Prefabricated part of cast-in-place building combined type pressure-bearing platform

By setting a fixing device for reserved holes and mounting parts on the prefabricated components of the cast-in-place building combined pressure-bearing platform, the problem of unstable binding of the suspended rope during crane lifting is solved, and stability and safety during the lifting process are achieved. Avoid safety accidents.

CN222227540UActive Publication Date: 2024-12-24TIANYUAN CONSTR GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420711536.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-09
Publication Date
2024-12-24
Estimated Expiration
2034-04-09

AI Technical Summary

Technical Problem

In the prior art, the rope is unstable when the crane lifts prefabricated components, resulting in safety accidents.

Method used

A prefabricated component of a cast-in-place building combined pressure-bearing platform is designed, and reserved holes and mounting parts are provided on the body of the pressure-bearing platform. The mounting parts are equipped with rotating connection fixing devices, including fixing rods, oblique rods, and inserts. The rod, circular plate, pad plate and spring, through the cooperation of these components, the suspension lugs and hooks are fixed, avoiding the binding of the suspension rope, and improving the safety of the suspension.

Benefits of technology

Through the design of the fixture, stability and safety during the lifting process are achieved, safety accidents caused by unstable tying of the suspended rope are avoided, and operation convenience of staff are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222227540U_ABST
    Figure CN222227540U_ABST
Patent Text Reader

Abstract

The utility model provides a prefabricated part of a cast-in-place building combined type pressure-bearing platform, which relates to the technical field of constructional engineering and comprises a pressure-bearing platform body, a plurality of steel bars are fixedly connected in the pressure-bearing platform body and are equally divided into two groups, and the steel bars are arranged in the pressure-bearing platform body. Four preformed holes are evenly formed in the upper surface of the pressure-bearing platform body and located in the four corners of the pressure-bearing platform body, mounting parts are arranged on the pressure-bearing platform body through the preformed holes, lifting lugs are rotatably connected to the surfaces of the mounting parts, fixing devices are arranged in the mounting parts, and the lifting lugs are rotatably connected to the surfaces of the fixing devices. The fixing device comprises a fixing rod, the fixing rod is arranged in the mounting piece, the effect that a worker can conveniently lift the pressure-bearing platform body through a crane is achieved through the fixing device, and the situation that when the worker lifts the pressure-bearing platform body through a lifting rope, due to the fact that the lifting rope is bound unstably, the pressure-bearing platform body is damaged is avoided. And therefore, safety accidents are avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building engineering, in particular to a prefabricated component of a cast-in-place building combined pressure-bearing platform. Background Art

[0002] With the development of modern industrial technology, when constructing buildings such as bridges and houses, the components of these buildings are generally prefabricated, then transported to the construction site and transported to the designated place for assembly by crane, thereby increasing the construction speed of the building.

[0003] In the prior art, when using a crane to hoist these prefabricated components, two lifting ropes are generally tied to the two ends of the prefabricated components, and then the crane hooks the two lifting ropes through a hook and lifts them up. However, when the workers use the lifting ropes to tie the prefabricated components, in order to prevent the lifting ropes from detaching from the prefabricated components, they generally wrap the lifting ropes around them for a large number of turns, which brings inconvenience to the workers. Utility Model Content

[0004] The utility model is to solve the shortcomings in the prior art and provides a prefabricated component of a cast-in-place building combined pressure-bearing platform.

[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a prefabricated component of a cast-in-place combined pressure-bearing platform, including a pressure-bearing platform body, a plurality of steel bars are fixedly connected inside the pressure-bearing platform body, and the plurality of steel bars are equally divided into two groups. Four reserved holes are evenly opened on the upper surface of the pressure-bearing platform body, and the four reserved holes are located at the four corners of the pressure-bearing platform body. The pressure-bearing platform body is provided with a mounting piece by means of the reserved holes, and a lifting ear is rotatably connected to the surface of the mounting piece. A fixing device is provided inside the mounting piece, and the fixing device includes a fixing rod, and the fixing rod is arranged inside the mounting piece. The fixing rod is located at the Two inclined rods are rotatably connected to one end of the mounting piece, and a circular plate is fixedly connected to the end of the fixing rod away from the inclined rod. Two symmetrical plug rods are slidably connected to the inside of the mounting piece, and one end of the inclined rod is rotatably connected to the plug rod. Reinforcing ribs are arranged inside the plug rod. A plug hole is provided at the position of the pressure platform body corresponding to the plug rod. The size of the plug rod matches the size of the plug hole, and the plug hole is located between two groups of steel bars. Two symmetrical pads are fixedly connected to the upper surface of the mounting piece, and a spring is fixedly connected to the end of the two pads close to each other, and a clamping plate is fixedly connected to the end of the spring away from the pad, and the cross-section of the clamping plate is trapezoidal.

[0006] The effect achieved by the above components is: when it is necessary to hoist the pressure platform body, first move the mounting piece, insert the four mounting pieces into the four reserved holes respectively, then press the circular plate, the circular plate moves the fixing rod toward the inside of the mounting piece, the inclined rod rotates, and the insertion rod is moved toward the insertion hole by the inclined rod. When the circular plate moves to the position of the clamping plate, the circular plate squeezes the inclined surface of the clamping plate, the clamping plate moves toward the direction of the pad, and the spring contracts. After the circular plate moves over the clamping plate, the clamping plate moves to the top of the circular plate under the action of the spring return elastic force. At this time, the clamping plate clamps the circular plate, thereby achieving the fixing rod and the insertion rod. To achieve the effect of fixing, the lifting ear is hung with the hook of the crane to lift the pressure platform body, wherein the socket for inserting the plug rod is located between the two steel bars, which enhances the load-bearing effect of the socket and avoids the cracking of the pressure platform body as much as possible. After the pressure platform body is moved to a suitable position, the mounting parts are removed from the pressure platform body, and the reserved holes are refilled with concrete. The fixing device facilitates the staff to lift the pressure platform body with a crane, and avoids the situation where the staff lifts the pressure platform body with a lifting rope and the lifting rope is unstable, thereby causing a safety accident.

[0007] Preferably, a limit rod is slidably provided on the surface of the pad, and one end of the limit rod is fixedly connected to the clamping plate.

[0008] The effect achieved by the above components is: by setting the limit rod, the effect of limiting the moving direction of the card plate is achieved, thereby preventing the card plate from rotating and improving the stability of the card plate movement.

[0009] Preferably, a placement groove is provided on the top of the mounting member, and the size of the placement groove is adapted to the size of the circular plate.

[0010] The effect achieved by the above components is: the circular plate can be placed by setting the placement groove, so that the circular plate can be conveniently hidden.

[0011] Preferably, a groove is formed at one end of the circular plate away from the fixing rod, and the circular plate is fixedly connected to the pulling rod via the groove.

[0012] The effect achieved by the above components is: the pull rod inside the groove makes it convenient for the staff to pull the circular plate, which brings convenience to the staff to disassemble and install the parts.

[0013] Preferably, the arc surface of the lifting ear is provided with an auxiliary device, which includes a fixing frame, which is fixedly connected to the arc surface of the lifting ear, and a screw is threadedly connected to the surface of the fixing frame, and one end of the screw located inside the fixing frame is rotatably connected to a clamping plate, and the cross-section of the clamping plate is arc-shaped.

[0014] The effect achieved by the above components is: when it is necessary to lift the lifting ear with a hook, pass the hook through the fixing frame, then rotate the screw, the screw moves with the clamping plate in the direction of the hook, the clamping plate and the lifting ear clamp the hook, thereby achieving the effect of fixing the hook. The effect of fixing the hook is achieved through the auxiliary device, which prevents the hook and the lifting ear from falling off when the crane hook lifts the pressure platform body, thereby improving the safety of the pressure platform body during installation.

[0015] Preferably, one end of the screw rod away from the clamping plate is fixedly connected to a handle, and the surface of the handle is provided with anti-slip grooves.

[0016] The effect achieved by the above components is: by providing the handle, it is convenient for the staff to rotate the screw, which brings convenience to the staff.

[0017] Preferably, a rubber pad is fixedly connected to one side of the clamping plate away from the screw rod, and the size of the rubber pad is matched with the size of the clamping plate.

[0018] The effect achieved by the above components is: the friction between the clamping plate and the hook is increased by arranging the rubber pad, thereby preventing the hook from sliding.

[0019] Preferably, a sliding rod is slidably provided on the surface of the fixing frame, and one end of the sliding rod is fixedly connected to the clamping plate.

[0020] The effects achieved by the above components are: by setting the slide bar, the moving direction of the splint is restricted, the rotation of the splint is prevented, and the stability of the movement of the splint is improved.

[0021] In summary, the beneficial effects of the utility model are:

[0022] When the pressure-bearing platform body needs to be hoisted, first move the mounting piece, insert the four mounting pieces into the four reserved holes respectively, then press the circular plate, the circular plate moves the fixing rod toward the inside of the mounting piece, the inclined rod rotates, and the insertion rod is moved toward the insertion hole by the inclined rod. When the circular plate moves to the position of the clamping plate, the circular plate squeezes the inclined surface of the clamping plate, the clamping plate moves toward the pad, and the spring contracts. After the circular plate moves over the clamping plate, the clamping plate moves to the top of the circular plate under the action of the spring return elastic force. At this time, the clamping plate clamps the circular plate, thereby achieving the effect of fixing the fixing rod and the insertion rod. The result is achieved by hanging the lifting ear with the hook of the crane to lift the pressure platform body, wherein the socket for inserting the plug rod is located between the two steel bars, which strengthens the load-bearing effect of the socket and avoids the cracking of the pressure platform body as much as possible. After the pressure platform body is moved to a suitable position, the mounting parts are removed from the pressure platform body, and the reserved holes are refilled with concrete. The fixing device is used to facilitate the staff to lift the pressure platform body with a crane, avoiding the occurrence of safety accidents caused by unstable lifting ropes when the staff lift the pressure platform body with lifting ropes. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0024] Figure 2 It is a three-dimensional structural schematic diagram of the mounting member of the utility model;

[0025] Figure 3 It is a cross-sectional view of the mounting member of the utility model;

[0026] Figure 4 For this utility model Figure 3 A magnified image of point A;

[0027] Figure 5 It is a schematic diagram of the three-dimensional structure of the lifting ear of the utility model;

[0028] Figure 6 For this utility model Figure 5 Enlarged view of point B.

[0029] Legend: 1. Pressure platform body; 2. Steel bars; 3. Reserved holes; 4. Mounting parts; 5. Lifting ears; 6. Fixing device; 61. Fixing rod; 62. Inclined rod; 63. Inserting rod; 64. Inserting hole; 65. Round plate; 66. Pad; 67. Spring; 68. Clamp; 69. Groove; 610. Pull rod; 611. Limiting rod; 612. Placement slot; 7. Auxiliary device; 71. Fixing frame; 72. Screw; 73. Clamp; 74. Rubber pad; 75. Sliding rod; 76. Handle. DETAILED DESCRIPTION

[0030] Reference Figure 1-6As shown, the present embodiment discloses a prefabricated component of a cast-in-place assembled pressure-bearing platform, including a pressure-bearing platform body 1, a plurality of steel bars 2 are fixedly connected inside the pressure-bearing platform body 1, the plurality of steel bars 2 are equally divided into two groups, four reserved holes 3 are evenly opened on the upper surface of the pressure-bearing platform body 1, the four reserved holes 3 are located at the four corners of the pressure-bearing platform body 1, the pressure-bearing platform body 1 is provided with a mounting member 4 by means of the reserved holes 3, a lifting ear 5 is rotatably connected to the surface of the mounting member 4, a fixing device 6 is provided inside the mounting member 4, and an auxiliary device 7 is provided on the arc surface of the lifting ear 5.

[0031] Reference Figure 1-6 As shown, the fixing device 6 includes a fixing rod 61, which is arranged inside the mounting member 4. One end of the fixing rod 61 located inside the mounting member 4 is rotatably connected to two inclined rods 62. One end of the fixing rod 61 away from the inclined rod 62 is fixedly connected to a circular plate 65. Two mutually symmetrical plug rods 63 are slidably connected inside the mounting member 4. One end of the inclined rod 62 is rotatably connected to the plug rod 63. Reinforcing ribs are arranged inside the plug rod 63. A plug hole 64 is opened at the pressure-bearing platform body 1 corresponding to the plug rod 63. The size of the plug rod 63 is adapted to the size of the plug hole 64. The plug hole 64 is located between the two groups of steel bars 2. Two mutually symmetrical pads 66 are fixedly connected to the upper surface of the mounting member 4. A spring 67 is fixedly connected to the end of the two pads 66 close to each other. A clamping plate 68 is fixedly connected to the end of the spring 67 away from the pad 66. The cross-section of the clamping plate 68 is trapezoidal. When the pressure-bearing platform body 1 needs to be hoisted, the mounting member 4 is first moved, and the four mounting members 4 are respectively inserted into the four reserved holes 3, and then the circular plate 65 is pressed, and the circular plate 65 moves with the fixing rod 61 toward the inner direction of the mounting member 4, the inclined rod 62 rotates, and the insertion rod 63 is moved toward the direction of the insertion hole 64 by the inclined rod 62. When the circular plate 65 moves to the position of the clamping plate 68, the circular plate 65 squeezes the inclined surface of the clamping plate 68, and the clamping plate 68 moves toward the direction of the pad 66, and the spring 67 contracts. After the circular plate 65 moves over the clamping plate 68, under the action of the restoring elastic force of the spring 67, the clamping plate 68 moves to the top of the circular plate 65, and the clamping plate 68 clamps the circular plate 65, achieving After fixing the fixing rod 61 and the inserting rod 63, the lifting ear 5 is hung with the hook of the crane to lift the pressure platform body 1, wherein the insertion hole 64 into which the inserting rod 63 is inserted is located between the two steel bars 2, thereby enhancing the load-bearing effect of the insertion hole 64 and avoiding cracking of the pressure platform body 1 as much as possible. After the pressure platform body 1 is moved to a suitable position, the mounting part 4 is removed from the pressure platform body 1, and the reserved hole 3 is refilled with concrete. The fixing device 6 is used to facilitate the staff to lift the pressure platform body 1 with a crane, thereby avoiding the occurrence of safety accidents caused by the unstable binding of the lifting rope when the staff lifts the pressure platform body 1 with the lifting rope.

[0032] Reference Figure 1-6As shown, a limit rod 611 is slidably inserted on the surface of the pad 66, and one end of the limit rod 611 is fixedly connected to the card plate 68. By setting the limit rod 611, the effect of limiting the moving direction of the card plate 68 is achieved, so that the card plate 68 is prevented from rotating, and the stability of the movement of the card plate 68 is improved. A placement groove 612 is provided on the top of the mounting member 4, and the size of the placement groove 612 is adapted to the size of the circular plate 65. By providing the placement groove 612, the effect of placing the circular plate 65 is achieved, which is convenient for hiding the circular plate 65. A groove 69 is provided at one end of the circular plate 65 away from the fixed rod 61, and the circular plate 65 is fixedly connected to a pull rod 610 by means of the groove 69. The pull rod 610 inside the groove 69 achieves the effect of facilitating the staff to pull the circular plate 65, which brings convenience to the staff to disassemble the mounting member 4.

[0033] Reference Figure 1-6 As shown, the auxiliary device 7 includes a fixing frame 71, which is fixedly connected to the arc surface of the lifting ear 5. The surface of the fixing frame 71 is threadedly connected with a screw 72, and one end of the screw 72 located inside the fixing frame 71 is rotatably connected with a clamping plate 73, and the cross section of the clamping plate 73 is in the shape of an arc. When the lifting ear 5 needs to be lifted by a hook, the hook is passed through the fixing frame 71, and then the screw 72 is rotated. The screw 72 moves with the clamping plate 73 in the direction of the hook, and the clamping plate 73 and the lifting ear 5 clamp the hook, achieving the effect of fixing the hook. The auxiliary device 7 achieves the effect of fixing the hook, and prevents the hook from falling off from the lifting ear 5 when the hook of the crane lifts the pressure platform body 1, thereby improving the safety of the pressure platform body 1 during installation.

[0034] Figure 1-6 As shown, the end of the screw 72 away from the splint 73 is fixedly connected with a handle 76, and the surface of the handle 76 is provided with anti-slip grooves. By providing the handle 76, the effect of facilitating the staff to rotate the screw 72 is achieved, which brings convenience to the staff. The side of the splint 73 away from the screw 72 is fixedly connected with a rubber pad 74, and the size of the rubber pad 74 is adapted to the size of the splint 73. By providing the rubber pad 74, the friction between the splint 73 and the hook is increased to prevent the hook from sliding. A sliding rod 75 is slidably provided on the surface of the fixed frame 71, and one end of the sliding rod 75 is fixedly connected to the splint 73. By providing the sliding rod 75, the effect of limiting the moving direction of the splint 73 is achieved, the rotation of the splint 73 is prevented, and the stability of the movement of the splint 73 is improved.

[0035] Working principle: when the pressure-bearing platform body 1 needs to be hoisted, first move the mounting member 4, insert the four mounting members 4 into the four reserved holes 3 respectively, then press the circular plate 65, the circular plate 65 moves with the fixing rod 61 toward the inner direction of the mounting member 4, the inclined rod 62 rotates, and the insertion rod 63 is moved toward the direction of the insertion hole 64 by the inclined rod 62, when the circular plate 65 moves to the position of the card plate 68, the circular plate 65 squeezes the inclined surface of the card plate 68, the card plate 68 moves toward the direction of the pad 66, and the spring 67 contracts. After the circular plate 65 moves over the card plate 68 and enters the placement groove 612, under the action of the restoring elastic force of the spring 67, the card plate 68 moves to the top of the circular plate 65, and at this time the card plate 68 clamps the circular plate 65, thereby achieving the effect of fixing the fixing rod 61 and the insertion rod 63, and then The lifting ear 5 is hung with the hook of the crane to lift the pressure platform body 1, wherein the insertion hole 64 into which the insertion rod 63 is inserted is located between the two steel bars 2, thereby enhancing the load-bearing effect of the insertion hole 64 and avoiding cracking of the pressure platform body 1 as much as possible. When the pressure platform body 1 is moved to a suitable position, the clamping plate 68 is moved, and the pull rod 610 in the groove 69 is pulled to move the fixing rod 61 toward the outside of the mounting member 4, and the insertion rod 63 is removed from the insertion hole 64. After that, the mounting member 4 is removed from the pressure platform body 1, and the reserved hole 3 is refilled with concrete. The fixing device 6 is used to facilitate the staff to lift the pressure platform body 1 with a crane, thereby avoiding the occurrence of safety accidents caused by the unstable binding of the lifting rope when the staff lifts the pressure platform body 1 with the lifting rope.

[0036] When it is necessary to lift the lifting ear 5 with a hook, the hook is passed through the fixing frame 71, and then the handle 76 is turned. The handle 76 rotates with the screw 72, and the screw 72 moves the clamping plate 73 in the direction of the hook. The clamping plate 73 clamps the hook with the help of the rubber pad 74 and the lifting ear 5, thereby achieving the effect of fixing the hook. The auxiliary device 7 achieves the effect of fixing the hook, which prevents the hook and the lifting ear 5 from falling off when the crane hook lifts the pressure platform body 1, thereby improving the safety of the pressure platform body 1 during installation.

Claims

1. A prefabricated component of a cast-in-place building combined pressure-bearing platform, comprising a pressure-bearing platform body (1), characterized in that: A plurality of steel bars (2) are fixedly connected inside the pressure-bearing platform body (1), and the plurality of steel bars (2) are equally divided into two groups. Four reserved holes (3) are evenly opened on the upper surface of the pressure-bearing platform body (1), and the four reserved holes (3) are located at four corners of the pressure-bearing platform body (1). The pressure-bearing platform body (1) is provided with a mounting member (4) by means of the reserved holes (3), and a lifting lug (5) is rotatably connected to the surface of the mounting member (4). A fixing device (6) is provided inside the mounting member (4), and the fixing device (6) comprises a fixing rod (61), and the fixing rod (61) is arranged inside the mounting member (4). One end of the fixing rod (61) located inside the mounting member (4) is rotatably connected to two inclined rods (62), and the fixing rod (61) is away from the inclined rod (62). One end of the mounting member (4) is fixedly connected with a circular plate (65), two mutually symmetrical insertion rods (63) are slidably connected inside the mounting member (4), one end of the inclined rod (62) is rotatably connected with the insertion rod (63), a reinforcing rib is arranged inside the insertion rod (63), a plug hole (64) is provided at a position corresponding to the insertion rod (63) of the pressure-bearing platform body (1), the size of the insertion rod (63) is matched with the size of the plug hole (64), the plug hole (64) is located between the two groups of steel bars (2), and the upper surface of the mounting member (4) is fixedly connected with two mutually symmetrical pads (66), the ends of the two pads (66) close to each other are fixedly connected with a spring (67), and the end of the spring (67) away from the pad (66) is fixedly connected with a clamping plate (68), and the cross-section of the clamping plate (68) is trapezoidal.

2. The prefabricated component of a cast-in-place building combined pressure-bearing platform according to claim 1, characterized in that: A limiting rod (611) is slidably inserted on the surface of the pad (66), and one end of the limiting rod (611) is fixedly connected to the clamping plate (68).

3. The prefabricated component of a cast-in-place building combined pressure-bearing platform according to claim 1, characterized in that: A placement groove (612) is provided on the top of the mounting member (4), and the size of the placement groove (612) is adapted to the size of the circular plate (65).

4. The prefabricated component of a cast-in-place building combined pressure-bearing platform according to claim 1, characterized in that: A groove (69) is formed at one end of the circular plate (65) away from the fixing rod (61), and the circular plate (65) is fixedly connected to the pulling rod (610) by means of the groove (69).

5. The prefabricated component of a cast-in-place building combined pressure-bearing platform according to claim 1, characterized in that: The arc surface of the lifting ear (5) is provided with an auxiliary device (7), and the auxiliary device (7) comprises a fixing frame (71), and the fixing frame (71) is fixedly connected to the arc surface of the lifting ear (5), and a screw rod (72) is threadedly connected to the surface of the fixing frame (71), and one end of the screw rod (72) located inside the fixing frame (71) is rotatably connected to a clamping plate (73), and the cross section of the clamping plate (73) is in the shape of an arc.

6. The prefabricated component of the cast-in-place combined pressure-bearing platform according to claim 5, characterized in that: One end of the screw rod (72) away from the clamping plate (73) is fixedly connected to a handle (76), and the surface of the handle (76) is provided with anti-slip grooves.

7. The prefabricated component of a cast-in-place building combined pressure-bearing platform according to claim 5, characterized in that: A rubber pad (74) is fixedly connected to one side of the clamping plate (73) away from the screw rod (72), and the size of the rubber pad (74) is adapted to the size of the clamping plate (73).

8. The prefabricated component of the cast-in-place combined pressure-bearing platform according to claim 5, characterized in that: A sliding rod (75) is slidably inserted on the surface of the fixing frame (71), and one end of the sliding rod (75) is fixedly connected to the clamping plate (73).