Construction engineering building climbing frame
By adding an adjustable front baffle and storage box structure to the building climbing frame, the problems of workers' drops and tool loss are solved, and safety and convenience are improved.
Patent Information
- Application Number
- CN202420998310.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-09
- Publication Date
- 2024-12-20
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing building climbing frame lacks protection after workers climb to the upper side of the climbing frame body, which poses a risk of falling, and lacks the placement of tools and parts, resulting in tools and parts being easily lost.
A building climbing frame is designed, including an adjustable front baffle and storage box structure, which adjusts the height of the front baffle through a motor to prevent falling, and the storage box facilitates the placement and removal of tools and parts through sliding stops and pushing board mechanisms. .
It effectively prevents workers from falling risks, avoids the loss of tools and parts, and improves the safety and convenience of staff.
Smart Images

Figure CN222207211U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building climbing frames, in particular to a building climbing frame for construction engineering. Background Art
[0002] Climbing scaffolds are a new type of scaffolding system in the modern construction industry. They can be realized through various forms of frame structures and auxiliary support structures, relying on construction equipment installed on the frame or on the exterior wall of the building, suitable for lifting and conveying materials. According to the different lifting methods, climbing scaffolds can be divided into self-lifting type, mutual lifting type and integral lifting type.
[0003] A Chinese patent with patent application number 202320459686.5 proposes a construction engineering building climbing frame, including a climbing frame frame and a standing board, the standing board is horizontally arranged inside the climbing frame, a vertical protective assembly is arranged inside the climbing frame, two L-shaped blocks are arranged on both sides of the protective frame, and a fixing tube matching the L-shaped block is arranged on the climbing frame, the L-shaped block is detachably arranged in the fixing tube, and the L-shaped block and the fixing tube are locked by a connecting assembly; the four groups of L-shaped blocks of the utility model are inserted into the fixing tube, and the protective assembly can be quickly installed; the connecting assembly can realize the locking of the protective assembly and the climbing frame, with high safety, and the installation process is more convenient and quick; by setting the handle in the placement groove, the staff can avoid accidentally touching the handle, thereby further improving safety.
[0004] However, after the improvement, the above patent still has the problem that when the workers climb to the upper side of the climbing frame body, there is a lack of protection, which makes the workers at risk of falling from the climbing frame body, and there is no place to place tools on the building climbing frame. When the workers need to place tools and parts on the building climbing frame, some tools and parts are small, so the tools and parts fall from the building climbing frame and are lost. Utility Model Content
[0005] In view of the deficiencies in the prior art, the utility model provides a construction engineering building climbing frame, which solves the problems raised in the above-mentioned background technology.
[0006] To achieve the above objectives, the utility model is implemented through the following technical solutions: a construction engineering building climbing frame, including a standing board, two first support columns are fixedly installed on one side of the standing board, and two second support columns are fixedly installed on the other side of the standing board, a top plate is fixedly installed on the top of the first support column and the second support column, a first sliding groove is opened inside the two first support columns, and screw rods are rotatably installed inside the two first sliding grooves, a motor is fixedly installed inside one of the first support columns, the output end of the motor is fixedly connected to the bottom of one of the screw rods, a first sliding block is slidably installed inside the two first sliding grooves, and the first sliding The block is threadedly connected with the screw rod, a front baffle is fixedly installed between the two first sliding blocks, and the front baffle is slidably connected to the two first support columns, a first square groove is opened inside the top plate and above the two first support columns, one end of the two screw rods extends into the inside of the first square groove, and the first bevel gear is fixedly installed on the top of the two screw rods, the first bevel gear is rotatably connected to the first square groove, the second bevel gear is rotatably installed inside the two first square grooves, the second bevel gear is meshed with the first bevel gear, a connecting rod is fixedly installed between the two second bevel gears, and the connecting rod is rotatably connected to the inside of the top plate.
[0007] Preferably, a rear baffle is fixedly installed between the two second support columns, a second square groove is opened inside the rear baffle, a storage box shell is rotatably installed inside the second square groove, a storage box is slidably installed inside the storage box shell, a partition is fixedly installed inside the storage box, and a handle groove is opened on one side of the storage box. By installing the storage box, the staff can place tools and parts inside conveniently to avoid the loss of tools and parts.
[0008] Preferably, second sliding grooves are provided inside the rear baffle and on both sides of the second square groove, first springs are fixedly installed inside the two second sliding grooves, blocks are fixedly installed at one end of the two first springs, second sliding blocks are fixedly installed on one side of the two blocks, and the two blocks are inserted into the interior of the storage box shell. The sliding blocks can contact the limit of the storage box shell, so that the storage box shell can be opened.
[0009] Preferably, a third rectangular groove is opened inside the rear baffle and on one side of the second square groove, two second springs are fixedly installed inside the third rectangular groove, and a push plate is fixedly installed at one end of the two second springs. When the limit of the storage box shell is released, the storage box shell is pushed out by the push plate, so as to facilitate the extraction of the storage box.
[0010] Preferably, a first support plate is fixedly installed at both ends of the standing plate, a second support plate is fixedly installed on both sides of the standing plate, two screws are inserted inside the first support plate and the second support plate, a first U-shaped groove is fixedly installed at both ends of the top plate, a second U-shaped groove is fixedly installed on both sides of the top plate, and two threaded grooves are provided on the inside of the top plate and on one side above the first U-shaped groove and the second U-shaped groove, the two first support plates are inserted into the corresponding first U-shaped grooves, the two second support plates are inserted into the corresponding second U-shaped grooves, and then the screws are inserted into the corresponding threaded grooves to ensure the stability between the two climbing frames when they overlap.
[0011] Preferably, the top of the standing board is provided with anti-slip grooves to prevent workers from slipping and getting injured.
[0012] The utility model provides a construction engineering building climbing frame, which has the following beneficial effects:
[0013] 1. The construction engineering building climbing frame can drive a motor to rotate one of the four screws, drive the first bevel gear to rotate, and drive the two second bevel gears to rotate, drive another screw to rotate, and make the front baffle move horizontally up and down. The height of the front baffle can be adjusted according to the workers of different heights to prevent the workers from falling.
[0014] 2. The construction engineering building climbing frame can make the stopper detach from the interior of the storage box shell by holding the second sliding block and sliding in the opposite direction, thereby releasing the limit on it. At this time, the second spring inside the third rectangular groove is reset, and the storage box shell is pushed down by the push plate, and the storage box is pulled out from the side, so that the staff can place tools and parts in the storage box to avoid the loss of tools and parts. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the structure of the utility model;
[0016] Figure 2 This is a front cross-sectional view of the utility model;
[0017] Figure 3 For this utility model Figure 2 A in the enlarged view;
[0018] Figure 4 It is a side view of the utility model;
[0019] Figure 5 This is a side view of the rear baffle of the utility model;
[0020] Figure 6 This is a top sectional view of the rear baffle of the utility model;
[0021] Figure 7 For this utility model Figure 6 The enlarged view of point B in the figure;
[0022] Figure 8 For this utility model Figure 6 Enlarged view of point C in the figure.
[0023] In the figure: 1. first support column; 2. second support column; 3. top plate; 4. standing plate; 5. first support plate; 6. second support plate; 7. first U-shaped groove; 8. second U-shaped groove; 9. threaded groove; 10. screw; 11. rear baffle; 12. front baffle; 13. first sliding block; 14. screw rod; 15. motor; 16. first square groove; 17. first bevel gear; 18. second bevel gear; 19. connecting rod; 20. second square groove; 21. storage box shell; 22. storage box; 23. handle groove; 24. partition; 25. second sliding groove; 26. first spring; 27. block; 28. second sliding block; 29. third square groove; 30. second spring; 31. push plate; 32. first sliding groove. DETAILED DESCRIPTION
[0024] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0025] Embodiment 1
[0026] See also Figures 1 to 8The utility model provides a technical solution: a construction engineering building climbing frame, including a standing board 4, two first support columns 1 are fixedly installed on one side of the standing board 4, and two second support columns 2 are fixedly installed on the other side of the standing board 4. A top plate 3 is fixedly installed on the top of the first support column 1 and the second support column 2. A first sliding groove 32 is opened inside the two first support columns 1, and a screw rod 14 is rotatably installed inside the two first sliding grooves 32. A motor 15 is fixedly installed inside one of the first support columns 1, and the output end of the motor 15 is fixedly connected to the bottom of one of the screw rods 14. A first sliding block 13 is slidably installed inside the two first sliding grooves 32, and the first sliding block 13 is threadedly connected to the screw rod 14. The two first A front baffle plate 12 is fixedly installed between the sliding blocks 13, and the front baffle plate 12 is slidably connected to the two first support columns 1. A first square groove 16 is opened inside the top plate 3 and above the two first support columns 1. One end of the two screw rods 14 extends into the inside of the first square groove 16, and a first bevel gear 17 is fixedly installed on the top of the two screw rods 14. The first bevel gear 17 is rotatably connected to the first square groove 16. A second bevel gear 18 is rotatably installed inside the two first square grooves 16, and the second bevel gear 18 is meshed with the first bevel gear 17. A connecting rod 19 is fixedly installed between the two second bevel gears 18, and the connecting rod 19 is rotatably connected to the inside of the top plate 3. The top of the standing plate 4 is provided with anti-slip grooves.
[0027] A rear baffle 11 is fixedly installed between the two second support columns 2, and a second square groove 20 is opened inside the rear baffle 11, and a storage box shell 21 is rotatably installed inside the second square groove 20, and a storage box 22 is slidably installed inside the storage box shell 21, and a partition 24 is fixedly installed inside the storage box 22, and a handle groove 23 is opened on one side of the storage box 22, and a third rectangular groove 29 is opened inside the rear baffle 11 and on one side of the second square groove 20, and two second springs 30 are fixedly installed inside the third rectangular groove 29, and a push plate 31 is fixedly installed on one end of the two second springs 30, and the storage box shell 21 is pushed out by the push plate 31, and pulling out the storage box 22 from the side can make it convenient for the staff to place tools and parts inside, so as to avoid the loss of tools and parts.
[0028] Second sliding grooves 25 are provided inside the rear baffle 11 and on both sides of the second square groove 20, first springs 26 are fixedly installed inside the two second sliding grooves 25, blocks 27 are fixedly installed at one end of the two first springs 26, and second sliding blocks 28 are fixedly installed on one side of the two blocks 27. The two blocks 27 are inserted into the interior of the storage box shell 21. When the limit of the storage box shell 21 is released, the storage box shell 21 is pushed out by the push plate 31 to facilitate the extraction of the storage box 22.
[0029] A first support plate 5 is fixedly installed at both ends of the standing plate 4, and a second support plate 6 is fixedly installed on both sides of the standing plate 4. Two screws 10 are inserted inside the first support plate 5 and the second support plate 6. A first U-shaped groove 7 is fixedly installed at both ends of the top plate 3, and a second U-shaped groove 8 is fixedly installed on both sides of the top plate 3. Two threaded grooves 9 are provided on the inside of the top plate 3 and on one side above the first U-shaped groove 7 and the second U-shaped groove 8. The two first support plates 5 are inserted into the corresponding first U-shaped grooves 7, and the two second support plates 6 are inserted into the corresponding second U-shaped grooves 8, and then the screws 10 are inserted into the corresponding threaded grooves 9 to ensure the stability between the two climbing frames when they overlap.
[0030] To sum up, when the construction engineering building climbing frame is used, when the two climbing frames are overlapped, the two first support plates 5 are inserted into the corresponding first U-shaped grooves 7, the two second support plates 6 are inserted into the corresponding second U-shaped grooves 8, and then the screws 10 are inserted into the corresponding threaded grooves 9. By starting the motor 15, one of the four screw rods 14 can be rotated, driving the first bevel gear 17 to rotate, so that the two second bevel gears 18 are rotated, and the other screw rod 14 is driven to rotate, so that the front baffle 12 can be moved horizontally up and down, and the height of the front baffle 12 can be adjusted according to the staff of different heights. Press the second sliding block 28 and slide it in the opposite direction, so that the block 27 can be disengaged from the interior of the storage box shell 21 and the limit on it is released. At this time, the second spring 30 inside the third shaped groove 29 is reset, so that the push plate 31 pushes down the storage box shell 21, and the storage box 22 is pulled out from the side, and the parts can be placed in the storage box 22 for subsequent use.
[0031] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A construction engineering building climbing frame, comprising a standing plate (4), characterized in that: Two first support columns (1) are fixedly installed on one side of the standing plate (4), and two second support columns (2) are fixedly installed on the other side of the standing plate (4); a top plate (3) is fixedly installed on the top of the first support column (1) and the second support column (2); first sliding grooves (32) are provided inside the two first support columns (1); screw rods (14) are rotatably installed inside the two first sliding grooves (32); a motor (15) is fixedly installed inside one of the first support columns (1); the output end of the motor (15) is fixedly connected to the bottom of one of the screw rods (14); first sliding blocks (13) are slidably installed inside the two first sliding grooves (32); the first sliding blocks (13) are threadedly connected to the screw rod (14); the two first sliding blocks (13) are fixedly connected to each other. A front baffle (12) is fixedly installed, and the front baffle (12) is slidably connected to the two first support columns (1). A first square groove (16) is opened inside the top plate (3) and above the two first support columns (1). One end of the two screw rods (14) extends into the inside of the first square groove (16). A first bevel gear (17) is fixedly installed on the top of the two screw rods (14). The first bevel gear (17) is rotatably connected to the first square groove (16). A second bevel gear (18) is rotatably installed inside the two first square grooves (16). The second bevel gear (18) is meshedly connected to the first bevel gear (17). A connecting rod (19) is fixedly installed between the two second bevel gears (18), and the connecting rod (19) is rotatably connected to the inside of the top plate (3).
2. A construction engineering building climbing frame according to claim 1, characterized in that: A rear baffle (11) is fixedly installed between the two second support columns (2), a second square groove (20) is provided inside the rear baffle (11), a storage box shell (21) is rotatably installed inside the second square groove (20), a storage box (22) is slidably installed inside the storage box shell (21), a partition (24) is fixedly installed inside the storage box (22), and a handle groove (23) is provided on one side of the storage box (22).
3. A construction engineering building climbing frame according to claim 2, characterized in that: Second sliding grooves (25) are provided inside the rear baffle (11) and on both sides of the second square groove (20); first springs (26) are fixedly installed inside the two second sliding grooves (25); blocks (27) are fixedly installed at one end of the two first springs (26); second sliding blocks (28) are fixedly installed on one side of the two blocks (27); and the two blocks (27) are inserted into the interior of the storage box shell (21).
4. A construction engineering building climbing frame according to claim 2, characterized in that: A third rectangular groove (29) is provided inside the rear baffle (11) and on one side of the second square groove (20), two second springs (30) are fixedly installed inside the third rectangular groove (29), and a push plate (31) is fixedly installed at one end of the two second springs (30).
5. A construction engineering building climbing frame according to claim 1, characterized in that: The first support plates (5) are fixedly mounted on both ends of the standing plate (4), the second support plates (6) are fixedly mounted on both sides of the standing plate (4), two screws (10) are inserted into the inside of the first support plate (5) and the second support plate (6), the first U-shaped grooves (7) are fixedly mounted on both ends of the top plate (3), the second U-shaped grooves (8) are fixedly mounted on both sides of the top plate (3), and two threaded grooves (9) are provided inside the top plate (3) and on one side located above the first U-shaped groove (7) and the second U-shaped groove (8).
6. A construction engineering building climbing frame according to claim 1, characterized in that: The top of the standing board (4) is provided with anti-slip grooves.
