Tower crane hole support-free plugging assembly

Through the design of the bracketless sealing assembly at the tower crane hole, the combination of the formwork main body and the I-shaped steel beam main body is used to solve the problems of extended sealing period and space occupation of traditional tower crane holes, and the casting and rapid dismantling of bracketless concrete is realized, and the construction is improved. Progress and overall strength of concrete.

CN222206812UActive Publication Date: 2024-12-20CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420818243.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-18
Publication Date
2024-12-20
Estimated Expiration
2034-04-18

AI Technical Summary

Technical Problem

In the construction of vehicle bases, large brackets are needed to be supported during the sealing of traditional tower crane holes, resulting in extended construction period and occupied space under the cover, affecting the construction progress.

Method used

Design a component without bracket sealing at the tower crane hole, including the formwork main body and the I-shaped steel beam main body. The concrete casting seal without bracket is achieved through bent steel plates and connectors. The upper surface of the formwork main body is arranged under the hole, The main body of the font steel beam is supported above the hole, and the bent steel plates and connectors are used to support the stability and lifting adjustment of the formwork main body, and the central groove body and eaves plate portion improve the overall strength of the concrete.

Benefits of technology

Concrete pouring without bottom bracket support is achieved, rapid disassembly, saving space undercover, improving construction progress, and enhancing the overall strength and safety of concrete.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222206812U_ABST
    Figure CN222206812U_ABST
Patent Text Reader

Abstract

The utility model discloses a support-free plugging assembly for a tower crane hole, which is used for concrete pouring plugging of a tower crane hole main body and comprises a template main body, an upper surface of the template main body is attached to the lower portion of the hole main body, and the template main body is used for being matched with the hole main body to weave reinforcing steel bars in the hole main body to pour concrete; the I-shaped steel beam main body is arranged above the hole opening main body, and the I-shaped steel beam main body is connected with the template main body through a plurality of supporting assemblies and used for supporting the template main body below the hole opening main body. The tower crane hole plugging device is simple in structure, does not need a bottom support for supporting during plugging of concrete pouring, can be conveniently stressed to bear concrete poured in a tower crane hole, can be quickly disassembled after concrete curing and forming, is convenient to use, improves the overall construction progress of a project, and reduces the construction cost. The problem that a large space below a cover plate is occupied due to the fact that a traditional support assembly needs to be erected at the bottom of the cover plate by workers is effectively relieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tower crane hole blocking, in particular to a tower crane hole blocking component without a bracket. Background Art

[0002] The construction of vehicle bases has difficulties such as large scale, multiple professions, complex processes and tight construction period. In order to ensure that the transportation of vehicle base materials can meet the needs of vehicle base construction, tower crane transportation is the main form of vehicle base material transportation. The tower crane in tower crane transportation is the main vertical transportation tool for engineering construction. It has strong transportation capacity and maneuverability. At the same time, due to the large space of public buildings, in order to improve the efficiency of tower crane construction, the tower crane will inevitably be arranged in the beam and slab part in the middle of the structural structure during specific use. At the same time, in order to facilitate the dismantling of the tower crane in the later stage, this beam and slab part will inevitably reserve a tower crane opening, and the opening sealing after the tower crane is dismantled requires secondary pouring construction.

[0003] In the construction project of the vehicle base, due to the particularity of the vehicle depot construction, the construction under the cover will be carried out after the cover construction is completed. How to ensure the continuity of the construction under the cover will be an important measure to ensure the project schedule. Because the traditional large-scale vehicle base has a large cover area and a large number of tower cranes during the construction process, the traditional tower crane needs to erect a large bracket in the basement space under the cover to support the overall structural sealing of the opening when sealing the opening, which is time-consuming and labor-intensive, and seriously affects the construction period.

[0004] To this end, the present application specifically proposes a tower crane opening without a bracket to seal the component, so as to solve the above-mentioned technical problems. Utility Model Content

[0005] The main purpose of the utility model is to provide a tower crane opening non-bracket blocking component which can simplify the construction process, save underground space under the cover, effectively alleviate the conflict between the tower crane blocking period and the under-cover construction, and improve the overall progress of the project construction.

[0006] In order to solve the above technical problems, the utility model provides a tower crane hole opening non-bracket blocking component, which is used for concrete pouring and blocking of the tower crane hole main body, including:

[0007] The template body has an upper surface that is fitted under the opening body, and the template body is used to cooperate with the opening body to weave steel bars and cast concrete in the opening body;

[0008] The I-beam main body is arranged above the opening main body, and the I-beam main body is connected to the template main body through a plurality of supporting components, so as to support the template main body below the opening main body.

[0009] Furthermore, both ends of the I-beam body are mounted on the upper surface of the opening body.

[0010] Furthermore, the support assembly comprises:

[0011] A plurality of bent steel plates are mounted on the main body of the I-beam and the two ends are mounted on the main body of the template through connectors, wherein the bent steel plates, the connectors at the two ends of the bent steel plates and the main body of the template form a through hole for the main body of the I-beam to pass through;

[0012] The bent steel plates are distributed in an array with equal spacing above the template body, and the bent steel plates have the same bending direction, so that the I-beam body passes through the through holes formed below the bent steel plates in the same row or column.

[0013] Furthermore, the connecting member includes a screw that is threadedly rotated through the bent steel plate, a rotating torsion block arranged at one end of the screw and a limit block arranged at the other end of the screw, and the limit block is rotatably arranged inside the template body.

[0014] Furthermore, a central groove body is provided on the upper surface of the template body and is located below the opening body, and the support assembly is arranged inside the central groove body. The outer edge of the template body is matched with the central groove body to be arranged as an eaves board part, and the upper surface of the eaves board part is arranged in a fit below the opening body.

[0015] Furthermore, a plurality of supporting steel bars are installed inside the central tank.

[0016] Furthermore, the eaves plate portion is fixedly installed below the opening body by means of bolts.

[0017] Furthermore, the template body is configured as a steel template.

[0018] The beneficial effects of the utility model are embodied in:

[0019] 1. The utility model has a simple structure and does not require a bottom bracket for support when pouring blocking concrete. It is convenient to bear the force to support the concrete poured in the tower crane hole and can be quickly disassembled after the concrete is cured and formed. It is easy to use, improves the overall construction progress of the project, and effectively alleviates the problem that traditional bracket components need to be set up by workers at the bottom of the cover plate, thereby occupying a large amount of space under the cover plate.

[0020] 2. The utility model sets a screw rod and controls the screw rod to rotate through the bent steel plate thread by rotating the torsion block, so as to control the bending steel plate to move up and down above the formwork body. In conjunction with the I-beam main body, it can be suitable for covering tower crane holes of different thicknesses to provide fitting support for the formwork body when sealing concrete pouring, which is convenient for use according to different construction environments.

[0021] 3. The utility model arranges the formwork body to consist of a central trough body and an eaves plate portion, and installs steel bars in the central trough body in advance, so as to ensure the overall strength of the concrete plugging after pouring when pouring the tower crane opening, and improve the safety of the cover plate when bearing gravity. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The drawings constituting part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:

[0023] Figure 1 The utility model is an overall three-dimensional diagram in the erection state. Figure 1 ;

[0024] Figure 2 The cross-sectional perspective view of the connection structure of the connector of the utility model is shown in FIG. Figure 1 ;

[0025] Figure 3 It is a schematic diagram of the structural disassembly of the utility model;

[0026] Figure 4 It is a cross-sectional schematic diagram of the utility model in use state;

[0027] Figure 5 The utility model is a three-dimensional overall schematic diagram of the cast steel bar installation state Figure 1 ;

[0028] Figure 6 It is an overall three-dimensional schematic diagram of the central tank body of the utility model when the internal support components are installed;

[0029] Figure 7 It is a three-dimensional schematic diagram of the utility model in a state where the bolts are connected to the eaves plate;

[0030] Figure 8 The utility model is an overall three-dimensional diagram in the erection state. Figure 2 ;

[0031] Fig. 9 This is a cross-sectional diagram of the utility model in use. Figure 2 ;

[0032] Fig.10 The utility model is a three-dimensional overall schematic diagram of the cast steel bar installation state Figure 2 .

[0033] In the figure:

[0034] 1. Opening body; 2. Formwork body; 21. Center trough; 22. Bolts; 23. Eaves plate; 3. Bending steel plate; 4. Connectors; 41. Screws; 42. Limiting blocks; 43. Rotating torsion blocks; 5. I-beam body. DETAILED DESCRIPTION

[0035] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. In the absence of conflict, the embodiments in this application and the features in the embodiments can be combined with each other. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.

[0036] In the first embodiment, see Figures 1 to 5 .

[0037] like Figure 1 , Figure 3 , Figure 4 and Figure 5 As shown, the utility model provides a tower crane hole plugging component without a bracket, which is used for concrete pouring and plugging of a tower crane hole body 1, and includes:

[0038] The template body 2 has an upper surface that fits under the opening body 1. The template body 2 is used to cooperate with the opening body 1 to weave steel bars and cast concrete in the opening body 1.

[0039] A plurality of I-beam main bodies 5 are arranged above the opening main body 1 . The I-beam main bodies 5 are connected to the formwork main body 2 through a plurality of supporting components, so as to support the formwork main body 2 below the opening main body 1 .

[0040] In the specific implementation, an I-beam main body 5 is erected above the opening body 1, and the formwork main body 2 is supported below the opening body 1 by a supporting assembly. At this time, the corresponding steel structure can be compiled and installed in the opening body 1 to carry out concrete pouring and sealing operations on the tower crane opening body 1.

[0041] It should be noted that at this time, both ends of the multiple I-beam main bodies 5 are erected on the upper surface of the opening main body 1 , which can ensure the stability of the support installation of the template main body 2 below the opening main body 1 .

[0042] Since the formwork body 2 is supported below the opening body 1 by the I-beam body 5, and the formwork body 2 is used to cooperate with the opening body 1 to complete the concrete pouring and sealing of the tower crane opening body 1, there is no need for bottom support when pouring the sealing concrete. This makes it convenient to support the concrete poured in the tower crane opening and to quickly disassemble it after the concrete is cured and formed, which is convenient to use, improves the overall construction progress of the project, and effectively alleviates the problem that traditional bracket components need to be set up by workers at the bottom of the cover plate, thereby occupying a large amount of space under the cover plate.

[0043] It should also be noted that the formwork body 2 here is set as a steel formwork, which has the characteristics of simple structure, easy adjustment and long service life, and is suitable for concrete support of a larger tower crane opening body 1.

[0044] However, it should also be noted that when a steel formwork is used for the formwork body 2, it is necessary to ensure that the cover plate has good load-bearing conditions at this time, and when it comes to smaller openings on the cover plate, wooden formwork can also be used to support the pouring of concrete.

[0045] Specifically, Figure 2 As shown, the support assembly includes:

[0046] A plurality of bent steel plates 3 are mounted on the I-beam main body 5 and the two ends are mounted on the template main body 2 through connectors 4. The bent steel plates 3, the connectors 4 at the two ends of the bent steel plates 3 and the template main body 2 form a through hole for the I-beam main body 5 to pass through.

[0047] The bent steel plates 3 are arranged in an array with equal spacing above the template body 2 , and the bent steel plates 3 are bent in the same direction, so that the I-beam body 5 passes through the through holes formed below the bent steel plates 3 in the same row or column.

[0048] Therefore, by installing the formwork body 2 using a plurality of I-beam bodies 5 and supporting components, the stability of the formwork body 2 can be improved, and the overall load-bearing capacity of the formwork body 2 can be enhanced when the tower crane opening body 1 is sealed with concrete.

[0049] Furthermore, the connecting member 4 includes a screw rod 41 that is threadedly rotated through the bent steel plate 3 , a rotating torsion block 43 arranged at one end of the screw rod 41 , and a limit block 42 arranged at the other end of the screw rod 41 , and the limit block 42 is rotatably arranged inside the template body 2 .

[0050] In the specific implementation, by rotating the torsion block 43 to control the screw 41 to rotate through the bent steel plate 3, the bent steel plate 3 can be controlled to rise and fall above the formwork body 2. In conjunction with the I-beam beam body 5, it can be suitable for covering tower crane openings of different thicknesses to provide fitting support for the formwork body 2 when sealing concrete pouring, which is convenient for use according to different construction environments.

[0051] In addition, it can be additionally explained that the screw 41 here can adopt the structure of a water-stop screw (refer to Figure 2 ), since a water stop ring is arranged in the middle of the screw, it can also play a waterproof role when pouring concrete.

[0052] In the second embodiment, see Figure 6 and Fig.10 .

[0053] Based on the above embodiments, the utility model proposes a tower crane hole plugging component without a bracket, which is used for concrete pouring and plugging of a tower crane hole body 1, comprising:

[0054] The template body 2 has an upper surface that fits under the opening body 1. The template body 2 is used to cooperate with the opening body 1 to weave steel bars and cast concrete in the opening body 1.

[0055] A plurality of I-beam main bodies 5 are arranged above the opening main body 1 . The I-beam main bodies 5 are connected to the formwork main body 2 through a plurality of supporting components, so as to support the formwork main body 2 below the opening main body 1 .

[0056] The difference from the first embodiment is that:

[0057] like Figures 6 to 10 As shown, the upper surface of the template body 2 is provided with a central groove body 21 located below the opening body 1, and the supporting assembly is arranged inside the central groove body 21, the outer edge of the template body 2 is matched with the central groove body 21 to be arranged as an eaves board part 23, and the upper surface of the eaves board part 23 is fitted and arranged below the opening body 1.

[0058] Specifically, the central trough body 21 is used to facilitate the installation of multiple supporting steel bars inside. At this time, by setting the formwork body 2 to consist of the central trough body 21 and the eaves plate portion 23, and installing steel bars are pre-installed in the central trough body 21, the overall strength of the concrete blockage after pouring can be ensured when pouring the tower crane opening, thereby improving the safety of the cover plate when bearing gravity.

[0059] Furthermore, the eaves plate portion 23 is fixedly installed below the opening body 1 by bolts 22, which can conveniently improve the connection strength of the formwork body 2 when installed below the tower crane opening body 1, and improve the concrete pouring bearing capacity of the formwork body 2.

[0060] In the third embodiment.

[0061] Based on the above embodiments, the utility model proposes a method for using a tower crane hole blocking component without a bracket, including the following specific operating steps:

[0062] S1. Overall template configuration: According to the size of the tower crane opening body 1, the overall template body 2 is designed and welded under the cover, and at the same time, a bent steel plate 3 is connected to the template body 2 by setting a connector 4;

[0063] S2. Overall hoisting by automobile crane: Use automobile crane to hoist the overall formwork body 2 to the bottom of the tower crane opening body 1;

[0064] S3. The template is supported and fixed on the cover plate in reverse: the I-beam body 5 is used to cooperate with the bent steel plate 3 to fix the overall template body 2 in reverse support on the cover plate;

[0065] S4. Concrete roughening and steel bar tying: roughening the concrete around the main opening 1, and tying steel bars on top of the formwork body 2 according to the structure of the main I-beam 5;

[0066] S5. Concrete pouring and concrete curing: pouring concrete on the inside of the main body 1 of the tower crane opening above the main formwork body 2, and performing concrete curing;

[0067] S6. Overall lifting and removal of the formwork: After the concrete strength reaches the standard, the main body of the formwork is removed as a whole, and the concrete pouring and sealing operation of the tower crane opening can be completed.

[0068] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

[0069] In addition, it should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back...), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indications will also change accordingly.

[0070] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the utility model, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the meaning of "and / or" appearing in the full text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or schemes that A and B meet at the same time. In addition, in the embodiments of the utility model, "multiple" refers to more than two. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the utility model.

Claims

1. A tower crane hole plugging component without a support, used for concrete pouring and plugging of a tower crane hole body (1), It is characterized in that include: A template body (2), the upper surface of which is arranged in close contact with the lower part of the opening body (1), and the template body (2) is used to cooperate with the opening body (1) to weave steel bars and cast concrete in the opening body (1); The I-beam main body (5) is arranged above the opening main body (1); the I-beam main body (5) is connected to the formwork main body (2) via a plurality of support components, and is used to support the formwork main body (2) below the opening main body (1).

2. The tower crane hole-blocking assembly without a bracket as claimed in claim 1, It is characterized in that Both ends of the I-beam body (5) are mounted on the upper surface of the opening body (1).

3. The tower crane hole blocking component without support as claimed in claim 1 or 2, It is characterized in that The support assembly comprises: A plurality of bent steel plates (3) are mounted on an I-beam main body (5) and are mounted on a template main body (2) at both ends via connectors (4); the bent steel plates (3), the connectors (4) at both ends of the bent steel plates (3) and the template main body (2) form through holes for the I-beam main body (5) to pass through; The bent steel plates (3) are arranged in an array with equal spacing above the template body (2), and the bent steel plates (3) are bent in the same direction, so as to allow the I-beam body (5) to pass through the through holes formed below the bent steel plates (3) in the same row or column.

4. The tower crane hole blocking component without support as claimed in claim 3, It is characterized in that The connecting member (4) comprises a screw rod (41) threadably rotating through the bent steel plate (3), a rotating torsion block (43) arranged at one end of the screw rod (41), and a limit block (42) arranged at the other end of the screw rod (41); the limit block (42) is rotatably arranged inside the template body (2).

5. The tower crane hole-blocking assembly without a bracket as claimed in claim 1, It is characterized in that The upper surface of the template body (2) is provided with a central groove body (21) located below the opening body (1), and the support assembly is arranged inside the central groove body (21); the outer edge of the template body (2) is arranged to cooperate with the central groove body (21) to form an eaves plate portion (23), and the upper surface of the eaves plate portion (23) is arranged to fit below the opening body (1).

6. The tower crane hole blocking component without support as claimed in claim 5, It is characterized in that A plurality of supporting steel bars are installed inside the central tank (21).

7. The tower crane hole blocking component without support as claimed in claim 5, It is characterized in that The eaves plate portion (23) is fixedly mounted below the opening body (1) by means of bolts (22).

8. The tower crane hole-blocking assembly without a bracket as claimed in claim 1, It is characterized in that The template body (2) is configured as a steel template.