High fill combined structure retaining wall

By setting up a multi-layer retaining structure and greening mechanism on the left side of the retaining wall of the high-fill combined structure, the problem of reduced amount of fill soil and increased footprint caused by insufficient height in the prior art is solved, and filling is achieved Increase the amount of soil and the reduction of land area, and reduce soil loss and aesthetics through greening.

CN222227362UInactive Publication Date: 2024-12-24CHINA CONSTR SECOND ENG BUREAU LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420628725.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-29
Publication Date
2024-12-24
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The height of the existing high-fill combined structure retaining wall is insufficient, resulting in a small angle on the left side of the fill soil, which reduces the amount of fill soil and increases the footprint, which cannot meet the needs of users.

Method used

A high-fill combined structure retaining wall was designed. By setting up a retaining structure on the left side of the high-fill soil and setting up a greening mechanism inside, including bottom plates, floor piles, retaining wall plates, layered plates, and anti-sinking piles , drainage layers, drainage pipes, reinforcement ribs and grilles to form a multi-layer retaining structure and greening system, increase the amount of fill soil and reduce the area of ​​land, and greening to reduce soil loss.

Benefits of technology

The multi-layer retaining structure increases the amount of fill soil, reduces the footprint, and reduces soil loss and increases aesthetics through greening mechanisms, meeting the needs of users.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222227362U_ABST
    Figure CN222227362U_ABST
Patent Text Reader

Abstract

The utility model relates to a high-fill combined structure retaining wall which comprises high-fill soil, a retaining structure is arranged on the left side of the high-fill soil, a greening mechanism is arranged in the high-fill soil, the retaining structure comprises a bottom plate, a ground pile is fixedly installed at the bottom of the bottom plate, a retaining wall plate is fixedly installed at the top of the bottom plate, and the greening mechanism is arranged in the retaining wall plate. A connecting inclined plate is fixedly mounted at the top of the bottom plate, layering plates are fixedly mounted at the top of the retaining wall plate and the top of the connecting inclined plate, and anti-sinking piles are fixedly mounted at the tops of the layering plates. According to the high-fill combined structure retaining wall, by arranging the retaining structure, the purpose of retaining soil of a high fill is achieved, the amount of filling soil is increased, the occupied area of the filling soil is reduced, by arranging the greening mechanism, the effect of greening the retaining wall is achieved, soil loss can be reduced, and the attractiveness of the retaining wall is improved; and the use requirements of users are met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of retaining walls, in particular to a retaining wall with a high-fill composite structure. Background Art

[0002] High fill projects generally have the following characteristics: they are located in high-intensity earthquake zones, and the fill height is large, often reaching tens to hundreds of meters. The post-construction settlement and deformation are large, the slope is steep, the stability of the covering soil layer is poor, the bearing capacity is low, and under complex working conditions, it is easy to cause old landslides to revive and other diseases. Construction projects are mostly located in valleys, steep slopes and other terrains, with narrow sites and inconvenient transportation, large-scale construction machinery is difficult, and the material supply cost is high. The use of slope reduction in high fill sections requires occupying a lot of land outside the road sideline. For example, if the fill height is 10m, the slope reduction requires an area of ​​15m, and if it exceeds 6m, it is necessary to increase the width of the staggered graded slope reduction by 2m. The width of the 10m high fill slope reaches 17m. The use of retaining walls can greatly reduce the land occupation, which is a common method to reduce the land occupation in fill sections.

[0003] A high fill composite structure retaining wall proposed in the patent with announcement number CN215715497U, the high fill composite structure retaining wall, through structural optimization design, directly transmits the ground load to the lower stable stratum through the upper reinforced soil permeable retaining wall and the lower buttress type permeable retaining wall structure, the lower buttress type permeable retaining wall structure has good anti-bending, anti-shear, anti-overturning and strong anti-slip performance, can improve the safety factor of the slope anti-sliding stability, the upper reinforced soil permeable retaining wall has the advantages of high shear strength, strong adaptability to deformation, smooth drainage and good stability, the bottom drainage layer is used to discharge rainwater from the top of the slope, seepage of the upper fill layer and the bottom drainage layer, to ensure that the groundwater and groundwater of the site will not have an adverse effect on the stability of the site, and the combined structure with the best safety and economic benefits can be obtained by adjusting the upper and lower heights, the slope ratio of the upper reinforced soil permeable retaining wall, etc.

[0004] However, the height of the high fill composite structure retaining wall is not enough, which makes the angle of the left side of the fill soil smaller, reduces the amount of fill soil, and increases the area occupied by the fill soil, which does not meet the user's use needs. Therefore, a high fill composite structure retaining wall is proposed to solve the above problems. Utility Model Content

[0005] In view of the shortcomings of the prior art, the utility model provides a high fill composite structure retaining wall, which has the advantage of constructing the retaining wall in layers and solves the problem that the height of the high fill composite structure retaining wall is not enough, which makes the angle of the left side of the fill soil smaller, reduces the amount of fill soil, and at the same time increases the area occupied by the fill soil, which does not meet the user's use needs.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a high fill combined structure retaining wall, comprising high fill soil, a retaining structure is arranged on the left side of the high fill soil, and a greening mechanism is arranged inside the high fill soil;

[0007] The retaining structure includes a base plate, a ground pile is fixedly installed at the bottom of the base plate, a retaining wall plate is fixedly installed at the top of the base plate, a connecting inclined plate is fixedly installed at the top of the base plate, a layered plate is fixedly installed at the top of the retaining wall plate and the top of the connecting inclined plate, and an anti-sinking pile is fixedly installed at the top of the layered plate.

[0008] The utility model adopts the technical scheme and is provided with a retaining structure, thereby achieving the purpose of retaining high fill, increasing the amount of fill soil and reducing the area occupied by the fill soil.

[0009] Furthermore, the greening mechanism includes a drainage layer, a drainage ditch is cast in concrete on the left side of the base plate, and a drainage pipe with one end penetrating through and extending above the drainage ditch is fixedly installed inside the drainage layer.

[0010] The utility model adopts the above technical solution and is provided with a greening mechanism, so as to play the role of greening the retaining wall, reduce soil loss and increase the aesthetics of the retaining wall.

[0011] Furthermore, a pile foundation cap beam is arranged on the top of the ground pile, and the bottom of the base plate and the pile foundation cap beam are integrally formed by cast-in-situ reinforced concrete.

[0012] The beneficial effect of adopting the above further solution is that the connection between the base plate and the ground piles is convenient.

[0013] Furthermore, the base plate, retaining wall plate, layered plate and anti-sinking piles are rigidly connected to form an integrated structure.

[0014] The beneficial effect of adopting the above further solution is to prevent cracks from occurring in the retaining structure.

[0015] Furthermore, the drainage layer is a crushed stone or pebble cushion layer wrapped with a geotextile with a thickness of 1.5 meters, and the drainage pipes are arranged every three meters.

[0016] The beneficial effect of adopting the above further solution is that excess water is discharged.

[0017] Furthermore, a reinforcing rib is fixedly installed on the left side of the connecting inclined plate, and the reinforcing rib is arranged every six meters.

[0018] The beneficial effect of adopting the above further solution is: increasing the strength of the retaining structure.

[0019] Furthermore, a grille is fixedly installed between opposite sides of the two reinforcing ribs, and green plants are arranged at the gaps between the grilles.

[0020] The beneficial effect of adopting the above further scheme is that greening plants can reduce soil loss.

[0021] Compared with the prior art, the technical solution of this application has the following beneficial effects:

[0022] The high fill composite structure retaining wall achieves the purpose of retaining high fill by providing a retaining structure, increases the amount of fill soil, and reduces the area occupied by fill soil. The greening mechanism is provided to green the retaining wall, which can reduce soil loss and increase the aesthetics of the retaining wall. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the structure of the utility model;

[0024] Figure 2 The utility model structure Figure 1 Left view of

[0025] Figure 3 It is a three-dimensional diagram of the earth retaining structure of the utility model.

[0026] In the figure: 1. high fill; 2. retaining structure; 201. bottom plate; 202. ground piles; 203. retaining wall panels; 204. layered panels; 205. anti-sinking piles; 206. connecting inclined panels; 3. greening structure; 301. drainage layer; 302. drainage pipe; 303. drainage ditch; 304. reinforcing ribs; 305. grilles; 306. greening plants. DETAILED DESCRIPTION

[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0028] See also Figure 1-3 A high fill composite structure retaining wall in this embodiment includes a high fill 1, a retaining structure 2 is arranged on the left side of the high fill 1, a greening mechanism 3 is arranged inside the high fill 1, the retaining structure 2 includes a bottom plate 201, a ground pile 202 is fixedly installed at the bottom of the bottom plate 201, a pile foundation crown beam is arranged on the top of the ground pile 202, and the bottom of the bottom plate 201 and the pile foundation crown beam are cast-in-place reinforced concrete as a whole.

[0029] Among them, a retaining wall panel 203 is fixedly installed on the top of the base plate 201, a connecting inclined plate 206 is fixedly installed on the top of the base plate 201, a layered plate 204 is fixedly installed on the top of the retaining wall panel 203 and the top of the connecting inclined plate 206, and an anti-sinking pile 205 is fixedly installed on the top of the layered plate 204. The base plate 201, the retaining wall panel 203, the layered plate 204 and the anti-sinking pile 205 are rigidly connected to form an integrated structure.

[0030] Specifically, the bottom plate 201 and the ground piles 202 prevent the retaining wall panels 203 from sinking, the retaining wall panels 203 and the layered panels 204 restrict the high fill 1 to prevent it from collapsing, the connecting inclined plates 206 and the anti-sinking piles 205 prevent the layered panels 204 from sinking, and the multi-layer retaining structure 2 increases the amount of fill and reduces the area occupied by the fill.

[0031] In this embodiment, the greening mechanism 3 includes a drainage layer 301, a drainage ditch 303 is cast in the concrete on the left side of the base plate 201, and a drainage pipe 302 with one end penetrating through and extending above the drainage ditch 303 is fixedly installed inside the drainage layer 301. The drainage layer 301 is a gravel or pebble cushion layer wrapped with a 1.5-meter thick geotextile, and a drainage pipe 302 is arranged every three meters.

[0032] Among them, a reinforcing rib 304 is fixedly installed on the left side of the connecting inclined plate 206, and a reinforcing rib 304 is arranged every six meters. A grille 305 is fixedly installed between the opposite sides of the two reinforcing ribs 304, and green plants 306 are arranged in the gaps of the grille 305.

[0033] Specifically, water flows into the drainage ditch 303 through the drainage layer 301 and the drainage pipe 302, and the rainwater outside waters the green plants 306. The grille 305 provides a suitable living environment for the green plants 306, thereby reducing soil loss through the green plants 306 and increasing the aesthetics of the retaining structure 2.

[0034] The working principle of the above embodiment is:

[0035] (1) The bottom plate 201 and the ground piles 202 prevent the retaining wall 203 from sinking. The retaining wall 203 and the layered plate 204 restrict the high fill 1 to prevent it from collapsing. The connecting inclined plate 206 and the anti-sinking piles 205 prevent the layered plate 204 from sinking. The multi-layer retaining structure 2 increases the amount of fill and reduces the area occupied by the fill.

[0036] (2) Water flows through the drainage layer 301 and the drainage pipe 302 into the drainage ditch 303, and the rainwater outside waters the green plants 306. The grille 305 provides a suitable living environment for the green plants 306, thereby reducing soil loss through the green plants 306 and increasing the aesthetics of the retaining structure 2.

[0037] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0038] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A high fill composite structure retaining wall, comprising high fill soil (1), characterized in that: A retaining structure (2) is arranged on the left side of the high fill (1), and a greening mechanism (3) is arranged inside the high fill (1); The retaining structure (2) comprises a base plate (201), a ground pile (202) is fixedly installed at the bottom of the base plate (201), a retaining wall plate (203) is fixedly installed at the top of the base plate (201), a connecting inclined plate (206) is fixedly installed at the top of the base plate (201), a layered plate (204) is fixedly installed at the top of the retaining wall plate (203) and the top of the connecting inclined plate (206), and an anti-sinking pile (205) is fixedly installed at the top of the layered plate (204).

2. A high fill composite structure retaining wall according to claim 1, characterized in that: The greening mechanism (3) comprises a drainage layer (301), a drainage ditch (303) is cast in concrete on the left side of the base plate (201), and a drainage pipe (302) with one end penetrating through and extending above the drainage ditch (303) is fixedly installed inside the drainage layer (301).

3. The high fill composite structure retaining wall according to claim 1, characterized in that: A pile foundation cap beam is arranged on the top of the ground pile (202), and the bottom of the base plate (201) and the pile foundation cap beam are integrally formed of cast-in-place reinforced concrete.

4. The high fill composite structure retaining wall according to claim 1, characterized in that: The base plate (201), the retaining wall plate (203), the layered plate (204) and the anti-sinking piles (205) are rigidly connected to form an integrated structure.

5. The high fill composite structure retaining wall according to claim 2, characterized in that: The drainage layer (301) is a crushed stone or pebble cushion layer wrapped with a geotextile having a thickness of 1.5 meters, and the drainage pipes (302) are arranged at intervals of three meters.

6. The high fill composite structure retaining wall according to claim 2, characterized in that: A reinforcing rib (304) is fixedly installed on the left side of the connecting inclined plate (206), and one reinforcing rib (304) is arranged every six meters.

7. The high fill composite structure retaining wall according to claim 6, characterized in that: A grille (305) is fixedly installed between opposite sides of the two reinforcing ribs (304), and green plants (306) are arranged at the gaps between the grilles (305).