Temporary power distribution network frame
By using rotating drill bits and leveling detection in the temporary distribution grid frame, combining screw drills and cutting edges to break the soil layer, and installing adjustable legs, the time-consuming problem of fixing and removing the existing temporary distribution grid frame is solved. Fast and stable fixation and disassembly are achieved, improving the efficiency and stability of use.
Patent Information
- Application Number
- CN202323419979.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-13
- Publication Date
- 2024-12-20
- Estimated Expiration
- 2033-12-13
AI Technical Summary
The existing temporary distribution grid frames are time-consuming when fixing and removing them, and require mechanical assistance, which wastes manpower and material resources, and is inconvenient for use.
The rotary drill bit is used to penetrate deep into the ground, and the leveling device performs verticality detection. It is equipped with four adjustable legs, which enhances the stability and resistance of the shaft foundation. It breaks the soil layer through screw drilling and cutting edge, combining the adjustable reinforcement structure and Support structure for rapid fixing and disassembly.
The fixing and removal efficiency of the distribution grid frame is improved, the manpower and material costs are reduced, and the stability and practicality of the grid frame is enhanced.
Smart Images

Figure CN222207422U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of power distribution network, in particular to a temporary power distribution network frame. Background Art
[0002] A distribution network refers to a power grid that receives electrical energy from a transmission network or a regional power plant, and distributes it locally or step by step according to voltage to various types of users through distribution facilities. When transmitting electricity, the distribution network needs to set up fixed frames along the way to support and fix the wires. The fixed frames can support and limit the wires to prevent the wires from shaking due to environmental influences and causing the wires to become entangled. Application No.: 202221295649.7 discloses a distribution network rack. The utility model can provide timely warnings for tilt problems, and replace replacement methods with adjustment methods during maintenance to reduce costs and improve efficiency. However, the following defects still exist: First, mechanical foundation excavation is required when the distribution network rack is fixed, which wastes manpower and material resources. Second, it is extremely inconvenient to use as a temporary distribution network rack, and mechanical assistance is required when taking it out. Utility Model Content
[0003] In view of the above situation, in order to overcome the defects of the prior art, the utility model proposes a temporary distribution network rack, which effectively solves the problem of time-consuming steps in fixing and removing temporary distribution network racks on the market. A rotating drill bit is used to go deep into the ground, and a level is used to detect the verticality, thereby improving the stability of the pole foundation. Four adjustable legs are also provided for reinforcement, thereby enhancing the resistance of the distribution network rack.
[0004] The technical solution adopted by the utility model is as follows: A temporary power distribution grid proposed by the utility model includes a pole body, an underground structure, a reinforcement structure and a power distribution structure, wherein the underground structure is arranged on the pole body, the reinforcement structure is arranged on the pole body, and the power distribution structure is arranged on the pole body; the underground structure includes a push rod, a connecting rod, a thread, a bevel, a screw drill and a cutting edge, the push rod is welded and arranged on the pole body, the connecting rod is welded and arranged on the pole body, the thread is fixedly connected to the connecting rod, and the thread plays a role of tightening, the bevel is fixedly connected to the connecting rod, and the bevel plays a role of facilitating breaking the soil, the screw drill is fixedly connected to the connecting rod, and the screw drill plays a role of breaking vertical soil, the cutting edge is welded and arranged on the screw drill, and the cutting edge plays a role of breaking horizontal soil.
[0005] Preferably, the reinforcement structure includes a screw, a fixing ring, a spirit level, a connecting block, a connecting column, an upper leg, an adjusting hole 1, a lower leg, an adjusting hole 2, a latch, a hinge column, a fixing plate and a steel chisel, the screw being slidably connected to the thread, the fixing ring being fixedly connected to the screw, the spirit level being riveted to the fixing ring, and the spirit level serving to observe whether the rod body is vertical, the connecting block being fixedly connected to the fixing ring, the connecting column being bolted to the connecting block, the upper leg being bolted to the connecting column, the adjusting hole 1 being fixedly connected to the upper leg, the lower leg being slidably connected to the upper leg, the adjusting hole 2 being fixedly connected to the lower leg, one end of the latch being slidably connected to the adjusting hole 1, and the other end being slidably connected to the adjusting hole 2, the latch serving to fix the upper leg and the lower leg, the hinge column being welded to the lower leg, the fixing plate being welded to the hinge column, the fixing plate serving to fix the lower leg, the steel chisel being slidably connected to the fixing plate, and the steel chisel serving to fix the fixing plate.
[0006] Preferably, the power distribution structure includes a base, a grid, a support plate, a fixed clamping seat and a movable clamping seat. The base is bolted to the rod body, and the base serves as a support. The grid is bolted to the rod body. One end of the support plate is bolted to the base, and the other end is bolted to the grid. The support plate serves to support the grid. The fixed clamping seat is fixedly connected to the grid. The movable clamping seat is bolted to the fixed clamping seat, and the movable clamping seat serves to fix the cable.
[0007] In order to achieve the purpose of fixing, the cutting edge is arranged between the bevel and the screw drill, the level is arranged between the fixing ring and the upper leg, the latch is arranged between the adjustment hole 1 and the adjustment hole 2, and the support plate is arranged between the base and the grid.
[0008] Furthermore, the connecting rod is arranged parallel to the rod body, the cutting edge is arranged vertically to the screw drill, the level is arranged vertically to the fixing ring, the latch is arranged vertically to the upper leg, and the base is arranged parallel to the grid.
[0009] Furthermore, the rod body is cylindrical, the cutting edge is triangular, the bevel is conical, the level is cylindrical, the upper leg is rectangular, the base is rectangular, and the grid is rectangular.
[0010] In order to achieve the overall flexible effect, the bevel is provided with one group, the cutting edge is provided with two groups, the screw drill is provided with one group, the level is provided with one group, the upper support legs are provided with four groups, the lower support legs are provided with four groups, the pins are provided with four groups, the fixed clamping seats are provided with four groups, and the movable clamping seats are provided with four groups.
[0011] The beneficial effects achieved by the utility model using the above structure are as follows: a temporary power distribution grid proposed in this scheme has the advantage that the screw drill and cutting edge in the underground structure can break the soil layer, penetrate deep into the underground to fix the pole body, thereby improving the stability of the pole body; in the reinforcement structure, adjustable legs are provided around the pole body, and the upper and lower legs can be adjusted according to the terrain, thereby improving the practicality of the grid. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 This is a schematic diagram of the overall structure of a temporary power distribution network frame proposed by the utility model;
[0013] Figure 2 This is a schematic diagram of the overall structure of a temporary power distribution network frame proposed by the utility model from another perspective;
[0014] Figure 3 for Figure 2 The structural diagram of part A in the figure;
[0015] Figure 4 for Figure 2 Schematic diagram of the structure of part B.
[0016] Among them, 1. rod body, 2. underground structure, 3. reinforcement structure, 4. power distribution structure, 5. push rod, 6. connecting rod, 7. thread, 8. bevel, 9. screw drill, 10. cutting edge, 11. screw, 12. fixing ring, 13. level, 14. connecting block, 15. connecting column, 16. upper support leg, 17. adjustment hole one, 18. lower support leg, 19. adjustment hole two, 20. latch, 21. hinge column, 22. fixing plate, 23. steel chisel, 24. base, 25. grid, 26. support plate, 27. fixed clamping seat, 28. movable clamping seat.
[0017] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. They are used together with the embodiments of the present invention to explain the present invention and do not constitute a limitation to the present invention. DETAILED DESCRIPTION
[0018] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments; based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0019] like Figure 1 , Figure 2 and Figure 3As shown, a temporary power distribution grid proposed by the utility model includes a pole body 1, an underground structure 2, a reinforcement structure 3 and a distribution structure 4, the underground structure 2 is arranged on the pole body 1, the reinforcement structure 3 is arranged on the pole body 1, and the distribution structure 4 is arranged on the pole body 1, the underground structure 2 includes a push rod 5, a connecting rod 6, a thread 7, a bevel 8, a screw drill 9 and a cutting edge 10, the push rod 5 is welded and arranged on the pole body 1, the connecting rod 6 is welded and arranged on the pole body 1, the thread 7 is fixedly arranged on the connecting rod 6, and the thread 7 plays a role of tightening, the bevel 8 is fixedly arranged on the connecting rod 6, and the bevel 8 plays a role of facilitating breaking the soil, the screw drill 9 is fixedly arranged on the connecting rod 6, and the screw drill 9 plays a role of breaking vertical soil, and the cutting edge 10 is welded and arranged on the screw drill 9, and the cutting edge 10 plays a role of breaking horizontal soil.
[0020] like Figure 1 , Figure 2 and Figure 4 As shown, the reinforcement structure 3 includes a screw 11, a fixing ring 12, a level 13, a connecting block 14, a connecting column 15, an upper leg 16, an adjustment hole 17, a lower leg 18, an adjustment hole 2 19, a latch 20, a hinge column 21, a fixing plate 22 and a steel chisel 23. The screw 11 is slidably connected to the thread 7, the fixing ring 12 is fixedly connected to the screw 11, the level 13 is riveted to the fixing ring 12, and the level 13 serves to observe whether the rod body 1 is vertical. The connecting block 14 is fixedly connected to the fixing ring 12, the connecting column 15 is bolted to the connecting block 14, and the upper leg 16 is bolted to the connecting column 15. On the upper side, an adjustment hole 17 is fixedly provided on the upper leg 16, a lower leg 18 is slidably provided on the upper leg 16, an adjustment hole 2 19 is fixedly provided on the lower leg 18, one end of a latch 20 is slidably provided on the adjustment hole 17, and the other end is slidably provided on the adjustment hole 2 19, the latch 20 plays a role in fixing the upper leg 16 and the lower leg 18, a hinge column 21 is welded on the lower leg 18, a fixing plate 22 is welded on the hinge column 21, the fixing plate 22 plays a role in fixing the lower leg 18, a steel chisel 23 is slidably provided on the fixing plate 22, and the steel chisel 23 plays a role in fixing the fixing plate 22.
[0021] like Figure 1 and Figure 2As shown, the power distribution structure 4 includes a base 24, a grid 25, a support plate 26, a fixed clamping seat 27 and a movable clamping seat 28. The base 24 is bolted to the rod body 1, and the base 24 plays a supporting role. The grid 25 is bolted to the rod body 1. One end of the support plate 26 is bolted to the base 24, and the other end is bolted to the grid 25. The support plate 26 plays a role in supporting the grid 25. The fixed clamping seat 27 is fixedly connected to the grid 25. The movable clamping seat 28 is bolted to the fixed clamping seat 27, and the movable clamping seat 28 plays a role in fixing the cable.
[0022] like Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, the cutting edge 10 is arranged between the bevel 8 and the screw drill 9, the level 13 is arranged between the fixing ring 12 and the upper leg 16, the pin 20 is arranged between the adjustment hole 17 and the adjustment hole 2 19, and the support plate 26 is arranged between the base 24 and the grid 25.
[0023] like Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, the connecting rod 6 is arranged parallel to the rod body 1, the cutting edge 10 is arranged vertically to the screw drill 9, the level 13 is arranged vertically to the fixing ring 12, the latch 20 is arranged vertically to the upper leg 16, and the base 24 is arranged parallel to the grid 25.
[0024] like Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, the rod body 1 is cylindrical, the cutting edge 10 is triangular, the bevel 8 is conical, the level 13 is cylindrical, the upper leg 16 is rectangular, the base 24 is rectangular, and the grid 25 is rectangular.
[0025] like Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, the bevel 8 is provided in one group, the cutting edge 10 is provided in two groups, the screw drill 9 is provided in one group, the level 13 is provided in one group, the upper support leg 16 is provided in four groups, the lower support leg 18 is provided in four groups, the latch 20 is provided in four groups, the fixed clamping seat 27 is provided in four groups, and the movable clamping seat 28 is provided in four groups.
[0026] When using the device specifically, the user first digs a pit in the ground to place the connecting rod 6, adjusts the lower leg 18 according to the surrounding terrain, and after the preliminary rough adjustment is completed, observes the level 13 on the fixing ring 12, and fine-adjusts according to the level 13. After the rod body 1 is vertical, the pin 20 is inserted into the adjusting hole 17 and the adjusting hole 2 19, and the fixing plate 22 on the hinge column 21 is rotated until it is vertical to the ground, and the steel drill 23 is inserted into the ground through the fixing plate 22, and the push rod 5 is rotated to make the screw drill 9 penetrate into the ground. After completion, adjust the direction of the base 24 and the grid frame 25 as needed, tighten the screws 11 after the adjustment, and then fix the base 24 and the grid frame 25 with the support plate 26, place the cable on the fixed clamping seat 27, close the movable clamping seat 28 and fix it with the screws 11. When disassembly is required, it is only necessary to open the movable clamping seat 28, unplug the pin 20 and the steel drill 23, and rotate the push rod 5 in the opposite direction, and the screw drill 9 will be separated from the ground. The above is the entire use process of a temporary power distribution grid.
[0027] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0028] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
[0029] The above description of the utility model and its implementation methods is not restrictive. The drawings show only one implementation method of the utility model, and the actual structure is not limited thereto. In short, if ordinary technicians in this field are inspired by it and design structural methods and embodiments similar to the technical solution without creativity without departing from the purpose of the invention of the utility model, they should all fall within the protection scope of the utility model.
Claims
1. A temporary power distribution network frame, characterized in that: It includes a rod body, an underground structure, a reinforcement structure and a power distribution structure, wherein the underground structure is arranged on the rod body, the reinforcement structure is arranged on the rod body, and the power distribution structure is arranged on the rod body. The underground structure includes a push rod, a connecting rod, a thread, a bevel, a screw drill and a cutting edge. The push rod is welded and arranged on the rod body, the connecting rod is welded and arranged on the rod body, the thread is fixedly arranged on the connecting rod, the bevel is fixedly arranged on the connecting rod, the screw drill is fixedly arranged on the connecting rod, and the cutting edge is welded and arranged on the screw drill.
2. A temporary power distribution network according to claim 1, characterized in that: The reinforcement structure includes screws, a fixing ring, a spirit level, a connecting block, a connecting column, an upper leg, an adjustment hole one, a lower leg, an adjustment hole two, a latch, a hinge column, a fixing plate and a steel chisel. The screw is slidably connected to the thread, the fixing ring is fixedly connected to the screw, the spirit level is riveted to the fixing ring, the connecting block is fixedly connected to the fixing ring, the connecting column is bolted to the connecting block, the upper leg is bolted to the connecting column, the adjustment hole one is fixedly connected to the upper leg, the lower leg is slidably connected to the upper leg, the adjustment hole two is fixedly connected to the lower leg, one end of the latch is slidably connected to the adjustment hole one, and the other end is slidably connected to the adjustment hole two, the hinge column is welded to the lower leg, the fixing plate is welded to the hinge column, and the steel chisel is slidably connected to the fixing plate.
3. A temporary power distribution network according to claim 2, characterized in that: The power distribution structure includes a base, a grid, a support plate, a fixed clamping seat and a movable clamping seat. The base is bolted to the rod body, the grid is bolted to the rod body, one end of the support plate is bolted to the base, and the other end is bolted to the grid, the fixed clamping seat is fixedly connected to the grid, and the movable clamping seat is bolted to the fixed clamping seat.
4. A temporary power distribution network according to claim 3, characterized in that: The cutting edge is arranged between the bevel and the screw drill, the level is arranged between the fixing ring and the upper leg, the latch is arranged between the first adjusting hole and the second adjusting hole, and the support plate is arranged between the base and the grid.
5. A temporary power distribution network according to claim 4, characterized in that: The connecting rod is arranged parallel to the rod body, the cutting edge is arranged vertically to the screw drill, the level is arranged vertically to the fixing ring, the latch is arranged vertically to the upper leg, and the base is arranged parallel to the grid.
6. A temporary power distribution network according to claim 5, characterized in that: The rod body is cylindrical, the cutting edge is triangular, the bevel is conical, the level is cylindrical, the upper leg is rectangular, the base is rectangular, and the grid is rectangular.
7. A temporary power distribution network according to claim 6, characterized in that: The bevels are provided in one group, the cutting edges are provided in two groups, the screw drills are provided in one group, the levels are provided in one group, the upper legs are provided in four groups, the lower legs are provided in four groups, the latches are provided in four groups, the fixed clamping seats are provided in four groups, and the movable clamping seats are provided in four groups.
Citation Information
Cited By
Temporary power distribution network frame
CN122436861A