Measurement point distribution bracket in underground tunnel

By introducing adjustable support arms and rotary pallet mechanisms into the measurement point bracket in the underground tunnel, the problem of inconvenience in installation in the prior art is solved, precise control of the position and level of the upper pallet is achieved, and the installation effect is improved.

CN222122819UActive Publication Date: 2024-12-06CCCC SECOND HIGHWAY ENG BUREAU RAILWAY CONSTR CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420950771.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-06
Publication Date
2024-12-06
Estimated Expiration
2034-05-06

AI Technical Summary

Technical Problem

When installing the measurement point bracket in the existing underground tunnel, it is difficult to accurately adjust the position and level of the upper pallet, resulting in poor installation effect and inconvenient use.

Method used

A bracket including a fixed base, an adjustable support arm and a tray mechanism is designed, and the length adjustment of the support arm is achieved through a second bolt, and a rotatable design and threaded fit are used in the tray mechanism to ensure three-dimensional Accurate control of coordinates and levels.

Benefits of technology

It realizes stable fixation and precise adjustment on the inner side wall of the tunnel, improving the accuracy and convenience of installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222122819U_ABST
    Figure CN222122819U_ABST
Patent Text Reader

Abstract

The utility model discloses a measuring distribution bracket in an underground tunnel, which comprises a fixed base, two first adjustable support arms and two second adjustable support arms, a lug plate is fixed on the bottom surface of the fixed base, an upper tray mechanism is arranged on one side of the fixed base, the two first adjustable support arms are clamped on the two sides of the lug plate, and the two second adjustable support arms are clamped on the two sides of the lug plate. The lug plate is connected with the two first adjustable supporting arms through a second bolt, and one end of the second bolt is in threaded fit with a second nut. The upper tray mechanism and the lower tray mechanism are installed on the fixed base and the third plate body at the bottom end of the second adjustable supporting arm, and the bracket can be fixed on the inner side wall of the tunnel through installation of the upper tray mechanism and the lower tray mechanism. The angles of the first plate bodies and the second plate bodies of the upper tray mechanism and the lower tray mechanism can be adjusted mutually, so that the upper tray mechanism and the lower tray mechanism are fixed on the inner side wall of the tunnel according to the use requirements of a user, and the three-dimensional coordinates and levelness of the upper tray mechanism and the lower tray mechanism are effectively and accurately controlled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of measuring point distribution brackets in underground tunnels, in particular to a measuring point distribution bracket in an underground tunnel. Background Art

[0002] An underground tunnel is an engineering structure located below the ground, which is built in underground rock or soil layers. As a component of urban transportation, underground tunnels are particularly suitable for areas with busy traffic, narrow ground areas and urban center areas. In addition, tunnels can also be built underwater to form cross-river or submarine tunnels. Underground tunnels are not only a component of urban transportation, but also widely used in other fields. For example, underground pipelines, water conservancy and power transmission projects will also use underground tunnels for construction. According to the geological environment and construction methods of the tunnel, underground tunnels can be further classified into mountain tunnels, underwater tunnels and urban tunnels. In order to accurately control the excavation position and direction of the shield machine during tunnel construction, it is necessary to lay out the measurement point distribution bracket in the tunnel. The bracket is mainly used for the layout of the rear-sight guide points of the shield machine.

[0003] The existing measuring point distribution bracket in the underground tunnel needs to be installed on the curved side wall of the tunnel during installation. The overall structure of the measuring point distribution bracket in the underground tunnel is fixed. It is difficult to adjust the position and levelness of the upper tray during installation. Generally, it can only be adjusted by adjusting the length of the fixing bolts or adding gaskets. Therefore, it is difficult to ensure the accuracy of the position and levelness of the upper tray, resulting in poor installation effect and inconvenience in use. Utility Model Content

[0004] The purpose of the utility model is to solve the problems in the prior art that a bracket for distributing measurement points in an underground tunnel needs to be installed on the curved side wall of the tunnel, the overall structure of the bracket for distributing measurement points in the underground tunnel is fixed, and the position and horizontality of the upper tray are difficult to adjust during installation, and generally can only be adjusted by adjusting the length of the fixing bolts or adding gaskets, thereby making it difficult to ensure the accuracy of the position and horizontality of the upper tray, resulting in poor installation effect and inconvenience in use. A bracket for distributing measurement points in an underground tunnel is proposed to solve the problems in the prior art that a bracket for distributing measurement points in an underground tunnel needs to be installed on the curved side wall of the tunnel, the overall structure of the bracket for distributing measurement points in the underground tunnel is fixed, and the position and horizontality of the upper tray are difficult to adjust during installation, and generally can only be adjusted by adjusting the length of the fixing bolts or adding gaskets. As a result, it is difficult to ensure the accuracy of the position and horizontality of the upper tray, the installation effect is poor, and the use is inconvenient.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] A bracket for measuring points in an underground tunnel comprises a fixed base, two first adjustable arms and two second adjustable arms, an ear plate is fixed on the bottom surface of the fixed base, an upper tray mechanism is installed on one side of the fixed base, the two first adjustable arms are clamped on both sides of the ear plate, the ear plate and the two first adjustable arms are connected by a second bolt, one end of the second bolt is threadedly matched with a second nut, the second adjustable arm is installed on the two first adjustable arms by the second bolt and the second nut, two sixth cylinders are installed on both sides of the second adjustable arm by the second bolt, the bottom ends of the two sixth cylinders are fixed to a third plate body, and the lower tray mechanism is installed on the third plate body;

[0007] The upper tray mechanism comprises two second cylinders, a third cylinder is clamped between the two second cylinders, one side of the third cylinder is fixed with the first plate body, and the first plate body is hinged to the second plate body.

[0008] Preferably, a hole is provided on the first plate body, two fourth cylinders are fixed on one side of the first plate body, and the fifth cylinder is fixed on the second plate body.

[0009] Preferably, the two second cylinders and the third cylinder, as well as the two fourth cylinders and the fifth cylinder, are all threadedly engaged with a first bolt, and one end of the first bolt is threadedly engaged with a first nut.

[0010] Preferably, the upper tray mechanism has the same structure as the lower tray mechanism, and the two second cylinders are fixed on the third plate body.

[0011] Preferably, the two first adjustable arms each comprise a steel plate, and a row of threaded holes is provided on the steel plate.

[0012] The utility model has the following beneficial effects:

[0013] 1. The utility model is provided with an upper tray mechanism and a lower tray mechanism installed on the third plate body at the bottom end of the fixed base and the second adjustable support arm. The installation of the upper tray mechanism and the lower tray mechanism can fix the bracket on the inner wall of the tunnel. The first plate body and the second plate body of the upper tray mechanism and the lower tray mechanism can be adjusted at relative angles, so that they can be fixed on the inner wall of the tunnel according to the needs of the user, and the three-dimensional coordinates and horizontality of the upper tray mechanism and the lower tray mechanism can be effectively and accurately controlled.

[0014] 2. The second adjustable support arm of the utility model can be moved between the two first adjustable support arms, so that the supporting length of the second adjustable support arm and the two first adjustable support arms can be adjusted. The second adjustable support arm and the two first adjustable support arms are fixed to and disassembled with each other by a second bolt and a second nut, which increases convenience of use. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is one of the schematic diagrams of the overall structure of the bracket;

[0016] Figure 2 This is the second schematic diagram of the overall structure of the bracket;

[0017] Figure 3 It is an exploded schematic diagram of the connection structure between the fixed base and the first adjustable support arm;

[0018] Figure 4 It is an exploded diagram of the overall structure of the upper tray mechanism.

[0019] In the figure: 1. fixed base; 101. ear plate; 2. upper tray mechanism; 201. second cylinder; 202. third cylinder; 203. first bolt; 204. first nut; 205. first plate body; 206. fourth cylinder; 207. fifth cylinder; 208. second plate body; 3. first adjustable arm; 301. steel plate; 302. threaded hole; 4. second bolt; 5. second nut; 6. second adjustable arm; 7. sixth cylinder; 8. third plate body; 9. lower tray mechanism. DETAILED DESCRIPTION

[0020] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0021] Reference Figure 1-4 , a measurement point bracket in an underground tunnel, comprising a fixed base 1, two first adjustable arms 3 and two second adjustable arms 6, an ear plate 101 is fixed on the bottom surface of the fixed base 1, a tray mechanism 2 is installed on one side of the fixed base 1, the two first adjustable arms 3 are clamped on both sides of the ear plate 101, the ear plate 101 and the two first adjustable arms 3 are connected by a second bolt 4, the connection between the two first adjustable arms 3 and the ear plate 101 is rotatable, which is convenient for rotation installation according to user needs, one end of the second bolt 4 is threaded with a second nut 5, the second adjustable arm 6 is installed on the two first adjustable arms 3 through the second bolt 4 and the second nut 5, two sixth cylinders 7 are installed on both sides of the second adjustable arm 6 through the second bolt 4, the bottom ends of the two sixth cylinders 7 are fixed to a third plate body 8, and a lower tray mechanism 9 is installed on the third plate body 8;

[0022] The upper tray mechanism 2 includes two second cylinders 201, and the third cylinder 202 is clamped between the two second cylinders 201. A first plate 205 with a hole inside is fixed to one side of the third cylinder 202. Two fourth cylinders 206 are fixed to one side of the first plate 205. A fifth cylinder 207 is clamped between the two fourth cylinders 206. The second plate 208 is fixed on the fifth cylinder 207. The first bolt 203 is threadedly engaged with the two second cylinders 201 and the third cylinder 202, and the first bolt 203 is threadedly engaged with the first nut 204 at one end, so as to ensure that the first plate 205 and the second plate 208 can achieve installation angle control.

[0023] The upper tray mechanism 2 has the same structure as the lower tray mechanism 9. The two second cylinders 201 of the lower tray mechanism 9 are fixed on the third plate 8. The installation of the upper tray mechanism 2 and the lower tray mechanism 9 allows the bracket to be fixed on the inner wall of the tunnel. The first plate 205 and the second plate 208 of the upper tray mechanism 2 and the lower tray mechanism 9 can be adjusted at relative angles, so that they can be fixed on the inner wall of the tunnel according to the user's requirements, thereby effectively and accurately controlling the three-dimensional coordinates and horizontality of the upper tray mechanism 2 and the lower tray mechanism 9.

[0024] The two first adjustable arms 3 each include a steel plate 301 on which a row of threaded holes 302 are provided. The second adjustable arm 6 has the same structure as the two first adjustable arms 3. The second adjustable arm 6 can be moved between the two first adjustable arms 3 so that the supporting length of the second adjustable arm 6 and the two first adjustable arms 3 can be adjusted. The second adjustable arm 6 and the two first adjustable arms 3 can be fixed to and disassembled with each other by a second bolt 4 and a second nut 5.

[0025] When using a measurement point distribution bracket in an underground tunnel, according to the user's needs, the upper tray mechanism 2 on one side of the fixed base 1 is adjusted so that the first plate 205 and the second plate 208 of the upper tray mechanism 2 can be rotated through the third cylinder 202 and the fifth cylinder 207 on the first bolt 203, so that the first plate 205 and the second plate 208 are fixed to the inner wall of the tunnel by using fixing screws, and slight adjustments are made according to the curvature of the inner wall of the tunnel so that the first plate 205 and the second plate 208 are completely fitted on the inner wall of the tunnel to ensure installation stability. According to needs, the two first adjustable arms 3 are rotated on the ear plate 101, and the second adjustable arm 6 between the two first adjustable arms 3 is moved. The two first adjustable arms 3 and the second adjustable arms 6 with adjustable lengths are fixed to each other by the second bolt 4 and the second nut 5, so that the lower tray mechanism 9 is fitted on the inner wall of the tunnel through the same operation method of the upper tray mechanism 2, and the upper and lower fixations are completed to form a measurement point distribution bracket.

[0026] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A bracket for measuring points in an underground tunnel, comprising a fixed base (1), two first adjustable arms (3) and two second adjustable arms (6), characterized in that: The bottom surface of the fixed base (1) is fixed with an ear plate (101); an upper tray mechanism (2) is installed on one side of the fixed base (1); two first adjustable arms (3) are clamped on both sides of the ear plate (101); the ear plate (101) and the two first adjustable arms (3) are connected via a second bolt (4); one end of the second bolt (4) is threadedly engaged with a second nut (5); the second adjustable arm (6) is installed on the two first adjustable arms (3) via the second bolt (4) and the second nut (5); two sixth cylinders (7) are installed on both sides of the second adjustable arm (6) via the second bolt (4); the bottom ends of the two sixth cylinders (7) are fixed with a third plate body (8); and a lower tray mechanism (9) is installed on the third plate body (8); The upper tray mechanism (2) comprises two second cylinders (201), a third cylinder (202) is clamped between the two second cylinders (201), a first plate body (205) is fixed on one side of the third cylinder (202), and the first plate body (205) is hinged to the second plate body (208).

2. The measurement point distribution bracket in an underground tunnel according to claim 1, characterized in that: The first plate (205) has a hole, two fourth cylinders (206) are fixed on one side of the first plate (205), and the fifth cylinder (207) is fixed on the second plate (208).

3. The measurement point distribution bracket in an underground tunnel according to claim 2, characterized in that: The first bolt (203) is threadedly engaged between the two second cylinders (201) and the third cylinder (202) as well as between the two fourth cylinders (206) and the fifth cylinder (207), and one end of the first bolt (203) is threadedly engaged with the first nut (204).

4. The measurement point distribution bracket in an underground tunnel according to claim 1, characterized in that: The upper tray mechanism (2) and the lower tray mechanism (9) have the same structure, and the two second cylinders (201) are fixed on the third plate body (8).