Novel pre-embedded wall connecting structure of attached type cantilever scaffold

By using embedded plastic pipes and positioners in the attached cantilever scaffolding combined with double-headed screws and burst screws, the problems of inaccurate and loose installation of embedded parts are solved, and installation efficiency and safety are improved.

CN222227923UActive Publication Date: 2024-12-24GUANGZHOU CHENGTOU HOUSING CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420996452.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-09
Publication Date
2024-12-24
Estimated Expiration
2034-05-09

Smart Images

  • Figure CN222227923U_ABST
    Figure CN222227923U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction scaffolds, and particularly discloses a novel pre-embedded wall connecting structure of an attached cantilever scaffold, which comprises a first beam body positioned at the lower part of a building, and the first beam body is connected with I-shaped steel through an I-shaped steel positioning connecting piece; the I-shaped steel positioning connecting piece comprises at least two pre-embedded plastic pipes, the at least two pre-embedded plastic pipes are pre-embedded in the first beam body through positioners, screw rods are detachably installed in the pre-embedded plastic pipes, the I-shaped steel is connected with the first beam body through the screw rods, and a scaffold is installed at the upper end of the I-shaped steel; according to the pre-embedded wall connecting structure, the pre-embedded plastic pipe is prevented from loosening, inclining or falling off in the first beam body through the positioner, the pre-embedded plastic pipe is stabilized in the first beam body, concrete can be effectively prevented from entering the cavity through the pre-embedded plastic pipe, I-shaped steel can be conveniently fixed through screws, and the construction efficiency is improved. The installation efficiency of the attached cantilever I-shaped steel is effectively improved, and the safety of the scaffold is improved.