Lifting appliance for bridge pre-component
By designing bridge pre-component spreaders, the bridge is stable lifting using beams, pulley components and fixtures, solving the problems of lifting material offset and complex operation, and improving safety and operation convenience.
Patent Information
- Application Number
- CN202421019602.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-11
- Publication Date
- 2024-12-24
- Estimated Expiration
- 2034-05-11
AI Technical Summary
During the bridge construction process, lifting materials are prone to offset, resulting in safety accidents. The existing technology requires the two cranes to be coordinated simultaneously and carried out under strict monitoring of ground personnel, and the operation is complicated and unsafe.
A bridge pre-component spreader is designed, including cross beams, pulley components, fixtures and suspenders. The bridge is stably lifted through mounting plates, pulleys and fixtures at both ends of the cross beam, avoiding coordination of multiple cranes and simplifying operation.
It effectively avoids material deviation, simplifies the lifting process, improves safety and operation convenience, and reduces safety hazards.
Smart Images

Figure CN222225715U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of slings, in particular to a sling for bridge prefabricated components. Background Art
[0002] In the existing technology, when building a bridge, in some scenarios, two cranes are needed to suspend the same material. The two cranes need to be coordinated synchronously, and the ground personnel need to carefully observe whether the material is offset. At the same time, during the lifting process, personnel are prohibited from standing under the material, and can only stand around the material and keep a safe distance. Therefore, if the two cranes are not coordinated and the ground personnel do not observe carefully, the material may be seriously offset, resulting in a safety accident. To this end, we propose a hoist for bridge prefabricated components. Utility Model Content
[0003] In order to solve the above technical problems or at least partially solve the above technical problems, the present application provides a hanger for bridge prefabricated components.
[0004] The present application provides a bridge prefabricated component hanger, comprising:
[0005] A crossbeam, both ends of which are fixedly connected to mounting plates, the mounting plate being divided into a symmetrical first mounting portion and a second mounting portion by the crossbeam, the second mounting portion being located below the first mounting portion, and a hanging hole being provided at one end of the first mounting portion away from the crossbeam;
[0006] A pulley assembly located at both ends of the crossbeam, the pulley assembly comprising a fixing bar, a first pulley and a second pulley, the fixing bar being connected to an end of the second mounting portion away from the crossbeam, the first pulley and the second pulley being symmetrically connected to both ends of the fixing bar, and the first pulley and the second pulley being connected to a first steel rope and a second steel rope respectively;
[0007] A clamp, the first steel rope and the second steel rope are connected to the clamp at one end away from the fixing bar, and the clamp is used to clamp the bridge prefabricated component;
[0008] A hanging rope passes through the hanging hole and is connected to the first mounting portion.
[0009] In a possible embodiment, the clamp includes a clamp body and a pressure block, the clamp body is connected to one end of the first steel rope or the second steel rope away from the fixing bar, and a clamping space for clamping the bridge prefabricated component is formed between the pressure block and the clamp body.
[0010] In a possible embodiment, it also includes a clamping bolt, a first mounting hole is opened on the clamp body, a second mounting hole is opened on the pressure block corresponding to the first mounting hole, and the clamping bolt passes through the second mounting hole and the first mounting hole in sequence to enable the pressure block to be adjustably connected to the clamp body.
[0011] In a possible implementation, a connecting bar is further included, which is arranged in a vertical direction, and one end of the connecting bar is connected to the clamp body, and the other end of the connecting bar is connected to one end of the first steel rope or the second steel rope.
[0012] In a possible implementation manner, a connection hole is formed at one end of the connection strip away from the clamp body.
[0013] In a possible implementation manner, a first thread is provided on a side of the clamp body facing the pressing block, and a second thread is provided on a side of the pressing block facing the clamp body.
[0014] In a possible implementation manner, the crossbeam is made of steel.
[0015] The above technical solution provided by the embodiment of the present application has the following advantages compared with the prior art:
[0016] By fixing the mounting plate at both ends of the beam and dividing the mounting plate into a first mounting portion and a second mounting portion, the first pulley and the second pulley are connected to the second mounting portion using a fixing bar, and the first steel rope and the second steel rope are respectively connected to the first pulley and the second pulley, and then the bridge pre-component is clamped by a clamp, and the clamp is connected to the first steel rope and the second steel rope, and finally the beam is lifted by a lifting equipment, thereby lifting the bridge pre-component. The lifting can be achieved without the use of multiple cranes, and the serious deviation of the lifting materials can be effectively solved. The structure is simple and the operation is convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The accompanying drawings herein are incorporated in and constitute a part of the specification, illustrate embodiments consistent with the present utility model, and together with the description, are used to explain the principles of the present utility model.
[0018] In order to more clearly illustrate the technical solutions in the embodiments of the utility model or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0019] In the attached figure:
[0020] Figure 1It is a structural schematic diagram of the hanger of the bridge prefabricated component of the utility model;
[0021] Figure 2 It is a structural schematic diagram of the hanger of the bridge prefabricated component of the utility model from another perspective;
[0022] Figure 3 yes Figure 2 Schematic diagram of the structure at A in the middle.
[0023] Figure Number:
[0024] 10. Crossbeam; 20. Mounting plate; 21. First mounting portion; 21a. Hanging hole; 22. Second mounting portion; 30. Pulley assembly; 31. Fixing bar; 32. First pulley; 33. Second pulley; 40. Clamp; 41. Clamp body; 41a. First thread; 42. Press block; 42a. Second thread; 43. Connecting bar; 43a. Connecting hole; 50. First steel rope; 60. Second steel rope; 70. Bridge prefabricated component. DETAILED DESCRIPTION
[0025] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, the specific implementation methods of the present invention are now described in detail with reference to the accompanying drawings. In the following description, it should be understood that the directions or positional relationships indicated by "front", "back", "up", "down", "left", "right", "longitudinal", "horizontal", "vertical", "horizontal", "top", "bottom", "inside", "outside", "head", "tail", etc. are based on the directions or positional relationships shown in the accompanying drawings, are constructed and operated in a specific direction, and are only for the convenience of describing the present technical solution, rather than indicating that the device or element referred to must have a specific direction, and therefore cannot be understood as a limitation to the present invention.
[0026] It should also be noted that, unless otherwise clearly specified and limited, the terms such as "installed", "connected", "connected", "fixed", "set" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. When an element is referred to as being "on" or "under" another element, the element can be "directly" or "indirectly" located on the other element, or there may be one or more intermediate elements. The terms "first", "second", "third", etc. are only for the convenience of describing the present technical solution, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first", "second", "third", etc. can explicitly or implicitly include one or more of the features. For those of ordinary skill in the art, the specific meanings of the above terms in the present utility model can be understood according to the specific circumstances.
[0027] In the following description, specific details such as specific system structures and technologies are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present invention. However, it should be clear to those skilled in the art that the present invention can also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to avoid unnecessary details that hinder the description of the present invention.
[0028] Please refer to Figures 1 to 3 The present application provides a suspension device for a bridge prefabricated component 70 , including a beam 10 , a clamp 40 , a suspension rope, and pulley assemblies 30 located at both ends of the beam 10 .
[0029] Specifically, both ends of the beam 10 are fixedly connected with a mounting plate 20, and the mounting plate 20 is divided into a symmetrical first mounting portion 21 and a second mounting portion 22 by the beam 10. The second mounting portion 22 is located below the first mounting portion 21, and a hanging hole 21a is provided at the end of the first mounting portion 21 away from the beam 10; the pulley assembly 30 includes a fixing bar 31, a first pulley 32 and a second pulley 33, the fixing bar 31 is connected to the end of the second mounting portion 22 away from the beam 10, the first pulley 32 and the second pulley 33 are symmetrically connected to both ends of the fixing bar 31, and the first pulley 32 and the second pulley 33 are respectively connected with a first steel rope 50 and a second steel rope 60; the first steel rope 50 and the second steel rope 60 are connected to the ends away from the fixing bar 31 with a clamp 40, and the clamp 40 is used to clamp the bridge prefabricated component 70; the suspension rope passes through the hanging hole 21a and is connected to the first mounting portion 21.
[0030] For example, when hoisting prefabricated bridge components, four steel wire ropes are wound into a lifting rope, and then the two ends of the lifting rope are respectively passed through the hanging holes of the first mounting part at both ends of the beam to connect the beam, thereby facilitating the subsequent use of a lifting device to smoothly lift the clamped prefabricated bridge components as a whole to avoid shaking during the lifting process.
[0031] The hoist of the bridge pre-component 70 based on the above technical features is achieved by fixing the mounting plate 20 at both ends of the beam 10, and dividing the mounting plate 20 into a first mounting portion 21 and a second mounting portion 22, and then connecting the first pulley 32 and the second pulley 33 to the second mounting portion 22 by using the fixing bar 31, and then connecting the first steel rope 50 and the second steel rope 60 to the first pulley 32 and the second pulley 33 respectively, and then clamping the bridge pre-component 70 by using the clamp 40, and connecting the clamp 40 to the first steel rope 50 and the second steel rope 60, and finally lifting the beam 10 by using the lifting equipment, so as to realize the lifting of the bridge pre-component 70, and the lifting can be realized without the cooperation of multiple cranes, which can effectively solve the problem of serious displacement of the lifting materials, and has a simple structure and is easy to operate.
[0032] In a possible embodiment, the clamp 40 includes a clamp body 41 and a pressure block 42. The clamp body 41 is connected to one end of the first steel rope 50 or the second steel rope 60 away from the fixing bar 31. A clamping space for clamping the bridge prefabricated component 70 is formed between the pressure block 42 and the clamp body 41.
[0033] In a possible embodiment, a clamping bolt is further included. A first mounting hole is opened on the clamp body 41, and a second mounting hole is opened on the pressure block 42, which is opposite to the first mounting hole. The clamping bolt passes through the second mounting hole and the first mounting hole in sequence, so that the pressure block 42 can be adjustably connected to the clamp body 41.
[0034] Exemplarily, when the bridge pre-component 70 needs to be hoisted, the clamp body 41 and the pressure block 42 are used to clamp the steel bars of the bridge pre-component 70. At this time, the first mounting hole and the second mounting hole are aligned. Then, the clamping bolt is passed through the first mounting hole and the second mounting hole in sequence and locked to clamp the bridge pre-component 70. Then, the clamp body 41 is connected to the first steel rope 50 or the second steel rope 60. Finally, the lifting equipment is used to lift the beam 10, thereby lifting the bridge pre-component 70. The operation is convenient and the lifting steps can be simplified.
[0035] In a possible implementation, a connecting bar 43 is further included. The connecting bar 43 is arranged in a vertical direction, and one end of the connecting bar 43 is connected to the clamp body 41 , and the other end of the connecting bar 43 is connected to one end of the first steel rope 50 or the second steel rope 60 .
[0036] In a possible implementation, a connection hole 43a is provided at one end of the connection bar 43 away from the clamp body 41. Thus, by providing the connection hole 43a on the connection bar 43, one end of the first steel rope 50 or the second steel rope 60 can pass through the connection hole 43a for fastening. Since the clamp body 41 is connected to the connection bar 43, the connection between the clamp body 41 and the first steel rope 50 or the second steel rope 60 can be achieved. The structure is simple and the disassembly is convenient. The corresponding clamp body 41 can be used according to different bridge prefabricated components 70.
[0037] In a possible implementation manner, a first thread 41 a is provided on a side of the clamp body 41 facing the pressing block 42 , and a second thread 42 a is provided on a side of the pressing block 42 facing the clamp body 41 .
[0038] Exemplarily, by distributing the first thread 41a and the second thread 42a on the clamp body 41 and the pressure block 42, when the steel bars of the bridge precomponent 70 are clamped, the first thread 41a and the second thread 42a can increase the contact friction with the steel bars of the bridge precomponent 70, thereby increasing the clamping effect on the bridge precomponent 70 and further strengthening the clamping of the bridge precomponent 70.
[0039] In a possible implementation, the cross beam 10 is made of steel. Thus, the cross beam 10 made of steel can have sufficient strength to avoid breakage during the hoisting process, which poses a safety hazard.
[0040] It can be understood that the above embodiments only express the preferred implementation methods of the utility model, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the patent scope of the utility model. It should be pointed out that, for ordinary technicians in this field, without departing from the concept of the utility model, the above-mentioned technical features can be freely combined, and several deformations and improvements can be made, which all belong to the protection scope of the utility model. Therefore, all equivalent changes and modifications made to the scope of the claims of the utility model should belong to the scope covered by the claims of the utility model.
Claims
1. A hanger for a bridge prefabricated component, characterized in that: include: A crossbeam, both ends of which are fixedly connected to mounting plates, the mounting plate being divided into a symmetrical first mounting portion and a second mounting portion by the crossbeam, the second mounting portion being located below the first mounting portion, and a hanging hole being provided at one end of the first mounting portion away from the crossbeam; A pulley assembly located at both ends of the crossbeam, the pulley assembly comprising a fixing bar, a first pulley and a second pulley, the fixing bar being connected to an end of the second mounting portion away from the crossbeam, the first pulley and the second pulley being symmetrically connected to both ends of the fixing bar, and the first pulley and the second pulley being connected to a first steel rope and a second steel rope respectively; A clamp, the first steel rope and the second steel rope are connected to the clamp at one end away from the fixing bar, and the clamp is used to clamp the bridge prefabricated component; A hanging rope passes through the hanging hole and is connected to the first mounting portion.
2. The bridge prefabricated member lifting device according to claim 1, characterized in that: The clamp includes a clamp body and a pressure block. The clamp body is connected to one end of the first steel rope or the second steel rope away from the fixing bar. A clamping space for clamping the bridge prefabricated component is formed between the pressure block and the clamp body.
3. The bridge prefabricated member lifting device according to claim 2, characterized in that: It also includes a clamping bolt. The clamp body is provided with a first mounting hole, and the pressure block is provided with a second mounting hole opposite to the first mounting hole. The clamping bolt passes through the second mounting hole and the first mounting hole in sequence to enable the pressure block to be adjustably connected to the clamp body.
4. The bridge prefabricated member lifting device according to claim 2, characterized in that: It also includes a connecting bar, which is arranged in a vertical direction, and one end of the connecting bar is connected to the clamp body, and the other end of the connecting bar is connected to one end of the first steel rope or the second steel rope.
5. The hanger for bridge prefabricated components according to claim 4, characterized in that: A connecting hole is formed at one end of the connecting strip away from the clamp body.
6. The hanger for bridge prefabricated components according to claim 2, characterized in that: A first thread is disposed on a side of the clamp body facing the pressing block, and a second thread is disposed on a side of the pressing block facing the clamp body.
7. The hanger for bridge prefabricated components according to claim 1, characterized in that: The crossbeam is made of steel.