Pouring formwork
The casting formwork system addresses the challenge of concrete pouring in tall and thin-walled structures by enabling mid-injection and vibration, ensuring complete pouring and structural integrity in sewage treatment plants.
Patent Information
- Application Number
- CN202420967481.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-07
- Publication Date
- 2024-12-20
- Estimated Expiration
- 2034-05-07
AI Technical Summary
The construction of tall and thin-walled pool structures in sewage treatment plants faces challenges in fully pouring concrete due to blocked pumping ports by complex steel bars, leading to gaps and holes, which compromise anti-seepage and anti-cracking requirements.
A casting formwork system with a fixed plate, injection port, hopper, and support rods, allowing concrete to be injected from the middle and vibrated effectively, while vertical partitions separate concrete to maintain flatness and prevent hardening at the injection port.
Ensures complete pouring and vibration of concrete at the bottom of high walls, enhances formwork durability, and maintains concrete flatness, preventing demoulding difficulties and ensuring structural integrity.
Smart Images

Figure CN222207219U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of concrete pouring, in particular to a pouring template. Background Art
[0002] As water pollution caused by traditional printing and dyeing or chemical industries gradually becomes more serious, the planning and construction of sewage treatment plants are increasingly valued by local government agencies and construction units. As a key construction category of municipal engineering, sewage treatment plants have many technical difficulties such as construction technology, structure maintenance, and equipment maintenance. Among them, the construction technology of tall and thin-walled pool structures in sewage treatment plants has always been a construction difficulty of municipal engineering.
[0003] The functions of various treatment tanks in sewage treatment plants are different. The internal structures are usually separated by partition walls. In addition, the construction area occupied by a single tank itself is limited, which results in the partition walls being often high and thin. After the wall reinforcement is tied and the wall formwork is erected, when pouring concrete from above, the pumping port of the pump truck is blocked outside the formwork by the complex and staggered steel bars, making it difficult to pump concrete to the bottom of the wall, making it difficult to fully pour the concrete at the bottom of the wall and unable to complete the vibration. This causes gaps and holes in the wall parts that are not fully poured and vibrated, and fails to meet the requirements of the tank body for anti-seepage and anti-cracking. Utility Model Content
[0004] In view of the deficiencies in the prior art, the utility model provides a casting template to solve the problems mentioned in the above background.
[0005] The utility model provides the following technical solutions: a casting formwork, comprising: a fixed plate for installation on a wall formwork, an injection port is provided on the surface of the fixed plate, a material hopper is installed on the surface of the fixed plate corresponding to the injection port, installation components are provided on both sides of the injection port, the fixed plate is installed on the surface of the wall formwork through the installation components, a guide frame is installed on the inner wall of the injection port, a vertical partition is installed on the inner wall of the guide frame, and a moving component is installed on the surface of the vertical partition.
[0006] Preferably, two support rods are provided on the surface of the material containing hopper, and the bottom ends of the support rods are connected to the surface of the fixing plate.
[0007] Preferably, each of the installation components includes ten tie bolts and two steel pipes, the ten tie bolts are grouped together with two each, five groups of tie bolts are evenly distributed on the surface of the steel pipes, and the bolt rods of the tie bolts are located between the two steel pipes, and the fixing plate is installed on the wall formwork through the tie bolts.
[0008] Preferably, a plurality of wooden poles are connected to the surface of the fixing plate, and the surface of the wooden poles is connected to the surface of the steel pipe.
[0009] Preferably, the number of the wooden pads is three, two of which are distributed below the material hopper, and the other wooden pad is located above the injection port.
[0010] Preferably, the moving assembly comprises a gripping rod, both ends of which are provided with welding plates, and the welding plates are connected to the surface of the vertical partition.
[0011] Preferably, the feed opening of the hopper is rectangular, and the bottom of the hopper is arc-shaped.
[0012] Preferably, the fixing plate is made of wood plywood, the hopper is made of galvanized iron, the length of the fixing plate is 90 cm, the width of the fixing plate is 80 cm, the length of the injection port is 45 cm, and the width of the injection port is 40 cm.
[0013] Compared with the prior art, the utility model has the following beneficial effects:
[0014] 1. The pouring formwork is provided with a fixed plate, an injection port and a hopper. When the wall is too high, multiple fixed plates and hoppers can be installed in the middle of the wall formwork, so that concrete is injected from the middle of the wall formwork, and a vibrating rod is extended into the poured concrete through the injection port, so that the concrete at the bottom of the wall is fully poured and vibration is conveniently completed.
[0015] 2. The casting formwork is provided with support rods. The two support rods can effectively offset the pumping impact force of the pumping port during the actual casting process, thereby effectively improving the durability of the overall formwork.
[0016] 3. The casting formwork is provided with vertical partitions, which can be cut vertically in time after the concrete is poured into place, to separate the wall concrete from the concrete in the material filling port, to avoid the gradual hardening of the concrete at the injection port, which makes demoulding difficult, and also to maintain the flatness of the concrete wall at the corresponding casting position. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;
[0018] Figure 2 This is a schematic diagram of the guide frame and vertical partition structure of the utility model;
[0019] Figure 3 It is a schematic diagram of the distribution structure of multiple casting templates of the utility model.
[0020] In the figure: 1. fixing plate; 2. injection port; 3. hopper; 41. tie bolt; 42. steel pipe; 5. guide frame; 6. vertical partition; 71. gripping rod; 72. welding plate; 8. wooden pole; 9. supporting rod; 10. wall formwork; 11. cushion layer; 12. raft foundation. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] See also Figure 1-3 A casting formwork comprises: a fixed plate 1 for being installed on a wall formwork 10, an injection port 2 is provided on the surface of the fixed plate 1, a material hopper 3 is installed on the surface of the fixed plate 1 at a position corresponding to the injection port 2, installation components are provided on both sides of the injection port 2, the fixed plate 1 is installed on the surface of the wall formwork 10 through the installation components, a guide frame 5 is installed on the inner wall of the injection port 2, a vertical partition 6 is installed on the inner wall of the guide frame 5, and a moving component is installed on the surface of the vertical partition 6.
[0023] Two support rods 9 are arranged on the surface of the hopper 3 , and the bottom ends of the support rods 9 are connected to the surface of the fixing plate 1 .
[0024] Each installation assembly includes ten tie bolts 41 and two steel pipes 42. The ten tie bolts 41 are grouped in pairs. Five groups of tie bolts 41 are evenly distributed on the surface of the steel pipes 42. The bolt rods of the tie bolts 41 are located between the two steel pipes 42. The fixing plate 1 is installed on the wall formwork 10 through the tie bolts 41.
[0025] A plurality of pad rods 8 are connected to the surface of the fixing plate 1 , and the surfaces of the pad rods 8 are connected to the surface of the steel pipe 42 .
[0026] The number of the padding rods 8 is three, two of which are distributed below the material hopper 3 , and the other padding rod 8 is located above the injection port 2 .
[0027] The moving assembly includes a gripping rod 71 , both ends of which are provided with welding plates 72 , and the welding plates 72 are connected to the surface of the vertical partition 6 .
[0028] The feeding opening of the hopper 3 is rectangular, and the bottom of the hopper 3 is arc-shaped.
[0029] The fixing plate 1 is made of wood plywood, the hopper 3 is made of galvanized iron, the length of the fixing plate 1 is 90 cm, the width of the fixing plate 1 is 80 cm, the length of the injection port 2 is 45 cm, and the width of the injection port 2 is 40 cm.
[0030] The construction process includes the following steps:
[0031] Step 1. In actual construction, the construction of the cushion layer 11 and the raft foundation 12 is first completed on site. After the steel bars of the tall and thin-walled wall are tied and the wall formwork 10 is installed, the casting formwork is installed. First, the fixed plate 1 is installed on the outer surface of the wall. Each fixed plate 1 is fixed with two of the above-mentioned installation components. The fixed plate 1 is installed on the wall formwork 10 by means of tie rod bolts 41, and pads are used to relieve the pressure.
[0032] Step 2: Arrange an appropriate number of casting formworks based on the actual wall height. The specific number of arrangements needs to refer to the overall height of the wall. For walls that are too high, the casting formworks can be evenly installed in the middle of the wall.
[0033] Step three, after installation, check the firmness and stability of the formwork, and deliver the concrete slurry from the pumping port of the pumping truck to the casting formwork position. The first position to be poured is the bottom of the wall, and the pumping port is aligned with the hopper 3 for discharging. During the discharging process, always pay attention to whether the hopper 3 is blocked or overflowing, and clean it manually in time.
[0034] Step 4: After the pouring formwork of a single part is poured to 80%, the pouring position is changed and the next hopper 3 is poured. At the same time, a vibrating rod is inserted into the hopper 3 at the previous pouring position to vibrate the concrete poured at the bottom, and the pouring is carried out in the same way.
[0035] Step 5. After the concrete pouring on the same horizontal plane is completed, the vertical partition 6 on the fixed plate 1 is promptly cut vertically through the gripping rod 71 to seal the injection port 2 on the fixed plate 1, and the wall concrete and the concrete in the material holding port are separated to prevent the concrete at the injection port 2 from gradually hardening and causing demoulding difficulties. At the same time, the flatness of the concrete wall at the corresponding pouring position is maintained, and the concrete at the lower part of the wall is fully vibrated.
[0036] Step 5. After the concrete pouring on the same horizontal plane is completed, the vertical partition 6 on the fixed plate 1 is promptly cut vertically through the gripping rod 71 to seal the injection port 2 on the fixed plate 1, and the wall concrete and the concrete in the material holding port are separated to prevent the concrete at the injection port 2 from gradually hardening and causing demoulding difficulties. At the same time, the flatness of the concrete wall at the corresponding pouring position is maintained, and the concrete at the lower part of the wall is fully vibrated.
[0037] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A casting formwork, characterized in that: include: A fixed plate (1) for installation on a wall formwork (10), the surface of the fixed plate (1) being provided with an injection port (2), a material hopper (3) being installed on the surface of the fixed plate (1) at a position corresponding to the injection port (2), installation components being provided on both sides of the injection port (2), the fixed plate (1) being installed on the surface of the wall formwork (10) via the installation components, a guide frame (5) being installed on the inner wall of the injection port (2), a vertical partition (6) being installed on the inner wall of the guide frame (5), and a movable component being installed on the surface of the vertical partition (6).
2. A casting formwork according to claim 1, characterized in that: Two support rods (9) are arranged on the surface of the material containing hopper (3), and the bottom ends of the support rods (9) are connected to the surface of the fixing plate (1).
3. A casting formwork according to claim 1, characterized in that: Each of the installation components comprises ten tie bolts (41) and two steel pipes (42), the ten tie bolts (41) are arranged in groups of two each, five groups of tie bolts (41) are evenly distributed on the surface of the steel pipes (42), and the bolt rods of the tie bolts (41) are located between the two steel pipes (42), and the fixing plate (1) is installed on the wall formwork (10) through the tie bolts (41).
4. A casting formwork according to claim 3, characterized in that: A plurality of wooden pads (8) are connected to the surface of the fixing plate (1), and the surface of the wooden pads (8) is connected to the surface of the steel pipe (42).
5. A casting formwork according to claim 4, characterized in that: The number of the wooden pads (8) is three, two of which are distributed below the material hopper (3), and the other wooden pad (8) is located above the injection port (2).
6. A casting formwork according to claim 1, characterized in that: The moving assembly comprises a gripping rod (71), both ends of which are provided with welding plates (72), and the welding plates (72) are connected to the surface of the vertical partition plate (6).
7. A casting formwork according to claim 1, characterized in that: The feed opening of the material hopper (3) is rectangular, and the bottom of the material hopper (3) is arc-shaped.
8. A casting formwork according to claim 1, characterized in that: The fixing plate (1) is made of wood plywood, the material hopper (3) is made of galvanized iron, the length of the fixing plate (1) is 90 cm, the width of the fixing plate (1) is 80 cm, the length of the injection port (2) is 45 cm, and the width of the injection port (2) is 40 cm.