Project cost progress management device

By designing an engineering cost progress management device with an extended frame with a knob and a fixed threaded rod and a clamping assembly, the problem of inconvenience in the prior art is solved and a convenient information registration and recording process is realized.

CN222103253UInactive Publication Date: 2024-12-03HOHHOT MUNICIPAL ENG DESIGN & RES INST CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421133383.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-23
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When the existing engineering cost progress management device logs in, it requires holding the mobile phone or information recording board in one hand, which is inconvenient to operate.

Method used

A device including a counterweight box, an extended frame, and a clamping assembly is designed. The mounting plate is locked through a knob and a fixed threaded rod, the position angle of the fixed box is adjusted, and the screw rod and clamping block are driven by the control handle to achieve no need for Recording operation with one hand.

Benefits of technology

This allows staff to easily adjust the viewing angle and fix the equipment when registering information, improves operation convenience and reduces the difficulty of one-handed operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222103253U_ABST
    Figure CN222103253U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of project cost progress management, and particularly relates to a project cost progress management device, which comprises a weight box, pulleys are rotatably mounted at four corners of the bottom of the weight box, and through an arranged expansion assembly, in the process of registration and entry according to information, the weight box can be conveniently and quickly stored. A mounting plate can be mounted according to the number of data needing to be registered, the mounting plate is inserted into the inner side of an expansion frame and locked through a rotary knob and a fixed threaded rod, so that a worker can adjust the position angle of a fixed box while expanding, and the worker can conveniently watch the data; through the arranged clamping assembly, data, a mobile phone or a tablet computer are placed above the supporting frame, a control handle is rotated to drive a lead screw to rotate, the lead screw can drive a clamping block to slide through screw-thread fit after rotating, the clamping block can clamp and fix the data, and the device does not need to be held by a worker with one hand for recording; and the operation of a worker is relatively convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of engineering cost progress management, in particular to an engineering cost progress management device. Background Art

[0002] Project cost refers to the construction cost that constitutes the estimated or actual expenditure of the project. The comprehensive use of knowledge and skills in management, economics and other fields to predict, plan, control, calculate, analyze and evaluate the project cost is called project cost. When cost engineers manage the progress of project cost, they need to integrate various data for unified calculation, apply calculation systems for calculation, and organize them into tables;

[0003] Announcement No. CN 220192464 U discloses a construction cost progress management device, including a workbench, a positioning ring and an I-shaped shaft, the positioning ring is provided in two groups, and the lower end of the positioning ring is fixedly connected to a support rod, the top ends of the support rods are fixedly connected to side plates, the upper surfaces of both ends of the side plates are provided with cross grooves, and the cross grooves are plugged with cross rods;

[0004] When in use, when personnel log in to enter progress information, the device requires the staff to hold the mobile phone or information recording board in one hand and record the information with the other hand, which makes the staff's operation inconvenient; therefore, we propose a construction cost progress management device. Utility Model Content

[0005] The utility model aims to provide a project cost progress management device to solve the existing problems.

[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0007] A construction cost progress management device comprises a counterweight box, pulleys are rotatably installed at the four corners of the bottom of the counterweight box, a lifting base is fixedly installed on the top of the counterweight box, a mounting frame is fixedly installed on the top of the lifting base, a display screen is fixedly installed on the front side of the mounting frame, an extension frame is fixedly installed on the rear side of the display screen, and connecting plates are fixedly installed on the left and right sides of the extension frame; an extension component, the extension component is installed on the extension frame; and a clamping component, the clamping component is installed on the extension component.

[0008] As a further improvement of the above scheme, the expansion component includes a mounting plate, a fixing box, a fixed threaded rod and a knob, the mounting plate is arranged on the inner side of the expansion frame, the fixing box is fixedly installed on one side of the mounting plate, the fixed threaded rod is threadedly installed on the inner side of the mounting plate and the fixing box, and the knob is fixedly installed on one side of the fixed threaded rod.

[0009] As a further improvement of the above scheme, the clamping assembly includes a support frame, a screw rod, a control handle, a fixed rod and a clamping block. The support frame is fixedly installed on the front side of the fixed box, the screw rod is rotatably installed on the inner side of the fixed box, the control handle is fixedly installed on the outside of one end of the screw rod, the fixed rod is fixedly installed on the inner side of the fixed box, the clamping block is threadedly installed on the left and right sides of the outer side of the screw rod, and the clamping block is slidably installed on the left and right sides of the outer side of the fixed rod.

[0010] As a further improvement of the above solution, a sliding groove is provided on one side of the expansion frame, and the outer diameter of the mounting plate is the same as the inner diameter of the sliding groove.

[0011] By adopting the above technical solution, the installation plate can be slid into the inner side of the expansion frame, making the connection more convenient.

[0012] As a further improvement of the above solution, a threaded hole is provided on one side of the connecting plate and the display screen, and a fixing bolt is threadedly installed inside the threaded hole.

[0013] By adopting the above technical solution, the expansion frame can be fixedly installed on the rear side of the display screen through the connecting plate, so that the connection is tighter.

[0014] As a further improvement of the above solution, a through slot is provided on one side of the expansion frame and the mounting plate, an internal thread is provided on the inner side of the through slot, and the fixed threaded rod is meshed with the internal thread.

[0015] By adopting the above technical solution, after the mounting plate slides into the inner side of the expansion frame, it can be locked by fixing the threaded rod, so that the expansion frame and the mounting plate are not easily separated.

[0016] As a further improvement of the above solution, a slide groove is provided on the front side of the fixed box, and the clamping block is slidably installed on the inner side of the slide groove.

[0017] By adopting the above technical solution, the slide groove can limit the clamping block, so that the clamping block can only slide after being subjected to force.

[0018] Compared with the prior art, the beneficial effects of the utility model are:

[0019] (1) The utility model is a construction cost progress management device. Through the expansion component, when the information needs to be logged in, the installation plate can be installed according to the amount of information to be registered, so that the installation plate is inserted into the inner side of the expansion frame and locked by the knob and the fixed threaded rod, so that the staff can adjust the position angle of the fixed box while expanding, which is convenient for the staff to watch;

[0020] (2) The utility model is a construction cost progress management device. By setting a clamping component, the data, mobile phone or tablet is placed on the top of the support frame. The control handle is turned to drive the screw rod to rotate. After the screw rod rotates, it can drive the clamping block to slide through the threaded cooperation, so that the clamping block can clamp and fix it. The device does not need to be held by one hand by the staff to record, which makes it more convenient for the staff to operate. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for describing the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0022] Figure 1 This is a three-dimensional structural diagram of a construction cost progress management device proposed by the utility model;

[0023] Figure 2 It is a partial three-dimensional structural schematic diagram of a construction cost progress management device proposed by the utility model;

[0024] Figure 3 It is a partial three-dimensional structural schematic diagram of a construction cost progress management device proposed by the utility model;

[0025] Figure 4 The utility model is a partial three-dimensional structural schematic diagram of a construction cost progress management device proposed by the utility model.

[0026] In the figure: 1. counterweight box; 2. pulley; 3. lifting base; 4. mounting frame; 5. display screen; 6. expansion frame; 7. connecting plate; 8. mounting plate; 9. fixing box; 10. fixing threaded rod; 11. knob; 12. support frame; 13. screw rod; 14. control handle; 15. fixing rod; 16. clamping block. DETAILED DESCRIPTION

[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0028] refer to Figure 1-4A construction cost progress management device includes a counterweight box 1, pulleys 2 are rotatably installed at the four corners of the bottom of the counterweight box 1, a lifting base 3 is fixedly installed on the top of the counterweight box 1, a mounting frame 4 is fixedly installed on the top of the lifting base 3, a display screen 5 is fixedly installed on the front side of the mounting frame 4, an expansion frame 6 is fixedly installed on the rear side of the display screen 5, and connecting plates 7 are fixedly installed on the left and right sides of the expansion frame 6; an expansion component, the expansion component is installed on the expansion frame 6; a clamping component, the clamping component is installed on the expansion component.

[0029] In this embodiment, the expansion component includes a mounting plate 8, a fixing box 9, a fixing threaded rod 10 and a knob 11. The mounting plate 8 is arranged on the inner side of the expansion frame 6, the fixing box 9 is fixedly installed on one side of the mounting plate 8, the fixing threaded rod 10 is threadedly installed on the inner side of the mounting plate 8 and the fixing box 9, and the knob 11 is fixedly installed on one side of the fixing threaded rod 10.

[0030] In this embodiment, the clamping assembly includes a support frame 12, a screw rod 13, a control handle 14, a fixed rod 15 and a clamping block 16. The support frame 12 is fixedly installed on the front side of the fixed box 9, the screw rod 13 is rotatably installed on the inner side of the fixed box 9, the control handle 14 is fixedly installed on the outside of one end of the screw rod 13, the fixed rod 15 is fixedly installed on the inner side of the fixed box 9, the clamping block 16 is threadedly installed on the left and right sides of the outer side of the screw rod 13, and the clamping block 16 is slidably installed on the left and right sides of the outer side of the fixed rod 15.

[0031] In this embodiment, a sliding groove is provided on one side of the expansion frame 6 , and the outer diameter of the mounting plate 8 is the same as the inner diameter of the sliding groove.

[0032] In this embodiment, threaded holes are provided on one side of the connecting plate 7 and the display screen 5, and fixing bolts are threadedly installed inside the threaded holes.

[0033] In this embodiment, a through groove is provided on one side of the expansion frame 6 and the mounting plate 8, and an internal thread is provided on the inner side of the through groove, and the fixed threaded rod 10 is meshed with the internal thread.

[0034] In this embodiment, a slide groove is provided on the front side of the fixing box 9, and the clamping block 16 is slidably installed on the inner side of the slide groove.

[0035] The implementation principle of one of the embodiments of the present application is: in the process of logging in according to the information, the mounting plate 8 can be installed according to the number of data to be registered, so that the mounting plate 8 is inserted into the inner side of the expansion frame 6, and locked by the knob 11 and the fixed threaded rod 10, so that the staff can adjust the position angle of the fixed box 9 while expanding, which is convenient for the staff to watch; place the data, mobile phone or tablet on the top of the support frame 12, and rotate the control handle 14 to drive the screw rod 13 to rotate, so that the screw rod 13 can drive the clamping block 16 to slide through the threaded cooperation after rotation, so that the clamping block 16 can clamp and fix it, so that the device does not need to be held by the staff with one hand for recording, which makes it more convenient for the staff to operate.

[0036] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0037] The above is a detailed introduction to a construction cost schedule management device provided by the utility model. This article uses specific embodiments to illustrate the principle and implementation method of the utility model. The description of the above embodiments is only used to help understand the method and core idea of ​​the utility model. It should be pointed out that for ordinary technicians in this technical field, without departing from the principle of the utility model, the utility model can also be improved and modified, and these improvements and modifications also fall within the scope of protection of the claims of the utility model.

Claims

1. A construction cost progress management device, characterized in that: include: A counterweight box (1), wherein pulleys (2) are rotatably mounted at the four corners of the bottom of the counterweight box (1), a lifting base (3) is fixedly mounted on the top of the counterweight box (1), a mounting frame (4) is fixedly mounted on the top of the lifting base (3), a display screen (5) is fixedly mounted on the front side of the mounting frame (4), an expansion frame (6) is fixedly mounted on the rear side of the display screen (5), and connecting plates (7) are fixedly mounted on the left and right sides of the expansion frame (6); An expansion component, the expansion component being mounted on an expansion frame (6); A clamping assembly is mounted on the expansion assembly.

2. A construction cost progress management device according to claim 1, characterized in that: The expansion component comprises a mounting plate (8), a fixing box (9), a fixing threaded rod (10) and a knob (11); the mounting plate (8) is arranged on the inner side of the expansion frame (6); the fixing box (9) is fixedly mounted on one side of the mounting plate (8); the fixing threaded rod (10) is threadedly mounted on the inner side of the mounting plate (8) and the fixing box (9); and the knob (11) is fixedly mounted on one side of the fixing threaded rod (10).

3. A construction cost progress management device according to claim 1, characterized in that: The clamping assembly comprises a support frame (12), a screw rod (13), a control handle (14), a fixed rod (15) and a clamping block (16); the support frame (12) is fixedly mounted on the front side of the fixed box (9); the screw rod (13) is rotatably mounted on the inner side of the fixed box (9); the control handle (14) is fixedly mounted on the outer side of one end of the screw rod (13); the fixed rod (15) is fixedly mounted on the inner side of the fixed box (9); the clamping block (16) is threadedly mounted on the left and right sides of the outer side of the screw rod (13); and the clamping block (16) is slidably mounted on the left and right sides of the outer side of the fixed rod (15).

4. A construction cost progress management device according to claim 2, characterized in that: A sliding groove is provided on one side of the expansion frame (6), and the outer diameter of the mounting plate (8) is the same as the inner diameter of the sliding groove.

5. The construction cost progress management device according to claim 1, characterized in that: A threaded hole is provided on one side of the connecting plate (7) and the display screen (5), and a fixing bolt is threadedly installed inside the threaded hole.

6. A construction cost progress management device according to claim 2, characterized in that: A through slot is provided on one side of the expansion frame (6) and the mounting plate (8), an internal thread is provided on the inner side of the through slot, and the fixed threaded rod (10) is meshed with the internal thread.

7. A construction cost progress management device according to claim 2, characterized in that: The front side of the fixed box (9) is provided with a slide groove, and the clamping block (16) is slidably mounted on the inner side of the slide groove.

Citation Information

Patent Citations

  • Project cost progress management device

    CN220192464U