Construction platform assembly for excavating earthwork
The construction platform assembly with a transfer mechanism addresses the high cost and inefficiency of using large equipment and multiple platforms by allowing the platform to move to preset positions, thereby optimizing excavation operations in ultra-deep foundation pits.
Patent Information
- Application Number
- CN202420192749.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-25
- Publication Date
- 2024-12-20
- Estimated Expiration
- 2034-01-25
AI Technical Summary
The construction of ultra-deep and ultra-large foundation pits in bridge construction requires large excavation equipment, leading to high costs and the need for multiple fixed platforms, which is uneconomical.
A construction platform assembly with a transfer mechanism, including a track and sliding member, allows the platform to move to preset positions, reducing the number of required platforms and lowering construction costs.
Enables efficient soil excavation at different locations by minimizing the number of platforms needed, thus reducing overall construction costs and improving operational efficiency.
Smart Images

Figure CN222206562U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge construction, in particular to a construction platform assembly for excavating earth. Background Art
[0002] In the field of bridge construction, with the emergence of long-span bridges, there are more and more ultra-deep and ultra-large foundation pits, which bring a series of challenges to construction. For ultra-deep foundation pits, excavation equipment (such as excavators) is required to excavate.
[0003] In the related art, the methods of vertical earth excavation include: 1) using larger-sized excavation equipment for vertical earth excavation, but the construction cost is high and it is very uneconomical; 2) setting up a fixed excavation platform, placing the excavation equipment on the excavation platform, and parking the dump truck near the excavation platform, but it is necessary to provide enough platforms to meet the needs of earth excavation at different locations.
[0004] For example, Figure 5 , Figure 6 An ultra-deep and ultra-large foundation pit with steps is shown. The depth of the foundation pit is h>20m, and the length of the steps is d. It is necessary to provide enough platforms to meet the needs of soil excavation at different positions. Utility Model Content
[0005] The utility model aims to solve at least one of the technical problems existing in the prior art. To this end, one purpose of the utility model is to provide a construction platform assembly for excavating earth, which can enable the construction platform to move to a preset position to meet the earth-taking requirements at different positions.
[0006] According to an embodiment of the utility model, a construction platform assembly for excavating earth includes a construction platform and a transfer mechanism.
[0007] The construction platform is used to place excavation equipment;
[0008] The transfer mechanism cooperates with the construction platform to enable the construction platform to move to a preset position.
[0009] This embodiment enables the construction platform to move to a preset position through a transfer mechanism to meet the soil excavation needs at different locations; at the same time, it avoids setting up more platforms, reduces the number of platforms, and helps to reduce construction costs.
[0010] According to some embodiments of the utility model, the transfer mechanism includes a slidably matched track and a sliding member, the sliding member is connected to the construction platform, and the sliding member moves along the extension direction of the track.
[0011] According to some embodiments of the present invention, the track is arranged on a foundation.
[0012] According to some embodiments of the utility model, at least two sliding members are provided on each of the tracks, and the sliding members are arranged at equal intervals at the bottom of the construction platform.
[0013] According to some embodiments of the utility model, the construction platform includes a truss beam mechanism and at least two second direction bearing beams, the second direction bearing beams are located at the bottom of the truss beam mechanism, the second direction bearing beams extend along the width direction of the construction platform, and each second direction bearing beam is arranged at equal intervals along the length direction of the construction platform.
[0014] According to some embodiments of the utility model, there are at least two tracks, and the tracks correspond to the second direction bearing beams one by one. There are multiple sliding parts between the second direction bearing beams and the tracks, and each sliding part is welded to the second direction bearing beam.
[0015] According to some embodiments of the utility model, the truss beam mechanism includes a plurality of beam assembly units, a plurality of second direction beams and a plurality of second direction lower beams, the beam assembly unit extends along the length direction of the construction platform, and the plurality of second direction beams and the plurality of second direction lower beams are arranged at equal intervals along the length direction of the beam assembly unit.
[0016] The second direction upper beam and the second direction lower beam are provided between two adjacent beam assembly units, wherein the second direction upper beam is close to the upper end of the beam assembly unit and the second direction lower beam is close to the lower end of the beam assembly unit to form a frame structure.
[0017] According to some embodiments of the utility model, the beam assembly unit includes a first directional beam, a first directional lower beam, a plurality of third directional beams and a plurality of reinforcing beams, the first directional beam and the first directional lower beam extending along the length direction of the construction platform, the third directional beam and the reinforcing beam being arranged between the first directional beam and the first directional lower beam,
[0018] A plurality of beams in the second direction are arranged at equal intervals along the length direction of the beam in the first direction or the beam in the first direction, a plurality of beams in the second direction are arranged at equal intervals along the length direction of the beam in the first direction or the beam in the first direction, and the reinforcing beams and the beams in the third direction are arranged alternately.
[0019] Wherein, the first-direction lower beam is connected to the second-direction bearing beam, the second-direction upper beam is located between two adjacent first-direction beams, and the second-direction lower beam is located between two adjacent first-direction lower beams.
[0020] According to some embodiments of the utility model, the construction platform further includes a corrugated plate and a plurality of second-direction auxiliary beams, the second-direction auxiliary beams are located at the top of the truss beam mechanism, the second-direction auxiliary beams extend along the width direction of the construction platform, and the second-direction auxiliary beams are arranged at equal intervals along the length direction of the construction platform.
[0021] The corrugated plate is laid on each of the second-direction auxiliary beams.
[0022] According to some embodiments of the present invention, N construction platforms are provided, where N is a positive integer, 1≤N≤3.
[0023] Additional aspects and advantages of the present invention will be given in part in the following description, and in part will become apparent from the following description, or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0025] Figure 1 is a schematic diagram of a construction platform assembly for excavating earth according to an embodiment of the utility model;
[0026] Figure 2 yes Figure 1 Schematic diagram of direction A;
[0027] Figure 3 yes Figure 1 Schematic diagram of direction B;
[0028] Figure 4 It is a schematic diagram of an application scenario of a construction platform assembly for earthwork according to an embodiment of the utility model;
[0029] Figure 5 It is a schematic diagram of a foundation pit in the background technology;
[0030] Figure 6 It is a schematic diagram of another foundation pit in the background technology;
[0031] Reference numerals:
[0032] Construction platform 10, second direction bearing beam 11;
[0033] Truss beam mechanism 12, beam assembly unit 121, first direction upper beam 1211, first direction lower beam 1212, third direction beam 1213, reinforcement beam 1214, second direction beam 122, second direction lower beam 123;
[0034] Second direction auxiliary beam 13, corrugated plate 14;
[0035] Transfer mechanism 20 , sliding member 21 , and track 22 . DETAILED DESCRIPTION
[0036] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0037] The disclosure below provides many different embodiments or examples for realizing different structures of the utility model. In order to simplify the disclosure of the utility model, the components and settings of specific examples are described below. Of course, they are merely examples, and the purpose is not to limit the utility model. In addition, the utility model can repeat reference numbers and / or letters in different examples. This repetition is for the purpose of simplification and clarity, and does not itself indicate the relationship between the various embodiments and / or settings discussed. In addition, the utility model provides various specific examples of processes and materials, but those of ordinary skill in the art can be aware of the applicability of other processes and / or the use of other materials.
[0038] like Figure 1-Figure 4 As shown, the construction platform assembly for excavating earth provided by the utility model includes: a construction platform 10 and a transfer mechanism 20. The construction platform 10 is used to place excavation equipment, and the transfer mechanism 20 cooperates with the construction platform 10 to enable the construction platform 10 to move to a preset position.
[0039] It should be noted that in the field of bridge construction, with the emergence of long-span bridges, there are more and more ultra-deep and ultra-large foundation pits, which brings a series of challenges to construction. For ultra-deep foundation pits, excavation equipment is required to excavate.
[0040] In the related art, the methods of vertical earth excavation include: 1) using larger excavation equipment for vertical earth excavation, but the construction cost is high and it is very uneconomical; 2) setting up a fixed excavation platform, placing the excavation equipment on the excavation platform, and parking the dump truck near the excavation platform, but it is necessary to provide enough platforms to meet the needs of earth excavation at different locations.
[0041] For example, Figure 5 , Figure 6 An ultra-deep and ultra-large foundation pit with steps is shown. The depth of the foundation pit is h>20m, and the length of the steps is d. It is necessary to provide enough platforms to meet the needs of soil excavation at different positions.
[0042] Based on this, this embodiment enables the construction platform 10 to move to a preset position through the transfer mechanism 20 to meet the soil excavation needs at different positions; at the same time, it avoids setting up more platforms, reduces the number of platforms, and helps to reduce construction costs.
[0043] It should be noted that the transfer mechanism 20 can be a transmission mechanism, for example, the transmission mechanism is a roller transmission mechanism, and the roller transmission mechanism includes a plurality of rollers, and the construction platform 10 is driven to a preset position by the rotating rollers.
[0044] The transfer mechanism 20 may include a track 22 and a sliding member 21 . The sliding member 21 moves along the extension direction of the track 22 . The sliding member 21 is connected to the construction platform 10 . The construction platform 10 is driven to a preset position by the sliding member 21 .
[0045] The transfer mechanism 20 may be a crawler mechanism or a wheel mechanism, the crawler mechanism is connected to the construction platform 10, or the wheel mechanism includes a plurality of arranged wheels, the wheel mechanism is connected to the construction platform 10, and then drives the construction platform 10 to a preset position.
[0046] Taking into account the construction cost and convenience of construction, preferably, the transfer mechanism 20 includes a track 22 and a sliding member 21 .
[0047] In practical applications, the track 22 is laid according to a preset track, and then the sliding member 21 can move to a plurality of preset positions. The construction is simple and convenient, and the construction cost is low.
[0048] Among them, Figure 2 and Figure 3 As shown, the track 22 is arranged on the foundation to prevent the track 22 from slipping. The track 22 may be a closed-loop track 22, a straight track 22, or a curved track 22.
[0049] The sliding member 21 is a crane sliding member 21 , that is, the crane sliding member 21 can withstand an extremely large load, and the sliding member 21 can still slide normally along the extending direction of the track 22 .
[0050] At least two sliding members 21 are arranged on each track 22, and the sliding members 21 are arranged at equal intervals at the bottom of the construction platform 10. Such an arrangement can reduce the pressure on the sliding member 21, and help the sliding member 21 slide along the extension direction of the track 22.
[0051] According to some embodiments of the present invention, the construction platform 10 includes a truss beam mechanism 12 and at least two second direction bearing beams 11. The second direction bearing beams 11 are located at the bottom of the truss beam mechanism 12, and the second direction bearing beams 11 extend along the width direction of the construction platform 10, and each second direction bearing beam 11 is arranged at intervals along the length direction of the construction platform 10.
[0052] It should be noted that the first direction is the length direction of the construction platform 10, that is, the X direction, and the second direction is the width direction of the construction platform 10, that is, the Y direction.
[0053] The truss beam mechanism 12 is formed by welding a plurality of beams, and the beams may be H-shaped steel, angle steel, or square steel. The truss beam mechanism 12 is welded to the second direction bearing beam 11 .
[0054] With such arrangement, the construction platform 10 has good strength, rigidity and stability, and can bear the load of the excavation equipment, while saving materials and reducing construction costs. The excavation equipment may be a crane.
[0055] Specifically, there are at least two rails 22, and the rails 22 correspond to the second direction bearing beams 11 one by one. There are multiple sliding members 21 between the second direction bearing beams 11 and the rails 22, and each sliding member 21 is welded to the second direction bearing beam 11. This arrangement prevents the sliding member 21 from shaking relative to the rails 22, thereby avoiding the problem of stagnation between the sliding member 21 and the rails 22.
[0056] like Figure 1 and Figure 2 As shown, the truss beam mechanism 12 includes a plurality of beam component units 121, a plurality of second direction upper beams 122 and a plurality of second direction lower beams 123. The beam component units 121 extend along the length direction of the construction platform 10, and the plurality of beam component units 121 are arranged at equal intervals along the width direction of the construction platform 10.
[0057] A plurality of second-direction upper beams 122 are arranged at equal intervals along the length direction of the beam assembly unit 121, and a plurality of second-direction lower beams 123 are arranged at equal intervals along the length direction of the beam assembly unit 121. A second-direction upper beam 122 and a second-direction lower beam 123 are arranged between two adjacent beam assembly units 121, the second-direction upper beam 122 is close to the upper end of the beam assembly unit 121, and the second-direction lower beam 123 is close to the lower end of the beam assembly unit 121, so as to form a frame structure. In other words, the truss beam mechanism 12 is arranged with a plurality of frame structures along the length direction of the construction platform 10, and the frame structure has good stability, which helps to improve the stability of the truss beam mechanism 12.
[0058] The beam assembly unit 121 includes a first direction upper beam 1211, a first direction lower beam 1212, a plurality of third direction beams 1213 and a plurality of reinforcing beams 1214. The first direction upper beam 1211 and the first direction lower beam 1212 extend along the length direction of the construction platform 10. The third direction beam 1213 and the reinforcing beam 1214 are arranged between the first direction upper beam 1211 and the first direction lower beam 1212. The third direction beam 1213 extends along the vertical direction.
[0059] A plurality of third directional beams 1213 are arranged at equal intervals along the length direction of the first directional upper beam 1211 or the first directional lower beam 1212 , a plurality of reinforcing beams 1214 are arranged at equal intervals along the length direction of the first directional upper beam 1211 or the first directional lower beam 1212 , and the reinforcing beams 1214 and the third directional beams 1213 are arranged alternately.
[0060] Among them, Figure 2 As shown, the first direction lower beam 1212 is connected to the second direction bearing beam 11 ; the second direction upper beam 122 is located between two adjacent first direction beams 1211 , and the second direction lower beam 123 is located between two adjacent first direction lower beams 1212 .
[0061] Two adjacent third directional beams 1213, the first directional upper beam 1211, and the first directional lower beam 1212 form a closed rectangular space, and the reinforcing beam 1214 divides the rectangular space into two triangular structures. In other words, the beam assembly unit 121 is arranged with a plurality of triangular structures along the length direction of the construction platform 10, and the triangular structure has good stability, which helps to improve the stability of the truss beam mechanism 12.
[0062] In addition, if Figure 1 and Figure 2 As shown, the construction platform 10 further includes a corrugated plate 14 and a plurality of second direction auxiliary beams 13, the second direction auxiliary beams 13 are located at the top of the truss beams, the second direction auxiliary beams 13 extend along the width direction of the construction platform 10, and the second direction auxiliary beams 13 are arranged at equal intervals along the length direction of the construction platform 10. The corrugated plate 14 is laid on each second direction auxiliary beam 13.
[0063] The corrugated plate 14 can provide sufficient friction so that the excavating equipment can operate stably on the construction platform 10 and avoid slipping.
[0064] In practical applications, if the track 22 can be a closed-loop track 22, N construction platforms 10 can be provided, where N is a positive integer, 1≤N≤3.
[0065] N=3 or 2, the platform can be set at the corner of the foundation pit.
[0066] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0067] In the description of the present invention, "first feature" or "second feature" may include one or more of the features.
[0068] In the description of the present invention, "plurality" means two or more.
[0069] In the description of the present invention, a first feature being “above” or “below” a second feature may include that the first and second features are directly in contact with each other, or may include that the first and second features are not in direct contact but are in contact with each other via another feature therebetween.
[0070] In the description of the present invention, a first feature “above”, “over” and “above” a second feature includes the first feature being directly above and obliquely above the second feature, or simply means that the first feature is horizontally higher than the second feature.
[0071] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0072] Although the embodiments of the present invention have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.
Claims
1. A construction platform assembly for earthwork, characterized in that: include: A construction platform (10), wherein the construction platform (10) is used to place excavation equipment; A transfer mechanism (20), the transfer mechanism (20) cooperates with the construction platform (10) to enable the construction platform (10) to move to a preset position, the transfer mechanism (20) comprising a track (22) and a sliding member (21) that slidably cooperate, the sliding member (21) being connected to the construction platform (10), and the sliding member (21) moving along an extension direction of the track (22).
2. The construction platform assembly for earthwork according to claim 1, characterized in that: The track (22) is arranged on a foundation.
3. The construction platform assembly for earthwork according to claim 2, characterized in that: At least two sliding members (21) are provided on each track (22), and the sliding members (21) are arranged at equal intervals on the bottom of the construction platform (10).
4. The construction platform assembly for earthwork according to claim 3, characterized in that: The construction platform (10) comprises a truss beam mechanism (12) and at least two second-direction bearing beams (11), wherein the second-direction bearing beams (11) are located at the bottom of the truss beam mechanism (12), the second-direction bearing beams (11) extend along the width direction of the construction platform (10), and the second-direction bearing beams (11) are arranged at equal intervals along the length direction of the construction platform (10).
5. The construction platform assembly for earthwork according to claim 4, characterized in that: There are at least two rails (22), and the rails (22) correspond to the second direction bearing beams (11) one by one. There are a plurality of sliding members (21) between the second direction bearing beams (11) and the rails (22), and each of the sliding members (21) is welded to the second direction bearing beams (11).
6. The construction platform assembly for earthwork according to claim 4, characterized in that: The truss beam mechanism (12) comprises a plurality of beam assembly units (121), a plurality of second direction upward beams (122) and a plurality of second direction downward beams (123); the beam assembly unit (121) extends along the length direction of the construction platform (10); the plurality of second direction upward beams (122) and the plurality of second direction downward beams (123) are arranged at equal intervals along the length direction of the beam assembly unit (121); The second direction upper beam (122) and the second direction lower beam (123) are provided between two adjacent beam assembly units (121), the second direction upper beam (122) being close to the upper end of the beam assembly unit (121), and the second direction lower beam (123) being close to the lower end of the beam assembly unit (121), so as to form a frame structure.
7. The construction platform assembly for earthwork according to claim 6, characterized in that: The beam assembly unit (121) comprises a first directional upper beam (1211), a first directional lower beam (1212), a plurality of third directional beams (1213) and a plurality of reinforcing beams (1214); the first directional upper beam (1211) and the first directional lower beam (1212) extend along the length direction of the construction platform (10); the third directional beam (1213) and the reinforcing beam (1214) are arranged between the first directional upper beam (1211) and the first directional lower beam (1212); A plurality of second-direction upper beams (122) are arranged at equal intervals along the length direction of the first-direction upper beam (1211) or the first-direction lower beam (1212); a plurality of second-direction lower beams (123) are arranged at equal intervals along the length direction of the first-direction upper beam (1211) or the first-direction lower beam (1212); the reinforcing beams (1214) and the third-direction beams (1213) are arranged alternately; Wherein, the first-direction lower beam (1212) is connected to the second-direction bearing beam (11), the second-direction upper beam (122) is located between two adjacent first-direction upper beams (1211), and the second-direction lower beam (123) is located between two adjacent first-direction lower beams (1212).
8. The construction platform assembly for earthwork according to claim 4, characterized in that: The construction platform (10) further comprises a corrugated plate (14) and a plurality of second-direction auxiliary beams (13), wherein the second-direction auxiliary beams (13) are located at the top of the truss beam mechanism (12), the second-direction auxiliary beams (13) extend along the width direction of the construction platform (10), and the second-direction auxiliary beams (13) are arranged at equal intervals along the length direction of the construction platform (10). The corrugated plate (14) is laid on each of the second-direction auxiliary beams (13).
9. The construction platform assembly for earthwork according to any one of claims 1 to 8, characterized in that: There are N construction platforms (10), where N is a positive integer, 1≤N≤4.