt 9 is controlled to operate to transport the rubber plate or rubber sheet to the position of the first calendering roller 10 and the second calendering roller 11. The driving component 2 will drive the first calendering roller 10 and the second calendering roller 11 to rotate in opposite directions to calender the rubber plate or rubber sheet, and finally complete the use of the calendering forming device.
[0034] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
Claims
1. A rubber product processing and calendering device, comprising a workbench (1), characterized in that: A conveyor belt (9) is installed on one side of the top of the workbench (1), a control box (3) is installed on the outer side of the workbench (1), a first calendering roller (10) is installed inside the workbench (1), and a driving component (2) is installed at one end of the first calendering roller (10), a second calendering roller (11) is arranged at the top of the first calendering roller (10), and support plates (4) are arranged on both sides of the first calendering roller (10), a slide groove (5) is arranged inside the support plate (4), and a slider (15) is installed inside the slide groove (5), and the slider (15) is installed at both ends of the second calendering roller (11), an electric push rod (6) is installed at the top of the support plate (4), and a fixed connection is formed between the bottom end of the electric push rod (6) and the slider (15).
2. A rubber product processing and calendering device according to claim 1, characterized in that: The first calendering roller (10) and the second calendering roller (11) are parallel to each other, and the support plates (4) are symmetrically distributed on both sides of the second calendering roller (11).
3. The rubber product processing and calendering device according to claim 1, characterized in that: The cross section of the sliding block (15) is in an "H" shape, and a sliding structure is formed between the sliding block (15) and the sliding groove (5).
4. The rubber product processing and calendering device according to claim 1, characterized in that: A main gear (16) is installed on the other side of the first calendering roller (10), and a secondary pulley (21) is installed on one side of the main gear (16), a pinion is installed on one side of the secondary pulley (21), and a meshing connection is formed between the pinion and the main gear (16), a synchronous belt (18) is installed on the other side of the second calendering roller (11), and a synchronous belt (18) is installed on the outer side of the synchronous belt (18) and the secondary pulley (21), and a transmission box (14) is installed on the outer side of the workbench (1) and the support plate (4), and the transmission box (14) is arranged on the outer side of the main gear (16) and the main pulley (19).
5. A rubber product processing and calendering device according to claim 4, characterized in that: A tension wheel (17) is installed inside the transmission box (14), and the tension wheel (17) is arranged between the main pulley (19) and the secondary pulley (21). A support rod (20) is installed on one side of the tension wheel (17), and the support rod (20) runs through one side of the transmission box (14). A spring is sleeved on the outer side of the support rod (20).
6. The rubber product processing and calendering device according to claim 1, characterized in that: A frame (7) is installed at the top of the workbench (1), and a pressure plate (13) is installed inside the frame (7). A threaded rod (8) is installed at the center position of the top of the pressure plate (13), and the threaded rod (8) passes through the top of the frame (7), and a threaded connection is formed between the threaded rod (8) and the frame (7).
7. A rubber product processing and calendering device according to claim 6, characterized in that: Four groups of guide columns (12) are installed on the top of the pressing plate (13), and the guide columns (12) are distributed in a rectangular shape.
8. The rubber product processing and calendering device according to claim 6, characterized in that: A plurality of groups of metal rollers (22) are installed inside the pressure plate (13), and the metal rollers (22) are arranged and distributed, and the pressure plate (13) and the conveyor belt (9) are parallel to each other.
