Water injection type rubber dam convenient to drain water
The water-injection rubber dam with a raised weir and separate inflatable and water-filled bags, equipped with three-way valves, addresses stability and drainage inefficiencies, enabling rapid flood discharge and level adjustment.
Patent Information
- Application Number
- CN202420531852.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-19
- Publication Date
- 2024-12-20
- Estimated Expiration
- 2034-03-19
AI Technical Summary
Traditional water-injected rubber dams suffer from poor stability, slow drainage, and require complex water injection systems, leading to inefficient flood discharge and increased costs.
A water-injection rubber dam design featuring a raised weir, differential water filling structure, and separate air-inflatable and water-filled rubber bags, equipped with three-way valves for rapid water filling and gas discharge, allowing for quick flood discharge and water level adjustment.
Facilitates rapid water filling and gas discharge, enhancing flood discharge efficiency and reducing operational complexity while maintaining dam stability.
Smart Images

Figure CN222206226U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of water conservancy drainage facilities, in particular to a water-injection rubber dam which is convenient for drainage. Background Art
[0002] Rubber dam, also known as rubber sluice, is made of high-strength synthetic fiber fabric as a load-bearing skeleton, coated with rubber inside and outside as a protective layer, processed into rubber tape, and then anchored on the bottom plate to form a closed dam bag. It is inflated with water (gas) through the filling and discharging pipeline to form a bag-type water retaining dam. The dam top can overflow, and the dam height can be adjusted as needed to control the upstream water level. These two types of dam bodies have fast gas filling and discharge speeds when in use, and can be used for emergency flood discharge, but their stability is poor, and the gas is easily compressed. The traditional water-injected rubber dam is filled with water very slowly when in use, and the drainage speed is also very slow when the upstream water level needs to be lowered, which reduces the speed of flood discharge during floods, and requires water sources and water injection devices for water injection, which is troublesome to operate. In order to solve the flood discharge problem, flood discharge gates are often built next to the rubber plate at this stage, which increases the cost. For this reason, we propose a water-injected rubber dam that is easy to drain. Utility Model Content
[0003] The main purpose of the utility model is to provide a water-filled rubber dam that is easy to drain, which can effectively solve the problems in the background technology.
[0004] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0005] A water-injection rubber dam for easy drainage comprises a raised weir and a rubber dam body structure, wherein an upstream riverbed is fixedly connected and installed upstream of the raised weir, a downstream riverbed is connected and installed downstream of the raised weir, an anchoring structure is fixedly installed on the upper surface of the raised weir near the upstream riverbed, the rubber dam body structure is fixedly installed on the upper surface of the raised weir through the anchoring structure, a rubber bottom plate is fixedly installed on one side of the anchoring structure on the upper surface of the raised weir, a differential water filling structure is connected to the surface of the rubber dam body structure, and side walls are built and installed on the upper surface of the raised weir at both ends of the rubber dam body structure.
[0006] Furthermore, the rubber dam structure includes a water-injected rubber bag, an inflatable rubber bag, a water discharge three-way valve, a one-way inflation valve and an exhaust three-way valve. The upper surface of the water-injected rubber bag is connected to and installed with the inflatable rubber bag, the surface of the water-injected rubber bag is fixedly installed with the water discharge three-way valve near the downstream position, the upper surface of the inflatable rubber bag is connected to the one-way inflation valve, and the upper surface of the inflatable rubber bag is fixedly installed with the exhaust three-way valve on one side of the one-way inflation valve.
[0007] Furthermore, the air-inflated rubber bag and the water-injected rubber bag are separated by a rubber sheet and are not connected to each other.
[0008] Furthermore, the differential water filling structure includes a diversion high-pressure pipe, a stop valve and a filter mesh cover. The surface of the diversion high-pressure pipe is connected to the stop valve. The differential water filling structure is connected to the water injection rubber bag through one end of the diversion high-pressure pipe, and the other end of the diversion high-pressure pipe is connected to the filter mesh cover.
[0009] Furthermore, the filter screen cover is arranged in the water inside the upstream gate, and the filter screen cover is more than one meter above the riverbed.
[0010] Furthermore, the upper surface of the upstream riverbed is lower than the upper surface of the heightened weir, the upper surface of the downstream riverbed is lower than the upper surface of the upstream riverbed, and both ends of the rubber dam structure are anchored on the side wall surfaces at both ends.
[0011] Compared with the prior art, the utility model has the following beneficial effects:
[0012] In the utility model, the water-injected rubber dam can introduce the water inside the upstream gate into the water-injected rubber bag through the diversion high-pressure pipe in the differential water-filling structure, so that the water-injected rubber bag can be quickly filled through the water level difference by only opening the stop valve, which saves time and effort in filling water, and in conjunction with the inflatable rubber bag, the exhaust three-way valve can be opened to quickly discharge the gas when a flood comes or when the upstream water level needs to be lowered, thereby playing the role of timely flood discharge and water level lowering, and the later inflation to raise the upstream water level is faster and more convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 The utility model is a schematic diagram of the overall structure of a water-filled rubber dam which is convenient for drainage.
[0014] In the figure: 1. Raised weir; 2. Upstream riverbed; 3. Downstream riverbed; 4. Anchoring structure; 5. Rubber bottom plate; 6. Rubber dam structure; 601. Water injection rubber bag; 602. Inflatable rubber bag; 603. Discharge three-way valve; 604. One-way inflation valve; 605. Exhaust three-way valve; 7. Differential water filling structure; 701. Diversion high-pressure pipe; 702. Stop valve; 703. Filter screen; 8. Side wall. DETAILED DESCRIPTION
[0015] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.
[0016] Embodiment 1:
[0017] like Figure 1As shown, a water injection type rubber dam for drainage includes a heightened weir 1 and a rubber dam body structure 6, wherein an upstream riverbed 2 is fixedly connected and installed at the upstream of the heightened weir 1, and a downstream riverbed 3 is connected and installed at the downstream of the heightened weir 1, an anchoring structure 4 is fixedly installed at a position close to the upstream riverbed 2 on the upper surface of the heightened weir 1, the rubber dam body structure 6 is fixedly installed on the upper surface of the heightened weir 1 through the anchoring structure 4, a rubber bottom plate 5 is fixedly installed on one side of the anchoring structure 4 on the upper surface of the heightened weir 1, a differential water filling structure 7 is connected to the surface of the rubber dam body structure 6, and side walls 8 are built and installed at both ends of the upper surface of the heightened weir 1 located at the rubber dam body structure 6;
[0018] The rubber dam structure 6 includes a water-filled rubber bag 601, an inflatable rubber bag 602, a water discharge three-way valve 603, a one-way inflation valve 604 and an exhaust three-way valve 605. The upper surface of the water-filled rubber bag 601 is connected to the inflatable rubber bag 602, and the surface of the water-filled rubber bag 601 is fixedly installed with the water discharge three-way valve 603 near the downstream position. The upper surface of the inflatable rubber bag 602 is connected to the one-way inflation valve 604, and the upper surface of the inflatable rubber bag 602 is located on one side of the one-way inflation valve 604 and the exhaust three-way valve 605 is fixedly installed. When multiple rubber dam structures 6 are provided, the water discharge three-way valve 603 is adjusted to a state where multiple water-filled rubber bags 601 are connected through a pipeline, and the drainage port is closed. When the exhaust three-way valve 605 is inflated, the valve is adjusted to a state where multiple inflatable rubber bags 602 are connected through a pipeline, and the exhaust port is closed. When the air is filled, only the exhaust and drainage ports need to be opened; the inflatable rubber bag 602 and the water injection rubber bag 601 are separated by a rubber sheet and are not connected to each other; the differential water filling structure 7 includes a diversion high-pressure pipe 701, a stop valve 702 and a filter screen cover 703. The surface of the diversion high-pressure pipe 701 is connected with the stop valve 702. The differential water filling structure 7 is connected to the water injection rubber bag 601 through one end of the diversion high-pressure pipe 701, and the other end of the diversion high-pressure pipe 701 is connected to the filter screen cover 703; the filter screen cover 703 is arranged in the water on the inner side of the upstream gate, and the filter screen cover 703 is more than one meter higher than the riverbed. This arrangement is to avoid the debris on the riverbed from being adsorbed and clogging the filter screen cover 703; the upper surface of the upstream riverbed 2 is lower than the upper surface of the heightened weir 1, and the upper surface of the downstream riverbed 3 is lower than the upper surface of the upstream riverbed 2. The two ends of the rubber dam structure 6 are anchored on the surface of the side walls 8 at both ends.
[0019] It should be noted that the utility model is a water-injection rubber dam that is easy to drain. The filter screen cover 703 of the dam body is arranged on the inner side of the upstream gate to filter the water inside the upstream water storage gate. The filtered water is discharged into the water-injection rubber bag 601 through the diversion high-pressure pipe 701 for filling. After filling, it is closed by the stop valve 702. When filling, if there is a section of rubber dam body structure 6, the water discharge three-way valve 603 on the adjacent rubber dam body structure 6 can be connected in series through a pipeline, and the connected water discharge three-way valve 603 is opened, so that multiple rubber dam body structures 6 can share A differential water filling structure 7 is used for filling with water, so it is more convenient and simple to fill with water in the later stage. After filling with water, the inflatable rubber bag 602 can be inflated by connecting the one-way inflation valve 604 through the inflation pump, wherein the inflatable rubber bag 602 can also be connected with the adjacent inflatable rubber bag 602 by a pipeline through the exhaust three-way valve 605. In this way, inflation only needs to pass through a one-way inflation valve 604 to inflate all the inflatable rubber bags 602, which is more convenient and labor-saving. Similarly, exhausting only needs to open an exhaust three-way valve 605 to quickly discharge the gas for discharge.
[0020] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.
Claims
1. A water-filled rubber dam that is easy to drain, characterized in that: The invention comprises a raised weir (1) and a rubber dam structure (6), wherein an upstream riverbed (2) is fixedly connected and installed at the upstream of the raised weir (1), and a downstream riverbed (3) is connected and installed at the downstream of the raised weir (1); an anchoring structure (4) is fixedly installed on the upper surface of the raised weir (1) near the upstream riverbed (2); the rubber dam structure (6) is fixedly installed on the upper surface of the raised weir (1) through the anchoring structure (4); a rubber bottom plate (5) is fixedly installed on one side of the anchoring structure (4) on the upper surface of the raised weir (1); a differential water filling structure (7) is connected to the surface of the rubber dam structure (6); and side walls (8) are built and installed on the upper surface of the raised weir (1) at both ends of the rubber dam structure (6).
2. A water-filled rubber dam for easy drainage according to claim 1, characterized in that: The rubber dam structure (6) comprises a water-injected rubber bag (601), an inflatable rubber bag (602), a water discharge three-way valve (603), a one-way inflation valve (604) and an exhaust three-way valve (605); the upper surface of the water-injected rubber bag (601) is connected to the inflatable rubber bag (602); the surface of the water-injected rubber bag (601) is fixedly provided with the water discharge three-way valve (603) near the downstream position; the upper surface of the inflatable rubber bag (602) is connected to the one-way inflation valve (604); the upper surface of the inflatable rubber bag (602) is fixedly provided with the exhaust three-way valve (605) on one side of the one-way inflation valve (604).
3. The water-filled rubber dam for easy drainage according to claim 2, characterized in that: The air-inflated rubber bag (602) and the water-injected rubber bag (601) are separated by a rubber sheet and are not connected to each other.
4. The water-filled rubber dam for easy drainage according to claim 3, characterized in that: The differential water filling structure (7) comprises a diversion high-pressure pipe (701), a stop valve (702) and a filter screen cover (703); the surface of the diversion high-pressure pipe (701) is connected to the stop valve (702); the differential water filling structure (7) is connected to the water injection rubber bag (601) via one end of the diversion high-pressure pipe (701); and the other end of the diversion high-pressure pipe (701) is connected to the filter screen cover (703).
5. The water-filled rubber dam for easy drainage according to claim 4, characterized in that: The filter screen cover (703) is arranged in the water inside the upstream gate, and the filter screen cover (703) is more than one meter above the riverbed.
6. The water-filled rubber dam for easy drainage according to claim 5, characterized in that: The upper surface of the upstream riverbed (2) is lower than the upper surface of the raised weir (1), the upper surface of the downstream riverbed (3) is lower than the upper surface of the upstream riverbed (2), and both ends of the rubber dam structure (6) are anchored on the surfaces of the side walls (8) at both ends.