Building decoration material lifting device

The building decoration material lifting device stabilizes the material basket using guide rails and a double-axis motor to prevent swinging, ensuring safe vertical lifting and lowering.

CN222204509UActive Publication Date: 2024-12-20JIANGYIN BINJIANG DECORATION CURTAIN WALL ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421126520.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-22
Publication Date
2024-12-20
Estimated Expiration
2034-05-22

AI Technical Summary

Technical Problem

The material basket used for lifting building decoration materials tends to swing during ascent, potentially causing damage to the outer wall of the building.

Method used

A building decoration material lifting device comprising a base, column, material basket, guide rails, and a winding mechanism with a double-axis motor and steel wire ropes, which ensures vertical lifting and lowering of the basket by using guide rails and fixing assemblies to stabilize the basket.

Benefits of technology

The device stabilizes the material basket during lifting, preventing it from swinging and ensuring safe, vertical movement without causing damage to the building.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222204509U_ABST
    Figure CN222204509U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of material lifting and discloses a building decoration material lifting device which comprises a base, a stand column, a material basket and a first guide rail, the material basket is located on one side of the base, the stand column is welded to one end of the top of the base, an insertion column is movably inserted into the top end of the stand column, and a movable rod is welded to the top end of the insertion column; and a winding mechanism for lifting the material basket is arranged at the top end of the movable rod. According to the scheme, the first guide rail and the base are fixedly connected through the fixing assembly, and then the first guide rail and the third guide rail or the first guide rail, the second guide rail and the third guide rail are spliced together according to the height of a construction floor; the first guide rail, the second guide rail and the third guide rail are fixed through cooperation of the two connecting plates and the four first bolts, and then when the sliding part slides on the surfaces of the third guide rail, the second guide rail and the first guide rail, the material basket can be limited, so that the material basket can only vertically ascend and descend without shaking.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of material lifting, and in particular to a device for lifting building decoration materials. Background Art

[0002] Building materials are the raw materials necessary for the construction of a building, usually cement, sand and gravel. When transporting them to the construction floor, a crane is usually used. Specifically, the crane is installed at the material receiving point on the construction floor, and then the bags of cement, sand and gravel are placed in the basket of the crane. The motor of the crane is then used to drive the stranding drum to reel in the wire rope. When the wire rope is reeled in, it can drive the basket to rise to the construction floor. However, in this process, the basket is very likely to swing when it rises. If it accidentally touches the outer wall of the building, it will inevitably cause damage to the outer wall of the building. Utility Model Content

[0003] In order to solve the problem that the material basket mentioned above is prone to swinging when rising, and if it accidentally touches the outer wall of the building, it will inevitably cause damage to the outer wall of the building, the present application provides a building decoration material lifting device.

[0004] The present application provides a building decoration material lifting device that adopts the following technical solution:

[0005] A building decoration material lifting device comprises a base, a column, a material basket and a first guide rail, wherein the material basket is located at one side of the base, the column is welded to one end of the top of the base, the top of the column is movably plugged with a plug column, the top of the plug column is welded with a movable rod, the top of the movable rod is provided with a winding mechanism for lifting the material basket, and a sliding member is welded to one side of the material basket;

[0006] The cam is configured to engage a plurality of first and second cams and to engage a plurality of second cams, wherein the plurality of first and second cams have respective opposite ends, and the plurality of second and second cams have respective opposite ends.

[0007] Preferably, the winding mechanism consists of a mounting base and a double-axis motor, the mounting base is welded to the top end of the movable rod, the double-axis motor is fixedly mounted on the middle part of the inner bottom wall of the mounting base, the two power shaft ends of the double-axis motor are welded with rotating shafts, the two rotating shafts respectively rotate and pass through the two inner side walls of the mounting base, the outer surfaces of the two rotating shafts are fixedly sleeved with a winding drum, and steel wire ropes are wound on the two winding drums, through holes are opened at both ends of the bottom of the mounting base, and the two steel wire ropes are movably passed through the two through holes respectively, and rectangular holes are opened on both sides of the material basket, the ends of the two steel wire ropes are fixedly passed through the two rectangular holes respectively, and the ends of the two steel wire ropes are respectively tied to the two ends of the top of the material basket.

[0008] Preferably, the fixing assembly consists of two fixing blocks and two second bolts, the two fixing blocks are respectively welded on both sides of the first guide rail, the two second bolts are respectively threaded through the two fixing blocks, and the two second bolts are both threadedly connected to the base.

[0009] Preferably, a gripping rod is welded to one side of the movable rod, a sponge sleeve is fixedly provided on the outer surface of the gripping rod, a sandbox is movably placed at the other end of the top of the base, and buckle grooves are provided on both sides of the sandbox.

[0010] To summarize, the present application includes the following beneficial technical effects: the first guide rail and the base are fixedly connected by utilizing a fixing assembly, and then, according to the height of the construction floor, the first guide rail and the third guide rail or the first guide rail and the second guide rail and the third guide rail are selected to be spliced ​​together, and two connecting plates and four first bolts are used to fix the first guide rail, the second guide rail and the third guide rail, and then when the sliding part slides on the surfaces of the third guide rail, the second guide rail and the first guide rail, the material basket can be limited so that the material basket can only be lifted and lowered vertically without shaking. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a schematic diagram of the three-dimensional structure of an embodiment of the application.

[0012] Figure 2 It is a schematic diagram of the split structure of an embodiment of the application.

[0013] Figure 3 It is a schematic diagram of the split structure of the first guide rail, the second guide rail and the third guide rail in the application embodiment.

[0014] Explanation of the reference numerals in the accompanying drawings: 1. base; 2. column; 31. plug-in column; 32. movable rod; 4. winding mechanism; 41. mounting seat; 42. dual-axis motor; 43. rotating shaft; 44. winding drum; 45. wire rope; 51. basket; 52. sliding member; 61. first guide rail; 62. second guide rail; 63. third guide rail; 64. plug-in rod; 65. connecting plate; 66. first bolt; 7. fixing assembly; 71. fixing block; 72. second bolt; 81. gripping rod; 82. sponge cover; 83. sandbox. DETAILED DESCRIPTION

[0015] The following is combined with Figure 1-3 This application is described in further detail.

[0016] The present application embodiment discloses a building decoration material lifting device, referring to Figure 1 and Figure 2 , including a base 1, a column 2, a material basket 51 and a first guide rail 61. The material basket 51 is located on one side of the base 1. The material basket 51 can be used to place building decoration materials. The column 2 is welded to one end of the top of the base 1. The top of the column 2 is movably plugged with a plug column 31. The top of the plug column 31 is welded with a movable rod 32. The plug column 31 can not only support the movable rod 32, but also enable the movable rod 32 to be rotated horizontally. The top of the movable rod 32 is provided with a winding mechanism 4 for lifting the material basket 51. The winding mechanism 4 is composed of a mounting seat 41 and a double-axis motor 42. The mounting seat 41 is welded to the top of the movable rod 32. The double-axis motor 42 is fixedly mounted on the middle part of the inner bottom wall of the mounting seat 41. The double-axis motor 42 is electrically connected to an external power supply through an external switch. The mounting seat 41 can support the double-axis motor 42. The two power shaft ends of the double-axis motor 42 are welded with a rotating shaft 43. The double-axis motor 42 can rotate the two rotating shafts 43 To provide driving force, the two rotating shafts 43 rotate and penetrate the two inner side walls of the mounting seat 41 respectively, and the outer surfaces of the two rotating shafts 43 are fixedly sleeved with twisting drums 44, and the two twisting drums 44 are wound with steel wire ropes 45. Through holes are opened at both ends of the bottom of the mounting seat 41, and the two steel wire ropes 45 are movably passed through the two through holes. Rectangular holes are opened on both sides of the material basket 51, and the ends of the two steel wire ropes 45 are fixedly passed through the two rectangular holes respectively, and the ends of the two steel wire ropes 45 are respectively tied to the two ends of the top of the material basket 51, and a sliding part 52 is welded on one side of the material basket 51. When the two power shafts of the dual-axis motor 42 drive the two rotating shafts 43 to rotate, the two rotating shafts 43 drive the two twisting drums 44 to rotate, and the two twisting drums 44 can reel in the two steel wire ropes 45 during the rotation process. When the two steel wire ropes 45 are reeled in, they can pull the material basket 51 up, and then lift the materials on the material basket 51 to the material receiving place on the construction floor;

[0017] Reference Figure 1 and Figure 3The first guide rail 61 is located at one side of the material basket 51, and the first guide rail 61 is fixedly installed on the base 1 through the fixing component 7, so that the first guide rail 61 and the base 1 are in a fixed connection state, and the sliding member 52 is movably sleeved on the outer surface of the first guide rail 61, and the second guide rail 62 is provided at the bottom of the first guide rail 61, and the third guide rail 63 is provided at the bottom of the second guide rail 62. The specifications of the first guide rail 61, the second guide rail 62 and the third guide rail 63 are the same, and the bottom ends of the first guide rail 61, the second guide rail 62 and the third guide rail 63 are all provided with plug holes, and the top ends of the second guide rail 62 and the third guide rail 63 are welded with plug rods 64, and the two plug rods 64 are movably inserted into the plug holes provided at the bottom ends of the first guide rail 61 and the plug holes provided at the bottom ends of the second guide rail 62, respectively, so that the first guide rail 61, the second guide rail 62 and the third guide rail 63 are in the same straight line, and the top ends of the second guide rail 62 and the third guide rail 63 are connected. The bottom end of the first guide rail 61 is in conflict with the top end of the third guide rail 63 and is in conflict with the bottom end of the second guide rail 62. A connecting plate 65 is provided on one side of the first guide rail 61 and one side of the second guide rail 62. The two ends of one side of the two connecting plates 65 are respectively in contact with the bottom end of one side of the first guide rail 61, the two ends of one side of the second guide rail 62 and the top end of one side of the third guide rail 63. The two ends of one side of the two connecting plates 65 are threaded with first bolts 66. The four first bolts 66 are respectively threadedly connected with the bottom end of one side of the first guide rail 61, the two ends of one side of the second guide rail 62 and the top end of one side of the third guide rail 63, so that the first guide rail 61, the second guide rail 62 and the third guide rail 63 can be spliced ​​together. After that, when the sliding member 52 slides on the surfaces of the third guide rail 63, the second guide rail 62 and the first guide rail 61, the material basket 51 can be limited so that the material basket 51 can only be lifted and lowered vertically without shaking.

[0018] Reference Figure 1 and Figure 3 The fixing assembly 7 is composed of two fixing blocks 71 and two second bolts 72. The two fixing blocks 71 are respectively welded on both sides of the first guide rail 61. The two second bolts 72 are respectively threaded through the two fixing blocks 71. The two second bolts 72 are both threadedly connected to the base 1, so that the first guide rail 61 can be fixedly installed on one side of the base 1.

[0019] Reference Figure 1 and Figure 2A grip rod 81 is welded on one side of the movable rod 32. After the sliding member 52 slides off the first guide rail 61, the material basket 51 is suspended on one side of the material receiving point on the construction floor. Then, the grip rod 81 is moved to drive the movable rod 32 to rotate. When the movable rod 32 rotates, the material basket 51 can be moved to the construction floor. A sponge sleeve 82 is fixed on the outer surface of the grip rod 81 to improve the comfort of holding the grip rod 81. A sand box 83 is movably placed on the other end of the top of the base 1. Buckle grooves are provided on both sides of the sand box 83. After the sand box 83 is placed on one end of the top of the base 1 by hand buckling the two buckle grooves, sand is added to the sand box 83. At this time, the gravity of the sand can increase the weight of one end of the top of the base 1 to prevent one end of the base 1 from tilting.

[0020] The implementation principle of the building decoration material lifting device of the embodiment of the present application is as follows: when in use, the external switch is started to control the double-axis motor 42 to work, the two power shafts of the double-axis motor 42 drive the two rotating shafts 43 to rotate, the two rotating shafts 43 drive the two twisting drums 44 to rotate, the two twisting drums 44 can reel in the two steel wire ropes 45 during the rotation process, and the two steel wire ropes 45 can pull the material basket 51 up when being reeled in. At this time, the sliding member 52 is sleeved on the outer surface of the third guide rail 63, and the material basket 51 is lifted. As the material basket 51 rises, the sliding member 52 slides on the surfaces of the third guide rail 63, the second guide rail 62 and the first guide rail 61 in sequence, and the material basket 51 can be limited so that the material basket 51 can only be lifted and lowered vertically without shaking. After the sliding member 52 slides off the first guide rail 61, the material basket 51 is suspended at one side of the material receiving place on the construction floor. Then, the gripping rod 81 is toggled to drive the movable rod 32 to rotate, and when the movable rod 32 rotates, the material basket 51 can be moved to the construction floor.

[0021] Finally, a few points should be explained: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, which may refer to mechanical connection or electrical connection, or internal communication between two components, or direct connection. "upper", "lower", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship may change;

[0022] Secondly: In the drawings of the embodiments disclosed in the present utility model, only the structures related to the embodiments disclosed in the present utility model are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present utility model can be combined with each other;

[0023] Finally: The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model should be included in the protection scope of the present utility model.

[0024] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A building decoration material lifting device, comprising a base (1), a column (2), a material basket (51) and a first guide rail (61), characterized in that: The material basket (51) is located on one side of the base (1), the column (2) is welded to one end of the top of the base (1), the top of the column (2) is movably plugged with a plug column (31), the top of the plug column (31) is welded with a movable rod (32), the top of the movable rod (32) is provided with a winding mechanism (4) for lifting the material basket (51), and a sliding member (52) is welded on one side of the material basket (51); The first guide rail (61) is located at one side of the basket (51). The first guide rail (61) is fixedly mounted on the base (1) through a fixing assembly (7). The sliding member (52) is movably sleeved on the outer surface of the first guide rail (61). A second guide rail (62) is arranged at the bottom of the first guide rail (61). A third guide rail (63) is arranged at the bottom of the second guide rail (62). Plug holes are provided at the bottom ends of the first guide rail (61), the second guide rail (62) and the third guide rail (63). Insertion rods (64) are welded at the top ends of the second guide rail (62) and the third guide rail (63). The two insertion rods (64) are movably inserted into the bottom ends of the second guide rail (62) and the third guide rail (63). In the insertion hole opened at the bottom end of the first guide rail (61) and the insertion hole opened at the bottom end of the second guide rail (62), one side of the first guide rail (61) and one side of the second guide rail (62) are both provided with connecting plates (65), and the two ends of one side of the two connecting plates (65) are respectively in contact with the bottom end of one side of the first guide rail (61), the two ends of one side of the second guide rail (62) and the top end of one side of the third guide rail (63), and the two ends of one side of the two connecting plates (65) are threadedly penetrated with first bolts (66), and the four first bolts (66) are respectively threadedly connected with the bottom end of one side of the first guide rail (61), the two ends of one side of the second guide rail (62) and the top end of one side of the third guide rail (63).

2. A building decoration material lifting device according to claim 1, characterized in that: The winding mechanism (4) is composed of a mounting seat (41) and a double-axis motor (42). The mounting seat (41) is welded to the top end of the movable rod (32). The double-axis motor (42) is fixedly mounted in the middle of the inner bottom wall of the mounting seat (41). The two power shaft ends of the double-axis motor (42) are welded with rotating shafts (43). The two rotating shafts (43) rotate and penetrate the two inner side walls of the mounting seat (41) respectively. The outer surfaces of the two rotating shafts (43) are fixedly sleeved with twisted wire drums (44). Steel wire ropes (45) are wound on the two twisted wire drums (44). Through holes are provided at both ends of the bottom of the mounting seat (41). The two steel wire ropes (45) are movable and penetrate the two through holes respectively. Rectangular holes are provided on both sides of the material basket (51). The ends of the two steel wire ropes (45) are fixed and penetrate the two rectangular holes respectively, and the ends of the two steel wire ropes (45) are respectively tied to the two ends of the top of the material basket (51).

3. A building decoration material lifting device according to claim 1, characterized in that: The fixing assembly (7) is composed of two fixing blocks (71) and two second bolts (72); the two fixing blocks (71) are respectively welded to two sides of the first guide rail (61); the two second bolts (72) are respectively threadedly passed through the two fixing blocks (71); and the two second bolts (72) are both threadedly connected to the base (1).

4. A building decoration material lifting device according to claim 1, characterized in that: A gripping rod (81) is welded to one side of the movable rod (32), a sponge sleeve (82) is fixedly sleeved on the outer surface of the gripping rod (81), a sandbox (83) is movably placed on the other end of the top of the base (1), and buckle grooves are provided on both sides of the sandbox (83).