Spiral pile driver for concrete pipe pile

By introducing a motor drive pulley and connecting rod system into a spiral pile driver for concrete pipe piles to increase the pile driving force, and using the threaded rod and U-block adjustment device to adapt to the terrain, the harder concrete pile driving efficiency and uneven ground is solved. Work limitations have achieved more efficient construction.

CN222206328UActive Publication Date: 2024-12-20HANCHUAN SOUTH ZHEJIANG JINSHI BUILDING MATERIALS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420812039.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-18
Publication Date
2024-12-20
Estimated Expiration
2034-04-18

AI Technical Summary

Technical Problem

The existing spiral pile drivers for concrete pipe piles have low pile efficiency when encountering harder concrete, and the device cannot be installed on uneven ground, resulting in increased work limitations.

Method used

A spiral pile driver for concrete pipe piles including a pile driver pressing mechanism and an adjustment mechanism is designed. The pile driving force is increased through the motor drive pulley and connecting rod system, and the height of the threaded rod and U-block adjustment device is adapted to different terrain.

Benefits of technology

The pile driving efficiency on harder concrete is improved, and the work limitations caused by ground unevenness are reduced, which enhances the applicability of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222206328U_ABST
    Figure CN222206328U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building machinery, in particular to a spiral pile driver for a concrete pipe pile, another belt pulley is connected with a protruding part of a first plate body in a sliding mode through a sliding groove, another belt pulley is connected with a rod body in a sliding mode through a sliding groove, and the surface of the rod body is attached to the top end of a connecting rod. According to the spiral pile driver for the concrete pipe pile, through cooperation of a pile driver pressing mechanism and a first plate body, a second motor drives a convex block to rotate clockwise, a first connecting rod swings downwards along with the surface of the convex block, and the first connecting rod is attached to the top end of a rod body to knock the rod body; the self gravity of the rod body and the drill rod is increased to pile the overhard concrete when encountering hard concrete, so that the working efficiency is improved, the adjusting mechanism and the first plate body are matched, the second plate body drives the two third connecting rods to swing, and the height of the two second plate bodies is adjusted according to different terrains, so that the device is parallel to the ground; therefore, the work limitation is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction machinery, in particular to a spiral pile driver for concrete pipe piles. Background Art

[0002] Pipe piles are hollow cylindrical slender concrete prefabricated components made by prestressing technology and centrifugal forming. They are mainly composed of a cylindrical pile body, end plates and steel sleeves. A bolt-type pile driver is required for driving pipe piles.

[0003] For example, the spiral pile driver for concrete pipe piles with the authorization announcement number "CN210288390U" has low construction noise, little impact on the surrounding environment, simple operation, higher construction efficiency, and can reduce the construction cost of piling. However, the spiral pile driver for concrete pipe piles has limited weight of the lifting rod itself. When encountering harder concrete, the weight of the lifting rod itself is slower to pile the hard concrete, thereby reducing work efficiency. At the same time, when the ground where the spiral pile driver for concrete pipe piles is uneven, the device cannot be installed at the pipe pile mouth and subsequent work cannot be carried out, thereby increasing work limitations. Utility Model Content

[0004] The utility model aims to solve the problems that when encountering harder concrete, the gravity of the lifting rod makes the pile driving of the hard concrete slow, thereby reducing the work efficiency; and when the ground where the device is located is uneven, the device cannot be installed at the pipe pile mouth and subsequent work cannot be carried out, thereby increasing the work limitations, and a spiral pile driver for concrete pipe piles is proposed.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A spiral pile driver for concrete pipe piles is designed, comprising a first plate body, a pile driver pressing mechanism is provided at the right end of the first plate body, an adjustment mechanism is provided at the lower end of the first plate body, the first plate body is fixedly connected to a first motor through a bracket, the output shaft of the first motor is rotatably connected to the first plate body through a bearing, the surface of the first motor is fixedly connected to a pulley, the other pulley is slidably connected to the protruding part of the first plate body through a slide groove, the other pulley is slidably connected to a rod body through a slide groove, and the surface of the rod body is in contact with the top end of the connecting rod.

[0007] Preferably, the pile driver pressing mechanism includes a first shell, which is slidably connected to the first plate body through a slide groove, the first shell is fixedly connected to the second motor through a bracket, the output shaft of the second motor is rotatably connected to the first shell through a bearing, the output shaft of the second motor is fixedly connected to the protrusion, the surface of the protrusion is fitted with the first connecting rod, the first connecting rod is slidably connected to the first shell through the slide groove, the surface of the first connecting rod is movably connected to the second connecting rod through a pin shaft, the surface of the second connecting rod is fixedly connected to the first shell, the outer wall of the first connecting rod is fixedly connected to the bottom end of the spring, the other end of the spring is fixedly connected to the first shell, and the surface of the first shell is provided with bolts.

[0008] Preferably, the adjusting mechanism includes a second shell, the surface of the second shell is fixedly connected to the first plate, the second shell is fixedly connected to the third motor through a bracket, the output shaft of the third motor is fixedly connected to a threaded rod, the threaded rod is rotatably connected to the second shell through a bearing, the surface of the threaded rod is threadedly connected to a nut, the nut is slidably connected to the second shell through a slide groove, the top end of the nut is fixedly connected to a U-shaped block, the U-shaped block is slidably connected to a protruding part of the lower end of the block through a slide groove, the block is movably connected to the second shell through a bearing, both ends of the block are fixedly connected with a third connecting rod, and the third connecting rod is slidably connected to the second plate through a slide groove.

[0009] Preferably, a bolt is provided on the surface of the rod body, and the top end of the connecting rod is tightly pressed against the bolt.

[0010] Preferably, a bolt is provided at the lower end of the connecting rod, and the lower end of the connecting rod is in contact with the drill rod.

[0011] Preferably, the surface of the drill rod is tightly pressed against the bolt at the lower end of the connecting rod, the first plate body is slidably connected to the second plate body via a slide groove, and the connecting rod and the drill rod both penetrate the pipe pile.

[0012] The utility model provides a spiral pile driver for concrete pipe piles, which has the beneficial effects that: through the cooperation between the pressing mechanism of the pile driver and the first plate body, the second motor drives the protrusion to rotate clockwise, the first connecting rod swings downward along with the surface of the protrusion, and the middle part of the first connecting rod swings on the second connecting rod. When the surface of the protrusion lifts the right end of the first connecting rod, the left end of the first connecting rod will swing downward, and the first connecting rod fits with the top end of the rod body to knock it. In the above manner, when encountering harder concrete, the self-weight of the rod body and the drill rod is increased to pile the hard concrete, thereby improving work efficiency.

[0013] Through the cooperation of the adjustment mechanism and the first plate body, the third motor drives the threaded rod to rotate, the threaded rod drives the nut to move to the left, the nut drives the U-shaped block to move, the U-shaped block is connected to the lower end of the block body through the slide groove so that the U-shaped block drives the block body to swing on the first plate body, and the block body drives the two third connecting rods to swing. Through the above method, the height of the two second plate bodies is adjusted according to different terrains to make the device parallel to the ground, thereby reducing working limitations. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the structure of the utility model;

[0015] Figure 2 for Figure 1 Frontal view of the

[0016] Figure 3 for Figure 2 Top view of the middle pulley;

[0017] Figure 4 for Figure 2 A partial perspective view of the middle pulley;

[0018] Figure 5 for Figure 2 A partial front cross-sectional view of

[0019] Figure 6 for Figure 5 Side view of

[0020] Figure 7 for Figure 2 The partial supplementary front view and sectional view;

[0021] Figure 8 for Figure 7 A partial side view of

[0022] In the figure: 1. first plate, 2. pressing mechanism of pile driver, 201. first shell, 202. second motor, 203. protrusion, 204. second connecting rod, 205. spring, 206. first connecting rod, 3. adjusting mechanism, 301. second shell, 302. third motor, 303. threaded rod, 304. nut, 305. U-shaped block, 306. block, 307. third connecting rod, 4. second plate, 5. first motor, 6. pulley, 7. rod body, 8. connecting rod, 9. drill rod, 10. pipe pile. DETAILED DESCRIPTION

[0023] The utility model is further described below in conjunction with the accompanying drawings:

[0024] Refer to the attached Figure 1-8: In the present embodiment, a spiral pile driver for concrete pipe piles comprises a first plate body 1, a pile driver pressing mechanism 2 is provided at the right end of the first plate body 1, an adjusting mechanism 3 is provided at the lower end of the first plate body 1, the first plate body 1 is fixedly connected to a first motor 5 through a bracket, the model of the first motor 5 can meet the working needs according to actual needs, the output shaft of the first motor 5 is rotatably connected to the first plate body 1 through a bearing, the first motor 5 rotates in the first plate body 1, the surface of the first motor 5 is fixedly connected to a pulley 6, the first motor 5 drives the pulley 6 to rotate, another pulley 6 is slidably connected to the protruding part of the first plate body 1 through a slide groove, and the pulley 6 rotates on the first plate body 1;

[0025] Another pulley 6 is slidably connected to the rod body 7 through a slide groove, and the rod body 7 slides in the pulley 6, and the pulley 6 drives the rod body 7 to rotate. The surface of the rod body 7 fits with the top end of the connecting rod 8, and the rod body 7 drives the connecting rod 8 to rotate. The surface of the rod body 7 is provided with bolts, and the top end of the connecting rod 8 is tightly against the bolts. The lower end of the connecting rod 8 is provided with bolts, and the lower end of the connecting rod 8 fits with the drill rod 9. The drill rod 9 is the prior art disclosed in the authorization announcement number "CN210288390U". The connecting rod 8 drives the drill rod 9 to rotate, and the surface of the drill rod 9 is tightly against the bolt at the lower end of the connecting rod 8. The first plate body 1 is slidably connected to the second plate body 4 through a slide groove, and the second plate body 4 slides in the first plate body 1. The connecting rod 8 and the drill rod 9 both penetrate the pipe pile 10.

[0026] Refer to the attached Figure 1 , Figure 2 , Figure 5 and Figure 6 : In the present embodiment, a spiral pile driver for concrete pipe piles is provided, and the pressing mechanism 2 of the pile driver includes a first shell 201, the first shell 201 is slidably connected to the first plate body 1 through a slide groove, the first shell 201 slides on the first plate body 1, the first shell 201 is fixedly connected to the second motor 202 through a bracket, the first shell 201 drives the second motor 202 to move, the model of the second motor 202 can meet the working needs according to actual needs, the output shaft of the second motor 202 is rotatably connected to the first shell 201 through a bearing, the output shaft of the second motor 202 rotates in the first shell 201, the output shaft of the second motor 202 is fixedly connected to the convex block 203, the second motor 202 drives the convex block 203 to rotate, the surface of the convex block 203 is in contact with the first connecting rod 206, and the convex block 203 drives the first connecting rod 206 to rotate;

[0027] The first connecting rod 206 is slidably connected to the first shell 201 through a sliding groove, the first connecting rod 206 rotates in the first shell 201, the surface of the first connecting rod 206 is movably connected to the second connecting rod 204 through a pin shaft, the first connecting rod 206 rotates on the second connecting rod 204, the surface of the second connecting rod 204 is fixedly connected to the first shell 201, the outer wall of the first connecting rod 206 is fixedly connected to the bottom end of the spring 205, the elastic coefficient of the spring 205 can meet the working needs according to actual needs, the other end of the spring 205 is fixedly connected to the first shell 201, and the surface of the first shell 201 is provided with bolts.

[0028] Refer to the attached Figure 1 , Figure 2 , Figure 7 and Figure 8 : In this embodiment, a spiral pile driver for concrete pipe piles is provided, and the adjustment mechanism 3 includes a second shell 301, the surface of the second shell 301 is fixedly connected to the first plate body 1, the second shell 301 is fixedly connected to the third motor 302 through a bracket, the model of the third motor 302 can meet the working needs according to actual needs, the output shaft of the third motor 302 is fixedly connected to the threaded rod 303, the third motor 302 drives the threaded rod 303 to rotate, the threaded rod 303 is rotatably connected to the second shell 301 through a bearing, and the threaded rod 303 rotates in the second shell 301;

[0029] The surface of the threaded rod 303 is threadedly connected to the nut 304, the threaded rod 303 drives the nut 304 to move, the nut 304 is slidably connected to the second shell 301 through a slide groove, the nut 304 slides in the second shell 301, the top of the nut 304 is fixedly connected to the U-shaped block 305, the nut 304 drives the U-shaped block 30 to move, the U-shaped block 305 is slidably connected to the protruding part of the lower end of the block 306 through the slide groove, the U-shaped block 305 drives the block 306 to rotate, the block 306 is movably connected to the second shell 301 through a bearing, the block 306 rotates in the second shell 301, both ends of the block 306 are fixedly connected with the third connecting rod 307, the block 306 drives the third connecting rod 307 to rotate, the third connecting rod 307 is slidably connected to the second plate body 4 through the slide groove, and the third connecting rod 307 drives the second plate body 4 to move.

[0030] Working principle:

[0031] Second plate adjustment process:

[0032] The device is hoisted to the location where piling is required, and then the second plate 4 is adjusted according to the terrain, and the external power supply of the third motor 302 is turned on and started, and the third motor 302 drives the threaded rod 303 to rotate, and the threaded rod 303 drives the nut 304 to move leftward (such as Figure 7), the nut 304 drives the U-shaped block 305 to move, and the U-shaped block 305 is connected to the lower end of the block 306 through a slide groove, so that the U-shaped block 305 drives the block 306 to swing on the first plate body 1, and the block 306 drives the two third connecting rods 307 to swing. Since the two third connecting rods 307 are fixed on the block body 306, when the block body 306 swings, the third connecting rod 307 at the left end is higher than the third connecting rod 307 at the right end, and the third connecting rod 307 drives the second plate body 4 to slide in the first plate body 1 through the slide groove. The height of the second plate body 4 at both ends will be adjusted with the swing height of the third connecting rod 307 at both ends. The two second plate bodies 4 are adjusted according to the terrain. After the second plate body 4 is adjusted to a suitable position, the third motor 303 is turned off. In the above method, the third motor 302 is reversed to drive the two second plate bodies 4 to reset. In the above method, the adjustment of the height of the second plate body 4 according to different terrains is completed.

[0033] Piling process in Guanzhuang:

[0034] The external power supply of the first motor 5 is turned on and started, the first motor 5 drives the pulley 6 to rotate, the pulley 6 drives the rod body 7 to rotate, the rod body 7 drives the connecting rod 8 to rotate, the connecting rod 8 drives the drill rod 9 to rotate, and the drill rod 9 performs piling work on the concrete in the pipe pile. When the rod body 7 rotates to the lowest end, the top of the rod body 7 will be stuck on the pulley 6 to prevent the rod body 7 from falling into the pipe pile. Then the first motor 5 is stopped, and then the rod body 7 is moved out of the slide groove of the pulley 6, and then the bolts on the surface of the rod body 7 are screwed to cancel the fixation of the connecting rod 8, and another connecting rod 8 is externally connected in the above manner to increase the piling depth of the drill rod 9 in the pipe pile. The rod body 8 is reset in the above manner, and the first motor 5 is started. The first motor 5 drives the drill rod 9 to continue to rotate so that the drill rod 10 continues to perform piling work;

[0035] When encountering harder concrete, the first shell 201 is moved to the left (eg Figure 2 ), after the first housing 201 moves to a suitable position, the first housing 201 is stopped, the bolts on the surface of the first housing 201 are screwed to make it abut against the first plate 4 to fix the first housing 201, the second motor 202 is connected to an external power supply and started, and the second motor 202 drives the protrusion 203 to rotate clockwise (such as Figure 5), the first connecting rod 206 swings downward along with the surface of the protrusion 203, and the middle part of the first connecting rod 206 swings on the second connecting rod 204. When the surface of the protrusion 203 lifts the right end of the first connecting rod 206, the left end of the first connecting rod 206 will swing downward. At this time, the spring 205 is stretched, and the first connecting rod 206 fits with the top of the rod body 7 to knock it. When the top of the protrusion 203 does not fit with the right end of the first connecting rod 206, the spring 205 rebounds and drives the first connecting rod 206 to reset. In the above manner, the first connecting rod 206 reciprocates to knock on the rod body 7 to increase the self-gravity of the rod body 7 and the drill rod 9, thereby increasing the strength of the drill rod 9 to pile on the concrete with greater hardness. After the piling is completed, the second motor 202 and the first motor 5 are turned off, and the first shell 201 is reset in the above manner, and then the device is removed from the pile. The piling work is completed in the above manner.

[0036] Although the present invention has been shown and described with reference to the preferred embodiments, it will be understood by those skilled in the art that various changes in form and details may be made therein within the scope of the claims.

Claims

1. A screw pile driver for concrete pipe piles, comprising a first plate (1), characterized in that: The right end of the first plate body (1) is provided with a pile driver pressing mechanism (2), the lower end of the first plate body (1) is provided with an adjusting mechanism (3), the first plate body (1) is fixedly connected to the first motor (5) through a bracket, the output shaft of the first motor (5) is rotatably connected to the first plate body (1) through a bearing, the surface of the first motor (5) is fixedly connected to a pulley (6), the other pulley (6) is slidably connected to the protruding part of the first plate body (1) through a slide groove, the other pulley (6) is slidably connected to the rod body (7) through the slide groove, the surface of the rod body (7) is in contact with the top of the connecting rod (8), and the pile driver pressing mechanism (2) comprises a first housing (201), wherein the first housing (201) is slidably connected to the first plate (1) via a slide groove, the first housing (201) is fixedly connected to the second motor (202) via a bracket, the output shaft of the second motor (202) is rotatably connected to the first housing (201) via a bearing, the output shaft of the second motor (202) is fixedly connected to a convex block (203), the surface of the convex block (203) is in contact with a first connecting rod (206), the first connecting rod (206) is slidably connected to the first housing (201) via a slide groove, and the surface of the first connecting rod (206) is movably connected to the second connecting rod (204) via a pin shaft. The surface of the second connecting rod (204) is fixedly connected to the first housing (201), the outer wall of the first connecting rod (206) is fixedly connected to the bottom end of the spring (205), the other end of the spring (205) is fixedly connected to the first housing (201), the surface of the first housing (201) is provided with bolts, the adjustment mechanism (3) comprises a second housing (301), the surface of the second housing (301) is fixedly connected to the first plate body (1), the second housing (301) is fixedly connected to the third motor (302) via a bracket, the output shaft of the third motor (302) is fixedly connected to the threaded rod (303), the threaded rod (303) is rotatably connected to the second shell (301) through a bearing, the surface of the threaded rod (303) is threadedly connected to the nut (304), the nut (304) is slidably connected to the second shell (301) through a slide groove, the top end of the nut (304) is fixedly connected to the U-shaped block (305), the U-shaped block (305) is slidably connected to the protruding part of the lower end of the block (306) through the slide groove, the block (306) is movably connected to the second shell (301) through a bearing, and both ends of the block (306) are fixedly connected to a third connecting rod (307), and the third connecting rod (307) is slidably connected to the second plate (4) through a slide groove.

2. A spiral pile driver for concrete pipe piles according to claim 1, characterized in that: A bolt is provided on the surface of the rod body (7), and the top end of the connecting rod (8) is tightly pressed against the bolt.

3. A spiral pile driver for concrete pipe piles according to claim 2, characterized in that: A bolt is provided at the lower end of the connecting rod (8), and the lower end of the connecting rod (8) is in contact with the drill rod (9).

4. A spiral pile driver for concrete pipe piles according to claim 3, characterized in that: The surface of the drill rod (9) is tightly pressed against the bolt at the lower end of the connecting rod (8); the first plate body (1) is slidably connected to the second plate body (4) via a sliding groove; and the connecting rod (8) and the drill rod (9) both penetrate the pipe pile (10).