ALC wallboard mounting structure
Through the design of the L-shaped fixed pipe card, the installation process of ALC wall panel is simplified, the problems of cumbersome and perishable U-shaped card are solved, and simple and labor-saving installation and efficient anti-rust and corrosion effects are achieved.
Patent Information
- Application Number
- CN202420376400.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-12-20
- Estimated Expiration
- 2034-02-28
AI Technical Summary
In the prior art, it is cumbersome to use U-shaped cards when installing ALC wall panels in the positive corners of concrete walls, and U-shaped cards are prone to rust and rot, and require thick putty layer to cover, which is time-consuming and labor-intensive.
The L-shaped fixed pipe card is adopted, including the mounting plate and the mounting pipe. The mounting plate is composed of the first and second plates that are vertically connected. The mounting pipe is inserted at the end of the ALC wall panel, and most of the fixed pipe card is structured. Covered or hidden by ALC wall panels, only the positioning part is exposed, simplifying the installation process and improving anti-rust and corrosion resistance.
It realizes simple and labor-saving installation of ALC wall panels, reduces operating volume and cost, improves installation stability and anti-rust and corrosion resistance, and avoids the need for thick putty layer plastering.
Smart Images

Figure CN222206878U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of wall panel installation, in particular to an ALC wall panel installation structure. Background Art
[0002] ALC wall panels are autoclaved lightweight partition panels. They are a new type of building material made of fly ash, cement, lime and other main raw materials, reinforced with processed steel bars and cured with high-pressure steam. They are widely used on the interior and exterior walls of concrete frame structures for various functions.
[0003] In the prior art, when installing ALC wall panels at the external corners of concrete walls, U-shaped clips are often used for fixing. During the construction process, at least two U-shaped clips with a wall thickness of 3 mm are required at each installation position. The installation and disassembly are cumbersome. After the wall panels are fixed, the thicker U-shaped clips are exposed as a whole on the outside of the ALC wall panels. The U-shaped clips are very easy to rust or corrode, and need to be covered with a thick putty layer to meet the delivery requirements. The overall construction process is cumbersome, time-consuming and labor-intensive. Utility Model Content
[0004] In view of this, the utility model provides an ALC wall panel installation structure to solve the problem of cumbersome installation and subsequent construction work of the ALC wall panel.
[0005] The utility model provides an ALC wall panel installation structure, comprising: a fixed pipe clamp; the fixed pipe clamp comprises: a mounting plate, which is composed of a first strip plate and a second strip plate connected vertically; the mounting plate is suitable for being clamped at the external corner of a concrete wall, and the first strip plate and the second strip plate are respectively fixed to the wall surfaces on both sides of the external corner line; a mounting tube, at least two of the mounting tubes are respectively arranged at the first strip plate and the second strip plate, and are located on the side of the strip plate away from the concrete wall; the mounting tube is suitable for being inserted into the end plate body of the ALC wall panel, and the end plate bodies of at least two of the ALC wall panels respectively cover the first strip plate and the second strip plate.
[0006] Beneficial effect: By setting up the L-shaped fixed pipe clamp, the first board and the second board are independent of each other and integrated with each other, and they are responsible for the installation of the ALC wall panels on both sides respectively, so that a single fixed pipe clamp can be used as the installation unit of the ALC wall panel and the concrete wall. At the same time, most of the structure of the fixed pipe clamp is covered or hidden by the ALC wall panel, so that the installation of the ALC wall panel and the subsequent construction are simple and labor-saving; the two ALC wall panels are connected to the same fixed pipe clamp, and the concrete walls on both sides of the positive angle line are fixed with the same fixed pipe clamp, which effectively solves the problem that the ALC wall panel needs to be fixed with the help of The technical defects of installing multiple U-shaped cards are greatly reduced, which greatly reduces the difficulty of installation and the amount of operation, making the installation of ALC wall panels simple, labor-saving and practical; all structures of the fixed pipe clamp except the positioning part are covered or hidden by the ALC wall panel, and only the positioning part is exposed outside the concrete wall, which greatly improves the anti-rust and anti-corrosion performance of the fixed pipe clamp. It can meet the delivery requirements without the need for thick putty layer plastering. The thin plastering process is adopted to save labor and cost; the two ALC wall panels are installed at the same fixed pipe clamp, so that the wall panels on both sides form a whole, which effectively improves the stability of the installation.
[0007] In an optional embodiment, the length of the first strip is L1, the length of the second strip is L2, and the thickness of the ALC wall panel is D1, wherein L1>D1>L2; the end panel of the ALC wall panel completely covers the second strip, and the end panel of the ALC wall panel does not completely cover the first strip; the exposed portion of the first strip is defined as a positioning portion, suitable for indicating the position of the fixed pipe clamp.
[0008] In an optional embodiment, a plurality of the fixed pipe clamps are fixed at intervals on the concrete wall.
[0009] In an optional embodiment, in two adjacent fixed pipe clamps, the wall surfaces to which the first strip is fixed are located on both sides of the external angle line.
[0010] In an optional embodiment, the first strip board and the second strip board are both arranged perpendicular to the external angle line of the concrete wall.
[0011] In an optional embodiment, the mounting tube is vertically fixed to the first strip board and the second strip board respectively.
[0012] In an optional embodiment, the thickness of the first strip board and the second strip board are both D2, wherein D2 = 1.5 ± 0.2 mm.
[0013] In an optional embodiment, the first strip and the second strip are both steel plates, and the mounting pipe is a steel pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0015] Figure 1 This is a structural schematic diagram of the utility model for fixing the pipe clamp;
[0016] Figure 2 This is a schematic diagram of the cooperation between the fixed pipe clamp and the concrete wall of the utility model;
[0017] Figure 3 It is a schematic diagram of the coordination of the fixed pipe clamp, concrete wall and ALC wall panel of the utility model.
[0018] Description of reference numerals:
[0019] 1. Fixing pipe clamp; 2. Mounting plate; 21. First strip; 22. Second strip; 23. Positioning part; 3. Mounting pipe; 4. Concrete wall; 41. External corner line; 5. ALC wall panel. DETAILED DESCRIPTION
[0020] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the utility model.
[0021] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0022] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0023] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0024] Combine the following Figures 1 to 3 , describing an embodiment of the utility model.
[0025] According to an embodiment of the utility model, an ALC wall panel installation structure is provided, comprising: a fixed pipe clamp 1, a plurality of the fixed pipe clamps 1 are fixed at intervals on the concrete wall 4; the fixed pipe clamp 1 comprises: a mounting plate 2, the mounting plate 2 has a first strip 21 and a second strip 22, the first strip 21 and the second strip 22 are vertically connected to form an L-shaped mounting plate 2; the L-shaped mounting plate 2 is suitable for clamping and fitting at the outer corner of the concrete wall 4, the first strip 21 and the second strip 22 are respectively fixed to the wall surface located on both sides of the outer corner line 41 at least two of the mounting tubes 3 are respectively arranged at the first strip 21 and the second strip 22, and are located on the side of the strip away from the concrete wall 4; the first strip 21 and the second strip 22 are each provided with at least one mounting tube 3; the mounting tube 3 is suitable for being inserted into the end plate body of the ALC wall panel 5, at least two ALC wall panels 5 are respectively fixed at the first strip 21 and the second strip 22, and the end plate bodies of the at least two ALC wall panels 5 respectively cover the corresponding first strip 21 and the second strip 22.
[0026] It should be noted that the length of the first strip 21 is L1, the length of the second strip 22 is L2, and the thickness of the ALC wall panel 5 is D1, wherein L1>D1>L2; the end plate body of the ALC wall panel 5 completely covers the second strip 22, the second strip 22 is completely covered under the ALC wall panel 5, and the second strip 22 has no exposed part; the end plate body of the ALC wall panel 5 does not completely cover the first strip 21, and part of the plate body of the first strip 21 is exposed; the exposed part of the first strip 21 is defined as the positioning part 23, which is suitable for indicating the position of the fixed pipe clamp 1 after the ALC wall panel 5 is fixed on the concrete wall 4.
[0027] The specific use process of the ALC wall panel installation structure is as follows: fix the fixed pipe clamp 1 at the positive corner position of the concrete wall 4. The fixing method can be by means of nails. The first strip 21 and the second strip 22 are respectively fixed to the wall surfaces on both sides of the positive corner line 41 by nails. Since the installation plate 2 is L-shaped, the first strip 21 and the second strip 22 are tightly attached to the concrete wall 4 at the positive corner position, so that the fixed pipe clamp 1 is firmly fixed to the concrete wall 4; multiple fixed pipe clamps 1 are arranged at intervals along the height direction of the concrete wall 4, and then the ALC wall panel 5 can be installed with the help of the fixed pipe clamps 1; two ALC wall panels 5 are installed separately, and one side wall panel is installed first, and a hole is punched at the central position of the end plate body of the ALC wall panel 5, and the hole of the wall panel is aligned with the installation pipe 3 located on the same side concrete wall 4, and the wall panel is pushed to make the installation pipe 3 match with the hole, and the installation pipe 3 is inserted into the ALC wall panel 5; multiple installation pipes 3 are inserted into the ALC wall panel 5 at intervals, and at the same time, the installation pipe 3 and the hole are interference fit, so as to effectively The freedom of movement and rotation of the wall panel is limited, so that the ALC wall panel 5 is firmly fixed on the concrete wall 4; when the ALC wall panel 5 on the other side is installed, before drilling holes in the wall panel, the hole spacing needs to be checked to make the hole spacing accurately correspond to the spacing of the fixed pipe clamp 1; the holes of the ALC wall panel 5 on the other side are matched with the mounting pipe 3 located on the concrete wall 4 on the other side, so that the wall panel is firmly fixed on the concrete wall 4; during the installation process, the two ALC wall panels 5 are connected to the same fixed pipe clamp 1, and the concrete walls 4 on both sides of the external angle line 41 are fixed with the same fixed pipe clamp 1, that is, a single fixed pipe clamp 1 can be used as an installation unit for the ALC wall panel 5 and the concrete wall 4, which effectively solves the technical defect that the ALC wall panel 5 needs to be installed with the help of multiple U-shaped cards, greatly reduces the difficulty of installation, and reduces the amount of operation, making the installation of the ALC wall panel 5 simple, labor-saving, and practical; at the same time, the two ALC wall panels 5 are installed at the same fixed pipe clamp 1, so that the wall panels on both sides form a whole, which effectively improves the stability of installation.
[0028] After the ALC wall panel 5 is installed, the second board 22 is completely covered under the ALC wall panel 5, and the first board 21 is partially covered under the ALC wall panel 5. The exposed part of the first board 21 is the positioning part 23, which is used to determine the position of the fixed pipe clamp 1; in addition, since the other structures of the fixed pipe clamp 1 except the positioning part 23 are covered or hidden by the ALC wall panel 5, only the positioning part 23 is exposed outside the concrete wall 4, the anti-rust and anti-corrosion performance of the fixed pipe clamp 1 is greatly improved, and the delivery requirements can be met without the need for thick putty layer plastering. The thin plastering process is adopted to save labor and cost.
[0029] In this embodiment, by setting an L-shaped fixed pipe clamp 1, the first strip 21 and the second strip 22 are independent of each other and integrated with each other, and respectively undertake the installation work of the ALC wall panels 5 on both sides, so that a single fixed pipe clamp 1 can be used as an installation unit of the ALC wall panel 5 and the concrete wall 4, and most of the structure of the fixed pipe clamp 1 is covered or hidden by the ALC wall panel 5, so that the installation of the ALC wall panel 5 and the subsequent construction are simple and labor-saving; the two ALC wall panels 5 are connected to the same fixed pipe clamp 1, and the concrete walls 4 on both sides of the external angle line 41 are fixed to the same fixed pipe clamp 1, which effectively solves the problem of the ALC wall panel 5. The technical defect that the panel 5 needs to be installed with the help of multiple U-shaped cards is eliminated, which greatly reduces the difficulty of installation and the amount of operation, making the installation of the ALC wall panel 5 simple, labor-saving and practical; the other structures of the fixed pipe clamp 1 except the positioning part 23 are covered or hidden by the ALC wall panel 5, and only the positioning part 23 is exposed outside the concrete wall 4, which greatly improves the anti-rust and anti-corrosion performance of the fixed pipe clamp 1, and does not need a thick putty layer of plastering to meet the delivery requirements. The thin plastering process is adopted to save labor and cost; the two ALC wall panels 5 are installed at the same fixed pipe clamp 1, so that the wall panels on both sides form a whole, which effectively improves the installation stability.
[0030] Optionally, the concrete wall 4 can be plastered with cement mortar to reduce the wet work of the ALC wallboard 5 and shorten the plastering period, while other processes such as decoration can be carried out.
[0031] Optionally, the first strip 21 and the second strip 22 are both steel plates, and the mounting tube 3 is a steel tube, so as to improve the overall force-bearing performance.
[0032] In some embodiments, in combination Figure 2 As shown, the fixed pipe clamps 1 are staggeredly installed on the concrete wall 4. In the two adjacent fixed pipe clamps 1, the wall surfaces to which the first strips 21 are fixed are respectively located on both sides of the external angle line 41, that is, the first strips 21 of the two adjacent fixed pipe clamps 1 are respectively fixed on the concrete walls 4 on different sides, ensuring that the positioning parts 23 are staggeredly distributed on the concrete walls 4 on both sides, so that the overall force is balanced and the installation stability is improved.
[0033] In some embodiments, in combination Figure 2 As shown, the mounting plate 2 is clamped at the positive corner position of the concrete wall 4, and the first strip 21 and the second strip 22 are both arranged perpendicular to the positive corner line 41 of the concrete wall 4, and the mounting tube 3 is vertically fixed at the first strip 21 and the second strip 22, respectively, to facilitate the plug-in installation of the mounting tube 3 and the ALC wall panel 5.
[0034] In some embodiments, in combination Figure 1As shown, the thickness of the first strip 21 and the second strip 22 are both D2, wherein D2 = 1.5 ± 0.2 mm, that is, the thickness of the mounting plate 2 is less than the thickness of the U-shaped card, and the steel consumption and cost are further reduced.
[0035] Obviously, the above embodiments are only examples for clear explanation, and are not intended to limit the implementation methods. Although the embodiments of the present utility model are described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present utility model, and such modifications and variations are all within the scope defined by the present utility model.
Claims
1. An ALC wall panel installation structure, It is characterized in that include: A fixed pipe clamp (1), wherein a plurality of the fixed pipe clamps (1) are fixed to the concrete wall (4) at intervals; The fixed pipe clamp (1) comprises: The mounting plate (2) is composed of a first strip plate (21) and a second strip plate (22) connected vertically; The mounting plate (2) is suitable for being clamped at the external corner of the concrete wall (4), and the first strip plate (21) and the second strip plate (22) are respectively fixed to the wall surfaces on both sides of the external corner line (41); Installation pipes (3), at least two of the installation pipes (3) are respectively arranged at the first strip board (21) and the second strip board (22), and are located on the side of the strip board away from the concrete wall (4); The installation tube (3) is suitable for being inserted into the end plate body of the ALC wall panel (5), and the end plate bodies of at least two of the ALC wall panels (5) respectively cover the first strip board (21) and the second strip board (22).
2. The ALC wall panel installation structure according to claim 1, It is characterized in that The length of the first strip (21) is L1, the length of the second strip (22) is L2, and the thickness of the ALC wallboard (5) is D1, wherein L1>D1>L2; The end plate of the ALC wall panel (5) is completely covered with the second strip plate (22), and the end plate of the ALC wall panel (5) is not completely covered with the first strip plate (21); The exposed portion of the first strip (21) is defined as a positioning portion (23), which is suitable for indicating the position of the fixed pipe clamp (1).
3. The ALC wall panel installation structure according to claim 1, It is characterized in that A plurality of the fixed pipe clamps (1) are arranged at intervals along the height direction of the concrete wall (4).
4. The ALC wall panel installation structure according to claim 3, It is characterized in that In two adjacent fixed pipe clamps (1), the wall surfaces to which the first strip (21) is fixed are respectively located on both sides of the external angle line (41).
5. The ALC wall panel installation structure according to claim 1, It is characterized in that The first strip board (21) and the second strip board (22) are both arranged perpendicular to the external angle line (41) of the concrete wall (4).
6. The ALC wall panel installation structure according to claim 1, It is characterized in that The mounting pipe (3) is vertically fixed to the first strip board (21) and the second strip board (22) respectively.
7. The ALC wall panel installation structure according to claim 1, It is characterized in that The thickness of the first strip board (21) and the second strip board (22) are both D2, wherein D2 = 1.5 ± 0.2 mm.
8. The ALC wall panel installation structure according to claim 1, It is characterized in that The first strip plate (21) and the second strip plate (22) are both steel plates, and the mounting pipe (3) is a steel pipe.
Citation Information
Cited By
ALC wallboard mounting structure
CN224259628U
