Assembly type building box body connecting structure
By using a combination of positioning parts and fasteners in the prefabricated building box connection structure, the problem of positioning position deviation is solved, efficient box connection and stability improvement is achieved, and construction efficiency is improved.
Patent Information
- Application Number
- CN202323486239.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-19
- Publication Date
- 2024-12-13
- Estimated Expiration
- 2033-12-19
AI Technical Summary
The position of the prefabricated steel structure module box is prone to deviation during construction, resulting in low lifting accuracy and manual adjustments are required to reduce construction efficiency.
A prefabricated building box connection structure is designed, using a combination of positioning members and fasteners to achieve precise positioning and fixing of the box through the conical structure of the positioning members and threaded rods to ensure the correct connection of adjacent boxes. Reduce the need for manual adjustments.
It improves the accuracy and construction efficiency of box connection, ensures the correct positioning and stability of box, reduces construction errors, and improves the overall stability of the building.
Smart Images

Figure CN222161576U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to an assembled building box connection structure. Background Art
[0002] The construction of prefabricated buildings has the advantages of convenient construction, short construction period, little pollution to the surrounding environment, easy factory production of building components, batch centralized production and easy assurance of component quality. Among them, prefabricated steel structure module box buildings are widely used due to the flexibility and aesthetics of module layout.
[0003] The steel structure module box building is transported to the installation site by large lifting equipment, connected through the corner boxes set at the corners of the module boxes and the bolt holes and fixing bolts set on the corner boxes, and multiple module boxes are connected into an integrated combination according to specific spatial positions and spatial sequences.
[0004] However, during the actual installation process, it is necessary to manually observe and adjust the position of the module box so that the module box falls to the installation position. The lifting accuracy of this method is not high and the error is large. After the module box is in place, the position deviation of the module box is often too large, resulting in a large misalignment of the bolt holes on the corner boxes of adjacent boxes that should correspond to each other, and the bolts cannot be screwed in to connect and fix. The position of the module box needs to be manually adjusted again, reducing construction efficiency. Utility Model Content
[0005] Therefore, the technical problem to be solved by the utility model is to overcome the defects in the prior art that the module box position is prone to deviation, and the position of the module box needs to be manually adjusted again, which reduces the construction efficiency, thereby providing an assembled building box connection structure.
[0006] In order to solve the above technical problems, the utility model provides an assembled building box connection structure, comprising: a lower box, wherein the top corner position of the lower box has an upper corner box;
[0007] An upper box body is located above the lower box body, and a lower corner piece box is provided at a bottom corner of the upper box body, wherein the lower corner piece box has a positioning hole for inserting a positioning piece;
[0008] A connecting plate, sandwiched between the lower box body and the upper box body;
[0009] A positioning piece vertically passes through the connecting plate and the upper corner piece box from one side, the bottom end of the positioning piece is fastened to the upper corner piece box, and the top end of the positioning piece is inserted into the positioning hole;
[0010] A fastener vertically passes through the lower corner piece box, the connecting plate and the upper corner piece box from one side, and two ends of the fastener are respectively fastened to the lower corner piece box and the upper corner piece box.
[0011] Optionally, the positioning member is a cone.
[0012] Optionally, a threaded rod extending downward is provided at the bottom of the cone, and one end of the threaded rod passes through the upper corner piece box and is connected to a first nut on the inner side of the upper corner piece box.
[0013] Optionally, the first nut is connected to the upper corner piece box by welding.
[0014] Optionally, the cone and the threaded rod are integrally formed.
[0015] Optionally, the diameter of the threaded rod is smaller than the diameter of the cone.
[0016] Optionally, one end of the connecting plate extends out of the upper corner box and is fixedly connected to the main building.
[0017] Optionally, the connecting plate is an integral structure continuously arranged along the length direction.
[0018] Optionally, the fastener is a tension bolt, and both ends of the tension bolt are connected to the upper corner piece box and the lower corner piece box respectively through a second nut.
[0019] Optionally, it also includes: a gasket, which is respectively arranged between one of the second nut and the upper corner piece box and between another of the second nut and the lower corner piece box.
[0020] The technical solution of the utility model has the following advantages:
[0021] 1. The assembled building box connection structure provided by the utility model fixes the connection plate and the upper corner box on the lower box together through the positioning piece. When placing the upper box, the top end of the positioning piece is inserted into the positioning hole of the lower corner box on the upper box, and then the fasteners are connected to the upper corner box and the lower corner box in sequence to complete the connection of the two adjacent boxes. The positioning piece can ensure that the installation position of the two adjacent boxes is correct and will not be offset. Workers do not need to adjust the position of the box again, thereby improving construction efficiency.
[0022] 2. In the assembled building box connection structure provided by the utility model, the positioning piece is set as a cone, and its top end is gradually reduced. When it cooperates with the positioning hole of the upper corner box, the side wall of the positioning hole can slide along the top end of the cone, which is convenient for adjusting the position of the box.
[0023] 3. The assembled building box connection structure provided by the utility model can improve the shear resistance of the box after the connecting plate is connected to the main building, so that the stability of the building formed by multiple boxes is better. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0025] Figure 1 A front view of the assembled building box connection structure provided in the first embodiment of the utility model;
[0026] Figure 2 for Figure 1 Magnified view of area A.
[0027] Description of reference numerals:
[0028] 1. Lower box body; 2. Upper corner box; 3. Upper box body; 4. Lower corner box; 5. Positioning hole; 6. Connecting plate; 7. Cone; 8. Threaded rod; 9. First nut; 10. Tension bolt; 11. Second nut; 12. Gasket. DETAILED DESCRIPTION
[0029] The technical solution of the utility model will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0030] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0031] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0032] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0033] like Figure 1 , Figure 2 As shown, a specific implementation of the assembled building box connection structure provided by this embodiment includes: a lower box 1, an upper box 3, a connecting plate 6, a positioning piece and a fastener. The four corners of the top of the lower box 1 are respectively provided with an upper corner box 2, and the four corners of the bottom of the upper box 3 are respectively provided with a lower corner box 4. The four lower corner boxes 4 have positioning holes 5 for inserting positioning pieces. The connecting plate 6 is clamped between the lower box 1 and the upper box 3. A plurality of boxes distributed up and down are connected together by the connecting plate 6. The positioning piece is fixed from One side vertically passes through the connecting plate 6 and the upper corner piece box 2, and the bottom end of the positioning piece is fastened to the upper corner piece box 2 to complete the installation of the positioning piece. There are four positioning pieces. When all four positioning pieces are inserted into the positioning holes 5 of the four lower corner piece boxes 4, the positioning between the lower box body 1 and the upper box body 3 can be completed. The fastener vertically passes through the lower corner piece box 4, the connecting plate 6 and the upper corner piece box 2 from one side, and the two ends of the fastener are fastened to the lower corner piece box 4 and the upper corner piece box 2 respectively, thereby fixing the upper box body 3 and the lower box body 1 together.
[0034] The assembled building box connection structure provided in this embodiment fixes the connecting plate 6 and the upper corner box 2 on the lower box 1 together by the positioning piece. When placing the upper box 3, the top end of the positioning piece is inserted into the positioning hole 5 of the lower corner box 4 on the upper box 3, and then the fasteners are connected to the upper corner box 2 and the lower corner box 4 in turn to complete the connection of the two adjacent boxes. The positioning piece can ensure that the installation position of the two adjacent boxes is correct and will not be offset. Workers do not need to adjust the position of the box again, thereby improving construction efficiency.
[0035] like Figure 1 , Figure 2As shown, in the assembled building box connection structure provided in this embodiment, the positioning member is a cone 7, the tip of the cone 7 is set upward, the top of the cone 7 is gradually reduced, and when it cooperates with the positioning hole 5 of the upper corner box 2, the side wall of the positioning hole 5 can slide along the top of the cone 7, so as to facilitate the adjustment of the position of the box. In addition, as an alternative embodiment, the positioning member can also be a cylinder.
[0036] like Figure 1 , Figure 2 As shown, in the prefabricated building box connection structure provided in this embodiment, a threaded rod 8 extending downward is provided at the bottom of the cone 7, the bottom end of the threaded rod 8 passes through the upper corner piece box 2 and is connected to a first nut 9 on the inner side of the upper corner piece box 2, and the cone 7 is fastened to the upper corner piece by the cooperation of the nut and the threaded rod 8. In addition, as an alternative embodiment, a threaded hole can also be provided on the upper corner piece box 2, and the cone 7 can be connected to the upper corner piece box 2 by the cooperation of the threaded rod 8 and the threaded hole.
[0037] like Figure 1 , Figure 2 As shown, in the assembled building box connection structure provided by this embodiment, the first nut 9 is welded to the inner side of the upper corner box 2. When the cone 7 is installed, there is no need to fix the nut, and the connection can be made by simply rotating the threaded rod 8, which makes the installation more convenient. In addition, as an alternative embodiment, a polygonal groove can also be provided on the inner side of the upper corner box 2, and the first nut 9 can be clamped in the polygonal groove.
[0038] like Figure 1 , Figure 2 As shown, in the assembled building box connection structure provided in this embodiment, the cone 7 and the threaded rod 8 are integrally formed, and the body of the cone 7 is a cylinder, one end of which is used to make the cone, and the other end is used to make the thread, thereby forming the threaded rod 8, which has higher strength and better connection effect. In addition, as an alternative embodiment, the cone 7 and the threaded rod 8 can also be welded together.
[0039] like Figure 1 , Figure 2 As shown, in the assembled building box connection structure provided by this embodiment, the diameter of the threaded rod 8 is smaller than the diameter of the cone 7. The smaller the diameter of the threaded rod 8, the smaller the opening of the corresponding upper corner box 2, which can reduce the degree of structural damage to the upper corner box 2, maintain the structural strength of the upper corner box 2, and ensure the stability of the connection between the upper box 3 and the lower box 1. In addition, as an alternative embodiment, the threaded rod 8 can also have the same diameter as the cone 7.
[0040] like Figure 1As shown, in the prefabricated building box connection structure provided in this embodiment, one end of the connecting plate 6 extends out between the upper corner box 2 and the lower corner box 4, and is fixedly connected to the main building by bolts, which can improve the shear resistance of the box and make the building formed by multiple boxes more stable.
[0041] like Figure 1 As shown, in the prefabricated building box connection structure provided in this embodiment, the connection plate 6 is an integral structure continuously arranged along the length direction, that is, it is an integral structure in the horizontal direction, and the connection plate 6 can be made of iron material, and the compressive strength of the connection plate 6 is better. In addition, as an alternative embodiment, when the material selected for the connection plate 6 is relatively hard, such as alloy, a plurality of circular holes can be set in the middle of the connection plate 6 to reduce the materials required for making the connection plate 6 and reduce the production cost.
[0042] like Figure 1 As shown, in the prefabricated building box connection structure provided in this embodiment, the fastener can be a tension bolt 10, which is vertically arranged, and its two ends are respectively connected to the upper corner box 2 and the lower corner box 4 through the second nut 11, and the second nut 11 is arranged on the inner side of the upper corner box 2 and the lower corner box 4, and the connection between the upper box 3 and the lower box 1 is achieved through the tension bolt 10. In addition, as an alternative embodiment, the fastener can also be a latch, and its upper and lower ends are respectively inserted into the upper corner box and the lower corner box 4, and then the limit rods are inserted at both ends of the latch, and the connection between the upper box 3 and the lower box 1 is achieved through the limit rod and the latch.
[0043] like Figure 1 As shown, the prefabricated building box connection structure provided in this embodiment also includes: a gasket 12, which is respectively arranged between a second nut 11 and the upper corner box 2 and between another second nut 11 and the lower corner box 4. The gasket 12 can play a buffering role to avoid direct contact with the second nut 11 and reduce the wear of the upper corner box 2 and the lower corner box 4.
[0044] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from these are still within the scope of protection of the present utility model.
Claims
1. An assembled building box connection structure, characterized in that: include: A lower box body (1), wherein the top corner of the lower box body (1) is provided with an upper corner piece box (2); An upper box body (3) is located above the lower box body (1), and a lower corner piece box (4) is provided at a bottom corner of the upper box body (3), and the lower corner piece box (4) has a positioning hole (5) for inserting a positioning piece; A connecting plate (6) is sandwiched between the lower box body (1) and the upper box body (3); A positioning piece vertically passes through the connecting plate (6) and the upper corner piece box (2) from one side, the bottom end of the positioning piece is fastened to the upper corner piece box (2), and the top end of the positioning piece is inserted into the positioning hole (5); A fastener vertically passes through the lower corner piece box (4), the connecting plate (6) and the upper corner piece box (2) from one side, and two ends of the fastener are respectively fastened to the lower corner piece box (4) and the upper corner piece box (2).
2. The assembled building box connection structure according to claim 1, characterized in that: The positioning member is a cone (7).
3. The assembled building box connection structure according to claim 2 is characterized in that: A threaded rod (8) extending downward is provided at the bottom of the cone (7), one end of the threaded rod (8) passes through the upper corner piece box (2) and is connected to a first nut (9) on the inner side of the upper corner piece box (2).
4. The assembled building box connection structure according to claim 3 is characterized in that: The first nut (9) is welded to the upper corner piece box (2).
5. The assembled building box connection structure according to claim 3 is characterized in that: The cone (7) and the threaded rod (8) are integrally formed.
6. The assembled building box connection structure according to claim 3, characterized in that: The diameter of the threaded rod (8) is smaller than the diameter of the cone (7).
7. The assembled building box connection structure according to claim 1, characterized in that: One end of the connecting plate (6) extends out of the upper corner piece box (2) and is fixedly connected to the main building.
8. The assembled building box connection structure according to claim 7, characterized in that: The connecting plate (6) is an integral structure continuously arranged along the length direction.
9. The assembled building box connection structure according to any one of claims 1 to 8, characterized in that: The fastener is a tension bolt (10), and the two ends of the tension bolt (10) are connected to the upper corner piece box (2) and the lower corner piece box (4) respectively through a second nut (11).
10. The assembled building box connection structure according to claim 9, characterized in that: Also includes: A gasket (12) is respectively arranged between one of the second nuts (11) and the upper corner piece box (2) and between another of the second nuts (11) and the lower corner piece box (4).